CN211775592U CN201922276958.4U CN201922276958U CN211775592U CN 211775592 U CN211775592 U CN 211775592U CN 201922276958 U CN201922276958 U CN 201922276958U CN 211775592 U CN211775592 U CN 211775592U
Authority
CN
China
Prior art keywords
scaffold
regulating block
scaffold frame
pole setting
dead lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922276958.4U
Other languages
Chinese (zh)
Inventor
叶纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yangtian Security Technology Co ltd
Original Assignee
Jiangsu Yangtian Security Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yangtian Security Technology Co ltd filed Critical Jiangsu Yangtian Security Technology Co ltd
Priority to CN201922276958.4U priority Critical patent/CN211775592U/en
Application granted granted Critical
Publication of CN211775592U publication Critical patent/CN211775592U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a scaffold frame base for construction relates to scaffold frame base technical field, for solving current scaffold frame base after surpassing anticipated bearing capacity, does not have urgent safeguard measure, can't give other people the time of buffering, the problem of easy emergence accident. The lower surface of metal soleplate is provided with the backing plate, the upper end of metal soleplate is provided with the spiral dead lever, and spiral dead lever and metal soleplate welded connection, the scaffold frame pole setting is installed to the upper end of spiral dead lever, install the regulating block on the outer wall of spiral dead lever, the inside of regulating block is provided with ring groove, the handle is all installed to the both sides of regulating block, all be provided with screw thread mechanism on the inner wall of regulating block and scaffold frame pole setting, and regulating block and scaffold frame pole setting all pass through screw thread mechanism and spiral dead lever threaded connection.

