CN211790252U - Intelligent temporary power utilization distribution box - Google Patents

Intelligent temporary power utilization distribution box Download PDF

Info

Publication number
CN211790252U
CN211790252U CN202020723648.2U CN202020723648U CN211790252U CN 211790252 U CN211790252 U CN 211790252U CN 202020723648 U CN202020723648 U CN 202020723648U CN 211790252 U CN211790252 U CN 211790252U
Authority
CN
China
Prior art keywords
wall
module
protection module
box body
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020723648.2U
Other languages
Chinese (zh)
Inventor
石磊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Construction Group Joint Stock Co ltd
Original Assignee
Nantong Construction Group Joint Stock Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Construction Group Joint Stock Co ltd filed Critical Nantong Construction Group Joint Stock Co ltd
Priority to CN202020723648.2U priority Critical patent/CN211790252U/en
Application granted granted Critical
Publication of CN211790252U publication Critical patent/CN211790252U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/14Protecting elements, switches, relays or circuit breakers

Landscapes

  • Distribution Board (AREA)

Abstract

The utility model discloses an interim power consumption block terminal of intelligence, the power distribution box comprises a box body, the welding of bottom half outer wall has four landing legs, and box one side outer wall articulates there is the case lid, and the box inner wall is provided with power supply mechanism and electrical system respectively, and box one side outer wall is provided with lighting system, power supply mechanism includes earth leakage protection module, overcurrent protection module, mainboard and electrical source controller, and box one side outer wall has inlayed main power source interface, main power source interface and mainboard electric connection, mainboard and earth leakage protection module electric connection. The utility model discloses a be provided with electrical control mechanism, electrical control mechanism can collect power consumption personnel information, uses power consumption information etc. and to electric power distribution terminal interaction, can be to the interim power consumption fine management in scene to when electric leakage or overload condition appear in the circuit, electrical control mechanism also can remind electric power monitoring personnel to maintain this information transfer to electric power distribution terminal, can in time handle the abnormal conditions, raises the efficiency.

Description

Intelligent temporary power utilization distribution box
Technical Field
The utility model relates to an interim block terminal design technical field especially relates to an interim power consumption block terminal of intelligence.
Background
Some block terminals for supplying power temporarily generally improve the obviously adorn block terminal, enlarge its area, increase the socket, provide 220V and 380V power respectively, fix it on the support of making again to reach the purpose of supplying power temporarily, this kind of block terminal is inserted the electricity and is used, can not carry out the management and control to the interim power consumption, and can not collect power consumption personnel information.
Through retrieval, the patent with the Chinese patent publication number of CN207303725U discloses a portable temporary electricity distribution box, which comprises a box body, a box door and a handle, wherein the handle is positioned at the top of the box body; a sealing strip is arranged at the joint of the box door and the box body; the box is internally provided with a control device and a power supply conveying device, the box door is provided with a socket, and a sealing rubber gasket is arranged at the joint of the socket and the box door. The above patents suffer from the following disadvantages: the electricity consumption, the information of the power consumers and the like can not interact with the power distribution terminal, so that reasonable power distribution can not be realized.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the interim power consumption block terminal of intelligence that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an interim power consumption block terminal of intelligence, includes the box, the welding of bottom half outer wall has four landing legs, and box one side outer wall articulates there is the case lid, and the box inner wall is provided with power supply mechanism and electrical control mechanism respectively, and box one side outer wall is provided with lighting system.
As a further aspect of the present invention: the power supply mechanism comprises a leakage protection module, an overcurrent protection module, a main board and a power supply controller, a main power interface is embedded on the outer wall of one side of the box body, the main power interface is electrically connected with the main board, the main board is electrically connected with the leakage protection module, the leakage protection module is electrically connected with the overcurrent protection module, the overcurrent protection module is electrically connected with the power supply controller, the outer wall of the main board is fixed on the inner wall of the box body through bolts, the leakage protection module, the outer walls of the bottoms of the overcurrent protection module and the power supply controller are all fixed on the inner wall of the bottom of the box body through bolts, more than three output sockets are embedded on the outer wall of one side of the box body.
As a further aspect of the present invention: the main power supply interface and the output socket are 220V industrial sockets.
As a further aspect of the present invention: electric control mechanism includes magnetic card response module, central processing module, charging module and wireless module, and central processing module, charging module, wireless module's outer wall all welds on the outer wall of mainboard, and central processing module, charging module and wireless module pass through the internal circuit electric connection of each other of mainboard, and magnetic card response module fixed mounting is on the top outer wall of box, and magnetic card response module and mainboard electric connection.
As a further aspect of the present invention: lighting system includes lighting fixture and lamp, and box one side outer wall welding has two parallel fixed blocks, and the equal sliding connection in inner wall of two fixed blocks has the dwang, and the relative one side outer wall joint of two dwangs is on the inner wall of same lighting fixture, and the lamp joint is on the inner wall of lighting fixture, and the friction disk has all been cup jointed to the outer wall of two dwangs, and the friction disk has same spring with the equal lock joint of the relative one side outer wall of lighting fixture.
As a further aspect of the present invention: the irradiation lamp is electrically connected with the overcurrent protection module.
As a further aspect of the present invention: the inner wall of the bottom of the box body is fixedly provided with a standby power supply through bolts, and the standby power supply is electrically connected with the main board.
Compared with the prior art, the utility model provides an interim power consumption block terminal of intelligence possesses following beneficial effect:
1. this interim power consumption block terminal of intelligence, through being provided with electrical control mechanism, electrical control mechanism can collect power consumption personnel's information, and power consumption information and expense information etc. and to electric power distribution terminal interaction, can be to the interim power consumption fine management in scene to when electric leakage or overload condition appear in the circuit, electrical control mechanism also can be with this information transfer to electric power distribution terminal, reminds electric power monitoring personnel to maintain, can in time handle the abnormal conditions, raises the efficiency.
2. This interim power consumption block terminal of intelligence, through being provided with magnetic card induction module and timing module, use the power consumption magnetic card in addition with this device is supporting, and every magnetic card has recorded the identity information of holding the magnetic card staff, when the staff need get the electricity, need supplement with money the magnetic card earlier, under the magnetic card has the condition of balance, insert the magnetic card in the magnetic card induction module, magnetic card induction module senses the magnetic card signal, and with signal transmission to central processing module, central processing module reads the storage and controls whole circuit circular telegram to identity information, the charging module begins the timing simultaneously, can monitor power consumption personnel information and power consumption, thereby implement the normalized power consumption.
3. This interim power distribution box of intelligence, through being provided with lighting system, lamp and overcurrent protection module electric connection, accessible overcurrent protection module acquire electric power and provide illuminating effect to lighting system's the angle of shining can be adjusted, has increased the practicality and the convenience of device.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses simple structure, convenient operation.
Drawings
Fig. 1 is a schematic view of a main view structure of an intelligent temporary electricity distribution box provided by the present invention;
fig. 2 is a schematic side view of an intelligent temporary electricity distribution box according to the present invention;
fig. 3 is a schematic structural view of an illumination system of an intelligent temporary electricity distribution box according to the present invention;
fig. 4 is a schematic diagram of a circuit structure of an intelligent temporary electricity distribution box provided by the present invention;
fig. 5 is a schematic diagram of a signal transmission structure of an intelligent temporary electricity distribution box provided by the present invention;
in the figure: the intelligent safety protection system comprises a box body 1, a supporting leg 2, a box cover 3, a magnetic card induction module 4, a main power interface 5, a main board 6, a central processing module 7, a billing module 8, a wireless module 9, a power controller 10, an overcurrent protection module 11, a leakage protection module 12, an output socket 13, a standby power supply 14, an illuminating lamp 15, a rotating rod 16, a fixed block 17, a friction disc 18, a spring 19 and a lamp holder 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In order to enable electricity utilization information of a device to be interacted with an electric power distribution terminal, the intelligent temporary electricity utilization distribution box comprises a box body 1, four support legs 2 are welded on the outer wall of the bottom of the box body 1, a box cover 3 is hinged to the outer wall of one side of the box body 1, a power supply mechanism and an electric control mechanism are respectively arranged on the inner wall of the box body 1, and a lighting system is arranged on the outer wall of one side of the box body 1; the electric control mechanism can collect information of power utilization personnel, power consumption and the like, interact with the power distribution terminal and can finely manage the temporary power utilization on site.
In order to normally supply power, as shown in fig. 1 and 3, the power supply mechanism includes a leakage protection module 12, an overcurrent protection module 11, a main board 6 and a power supply controller 10, a main power interface 5 is embedded on an outer wall of one side of the box 1, the main power interface 5 is electrically connected with the main board 6, the main board 6 is electrically connected with the leakage protection module 12, the leakage protection module 12 is electrically connected with the overcurrent protection module 11, the overcurrent protection module 11 is electrically connected with the power supply controller 10, an outer wall of the main board 6 is fixed on an inner wall of the box 1 through bolts, outer walls of bottoms of the leakage protection module 12, the overcurrent protection module 11 and the power supply controller 10 are all fixed on an inner wall of the bottom of the box 1 through bolts, an outer wall of one side of the box 1 is, the main power interface 5 and the output sockets 13 are 220V industrial sockets, and the three output sockets 13 are electrically connected with the output end of the power controller 10; when the power supply is used, an external power supply can be connected through a power line matched with the main power interface 5, the power supply is powered on, electric power is transmitted to the power supply controller 10 through the current protection module 11 and the leakage protection module 12 through the mainboard 6, the power supply controller 10 transmits the electric power to the output socket 13, during power utilization, an external equipment plug can be inserted into the output socket 13 to take power, the leakage protection module 12 can detect the circuit leakage condition, when the leakage phenomenon occurs, the whole circuit can be cut off through the power supply controller 10, a signal of leakage is transmitted to the mainboard 6, the current state in the circuit can be monitored through the current protection module 11, when the circuit is overcurrent due to the fact that the external power equipment is connected excessively, the whole circuit can be cut off through the power supply controller 10, and the overcurrent signal is transmitted to the mainboard 6.
In order to be able to take electricity and monitor electricity consumption information through the electricity consumption magnetic card of a worker, as shown in fig. 1, the electric control mechanism comprises a magnetic card induction module 4, a central processing module 7, a billing module 8 and a wireless module 9, the outer walls of the central processing module 7, the billing module 8 and the wireless module 9 are all welded on the outer wall of the mainboard 6, the central processing module 7, the billing module 8 and the wireless module 9 are electrically connected with each other through an internal circuit of the mainboard 6, the magnetic card induction module 4 is fixedly installed on the outer wall of the top of the box body 1, and the magnetic card induction module 4 is electrically connected with the mainboard 6; when the device is used, the device is also provided with the electromagnetic cards, each card records the identity information of the magnetic card worker, when in use, the magnetic card is charged first, when the worker needs to get electricity, the magnetic card is inserted into the magnetic card induction module 4, the magnetic card induction module 4 induces the magnetic card signal, the signal is transmitted to a central processing module 7, the central processing module 7 reads and stores the identity information, then the power-on of the whole circuit is controlled through the balance information of the magnetic card, and at the same time, the charging module 8 starts charging, when the electricity utilization is finished, the magnetic card is taken away, at the moment, the charging module 8 stops charging, and with power consumption personnel identity information, power consumption amount information transfer to wireless module 9, wireless module 9 accessible wireless network is connected with electric power distribution terminal to transmit information to electric power distribution terminal and supply electric power supervisory personnel to examine.
In order to enable the device to provide a light source when being used at night, as shown in fig. 3, the lighting system comprises a lamp holder 20 and a lamp 15, two parallel fixed blocks 17 are welded on the outer wall of one side of the box body 1, the inner walls of the two fixed blocks 17 are both connected with rotating rods 16 in a sliding manner, the outer wall of one opposite side of each of the two rotating rods 16 is clamped on the inner wall of the same lamp holder 20, the lamp 15 is clamped on the inner wall of the lamp holder 20, the lamp 15 is electrically connected with the overcurrent protection module 11, the outer walls of the two rotating rods 16 are both sleeved with friction discs 18, and the friction discs 18 and the outer wall of one opposite side of the; 15 lamps and lanterns and 11 electric connection of overcurrent protection module, accessible overcurrent protection module 11 acquires electric power and provides the illuminating effect, and lighting fixture 20 is through two dwang 16 and fixed block 17 sliding connection, fixed block 17 and friction disk 18 contact each other, be provided with spring 19 between friction disk 18 and the lighting fixture 20, spring 19 can exert pressure to friction disk 18, make frictional force increase between friction disk 18 and the fixed block 17, thereby guarantee that lighting fixture 20 can not rock when not receiving external force, when needing to adjust 15 angles of lamps and lanterns, only need rotate lighting fixture 20 and provide great torque can.
In order to ensure that the device can still normally work in an abnormal power failure state, as shown in fig. 1, a standby power supply 14 is fixed on the inner wall of the bottom of the box body 1 through bolts, and the standby power supply 14 is electrically connected with the main board 6; when the equipment is powered on, the main board 6 controls the standby power supply 14 to be in a charging state, and when the equipment is abnormally powered off, the main board 6 controls the standby power supply 14 to be in a discharging state, so that a certain amount of electric energy can be provided for the equipment.
The working principle is as follows: in the embodiment, when the power supply device is used, an external power supply can be connected through a power line matched with the main power interface 5 to power on the device, the power is transmitted to the power supply controller 10 through the current protection module 11 and the leakage protection module 12 through the mainboard 6, the power supply controller 10 transmits the power to the output socket 13, when the power is used, an external device plug can be inserted into the output socket 13 to take power, the leakage protection module 12 can detect the circuit leakage condition, and when the leakage phenomenon occurs, the whole circuit can be cut off through the power supply controller 10 and a signal with leakage is transmitted to the mainboard 6, the overcurrent protection module 11 can monitor the current state in the circuit, when excessive external power devices are connected to cause the overcurrent of the circuit, the overcurrent protection module 11 can cut off the whole circuit through the power supply controller 10 and transmit the signal with overcurrent to the mainboard 6, when the device is used, the magnetic card is required to be recharged, when the worker needs to take electricity, the magnetic card is inserted into the magnetic card induction module 4, the magnetic card induction module 4 induces the magnetic card signal and transmits the signal to the central processing module 7, the central processing module 7 reads and stores the identity information, then the whole circuit is controlled to be electrified through the balance information of the magnetic card, and meanwhile, the charging module 8 starts charging, when the electricity is used, the magnetic card is taken away, the charging module 8 stops charging, the identity information of the electricity-using person is transmitted to the wireless module 9, the wireless module 9 can be connected with the electric power distribution terminal through a wireless network and transmits the information to the electric power distribution terminal for the electric power supervision personnel to check, and the irradiation lamp can obtain the electric power through the overcurrent protection module 11 to provide the illumination effect, and the spring 19 can exert pressure to the friction disc 18, so that the friction force between the friction disc 18 and the fixed block 17 is increased, and the lamp holder 20 is ensured not to shake when not subjected to external force, when the angle of the irradiation lamp 15 needs to be adjusted, only the lamp holder 20 needs to be rotated to provide larger torque, when the lamp holder is in a power-on state, the main board 6 controls the standby power supply 14 to be in a charging state, and when the equipment is abnormally powered off, the main board 6 controls the standby power supply 14 to be in a discharging state, so that a certain amount of electric energy can.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. An intelligent temporary electricity distribution box comprises a box body (1) and is characterized in that four support legs (2) are welded on the outer wall of the bottom of the box body (1), a box cover (3) is hinged on the outer wall of one side of the box body (1), a power supply mechanism and an electric control mechanism are respectively arranged on the inner wall of the box body (1), a lighting system is arranged on the outer wall of one side of the box body (1), the electric control mechanism comprises a magnetic card induction module (4), a central processing module (7), a billing module (8) and a wireless module (9), the outer walls of the central processing module (7), the billing module (8) and the wireless module (9) are all welded on the outer wall of a mainboard (6), the central processing module (7), the billing module (8) and the wireless module (9) are mutually electrically connected through an internal circuit of the mainboard (6), and the magnetic card induction module (, the magnetic card induction module (4) is electrically connected with the mainboard (6).
2. The intelligent temporary power distribution box according to claim 1, wherein the power supply mechanism comprises a leakage protection module (12), an overcurrent protection module (11), a main board (6) and a power controller (10), a main power interface (5) is embedded on the outer wall of one side of the box body (1), the main power interface (5) is electrically connected with the main board (6), the main board (6) is electrically connected with the leakage protection module (12), the leakage protection module (12) is electrically connected with the overcurrent protection module (11), the overcurrent protection module (11) is electrically connected with the power controller (10), the outer wall of the main board (6) is fixed on the inner wall of the box body (1) through bolts, and the outer walls of the bottoms of the leakage protection module (12), the overcurrent protection module (11) and the power controller (10) are fixed on the inner wall of the bottom of the box body (1) through bolts, the outer wall of one side of box (1) is inlayed and is connect with more than three output socket (13), and more than three output socket (13) all are connected with the output electric property of power controller (10).
3. An intelligent temporary electricity distribution box according to claim 2, wherein the main power supply interface (5) and the output socket (13) are 220V industrial sockets.
4. The intelligent temporary power distribution box according to claim 1, wherein the lighting system comprises a lamp holder (20) and a lamp (15), two parallel fixing blocks (17) are welded on the outer wall of one side of the box body (1), rotating rods (16) are connected to the inner walls of the two fixing blocks (17) in a sliding manner, the outer walls of the two opposite sides of the two rotating rods (16) are connected to the inner wall of the same lamp holder (20) in a clamping manner, the lamp (15) is connected to the inner wall of the lamp holder (20) in a clamping manner, friction discs (18) are sleeved on the outer walls of the two rotating rods (16), and the same spring (19) is buckled on the outer walls of the opposite sides of the friction discs (18) and the lamp holder.
5. An intelligent temporary power distribution box according to claim 4, wherein the illumination lamp (15) is electrically connected to the overcurrent protection module (11).
6. An intelligent temporary power distribution box according to claim 1, wherein a standby power supply (14) is fixed on the inner wall of the bottom of the box body (1) through bolts, and the standby power supply (14) is electrically connected with the main board (6).
CN202020723648.2U 2020-05-06 2020-05-06 Intelligent temporary power utilization distribution box Expired - Fee Related CN211790252U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020723648.2U CN211790252U (en) 2020-05-06 2020-05-06 Intelligent temporary power utilization distribution box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020723648.2U CN211790252U (en) 2020-05-06 2020-05-06 Intelligent temporary power utilization distribution box

Publications (1)

Publication Number Publication Date
CN211790252U true CN211790252U (en) 2020-10-27

Family

ID=72956613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020723648.2U Expired - Fee Related CN211790252U (en) 2020-05-06 2020-05-06 Intelligent temporary power utilization distribution box

Country Status (1)

Country Link
CN (1) CN211790252U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112986639A (en) * 2021-02-07 2021-06-18 江苏盛德电子仪表有限公司 Mobile intelligent low-power consumption electric energy meter capable of being used in extreme environment
CN113960939A (en) * 2021-09-09 2022-01-21 深圳市宏智智能装备有限公司 Gas equipment block terminal dual control system
CN114156748A (en) * 2021-11-15 2022-03-08 中铁电气化局集团有限公司 Three-stage lighting distribution box

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112986639A (en) * 2021-02-07 2021-06-18 江苏盛德电子仪表有限公司 Mobile intelligent low-power consumption electric energy meter capable of being used in extreme environment
CN112986639B (en) * 2021-02-07 2022-11-18 江苏盛德电子仪表有限公司 Mobile intelligent low-power consumption electric energy meter capable of being used in extreme environment
CN113960939A (en) * 2021-09-09 2022-01-21 深圳市宏智智能装备有限公司 Gas equipment block terminal dual control system
CN113960939B (en) * 2021-09-09 2024-05-17 深圳市宏智智能装备有限公司 Dual-control system for distribution box of gas equipment
CN114156748A (en) * 2021-11-15 2022-03-08 中铁电气化局集团有限公司 Three-stage lighting distribution box

Similar Documents

Publication Publication Date Title
CN211790252U (en) Intelligent temporary power utilization distribution box
CN212391597U (en) Medical electronic equipment outage detection device
CN101825228A (en) Portable illumination device
CN209329428U (en) A kind of power distribution cabinet with warning function
CN204967334U (en) Wireless battery charging outfit of cell -phone
CN201925741U (en) Solar flashlight
CN102157969B (en) Portable charge device
CN201403057Y (en) Portable solar energy mobile power supply
CN202737568U (en) Management and monitoring system of down hole uninterrupted power supply (UPS)
CN206488213U (en) A kind of solar energy lifts lamp
CN204886402U (en) Smart electric meter working power supply device
CN204559373U (en) The wireless power adapter that a kind of novel intelligent is powered fast
CN203312865U (en) Portable stand-by power supply for fusion splicer
CN209150786U (en) A kind of emergency service case and cabinet group of powering
CN209068372U (en) A kind of wireless lighting systems for channel of coal mining working surface
CN208806602U (en) A kind of low-tension transformer short-circuit protection circuit
CN201515792U (en) Solar general charging pocket
CN203205911U (en) Mining intrinsically safe type power box
CN202005053U (en) Intelligent control system of emergency lighting electrodeless lamp
CN201478851U (en) Nickel-chrome nickel-metal hydride AAA, AA battery charger
CN204118859U (en) Possesses the ni-mh explosion-proof power box of remote monitoring function
CN211579615U (en) External direct-current power supply device
CN205418128U (en) Portable starting drive of helicopter
CN210838580U (en) New forms of energy power box system control device
CN203560807U (en) Multifunctional LED (light emitting diode) light tube

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027

Termination date: 20210506

CF01 Termination of patent right due to non-payment of annual fee