CN211777034U - Energy-saving shutter structure of green building - Google Patents

Energy-saving shutter structure of green building Download PDF

Info

Publication number
CN211777034U
CN211777034U CN202020317466.5U CN202020317466U CN211777034U CN 211777034 U CN211777034 U CN 211777034U CN 202020317466 U CN202020317466 U CN 202020317466U CN 211777034 U CN211777034 U CN 211777034U
Authority
CN
China
Prior art keywords
water
pipe
energy
catch bowl
shower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020317466.5U
Other languages
Chinese (zh)
Inventor
李永文
黄源军
黄勇彬
卢仕明
赵芝彬
赵东明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Construction Engineering Construction Co Ltd
Original Assignee
Guangdong Construction Engineering Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Construction Engineering Construction Co Ltd filed Critical Guangdong Construction Engineering Construction Co Ltd
Priority to CN202020317466.5U priority Critical patent/CN211777034U/en
Application granted granted Critical
Publication of CN211777034U publication Critical patent/CN211777034U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Nozzles (AREA)

Abstract

The utility model belongs to the technical field of the technique of shutter and specifically relates to an energy-saving shutter structure of green building is related to, it includes the framework and installs two glass in the framework, two set up the cavity intermediate layer between the glass, install shutter plate and water jet equipment in the cavity intermediate layer, water jet equipment includes water catch bowl, shower and the pump body, and the bottom of framework is located to the water catch bowl, and shower and water catch bowl pass through pump body intercommunication setting, and the shower is located the water catch bowl top, and the shower is equipped with a plurality of hole for water spraying. The utility model discloses a set up the water curtain and increase the cyclic utilization of water, reduced owing to receive the sunlight to penetrate directly and the cavity interbedded temperature of temperature higher than normal to weaken indoor heat load, effectively reduced illumination energy consumption and air conditioner energy consumption, great degree reduces the building energy consumption, has satisfied green building requirement.