Description

Scaffold base for construction
Technical Field
The utility model relates to a scaffold frame base technical field specifically is a scaffold frame base for construction.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form. Since the nineties, some domestic enterprises have introduced foreign advanced technology and developed various new scaffolds, such as bolt-type scaffolds, CRAB module scaffolds, disc-type scaffolds, square-tower scaffolds, and various types of climbing frames. In 2013, domestic professional scaffold production enterprises have more than one family, mainly in areas without stannum, Guangzhou, Qingdao and the like. Technically, scaffold enterprises in China already have the capability of processing and producing various novel scaffolds.
However, after the expected bearing capacity of the existing scaffold base is exceeded, no emergency protection measures are provided, buffering time cannot be provided for people, and accidents are easy to happen; therefore, the existing requirements are not met, and the scaffold base for building construction is provided for the existing requirements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold frame base for construction to the current scaffold frame base that provides in solving above-mentioned background art is after surpassing anticipated bearing capacity, does not have urgent safeguard measure, can't give the time of buffering, the problem of easy emergence accident.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a scaffold puts up base for construction, includes the metal base plate, the lower surface of metal base plate is provided with the backing plate, the upper end of metal base plate is provided with the spiral dead lever, and spiral dead lever and metal base plate welded connection, the scaffold frame pole setting is installed to the upper end of spiral dead lever, install the regulating block on the outer wall of spiral dead lever, the inside of regulating block is provided with ring groove, the handle is all installed to the both sides of regulating block.
Preferably, all be provided with screw-thread mechanisms on the inner wall of regulating block and scaffold pole setting, and regulating block and scaffold pole setting all pass through screw-thread mechanisms and screw fixation pole threaded connection.
Preferably, the magnet is installed inside the ring-shaped clamping groove and fixedly connected with the ring-shaped clamping groove.
Preferably, all install the bumper bar around the regulating block lower surface, and the bumper bar is provided with four, four the yielding rubber piece is all installed to the one end of bumper bar.
Preferably, the outer wall of the handle is provided with an anti-slip sleeve.
Preferably, the metal base plate is provided with four connecting through holes, the bolts are installed inside the four connecting through holes, and the metal base plate is in threaded connection with the base plate through the bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a below at the regulating block sets up four bumpers, if the base surpasses anticipated bearing capacity during the construction, when leading to threaded connection structure pine to take off the downward landing, four bumpers can play the effect of auxiliary stay, and rely on the yielding rubber piece of bottom to dump partial impact force, support the scaffold in the short time, give other people the time of buffering, avoid the scaffold frame directly to collapse, take place major accident.
2. Through installation magnet in the regulating block, after regulating block and scaffold frame pole setting bottom locking, magnet can play supplementary absorbent effect, makes connection between them more firm, has improved bottom coupling part's security.
3. Through set up the antiskid cover on the outer wall of handle, the rubber sleeve of antiskid cover for having anti-skidding line, with its cladding in the handle outside, can increase the frictional force between palm and handle, make to rotate and adjust more laborsaving.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic top view of the base portion of the present invention;
fig. 3 is a schematic view of the adjusting block of the present invention;
in the figure: 1. a metal base plate; 2. a screw fixing rod; 3. erecting a scaffold; 4. a screw mechanism; 5. an adjusting block; 6. a magnet; 7. a handle; 8. an anti-slip sleeve; 9. a bumper; 10. a shock-absorbing rubber block; 11. a base plate; 12. a bolt; 13. a connecting through hole; 14. and an annular clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: the utility model provides a scaffold puts up base for construction, including metal bottom plate 1, metal bottom plate 1's lower surface is provided with backing plate 11, backing plate 11 has played the effect of supporting fixed metal bottom plate 1, metal bottom plate 1's upper end is provided with spiral dead lever 2, and spiral dead lever 2 and 1 welded connection of metal bottom plate, spiral dead lever 2 is used for with 3 threaded connection of scaffold frame pole setting, scaffold frame pole setting 3 is installed to spiral dead lever 2's upper end, install regulating block 5 on spiral dead lever 2's the outer wall, regulating block 5 has played the effect of locking spiral dead lever 2 and scaffold frame pole setting 3, the inside of regulating block 5 is provided with ring groove 14, ring groove 14 is used for installing magnet 6, handle 7 is all installed to regulating block 5's both sides, handle 7 can drive regulating block 5 and rotate along 2 outer walls of spiral.
Further, all be provided with screw thread mechanism 4 on the inner wall of regulating block 5 and scaffold pole setting 3, and regulating block 5 and scaffold pole setting 3 all through screw thread mechanism 4 and 2 threaded connection of spiral fixed rod, after scaffold pole setting 3 is connected to suitable height with spiral fixed rod 2, accessible rotation regulating block 5 makes it shift up, until with pole setting bottom in close contact with to reach the effect of locking.
Further, ring slot 14's internally mounted has magnet 6, and magnet 6 and ring slot 14 fixed connection, magnet 6 can play absorbent effect in regulating block 5 and 3 bottom locking backs of scaffold pole setting, makes to connect more firmly.
Further, bumper 9 is all installed all around to regulating block 5 lower surface, and bumper 9 is provided with four, and the yielding rubber piece 10 is all installed to the one end of four bumper 9, surpasss anticipated bearing capacity when the scaffold frame base, leads to the threaded connection structure pine to take off when the landing downwards, and four bumper 9 can play the effect of auxiliary stay, and rely on bottom yielding rubber piece 10 to dump partial impact force, and the phenomenon of avoiding the scaffold frame directly to collapse takes place.
Further, be provided with on the outer wall of handle 7 anti-skidding cover 8, anti-skidding cover 8 is the rubber sleeve that has anti-skidding line, with its cladding in handle 7 outside, can increase the frictional force between palm and handle 7, makes to rotate more laborsavingly.
Further, the metal base plate 1 is provided with four connecting through holes 13, the bolts 12 are installed inside the four connecting through holes 13, and the metal base plate 1 is in threaded connection with the backing plate 11 through the bolts 12, so that the support of the base plate is firmer and more stable.
The working principle is as follows: during the use, at first, the screw thread mechanism 4 that utilizes 3 inner walls of scaffold pole setting is connected it with the spiral fixed rod 2 on the base, after being connected to suitable height, through 7 rotatory regulating blocks 5 of handle, make it shift up, until with pole setting bottom in close contact with, thereby reach the effect of locking, in the locking, 6 mechanisms of magnet in the regulating blocks 5 can utilize the supplementary absorption of self magnetic force, in order to promote the firmness of connecting, in the support process, if the base surpasses anticipated bearing capacity, when leading to threaded connection structure pine to take off and fall downwards, four bumper bars can play the effect of auxiliary stay, and rely on the bottom shock attenuation rubber block to unload partial impact force, avoid the phenomenon of scaffold frame direct collapse to take place.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a scaffold frame base for construction, includes metal bottom plate (1), its characterized in that: the lower surface of metal soleplate (1) is provided with backing plate (11), the upper end of metal soleplate (1) is provided with spiral fixed rod (2), and spiral fixed rod (2) and metal soleplate (1) welded connection, scaffold frame pole setting (3) are installed to the upper end of spiral fixed rod (2), install regulating block (5) on the outer wall of spiral fixed rod (2), the inside of regulating block (5) is provided with ring groove (14), handle (7) are all installed to the both sides of regulating block (5).
2. The scaffold base for building construction according to claim 1, wherein: all be provided with screw-threaded mechanism (4) on the inner wall of regulating block (5) and scaffold pole setting (3), and regulating block (5) and scaffold pole setting (3) all through screw-threaded mechanism (4) and screw fixation pole (2) threaded connection.
3. The scaffold base for building construction according to claim 1, wherein: magnet (6) are installed inside ring groove (14), and magnet (6) and ring groove (14) fixed connection.
4. The scaffold base for building construction according to claim 1, wherein: all install bumper bar (9) all around of regulating block (5) lower surface, and bumper bar (9) are provided with four, four damping rubber piece (10) are all installed to the one end of bumper bar (9).
5. The scaffold base for building construction according to claim 1, wherein: and an anti-skid sleeve (8) is arranged on the outer wall of the handle (7).
6. The scaffold base for building construction according to claim 1, wherein: be provided with connect the via hole (13) on metal soleplate (1), and connect the via hole (13) and be provided with four, four bolt (12) are all installed to the inside of connect the via hole (13), metal soleplate (1) passes through bolt (12) and backing plate (11) threaded connection.
CN201922276958.4U 2019-12-18 2019-12-18 Scaffold base for construction Active CN211775592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922276958.4U CN211775592U (en) 2019-12-18 2019-12-18 Scaffold base for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922276958.4U CN211775592U (en) 2019-12-18 2019-12-18 Scaffold base for construction

Publications (1)

Publication Number Publication Date
CN211775592U true CN211775592U (en) 2020-10-27

Family

ID=72981828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922276958.4U Active CN211775592U (en) 2019-12-18 2019-12-18 Scaffold base for construction

Country Status (1)

Country Link
CN (1) CN211775592U (en)

Similar Documents

Publication Publication Date Title
CN201826516U (en) Novel attached lifting scaffold
CN207048348U (en) A kind of tool-type, which is pressurized, supports discharging platform
CN203530851U (en) Basket device for combined basket working vehicle
CN211775592U (en) Scaffold base for construction
CN202483154U (en) High bearing capacity suspending scaffold
CN202017335U (en) Hydraulic mutual-climbing type lifting scaffold
CN207484937U (en) A kind of high-altitude hanging basket safety device
CN212388962U (en) Attached type lifting scaffold wall-attached support for bay window
CN111206762A (en) Building outer wall operation platform capable of being clamped on floor slab and being quickly disassembled and assembled
CN207228591U (en) A kind of architectural engineering scaffold
CN213326257U (en) Counterweight postpositive home elevator
CN212743330U (en) Heightening device for connection of climbing frame and building structure
CN212450250U (en) Special lifting appliance for outdoor construction of transformer substation
CN211569905U (en) Net rack short column embedded part hoisting device
CN210340016U (en) Building construction elevator cable limit structure
CN211776076U (en) Steel construction retractable cat ladder of going to people for elevator well
CN210366531U (en) Protection device for construction hoist
CN203545501U (en) Auxiliary lifting device of inner crawl type tower crane in small space
CN106495061A (en) Stable lifting device for steel structure machining
CN207419795U (en) Bright frame glass curtain wall
CN209778083U (en) Flywheel type pulley capable of preventing derailment
CN219731707U (en) Bridge construction hanging basket
CN208618780U (en) A kind of building scaffold safety device
CN214739838U (en) Dish knot formula scaffold frame based on BIM
CN217051304U (en) Large-scale hoist and mount operation auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant