CN211814055U CN202020351274.6U CN202020351274U CN211814055U CN 211814055 U CN211814055 U CN 211814055U CN 202020351274 U CN202020351274 U CN 202020351274U CN 211814055 U CN211814055 U CN 211814055U
Authority
CN
China
Prior art keywords
pipe
sludge
sealing
ring
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020351274.6U
Other languages
Chinese (zh)
Inventor
马翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zdh Environmental Technology Co ltd
Original Assignee
Jiangsu Zdh Environmental Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zdh Environmental Technology Co ltd filed Critical Jiangsu Zdh Environmental Technology Co ltd
Priority to CN202020351274.6U priority Critical patent/CN211814055U/en
Application granted granted Critical
Publication of CN211814055U publication Critical patent/CN211814055U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a silt treatment facility that can intelligently operate, its technical scheme main points are: the rapid fixing device comprises a dehydration treatment pipe, wherein a sludge outlet is formed in one end of the dehydration treatment pipe, a drain pipe is arranged at the bottom end of the dehydration treatment pipe, a connecting pipe is arranged in the middle of the bottom end of the drain pipe, a water outlet pipe is arranged at the bottom end of the connecting pipe, a connecting ring is arranged on the outer side of the bottom end of the connecting pipe, a compression sheet is arranged at the top end of the connecting ring, a fixing lug is arranged at the top end of the outer side of the compression sheet, a rapid fixing sleeve is arranged on the outer side of the connecting pipe, the bottom end of the inner wall of the rapid fixing sleeve is positioned on the outer side of the top end of the rapid fixing sleeve; through install quick fixed cover additional in the connecting pipe and the play water piping connection department outside, made things convenient for the staff to install and assemble silt treatment facility.