Description

Energy-saving shutter structure of green building
Technical Field
The utility model belongs to the technical field of the technique of shutter and specifically relates to an energy-saving shutter structure of green building is related to.
Background
The main principle of the shutter is that the refraction direction of sunlight is changed by adjusting the angle of the blades so as to adjust the indoor lighting environment, the shutter can effectively reduce the lighting energy consumption and the air conditioner energy consumption while meeting the comfort of people, the building energy consumption is reduced to a greater extent, and the requirement of green buildings is met.
The existing shutter is influenced by the shape and the shape of the blades, when the shutter is closed, less light enters the room due to smaller luminous flux, indoor illumination needs to be turned on, when the shutter is turned on, more light enters the room due to too large luminous flux, and a large amount of heat enters the room due to direct sunlight, so that the indoor heat load is increased. Therefore, the existing shutter design is not considered from the energy-saving perspective, and the shutter can not be opened to increase the indoor lighting effect and avoid the direct irradiation of sunlight to the indoor temperature.
In order to avoid because the indoor intensification that the sunlight directly penetrated and lead to, refer to utility model patent that publication number is CN203097662U, this utility model discloses a water curtain formula shutter, including the window form, the internally mounted of window form has the tripe, and the draw-in groove is installed to the bottom of window form, and the draw-in groove setting is inside the basin, and the water pump is installed to the one end of basin, and the water pipe is connected to the one end of water pump, its other end connecting plug, and one side of basin is provided with control switch.
The above prior art solutions have the following drawbacks: the utility model discloses a cascade design of interior adoption is difficult to realize the circulation of water usually, and the poor utilization ratio that leads to water of the cyclicity of water is not high.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an energy-saving shutter structure of green building has the advantage that improves the circulation performance of water.
The utility model discloses a can realize through following technical scheme: the utility model provides an energy-saving shutter structure of green building, includes the framework and installs two glass in the framework, two set up the cavity intermediate layer between the glass, install shutter plate and water jet equipment in the cavity intermediate layer, water jet equipment includes water catch bowl, shower and the pump body, the bottom of framework is located to the water catch bowl, shower and water catch bowl pass through pump body intercommunication setting, the shower is located the water catch bowl top, the shower is equipped with a plurality of hole for water spraying.
By adopting the technical scheme, the pump body is opened, the water spraying device starts to operate, water in the water collecting tank circulates in the spraying pipe, the water in the spraying pipe falls through the water spraying holes to form the water curtain, and the water falling through the spraying pipe circulates in the spraying pipe through the pump body, so that the circulation of the water in the water collecting tank is realized, the utilization rate of the water is improved, and the cost is reduced; meanwhile, the continuously falling water curtain reduces the temperature of the hollow interlayer with higher temperature due to direct sunlight, so that the indoor heat load is weakened, the illumination energy consumption and the air conditioner energy consumption are effectively reduced, the building energy consumption is reduced to a greater extent, and the requirement of green buildings is met. When the temperature of the hollow interlayer is reduced, the pump body is closed, and the water spraying device stops working.
The utility model discloses further set up to: the spray pipe is positioned in the frame body, and the water spray holes are communicated with the hollow interlayer.
Through adopting above-mentioned technical scheme, reduced the shower to the shutter when opening and shutting the interference, played the effect that reduces water jet equipment's occupation space, and increased the utility model discloses an aesthetic property.
The utility model discloses further set up to: the spraying pipe comprises a water curtain pipe and a water feeding circulating pipe, the water curtain pipe and the water feeding circulating pipe are communicated, the water curtain pipe is fixedly arranged at the top of the frame body, the water curtain pipe is arranged at one side, facing the water collecting tank, of the water curtain pipe through a plurality of water spraying holes, the water feeding circulating pipe is fixedly arranged at one side of the frame body, and one end, far away from the water curtain pipe, of the water feeding circulating pipe is communicated with the water collecting tank through a pump body.
Through adopting above-mentioned technical scheme, compare and set up the hole for water spraying in the water circulating pipe, the water circulating pipe of going up is the parabola whereabouts under the action of gravity through hole for water spraying spun water, the hole for water spraying spun water that is located the water circulating pipe top can not avoid easily overlapping with the hole for water spraying spun water that is located the water circulating pipe below, the area of contact of the steam in water curtain and the cavity intermediate layer has been reduced, consequently set up the hole for water spraying on the water curtain pipe can furthest increase the area of contact of the steam in water curtain and the cavity intermediate layer that the water curtain pipe water spraying formed, and then accelerate the intraformational temperature rate of decline of cavity intermediate layer.
The utility model discloses further set up to: the spraying pipe also comprises a lower water circulating pipe, two ends of the lower water circulating pipe are respectively communicated with the water curtain pipe and the water collecting tank, and the lower water circulating pipe is fixedly arranged on one side of the frame body opposite to the upper water circulating pipe.
By adopting the technical scheme, the water in the water curtain pipe is generally difficult to completely circulate through the water spray holes, and the arrangement of the lower water circulating pipe can realize the circulation of the residual water in the water curtain pipe and the water in the water collecting tank, so that the circulation performance of the water in the water collecting tank is further improved.
The utility model discloses further set up to: the two ends of the spraying pipe are respectively provided with an arc-shaped pipe at the joint of the upper water circulating pipe and the lower water circulating pipe, and the arc-shaped pipes are arranged in a concave mode towards the direction of the water collecting tank.
Through adopting above-mentioned technical scheme for in the water circulation pipe more circulate to the cascade in for go up the water, and the intraductal water of cascade also more circulates to the sewer circulation intraductal, has accelerated the circulation rate of the water in the water catch bowl, thereby accelerates the intraformational temperature rate of decline of cavity interlayer.
The utility model discloses further set up to: the water feeding circulating pipe is provided with a switch valve, the switch valve is provided with a handle, and the handle extends out of the frame body.
Through adopting above-mentioned technical scheme, the switch valve is convenient for people to adjust the discharge in the water circulation pipe to satisfy people's actual demand, the handle has then made things convenient for people to the control of switch valve.
The utility model discloses further set up to: the water collecting tank is characterized in that a drain pipe is arranged at the bottom of the water collecting tank and communicated with the water collecting tank, the drain pipe penetrates through the frame body and extends out of the frame body, and an open-close cover used for covering the drain pipe is installed at one end, extending out of the frame body, of the drain pipe.
By adopting the technical scheme, when the water spraying device is not needed to be used for a long time, or the water in the water collecting tank needs to be replaced due to temperature rise, the switch cover is opened, the water in the water collecting tank can be discharged through the drain pipe, and new water is injected into the water collecting tank through the water pipe again, so that the water spraying device is circulated.
The utility model discloses further set up to: the switch cover is in threaded connection with the outer peripheral surface of the drain pipe.
By adopting the technical scheme, the leakproofness of the drain pipe is increased, and the opening and closing of the switch cover are facilitated for people, so that the water in the water collecting tank can be replaced or removed easily.
To sum up, the utility model discloses a beneficial technological effect does:
1. by arranging the water curtain and increasing the recycling of water, the temperature of the hollow interlayer with higher temperature due to direct sunlight is reduced, so that the indoor heat load is weakened, the illumination energy consumption and the air-conditioning energy consumption are effectively reduced, the building energy consumption is reduced to a greater extent, and the requirement of green buildings is met;
2. simple structure, convenient operation is swift.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the water spray device.
Fig. 3 is a schematic view of another perspective structure of the present invention.
Fig. 4 is an enlarged schematic view of B in fig. 3.
Fig. 5 is an enlarged schematic view of a structure at a in fig. 2.
In the figure: 11. a frame body; 12. glass; 2. louver blades; 3. a water spraying device; 31. a water collection tank; 32. a shower pipe; 321. a water curtain pipe; 322. a water supply circulating pipe; 323. a sewage circulating pipe; 324. an arc tube; 325. a water spray hole; 33. a pump body; 34. an on-off valve; 35. a handle; 36. a drain pipe; 37. and (6) opening and closing a cover.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses an energy-saving shutter structure of green building, including framework 11 and two glass 12 of installing in framework 11, set up the cavity intermediate layer between two glass 12, install shutter plate 2 and water jet equipment 3 in the cavity intermediate layer.
Referring to fig. 1 and 2, the water spray device 3 includes a water collection tank 31, a shower pipe 32, and a pump body 33. The water collecting tank 31 is arranged at the bottom of the frame body 11, the spray pipe 32 and the water collecting tank 31 are communicated through the pump body 33, the water collecting tank 31 is communicated with a water inlet pipe (not shown in the figure), the water collecting tank 31 is communicated with the hollow interlayer, and the pump body 33 is positioned at the joint of one end of the spray pipe 32 and the water collecting tank 31.
The spray pipe 32 is in an inverted U shape, two ends of the spray pipe 32 are respectively communicated with two ends of the water collecting tank 31, the spray pipe 32 is arranged around the inner wall of the frame body 11, and the spray pipe 32 is positioned inside the frame body 11. The shower pipe 32 includes a water curtain pipe 321, an upper water circulation pipe 322, and a lower water circulation pipe 323. The water curtain pipe 321 is fixedly disposed on the top of the frame 11. Referring to fig. 3 and 4, a plurality of water spraying holes 325 are formed on one side of the water curtain pipe 321 facing the water collecting tank 31, the water spraying holes 325 are communicated with the hollow interlayer, and the water spraying holes 325 are located right above the water collecting tank 31.
Referring to fig. 1 and 2, an upper water circulation pipe 322 and a lower water circulation pipe 323 are fixedly provided at both side walls of the frame body 11, respectively. One ends of the upper water circulating pipe 322 and the lower water circulating pipe 323 far away from the water collecting tank 31 are respectively communicated with two ends of the water curtain pipe 321. The joints of the upper water circulating pipe 322, the lower water circulating pipe 323 and the water curtain pipe 321 are all provided with an arc-shaped pipe 324, and the arc-shaped pipe 324 is arranged in a concave manner towards the direction of the water collecting tank 31. The ends of the upper water circulating pipe 322 and the lower water circulating pipe 323 far away from the water curtain pipe 321 are respectively communicated with the water collecting tank 31, and the ends of the upper water circulating pipe 322 and the lower water circulating pipe 323 far away from the water curtain pipe 321 are both positioned in the water collecting tank 31. The pump body 33 is located at the junction of the upper water circulation pipe 322 and the water collection tank 31.
The end of the upper water circulation pipe 322 far away from the water curtain pipe 321 is provided with a switch valve 34, and the switch valve 34 is positioned above the pump body 33. The switch valve 34 is provided with a handle 35, and the handle 35 extends out of the frame 11.
Referring to fig. 1 and 5, a drain pipe 36 is disposed at the bottom of the water collecting tank 31, the drain pipe 36 is located at one end of the water collecting tank 31, and the drain pipe 36 is communicated with the water collecting tank 31. The drain pipe 36 penetrates the frame 11 and extends out of the frame 11. An opening and closing cover 37 is arranged at one end of the water drainage pipe 36 far away from the water collecting tank 31, and the opening and closing cover 37 is in threaded connection with the outer peripheral surface of the water drainage pipe 36.
The utility model discloses an implement the principle and do: when the pump body 33 and the on-off valve 34 are opened, the water spraying device 3 starts to operate, the pump body 33 circulates the water in the water collecting tank 31 to the upper water circulating pipe 322, the water in the water collecting tank 31 circulates in the shower pipe 32, and the water in the water curtain pipe 321 falls through the water spraying holes 325 to form a water curtain.
The continuous hydrothermal curtain that falls constantly absorbs owing to receive the sunlight to penetrate directly and the interbedded temperature of cavity of temperature on the high side to the temperature in the water catch bowl 31 risees, closes the pump body 33 and ooff valve 34, and water jet equipment 3 stop work unscrews switch cover 37, makes switch cover 37 break away from drain pipe 36, can discharge the water in the water catch bowl 31, and the while leads to pipe is new water of water catch bowl 31 replenishment, realizes the utility model discloses a heat dissipation problem.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides an energy-saving shutter structure of green building which characterized in that: including framework (11) and install two glass (12) in framework (11), two set up hollow intermediate layer between glass (12), install shutter plate (2) and water jet equipment (3) in the hollow intermediate layer, water jet equipment (3) are including water catch bowl (31), shower (32) and pump body (33), the bottom of framework (11) is located in water catch bowl (31), shower (32) and water catch bowl (31) set up through pump body (33) intercommunication, shower (32) are located water catch bowl (31) top, shower (32) are equipped with a plurality of hole for water sprayings (325).
2. The energy-saving blind structure for green buildings according to claim 1, wherein: the spray pipe (32) is positioned in the frame body (11), and the water spray holes (325) are communicated with the hollow interlayer.
3. The energy-saving blind structure for green buildings according to claim 1, wherein: spray pipe (32) include water curtain pipe (321) and water feeding circulation pipe (322), water curtain pipe (321) and water feeding circulation pipe (322) intercommunication set up, water curtain pipe (321) are fixed to be set up in the top of framework (11), one side of water curtain pipe (321) orientation water catch bowl (31) is located in a plurality of hole for water jets (325), water feeding circulation pipe (322) are fixed to be set up in one side of framework (11), the one end that water curtain pipe (321) were kept away from in water feeding circulation pipe (322) is through pump body (33) and water catch bowl (31) intercommunication setting.
4. The energy-saving blind structure for green buildings according to claim 3, wherein: the spraying pipe (32) further comprises a lower water circulating pipe (323), two ends of the lower water circulating pipe (323) are respectively communicated with the water curtain pipe (321) and the water collecting tank (31), and the lower water circulating pipe (323) is fixedly arranged on one side, opposite to the frame body (11) and the upper water circulating pipe (322).
5. The energy-saving blind structure for green buildings according to claim 4, wherein: the two ends of the spray pipe (32) are respectively provided with an arc pipe (324) at the joint of the upper water circulating pipe (322) and the lower water circulating pipe (323), and the arc pipe (324) is arranged in a concave manner towards the water collecting tank (31).
6. The energy-saving blind structure for green buildings according to claim 3, wherein: go up water circulating pipe (322) and be equipped with ooff valve (34), ooff valve (34) are equipped with handle (35), handle (35) extend outside framework (11).
7. The energy-saving blind structure for green buildings according to claim 1, wherein: the water collecting tank (31) is provided with a drain pipe (36) at the bottom, the drain pipe (36) is communicated with the water collecting tank (31), the drain pipe (36) penetrates through the frame body (11) and extends out of the frame body (11), and one end of the drain pipe (36) extending out of the frame body (11) is provided with a switch cover (37) for covering an opening of the drain pipe (36).
8. The energy-saving blind structure for green buildings according to claim 7, wherein: the switch cover (37) is in threaded connection with the outer peripheral surface of the drain pipe (36).
CN202020317466.5U 2020-03-12 2020-03-12 Energy-saving shutter structure of green building Active CN211777034U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020317466.5U CN211777034U (en) 2020-03-12 2020-03-12 Energy-saving shutter structure of green building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020317466.5U CN211777034U (en) 2020-03-12 2020-03-12 Energy-saving shutter structure of green building

Publications (1)

Publication Number Publication Date
CN211777034U true CN211777034U (en) 2020-10-27

Family

ID=72929909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020317466.5U Active CN211777034U (en) 2020-03-12 2020-03-12 Energy-saving shutter structure of green building

Country Status (1)

Country Link
CN (1) CN211777034U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115200114A (en) * 2022-06-29 2022-10-18 合肥工业大学 Micro-channel louvered composite wall based on evaporative cooling technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115200114A (en) * 2022-06-29 2022-10-18 合肥工业大学 Micro-channel louvered composite wall based on evaporative cooling technology

Similar Documents

Publication Publication Date Title
CN211114284U (en) Energy-saving curtain wall for building decoration
CN205444603U (en) Biological decontamination system
CN211777034U (en) Energy-saving shutter structure of green building
CN100575631C (en) A kind of internal and external double-circulating double-layer curtain wall
CN209944678U (en) A new trend device for wisdom building
CN200971574Y (en) Internal-external double-circulation double-layer curtain wall
CN217811789U (en) Energy-conserving curtain of formula of respiration photovoltaic
CN210197590U (en) Energy-saving fresh air ventilator
KR20100133224A (en) Insulation system for building using water screen and method for insulating of that
CN204960177U (en) Open controllable type photovoltaic ventilation solar shading system
CN106642462A (en) Layered cooling type air conditioning system combining impounding reservoir temperature lowering and used for building with tall and large space
CN210562916U (en) Daylighting ventilation photovoltaic power generation integration energy-conserving double-deck roofing
CN209431593U (en) A kind of ceiling mounting type air duct humidification cylinder
CN208519922U (en) A kind of Liftable type ground heat-exchange system
CN213577857U (en) Heat insulation device of assembly type building
CN206330245U (en) Suitable for the layering cooled energy-saving air conditioning system of large-space clean factory building
CN205717722U (en) A kind of house ventilation equipment of self-purging air
CN213901240U (en) Solar heating and ventilating equipment for house
CN104329752A (en) Toilet air conditioner commonly using cleaning water with flushing closestool
CN204531986U (en) A kind of building spraying cooling window construction
CN212866659U (en) Double-ventilation daylighting energy-saving roof panel body for constructional engineering
CN210342462U (en) Ecological roof structure
CN219605181U (en) Sandwich spraying flow water window heat sink
CN115325629B (en) Window structure and house
CN211597047U (en) Device for improving performance of internal space of house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant