CN211775804U - Template clamping device for building reinforcement - Google Patents

Template clamping device for building reinforcement Download PDF

Info

Publication number
CN211775804U
CN211775804U CN202020272095.3U CN202020272095U CN211775804U CN 211775804 U CN211775804 U CN 211775804U CN 202020272095 U CN202020272095 U CN 202020272095U CN 211775804 U CN211775804 U CN 211775804U
Authority
CN
China
Prior art keywords
hole
building
close
clamping device
grooves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020272095.3U
Other languages
Chinese (zh)
Inventor
马鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020272095.3U priority Critical patent/CN211775804U/en
Application granted granted Critical
Publication of CN211775804U publication Critical patent/CN211775804U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a template clamping device for building reinforcement, including the diaphragm, the through-hole has been seted up to one side of diaphragm, and slidable mounting has two movable posts in the through-hole, and the one end that two movable posts were kept away from each other all extends to outside the through-hole, and the equal fixed mounting of one end that two movable posts were kept away from each other has a riser, and the equal fixed mounting in one side that two risers are close to each other has the connecting rod, and two connecting rods all are located the below of diaphragm, and the equal fixed mounting of one end that two connecting rods are close to each other has splint, and the thread groove has all been seted up. The utility model relates to a rationally, the simple operation is convenient for adjust the interval between two splint, utilizes the centre gripping cooperation of two splint, fastens the centre gripping to building templates, and is firm to building templates's reinforcement, and building templates is difficult and wait to water building wall or beam column and break away from, and convenient the building templates of waiting to water on the building wall to the difference fastens moreover, and the practicality is good.

Description

Template clamping device for building reinforcement
Technical Field
The utility model relates to a construction equipment technical field specifically is a template clamping device for building reinforcement.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that a concrete structure and a component are formed according to the specified position and geometric dimension, the correct position of the concrete structure and the component is kept, the self weight of the building formwork and the external load acting on the building formwork are borne, the aim of the formwork engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost.
However, in the prior art, the existing clamping device is not stable enough for fixing the building template, the building template is easily separated from the building wall to be poured, the operation process is complicated, the problem of inconvenient adjustment exists, the different building wall to be poured which cannot be well applicable is fastened, and the practicability is poor.
Disclosure of Invention
Technical problem to be solved
Not enough to prior art, the utility model provides a template clamping device for building reinforcement has solved clamping device and has stabilized the fixed of building templates inadequately, and operation process is loaded down with trivial details, has the problem of being not convenient for adjust, and the different wall bodies of waiting to pour that are applicable to that can not be fine fasten, the relatively poor problem of practicality.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a template clamping device for building reinforcement comprises a transverse plate, wherein a through hole is formed in one side of the transverse plate, two movable columns are slidably mounted in the through hole, the ends, far away from each other, of the two movable columns extend out of the through hole, vertical plates are fixedly mounted at the ends, far away from each other, of the two movable columns, connecting rods are fixedly mounted at the sides, close to each other, of the two vertical plates and are located below the transverse plate, clamping plates are fixedly mounted at the ends, close to each other, of the two connecting rods, threaded grooves are formed in the ends, close to each other, of the two movable columns, threaded columns are mounted in the threaded grooves in a threaded manner, the ends, close to each other, of the two threaded columns extend out of the corresponding threaded grooves, first conical gears are fixedly mounted at the ends, close to each other, of the two threaded columns, first, outside the both ends of pivot all extended to the mounting hole, the bottom fixed mounting of pivot had second conical gear, and two first conical gear all engaged with second conical gear, and the top fixed mounting of pivot has the plectane, and the top of plectane is seted up threaded hole, and the bolt is installed to the screw hole internal thread, and outside the both ends of bolt all extended to the screw hole, the draw-in groove had been seted up at the top of diaphragm, and the bottom of bolt extended to in the draw-in groove.
Preferably, the bottom fixed mounting of diaphragm has two dead levers, and one side fixed mounting that two dead levers are close to each other has same guide bar, and two splint all slip the cover and establish on the guide bar.
Preferably, two limiting grooves are formed in the inner wall of the top of the through hole and the inner wall of the bottom of the through hole, limiting rods are fixedly mounted at the tops and the bottoms of the two movable columns, and the four limiting rods are slidably mounted in the corresponding limiting grooves respectively.
Preferably, the anti-skid pad is fixedly arranged on one side, close to each other, of each of the two clamping plates.
Preferably, the rotating shaft is fixedly sleeved with a bearing, and an outer ring of the bearing is fixedly connected with the inner wall of the mounting hole.
Preferably, the number of the clamping grooves is multiple, and the plurality of clamping grooves are annularly arranged at equal intervals by taking the rotating shaft as the center.
(III) advantageous effects
The utility model provides a template clamping device for building reinforcement. The method has the following beneficial effects:
(1) the template clamping device for building reinforcement is characterized in that the fixing of the circular plate is released by screwing the bolts out of the corresponding clamping grooves, the circular plate is rotated clockwise, the circular plate drives the rotating shaft and the second bevel gear to rotate, the second bevel gear drives the two first bevel gears to rotate, the two movable columns slide in the directions away from each other due to the opposite screw threads of the two threaded columns, the two movable columns drive the corresponding vertical plates, the connecting rods and the clamping plates to move, the two clamping plates move in the directions away from each other, when the distance between the two clamping plates is adjusted to be slightly larger than the width of the two building templates, the building templates on the two sides of a concrete wall or a beam column are positioned between the two clamping plates, the circular plate is rotated anticlockwise, the circular plate drives the rotating shaft and the second bevel gear to rotate in the opposite direction, and the two movable columns slide in the directions close to each other, two movable posts drive corresponding riser, connecting rod and splint remove, two splint remove to the direction that is close to each other, slipmat on two splint is with two building templates presss from both sides the back closely respectively, can in the corresponding draw-in groove of bolt screw in, utilize two splint to fasten the centre gripping to the both sides building templates that supports at concrete wall or beam column, the cooperation that utilizes bolt and draw-in groove is carried on spacingly to the position of plectane, the restriction plectane rotates, make the position of two splint can not change, thereby it is firm to consolidate the centre gripping of building templates, the building templates is difficult for breaking away from with waiting to water building wall or beam column.
(2) This template clamping device for building reinforcement through outside the corresponding draw-in groove of bolt back-out, removes the fixed to the plectane, through clockwise or anticlockwise rotation plectane, can adjust the interval between two splint, is convenient for water to the difference and builds the wall body and fasten, has improved practicality.
Drawings
FIG. 1 is a schematic sectional view of the main view of the present invention;
fig. 2 is an enlarged schematic view of a portion a of fig. 1.
In the figure: 1. a transverse plate; 2. a through hole; 3. a movable post; 4. a vertical plate; 5. a connecting rod; 6. a splint; 7. a thread groove; 8. a threaded post; 9. a first bevel gear; 10. mounting holes; 11. a rotating shaft; 12. a second bevel gear; 13. a circular plate; 14. a threaded hole; 15. a bolt; 16. a clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-2, the utility model provides a technical solution: a template clamping device for building reinforcement comprises a transverse plate 1, a through hole 2 is formed in one side of the transverse plate 1, two movable columns 3 are slidably mounted in the through hole 2, the ends, far away from each other, of the two movable columns 3 extend out of the through hole 2, the ends, far away from each other, of the two movable columns 3 are fixedly mounted with vertical plates 4, one sides, close to each other, of the two vertical plates 4 are fixedly mounted with connecting rods 5, the two connecting rods 5 are located below the transverse plate 1, the ends, close to each other, of the two connecting rods 5 are fixedly mounted with clamping plates 6, the ends, close to each other, of the two movable columns 3 are respectively provided with threaded grooves 7, threaded columns 8 are respectively and threadedly mounted in the two threaded grooves 7, the ends, close to each other, of the two threaded columns 8 respectively extend out of the corresponding threaded grooves 7, first conical gears 9 are fixedly mounted at the ends, close to each, pivot 11 is installed to the internal rotation of mounting hole 10, the both ends of pivot 11 all extend to outside the mounting hole 10, the bottom fixed mounting of pivot 11 has second bevel gear 12, two first bevel gears 9 all mesh with second bevel gear 12 mutually, the top fixed mounting of pivot 11 has plectane 13, screw hole 14 is seted up at plectane 13's top, bolt 15 is installed to screw hole 14 internal thread, bolt 15's both ends all extend to outside screw hole 14, draw-in groove 16 has been seted up at diaphragm 1's top, bolt 15's bottom extends to in the draw-in groove 16.
Diaphragm 1's bottom fixed mounting has two dead levers, one side fixed mounting that two dead levers are close to each other has same guide bar, two splint 6 all slip cap establish on the guide bar, two spacing grooves have all been seted up on through-hole 2's the top inner wall and the bottom inner wall, the equal fixed mounting in top and the bottom of two movable column 3 has the gag lever post, four gag lever posts are slidable mounting respectively at corresponding spacing inslot, the equal fixed mounting in one side that two splint 6 are close to each other has the slipmat, fixed cover is equipped with the bearing in the pivot 11, the outer lane of bearing and the inner wall fixed connection of mounting hole 10, the quantity of draw-in groove 16 is a plurality of, a plurality of draw-in grooves 16 use pivot 11 to be equidistant annular.
When the device is used, the thread turning directions of the two thread columns 8 are opposite, the two thread columns 8 are respectively in threaded connection and matching with the corresponding thread grooves 7, firstly, the bolts 15 are screwed out of the corresponding clamping grooves 16, so that the fixation of the circular plate 13 can be removed, the circular plate 13 is rotated clockwise, the circular plate 13 drives the rotating shaft 11 and the second bevel gear 12 to rotate, the second bevel gear 12 drives the two first bevel gears 9 to rotate, according to the transmission characteristics of the gears, the turning directions of the two first bevel gears 9 are opposite, because the thread turning directions of the two thread columns 8 are opposite, under the matching action of the limiting rod and the limiting groove, the two movable columns 3 slide towards the direction far away from each other, the two movable columns 3 drive the corresponding vertical plates 4, the connecting rods 5 and the clamping plates 6 to move towards the direction far away from each other, the two clamping plates 6 slide on the guide rods, according to the width of the building templates on the two sides of the poured concrete wall or the beam, when the distance between the two clamping plates 6 is adjusted to be slightly larger than the width of the two building templates, the two clamping plates 6 are respectively placed on one sides of the two building templates which are far away from each other, so that the concrete wall or the beam column and the building templates on the two sides of the concrete wall or the beam column are positioned between the two clamping plates 6, then the circular plate 13 is rotated anticlockwise, the circular plate 13 drives the rotating shaft 11 and the second bevel gear 12 to rotate in opposite directions, the second bevel gear 12 drives the two first bevel gears 9 to rotate, so that the two movable columns 3 slide in the direction of approaching each other, the two movable columns 3 drive the corresponding vertical plates 4, the connecting rods 5 and the clamping plates 6 to move, so that the two clamping plates 6 move in the direction of approaching each other, the anti-skid pads on the two clamping plates 6 are respectively clamped with the two building templates, the rotation of the circular plate 13 is stopped, the bolts 15 are screwed into the corresponding clamping grooves 16, and the two, utilize the cooperation of bolt 15 and draw-in groove 16 to carry on spacingly to the position of plectane 13, restriction plectane 13 rotates, make the position of two splint 6 not change, thereby it is more firm to the centre gripping of building templates, it is firm to the reinforcement of building templates, building templates is difficult for breaking away from with waiting to water building wall or beam column, through screwing bolt 15 out corresponding draw-in groove 16 outside, remove the fixed to plectane 13, through clockwise or anticlockwise rotation plectane 13, can adjust the interval between two splint 6, be convenient for fasten the different waiting to water building wall, the practicality is improved, the content that does not make detailed description in this specification all belongs to the prior art that technical personnel publicly know in this field simultaneously.
To sum up, the formwork clamping device for building reinforcement is characterized in that bolts 15 are screwed out of corresponding clamping grooves 16, so that the fixing of the circular plate 13 is released, the circular plate 13 is rotated clockwise, the circular plate 13 drives the rotating shaft 11 and the second bevel gear 12 to rotate, the second bevel gear 12 drives the two first bevel gears 9 to rotate, the two movable columns 3 slide in the direction away from each other due to the opposite screw thread directions of the two screw thread columns 8, the two movable columns 3 drive the corresponding vertical plates 4, the connecting rods 5 and the clamping plates 6 to move, the two clamping plates 6 move in the direction away from each other, when the distance between the two clamping plates 6 is adjusted to be slightly larger than the width of the two building formworks, the concrete wall or beam column and the building formworks on the two sides of the concrete wall or beam column are positioned between the two clamping plates 6, the circular plate 13 is rotated anticlockwise, the circular plate 13 drives the rotating shaft 11 and the second, the two movable columns 3 slide towards the direction close to each other, the two movable columns 3 drive the corresponding vertical plates 4, the connecting rods 5 and the clamping plates 6 to move, the two clamping plates 6 move towards the direction close to each other, after anti-slip pads on the two clamping plates 6 are respectively clamped with the two building templates, the bolts 15 are screwed into the corresponding clamping grooves 16, the building templates supported on two sides of a concrete wall or a beam column can be fastened and clamped by the two clamping plates 6, the positions of the circular plates 13 are limited by the matching of the bolts 15 and the clamping grooves 16, the rotation of the circular plates 13 is limited, so that the positions of the two clamping plates 6 cannot be changed, the building templates are firmly clamped and are not easy to separate from the building wall or the beam column to be cast, the bolts 15 are screwed out of the corresponding clamping grooves 16, the fixing of the circular plates 13 is released, and the circular plates 13 are rotated clockwise or anticlockwise, can adjust the interval between two splint 6, be convenient for water to the waiting of difference and build the wall and fasten, improved the practicality, the utility model relates to a rationally, the simple operation is convenient for adjust the interval between two splint 6, utilizes the centre gripping cooperation of two splint 6, fastens the centre gripping to building templates, and is firm to building templates's reinforcement, building templates is difficult and wait to water building walls or beam column and break away from, conveniently waters the building templates on building the wall to the difference in addition and fastens, and the practicality is good.

Claims (6)

1. The utility model provides a template clamping device for building reinforcement, includes diaphragm (1), its characterized in that: the through hole (2) is formed in one side of the transverse plate (1), two movable columns (3) are slidably mounted in the through hole (2), one ends, far away from each other, of the two movable columns (3) extend out of the through hole (2), vertical plates (4) are fixedly mounted at one ends, far away from each other, of the two movable columns (3), connecting rods (5) are fixedly mounted at one sides, close to each other, of the two vertical plates (4), the two connecting rods (5) are located below the transverse plate (1), clamping plates (6) are fixedly mounted at one ends, close to each other, of the two connecting rods (5), thread grooves (7) are formed at one ends, close to each other, of the two movable columns (3), thread columns (8) are mounted in the two thread grooves (7) in a threaded mode, one ends, close to each other, of the two thread columns (8) extend out of the corresponding thread grooves (7) respectively, first bevel gears (9) are fixedly, mounting hole (10) have been seted up on the top inner wall of through-hole (2), pivot (11) are installed to mounting hole (10) internal rotation, the both ends of pivot (11) all extend to mounting hole (10) outside, the bottom fixed mounting of pivot (11) has second bevel gear (12), two first bevel gear (9) all mesh with second bevel gear (12), the top fixed mounting of pivot (11) has plectane (13), screw hole (14) have been seted up at the top of plectane (13), bolt (15) are installed to screw hole (14) internal thread, the both ends of bolt (15) all extend to outside screw hole (14), draw-in groove (16) have been seted up at the top of diaphragm (1), the bottom of bolt (15) extends to in draw-in groove (16).
2. The formwork clamping device for building reinforcement according to claim 1, characterized in that: the bottom fixed mounting of diaphragm (1) has two dead levers, and one side fixed mounting that two dead levers are close to each other has same guide bar, and two splint (6) are all slided the cover and are established on the guide bar.
3. The formwork clamping device for building reinforcement according to claim 1, characterized in that: two limiting grooves are formed in the inner wall of the top of the through hole (2) and the inner wall of the bottom of the through hole, limiting rods are fixedly mounted at the tops and the bottoms of the two movable columns (3), and the four limiting rods are slidably mounted in the corresponding limiting grooves respectively.
4. The formwork clamping device for building reinforcement according to claim 1, characterized in that: one side of each of the two clamping plates (6) close to each other is fixedly provided with an anti-slip pad.
5. The formwork clamping device for building reinforcement according to claim 1, characterized in that: the rotating shaft (11) is fixedly sleeved with a bearing, and the outer ring of the bearing is fixedly connected with the inner wall of the mounting hole (10).
6. The formwork clamping device for building reinforcement according to claim 1, characterized in that: the number of the clamping grooves (16) is multiple, and the clamping grooves (16) are annularly arranged at equal intervals by taking the rotating shaft (11) as the center.
CN202020272095.3U 2020-03-09 2020-03-09 Template clamping device for building reinforcement Expired - Fee Related CN211775804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020272095.3U CN211775804U (en) 2020-03-09 2020-03-09 Template clamping device for building reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020272095.3U CN211775804U (en) 2020-03-09 2020-03-09 Template clamping device for building reinforcement

Publications (1)

Publication Number Publication Date
CN211775804U true CN211775804U (en) 2020-10-27

Family

ID=72940099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020272095.3U Expired - Fee Related CN211775804U (en) 2020-03-09 2020-03-09 Template clamping device for building reinforcement

Country Status (1)

Country Link
CN (1) CN211775804U (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112360152A (en) * 2020-11-23 2021-02-12 卢安康 Template anchor clamps based on building engineering construction usefulness
CN112523102A (en) * 2020-12-11 2021-03-19 何文龙 Portable building guardrail template construction equipment
CN112663957A (en) * 2020-12-15 2021-04-16 蚌埠美域装饰工程有限公司 Multipurpose clamping and fixing device for building construction
CN112678666A (en) * 2020-12-19 2021-04-20 台州学院 Hoisting device and hoisting method for building board with asymmetric structure
CN112814379A (en) * 2020-12-31 2021-05-18 无锡商业职业技术学院 Connecting and locking device suitable for building template
CN112900465A (en) * 2021-01-20 2021-06-04 广东金铭顺建设有限公司 Building construction device and method for foundation construction of house construction project
CN112982980A (en) * 2021-03-05 2021-06-18 河南宏程工程建设有限责任公司 Fixed template structure of pouring frame for construction engineering construction
CN113006467A (en) * 2021-02-25 2021-06-22 浙江宝盛建设集团有限公司 Construction reinforcing device for building sliding formwork
CN113027126A (en) * 2021-03-18 2021-06-25 郑州大学 Convenient connection locking structure of building templates
CN113304370A (en) * 2021-06-04 2021-08-27 南昌大学第一附属医院 Novel trachea catheter fixator for general anesthesia operation of head and face
CN113482336A (en) * 2021-07-16 2021-10-08 广东韩江工程总承包有限公司 Adjustable column formwork construction reinforcement process and device thereof
CN113944186A (en) * 2021-09-29 2022-01-18 中国一冶集团有限公司 Concrete retaining wall sliding form device and using method thereof
CN114991524A (en) * 2022-07-08 2022-09-02 南京工业大学 Be used for building antidetonation reinforced structure

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112360152A (en) * 2020-11-23 2021-02-12 卢安康 Template anchor clamps based on building engineering construction usefulness
CN112523102A (en) * 2020-12-11 2021-03-19 何文龙 Portable building guardrail template construction equipment
CN112663957A (en) * 2020-12-15 2021-04-16 蚌埠美域装饰工程有限公司 Multipurpose clamping and fixing device for building construction
CN112678666B (en) * 2020-12-19 2022-10-04 台州学院 Hoisting device and hoisting method for building board with asymmetric structure
CN112678666A (en) * 2020-12-19 2021-04-20 台州学院 Hoisting device and hoisting method for building board with asymmetric structure
CN112814379A (en) * 2020-12-31 2021-05-18 无锡商业职业技术学院 Connecting and locking device suitable for building template
CN112900465A (en) * 2021-01-20 2021-06-04 广东金铭顺建设有限公司 Building construction device and method for foundation construction of house construction project
CN113006467A (en) * 2021-02-25 2021-06-22 浙江宝盛建设集团有限公司 Construction reinforcing device for building sliding formwork
CN112982980A (en) * 2021-03-05 2021-06-18 河南宏程工程建设有限责任公司 Fixed template structure of pouring frame for construction engineering construction
CN113027126A (en) * 2021-03-18 2021-06-25 郑州大学 Convenient connection locking structure of building templates
CN113304370A (en) * 2021-06-04 2021-08-27 南昌大学第一附属医院 Novel trachea catheter fixator for general anesthesia operation of head and face
CN113304370B (en) * 2021-06-04 2022-11-01 南昌大学第一附属医院 Novel trachea catheter fixator for general anesthesia operation of head and face
CN113482336A (en) * 2021-07-16 2021-10-08 广东韩江工程总承包有限公司 Adjustable column formwork construction reinforcement process and device thereof
CN113482336B (en) * 2021-07-16 2022-03-29 广东韩江工程总承包有限公司 Adjustable column formwork construction reinforcement process and device thereof
CN113944186A (en) * 2021-09-29 2022-01-18 中国一冶集团有限公司 Concrete retaining wall sliding form device and using method thereof
CN114991524A (en) * 2022-07-08 2022-09-02 南京工业大学 Be used for building antidetonation reinforced structure
CN114991524B (en) * 2022-07-08 2023-08-25 南京工业大学 Reinforcing structure for building earthquake resistance

Similar Documents

Publication Publication Date Title
CN211775804U (en) Template clamping device for building reinforcement
CN211173120U (en) A consolidate bearing structure for building engineering
CN101270610B (en) Template early-dismantling device
CN208039827U (en) A kind of constructional form fixing apparatus
CN215802667U (en) Steel structure crossbeam
CN111119463A (en) Hanging basket system for erecting precast beam piece
CN2895618Y (en) Device for adjusting and supporting formboard
CN213387424U (en) Multifunctional steel plate combined hoisting sling
CN213062998U (en) Pre-buried rag bolt locating support
CN201217944Y (en) Early dismantling column head of template
CN206987144U (en) A kind of dismountable steel bar truss floor support plate of bed die
CN206844643U (en) Post-cast strip independence braced wing support combination unit
CN212921924U (en) Hull planking strutting arrangement
CN211446621U (en) Anticorrosive lock foot device of road bridge steel form
CN214006525U (en) Formwork support material for right angle of cast-in-place building structure
CN205061391U (en) Install pulley support on ship board
CN112663942A (en) Template assembly for building
CN212477432U (en) Cast-in-place formwork for construction of corrugated steel web cantilever beam bridge
CN220539318U (en) Building templates for support
CN213569267U (en) Tower crane standard festival connection structure
CN216810965U (en) Adjustable top support for formwork
CN216277009U (en) Tool for prefabricated plate base film top support
CN218148489U (en) Circular equipment foundation template device
CN216893477U (en) Concrete form strutting arrangement for building engineering
CN211803736U (en) Continuous casting hydraulic device of steel mill

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027

CF01 Termination of patent right due to non-payment of annual fee