Description

Sludge treatment equipment capable of intelligently running
Technical Field
The utility model belongs to can intelligent operation's silt treatment facility field, concretely relates to can intelligent operation's silt treatment facility.
Background
In real life, the river bottom sludge is required to be cleaned from river channels frequently, in engineering construction, a large amount of sludge is dug out mainly during pile digging, the sludge contains a large amount of organic matters, abundant nutrients such as nitrogen and phosphorus, and a large amount of heavy metals and toxic substances, if the sludge is not treated or treated improperly, serious secondary pollution and ecological environment damage are easily caused, so that sludge treatment becomes especially important, and in order to improve the sludge treatment efficiency, intelligent sludge treatment equipment is developed by people.
The utility model discloses a silt solidification processing apparatus as grant bulletin number is CN208684743U, including silt conveyer belt, device frame, silt solidification equipment, curing agent conveyer belt, slay stone conveyer belt and silt processing apparatus, silt solidification equipment sets up in the device frame, is equipped with curing agent conveyer belt, slay stone conveyer belt and silt processing apparatus on the device frame, is equipped with the silt conveyer belt on the silt processing apparatus.
The sludge treatment equipment has the advantages of simple and exquisite structure; however, the sludge treatment equipment does not solve the problems that the water outlet pipe and the connecting pipe are in butt joint trouble in the existing sludge treatment equipment, and the efficiency of assembling the sludge treatment equipment by workers is reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a silt treatment facility that can intelligent operation to it is troublesome with the connecting pipe butt joint to put forward outlet pipe among the current silt treatment facility in the above-mentioned background art of solution, has reduced the problem of staff's equipment silt treatment facility efficiency.
In order to achieve the above object, the utility model provides a following technical scheme: an intelligently operated sludge treatment device comprises a dehydration treatment pipe, wherein one end of the dehydration treatment pipe is provided with a sludge outlet, the bottom end of the dehydration treatment pipe is provided with a drain pipe, the middle of the bottom end of the drain pipe is provided with a connecting pipe, the bottom end of the connecting pipe is provided with a drain pipe, the outer side of the bottom end of the connecting pipe is provided with a connecting ring, the top end of the connecting ring is provided with a compression sheet, the top end of the outer side of the compression sheet is provided with a fixing lug, the outer side of the connecting pipe and the outer side of the connection part of the drain pipe is provided with a quick fixing sleeve, the bottom end of the inner wall of the quick fixing sleeve is positioned at the outer side of the top end of the quick fixing sleeve, the fixing groove penetrates, the sealing ring is located the outlet pipe outside, the seal groove has been seted up on go-between bottom surface, the inside seal cover that is provided with of seal groove, the sealing ring is located inside the seal cover.
Preferably, dehydration treatment pipe top one side is provided with into mud pipe, it is provided with the sealed pad of second to advance mud pipe top, the sealed top of filling up of second is provided with solid fixed ring, gu fixed ring top is provided with takes out the mud pipe, it is provided with the adapter sleeve with advancing the mud union coupling outside to take out the mud pipe, it all is located inside the adapter sleeve to take out mud pipe and the sealed pad of second, the adapter sleeve outside is provided with dismantlement formula bull stick, dismantlement formula bull stick one end is located inside the adapter sleeve.
Preferably, the dehydration treatment pipe is fixedly connected with the sludge outlet and the water discharge pipe, and the connecting pipe is fixedly connected with the water discharge pipe and the connecting ring.
Preferably, the compression plate is fixedly connected with the fixed bump and the connecting ring, and the sealing sleeve is fixedly connected with the connecting ring through the sealing groove.
Preferably, a first sealing gasket is arranged between the connecting pipe and the water outlet pipe, and the first sealing gasket is fixedly connected with the water outlet pipe.
Preferably, the sealing ring passes through the seal groove and seal cover and go up ring sealing connection, the outlet pipe passes through first sealed pad and connecting pipe sealing connection.
Preferably, the mud inlet pipe is fixedly connected with the dehydration treatment pipe, the detachable rotating rod is fixedly connected with the connecting sleeve through threads, and the mud inlet pipe is fixedly connected with the connecting sleeve through threads.
Preferably, the fixed ring is fixedly connected with the second sealing gasket and the mud pumping pipe, and the mud feeding pipe is hermetically connected with the fixed ring through the second sealing gasket.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) through install quick fixed cover additional in the connecting pipe and the outlet pipe junction outside, when needs with outlet pipe and connecting pipe butt joint, remove quick fixed cover, drive the outlet pipe simultaneously by quick fixed cover, sealing ring and fixed slot remove, aim at the sealing ring seal cover, when sealing ring and seal cover contact, quick fixed cover top and fixed lug contact this moment, fixed lug is under the effect of force, compress compression piece one end by fixed lug, when the sealing ring gets into the seal cover, fixed lug and fixed slot contact, the compression piece is under the elastic action, drive fixed lug by the compression piece and reset, fixed lug gets into inside the fixed slot, accomplish the fixing to the outlet pipe, thereby accomplish the fixing to the outlet pipe, and then accomplish the fixing of outlet pipe and connecting pipe, the operation is accomplished, the staff's equipment silt treatment facility of ann's equipment has been made things.
(2) The connecting sleeve is additionally arranged on the outer side of the top end of the mud inlet pipe, when the mud pumping pipe and the mud inlet pipe are required to be fixed, the mud pumping pipe is moved, the fixing ring is driven by the mud pumping pipe to move, the second sealing gasket is driven by the fixing ring to move, the connecting sleeve is driven by the fixing ring to move at the same time, and is aligned to the mud inlet pipe, when the outer side thread of the mud inlet pipe is in contact with the inner side thread of the connecting sleeve, the mud pumping pipe is held to rotate the detachable rotating rod, the connecting sleeve is driven by the detachable rotating rod to rotate, the connecting sleeve is not moved downwards under the action of the thread, the fixing ring drives the second sealing gasket to move downwards until the connecting sleeve is not moved, the second sealing gasket is tightly contacted with the mud inlet pipe at the moment, the sealing connection between the mud pumping pipe and the mud inlet pipe is completed.
Drawings
Fig. 1 is one of the schematic structural diagrams of the present invention;
FIG. 2 is an enlarged view of a portion a of FIG. 1
Fig. 3 is a schematic view of the cross-sectional structure of the rapid fixing sleeve of the present invention;
FIG. 4 is an enlarged view of the structure at b in FIG. 3;
fig. 5 is a schematic top view of the connection ring of the present invention;
fig. 6 is a schematic view of a sectional structure of the connection sleeve of the present invention.
Description of the reference numerals
1. A dehydration treatment pipe; 2. a sludge outlet; 3. a drain pipe; 4. a connecting pipe; 5. fixing the sleeve quickly; 6. a water outlet pipe; 7. a mud inlet pipe; 8. connecting sleeves; 9. a detachable rotating rod; 10. a mud pumping pipe; 11. fixing grooves; 12. fixing the bump; 13. compressing the tablets; 14. a connecting ring; 15. sealing sleeves; 16. a seal ring; 17. a first gasket; 18. a second gasket; 19. and (4) fixing the ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution, wherein the technical solution is as follows: an intelligently operated sludge treatment device comprises a dehydration treatment pipe 1, one end of the dehydration treatment pipe 1 is provided with a sludge outlet 2, the bottom end of the dehydration treatment pipe 1 is provided with a drain pipe 3, the middle of the bottom end of the drain pipe 3 is provided with a connecting pipe 4, the bottom end of the connecting pipe 4 is provided with a water outlet pipe 6, the outer side of the bottom end of the connecting pipe 4 is provided with a connecting ring 14, the top end of the connecting ring 14 is provided with a compression sheet 13, the top end of the outer side of the compression sheet 13 is provided with a fixing lug 12, the outer side of the joint of the connecting pipe 4 and the water outlet pipe 6 is provided with a quick fixing sleeve 5, the bottom end of the inner wall of the quick fixing sleeve 5 is positioned at the outer side of the top end of the quick fixing sleeve 5, the fixing groove 11 penetrates through, the sealing ring 16 is located outside the water outlet pipe 6, a sealing groove is formed in the surface of the bottom end of the connecting ring 14, a sealing sleeve 15 is arranged inside the sealing groove, and the sealing ring 16 is located inside the sealing sleeve 15.
In this embodiment, preferably, one side of the top end of the dehydration treatment pipe 1 is provided with the mud inlet pipe 7, the top end of the mud inlet pipe 7 is provided with the second sealing gasket 18, the top end of the second sealing gasket 18 is provided with the fixing ring 19, the top end of the fixing ring 19 is provided with the mud pumping pipe 10, the mud pumping pipe 10 and the outside of the joint of the mud inlet pipe 7 are provided with the connecting sleeve 8, the mud pumping pipe 10 and the second sealing gasket 18 are both located inside the connecting sleeve 8, the outside of the connecting sleeve 8 is provided with the detachable rotating rod 9, and one end of the detachable rotating rod 9 is.
In this embodiment, the dewatering processing pipe 1 is preferably fixedly connected to the sludge outlet 2 and the drainage pipe 3, and the connection pipe 4 is preferably fixedly connected to the drainage pipe 3 and the connection ring 14.
In this embodiment, preferably, the compression plates 13 are fixedly connected to the fixing protrusions 12 and the connecting ring 14, and the sealing sleeve 15 is fixedly connected to the connecting ring 14 through a sealing groove.
In this embodiment, preferably, a first sealing gasket 17 is disposed between the connecting pipe 4 and the water outlet pipe 6, and the first sealing gasket 17 is fixedly connected to the water outlet pipe 6.
In this embodiment, preferably, the sealing ring 16 is hermetically connected with the connecting ring 14 through a sealing groove and the sealing sleeve 15, and the water outlet pipe 6 is hermetically connected with the connecting pipe 4 through a first sealing gasket 17.
In this embodiment, preferably, the sludge inlet pipe 7 is fixedly connected with the dehydration treatment pipe 1, the detachable rotating rod 9 is fixedly connected with the connecting sleeve 8 through a thread, and the sludge inlet pipe 7 is fixedly connected with the connecting sleeve 8 through a thread.
In this embodiment, preferably, the fixing ring 19 is fixedly connected to the second sealing gasket 18 and the mud pumping pipe 10, and the mud feeding pipe 7 is hermetically connected to the fixing ring 19 through the second sealing gasket 18.
The utility model discloses a theory of operation and use flow: after the device is completed, by additionally arranging the quick fixing sleeve 5 at the outer side of the joint of the connecting pipe 4 and the water outlet pipe 6, when the water outlet pipe 6 is required to be in butt joint with the connecting pipe 4, the quick fixing sleeve 5 is moved, the quick fixing sleeve 5 simultaneously drives the water outlet pipe 6, the sealing ring 16 and the fixing groove 11 to move, the sealing ring 16 is aligned to the sealing sleeve 15, when the sealing ring 16 is in contact with the sealing sleeve 15, the top end of the quick fixing sleeve 5 is in contact with the fixing lug 12 at the moment, the fixing lug 12 compresses one end of the compression sheet 13 by the fixing lug 12 under the action of force, when the sealing ring 16 enters the sealing sleeve 15, the fixing lug 12 is in contact with the fixing groove 11, the compression sheet 13 drives the fixing lug 12 to reset by the compression sheet 13 under the elastic action, the fixing lug 12 enters the fixing groove 11 to complete the fixing of the, after the operation is finished, the installation and assembly of the sludge treatment equipment by workers are facilitated, the connecting sleeve 8 is additionally arranged on the outer side of the top end of the sludge inlet pipe 7, when the sludge pumping pipe 10 and the sludge inlet pipe 7 need to be fixed, the sludge pumping pipe 10 is moved, the fixing ring 19 is driven by the sludge pumping pipe 10 to move, the second sealing gasket 18 is driven by the fixing ring 19 to move, the connecting sleeve 8 is driven by the fixing ring 19 to move simultaneously, the connecting sleeve 8 is aligned with the sludge inlet pipe 7, when the outer side thread of the sludge inlet pipe 7 is in contact with the inner side thread of the connecting sleeve 8, the sludge pumping pipe 10 is held to rotate the detachable rotating rod 9, the connecting sleeve 8 is driven by the detachable rotating rod 9 to rotate, the connecting sleeve 8 does not move downwards under the action of the thread, the fixing ring 19 drives the fixing ring 19 to move downwards, the connecting sleeve 8 is not moved until the second sealing gasket 18 is rotated, the second sealing gasket 18 is tightly contacted with the sludge inlet pipe, the staff of being convenient for is connected silt treatment facility with taking out mud equipment.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a silt treatment facility that can intelligent operation, includes dehydration treatment pipe (1), dehydration treatment pipe (1) one end is provided with mud outlet (2), dehydration treatment pipe (1) bottom is provided with drain pipe (3), be provided with connecting pipe (4) in the middle of drain pipe (3) bottom, connecting pipe (4) bottom sets up outlet pipe (6), the connecting pipe (4) bottom outside is provided with go-between (14), go-between (14) top is provided with compression piece (13), compression piece (13) outside top is provided with fixed lug (12), the connecting pipe (4) is provided with quick fixed cover (5) with outlet pipe (6) the junction outside, quick fixed cover (5) inner wall bottom is located the quick fixed cover (5) top outside, fixed slot (11) have been seted up on quick fixed cover (5) outside top, fixed cover (5) are run through fast in fixed slot (11), go-between (14) and compression piece (13) all are located inside fixed cover (5) fast, fixed lug (12) are located inside fixed slot (11), the inside bottom of fixed cover (5) fast is provided with sealing ring (16), sealing ring (16) are located outlet pipe (6) the outside, the seal groove has been seted up on go-between (14) bottom surface, seal groove inside is provided with seal cover (15), sealing ring (16) are located inside seal cover (15).
2. The sludge treatment equipment capable of intelligently operating according to claim 1, wherein a sludge inlet pipe (7) is arranged on one side of the top end of the dehydration treatment pipe (1), a second sealing gasket (18) is arranged on the top end of the sludge inlet pipe (7), a fixing ring (19) is arranged on the top end of the second sealing gasket (18), a sludge pumping pipe (10) is arranged on the top end of the fixing ring (19), a connecting sleeve (8) is arranged on the outer side of the joint of the sludge pumping pipe (10) and the sludge inlet pipe (7), the sludge pumping pipe (10) and the second sealing gasket (18) are both positioned inside the connecting sleeve (8), a detachable rotating rod (9) is arranged on the outer side of the connecting sleeve (8), and one end of the detachable rotating rod (9) is positioned inside the connecting sleeve (8).
3. The intelligently operable sludge treatment apparatus according to claim 1, wherein the dewatering treatment pipe (1) is fixedly connected with the sludge outlet (2) and the drain pipe (3), and the connecting pipe (4) is fixedly connected with the drain pipe (3) and the connecting ring (14).
4. The sludge treatment apparatus capable of intelligently operating according to claim 1, wherein the compression plates (13) are both fixedly connected with the fixing lugs (12) and the connecting ring (14), and the sealing sleeves (15) are fixedly connected with the connecting ring (14) through sealing grooves.
5. The sludge treatment plant according to claim 1, wherein a first gasket (17) is arranged between the connecting pipe (4) and the water outlet pipe (6), and the first gasket (17) is fixedly connected with the water outlet pipe (6).
6. The sludge treatment equipment capable of intelligently operating according to the claim 1, wherein the sealing ring (16) is in sealing connection with the sealing sleeve (15) and the connecting ring (14) through a sealing groove, and the water outlet pipe (6) is in sealing connection with the connecting pipe (4) through a first sealing gasket (17).
7. The sludge treatment plant capable of being intelligently operated according to claim 2, wherein the sludge inlet pipe (7) is fixedly connected with the dehydration treatment pipe (1), the detachable rotating rod (9) is fixedly connected with the connecting sleeve (8) through a thread, and the sludge inlet pipe (7) is fixedly connected with the connecting sleeve (8) through a thread.
8. The intelligently operable sludge treatment apparatus according to claim 2, wherein the fixing ring (19) is fixedly connected with the second sealing gasket (18) and the sludge pumping pipe (10), and the sludge inlet pipe (7) is hermetically connected with the fixing ring (19) through the second sealing gasket (18).
CN202020351274.6U 2020-03-19 2020-03-19 Sludge treatment equipment capable of intelligently running Active CN211814055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020351274.6U CN211814055U (en) 2020-03-19 2020-03-19 Sludge treatment equipment capable of intelligently running

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020351274.6U CN211814055U (en) 2020-03-19 2020-03-19 Sludge treatment equipment capable of intelligently running

Publications (1)

Publication Number Publication Date
CN211814055U true CN211814055U (en) 2020-10-30

Family

ID=73012953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020351274.6U Active CN211814055U (en) 2020-03-19 2020-03-19 Sludge treatment equipment capable of intelligently running

Country Status (1)

Country Link
CN (1) CN211814055U (en)

Similar Documents

Publication Publication Date Title
CN208964779U (en) A kind of construction site mud conditioning device
CN211814055U (en) Sludge treatment equipment capable of intelligently running
CN213625785U (en) Silt cleaning device for hydraulic engineering
CN108842847A (en) The quick desilting equipment of water conservancy construction
CN212974388U (en) Improved high-speed filter for cyclone well
CN211523350U (en) Rainwater collecting device for environment-friendly building
CN204533596U (en) A kind of for dredging spoil disposal pipeline hydraulic sluice valve
CN210597510U (en) Garbage cleaning device convenient for dredging sewer
CN209782006U (en) Novel cement pipe sealing cover plate
CN212376853U (en) Flow bypass valve of high-pressure pump
CN207760917U (en) A kind of silt displacement device of river reparation
CN220927966U (en) Anti-floating anchor rod abandoned slurry collection device
CN217651931U (en) Super high-rise construction floor water interception structure
CN219911800U (en) Connecting structure with sealing structure for grouting pipe
CN217204574U (en) Water conservancy water and electricity construction drainage device
CN215807007U (en) Pipeline for hydraulic engineering with filter screen
CN220889216U (en) Building structural design roof cornice waterproof construction
CN214245571U (en) A diversion equipment for hydraulic engineering construction
CN214105962U (en) Drainage pipeline for preventing and treating water in coal mine
CN218687138U (en) Terylene production wastewater filtering component convenient to disassemble and replace
CN212131615U (en) Water supply and drainage engineering drain pipe connecting device
CN214718961U (en) Water-saving fluorescent powder belt cleaning device
CN210049206U (en) Hydraulic engineering blocks sand water intaking gate
CN214939945U (en) River surface debris cleaning device of river course treatment usefulness
CN218374368U (en) Just rain collecting pipe washing unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant