CN211775200U - Overhanging type pipeline bracket - Google Patents

Overhanging type pipeline bracket Download PDF

Info

Publication number
CN211775200U
CN211775200U CN201922226340.7U CN201922226340U CN211775200U CN 211775200 U CN211775200 U CN 211775200U CN 201922226340 U CN201922226340 U CN 201922226340U CN 211775200 U CN211775200 U CN 211775200U
Authority
CN
China
Prior art keywords
wall
hoop
embedded
precast concrete
gasket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922226340.7U
Other languages
Chinese (zh)
Inventor
史冬杰
夏宇雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201922226340.7U priority Critical patent/CN211775200U/en
Application granted granted Critical
Publication of CN211775200U publication Critical patent/CN211775200U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an overhanging type pipe bracket relates to building electromechanical installation engineering technical field. The mounting mode to current building outer wall downspout has destroyed architectural surface and outer heat preservation, can not guarantee construction quality's problem. The device comprises a pair of support frames, a sliding chute and a hoop connecting piece, wherein one end of each support frame is embedded in the precast concrete outer wall, and the other end of each support frame extends to the outside of the precast concrete outer wall; in the concrete pouring stage of the precast concrete outer wall, the embedded ends of the support frames are embedded in advance to enable the overhanging type pipeline support to be anchored on the precast concrete outer wall, after the on-site splicing construction of the building outer wall is completed, the pipeline which is provided with the hoop is connected to the hoop connecting piece, and the chute serving as the hoop support is anchored on the precast concrete wall in an embedded mode, so that the concrete wall, the outer heat insulation layer and the decorative surface layer cannot be damaged, and the installation quality of the outer wall pipeline is guaranteed.

Description

Overhanging type pipeline bracket
Technical Field
The utility model relates to a building electromechanical installation engineering technical field, in particular to overhanging type pipe bracket.
Background
The rainwater pipe mounting mode of the traditional building outer wall is as follows: firstly, the pipe nails are punched into the outer wall body, and then the rain pipe sleeved with the hoop is installed, so that the hoop is connected with the pipe nails. However, for the precast concrete outer wall (i.e. PC outer wall) with the outer insulation layer and the decorative surface layer, if the pipe nails are driven into the precast concrete outer wall according to the traditional installation method, not only the pipe nails are easy to be askew, but also the pipe nails driven into the wall body still destroy the decorative surface layer and the outer insulation layer, the construction quality cannot be ensured, and the concept of assembly type construction and green construction is violated in the later repair construction.
Disclosure of Invention
The mounting means to current building outer wall downspout has destroyed architectural surface and outer heat preservation, can not guarantee construction quality's problem, the utility model aims at providing an overhanging type pipe bracket, owing to pass through pre-buried mode anchor in precast concrete wall body as the spout of staple bolt support, therefore can not lead to the fact destruction to concrete wall body, outer heat preservation and architectural surface, guaranteed outer wall pipeline's installation quality.
The utility model provides a technical scheme that its technical problem adopted is: an outrigger pipe mount comprising:
the pair of supporting frames comprise embedded ends embedded in the precast concrete outer wall and extending ends extending out of the precast concrete outer wall;
the sliding chute is transversely and fixedly connected to the extending end of the supporting frame;
and one end of the hoop connecting piece is buckled in the sliding groove and can horizontally slide along the sliding groove, and the other end of the hoop connecting piece is connected with the hoop of the pipeline.
The utility model discloses an overhanging type pipeline bracket, which comprises a pair of supporting frames, a sliding chute and a hoop connecting piece, wherein one end of each supporting frame is embedded in the outer wall of precast concrete, and the other end of each supporting frame extends out of the outer wall of the precast concrete; in the concrete pouring stage of the precast concrete outer wall, the embedded end of the support frame is embedded in advance, so that the overhanging type pipeline support is anchored to the precast concrete outer wall, after the on-site splicing construction of the building outer wall is completed, the pipeline sleeved with the hoop is connected to the hoop connecting piece, and the chute serving as the hoop support is anchored to the precast concrete wall in an embedded mode, so that the concrete wall, the outer heat insulation layer and the decorative surface layer cannot be damaged; and moreover, the hoop connecting piece can horizontally move along the sliding groove, so that the hoops and the pipelines on the upper and lower floors can be positioned on the same vertical line, and the installation quality of the outer wall pipeline is ensured.
Preferably, the hoop connector comprises: the screw rod is fixedly locked by a nut sleeved on the screw rod, and the other end of the screw rod is in threaded connection with the hoop.
Preferably, the middle part of the internal gasket is provided with a threaded interface matched with the external thread of the screw rod, the middle part of the external gasket is provided with a through hole corresponding to the threaded interface, and one end of the screw rod penetrates through the through hole of the external gasket and is in threaded connection with the internal gasket.
Preferably, the supporting frame and the sliding chute are both made of section steel with a C-shaped cross section, and two ends of the sliding chute are respectively embedded and fixedly connected in a pair of grooves formed in the supporting frame in an opposite mode.
Preferably, the extending end of the support frame further comprises an end cap blocking the end thereof.
Preferably, the embedded end of the support frame further comprises an embedded gasket vertically connected to the end portion of the support frame.
Drawings
Fig. 1 is a schematic structural view of an embodiment of an overhanging type pipe bracket according to the present invention;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
fig. 3 is a side view of fig. 1.
The numbers in the figures are as follows:
a chute 10; a notch 11;
a hoop connector 20; a built-in gasket 21; an external gasket 22; a screw rod 23; a nut 24;
a support frame 30; pre-burying a gasket 31; an end cap 32.
Detailed Description
The present invention will be described in further detail with reference to the following drawings and specific embodiments. It should be noted that the drawings are in simplified form and are not to precise scale, and are provided for convenience and clarity in order to facilitate the description of the embodiments of the present invention. For convenience of description, the directions of "up" and "down" in the following description are the same as the directions of "up" and "down" in the drawings, but this should not be construed as limiting the technical solution of the present invention.
The overhanging type pipe bracket of the present invention is described with reference to fig. 1 to 3, which includes:
a pair of support frames 30 including embedded ends embedded in the precast concrete outer wall and extended ends extended to the outside of the precast concrete outer wall;
a sliding chute 10 transversely and fixedly connected with an extending end of the supporting frame 30;
the hoop connecting piece 20, one end of the hoop connecting piece 20 is fastened in the sliding groove 10 and can horizontally slide along the sliding groove 10, and the other end is connected with the hoop of the pipeline.
The utility model discloses an overhanging type pipeline bracket, which comprises a pair of supporting frames 30, a sliding chute 10 and a hoop connecting piece 20, wherein one end of each supporting frame is embedded in the precast concrete outer wall, and the other end of each supporting frame extends out of the precast concrete outer wall; in the concrete pouring stage of the precast concrete outer wall, the embedded end of the support frame 30 is embedded in advance, so that the overhanging type pipeline support is anchored to the precast concrete outer wall, after the on-site splicing construction of the building outer wall is completed, the pipeline sleeved with the hoop is connected to the hoop connecting piece 20, and the chute 10 serving as the hoop support is anchored to the precast concrete wall in an embedded mode, so that the concrete wall, the outer heat insulation layer and the decorative surface layer cannot be damaged; moreover, the hoop connector 20 can horizontally move along the sliding groove 10, so that the hoops and the pipelines on the upper and lower floors can be positioned on the same vertical line, and the installation quality of the outer wall pipeline is ensured. The utility model discloses an overhanging pipe bracket is particularly useful for the outer wall and has unsmooth molding and lead to the rainwater pipe apart from the outer wall condition far away.
With continued reference to fig. 2, the hoop connector 20 includes: the pipeline clamping device comprises an internal gasket 21, an external gasket 22, a screw rod 23 and a nut 24, wherein the internal gasket 21 and the external gasket 22 are respectively arranged on the inner side and the outer side of a notch 11 of the sliding groove 10, one end of the screw rod 23 penetrates through the external gasket 22, the internal gasket 21 and the notch 11 of the sliding groove 10 and is locked and fixed by the nut 24 sleeved on the screw rod 23, the other end of the screw rod 23 is in threaded connection with the hoop, and a pipeline penetrates through the hoop and is clamped and fixed. Because the lead screw 23 is clamped and fixed through the two gaskets and the nut 24, the anchor ear is convenient to disassemble and assemble, the anchor ear can be replaced according to construction needs, the lead screw 23 can horizontally slide along the sliding groove 10, the horizontal position of the anchor ear can be flexibly adjusted, and the anchor ears on the upper floor and the lower floor are positioned on the same vertical line, so that the installation quality of the pipeline is ensured.
In this embodiment, built-in gasket 21 and external gasket 22 adopt the square steel gasket that the size is 35mm, the middle part of built-in gasket 21 is equipped with the internal diameter and is 8 mm's hickey, the middle part of external gasket 22 is equipped with the through-hole that the internal diameter corresponding with the hickey is 8mm, the external diameter is 8 mm's 23 one end of lead screw and runs through the through-hole of external gasket 22 and with built-in gasket 21 threaded connection, the built-in gasket 21 and the nut 24 that are located 10 notches 11 both sides of spout play the effect of location lead screw 23 jointly.
As shown in fig. 1 and 3, the supporting frames 30 and the sliding chute 10 are made of steel with a C-shaped cross section, two ends of the sliding chute 10 are respectively embedded and welded in the oppositely arranged grooves of the pair of supporting frames 30, so that during concrete pouring construction, garbage such as mortar on two sides of the sliding chute 10 is prevented from entering the inner cavity of the sliding chute 10, and a gap between the pair of supporting frames 30 is filled with a decorative surface material to ensure the overall beauty of the outer wall.
As shown in fig. 3, the extended end of the supporting frame 30 further includes an end cap 32 sealed at the end thereof to prevent the chute 10 from being separated from the supporting frame 30.
As shown in fig. 1 and 2, the embedded end of the supporting frame 30 further includes an embedded gasket 31 vertically connected to the end thereof, so as to anchor the wall.
The construction process of the overhanging type pipe bracket of the present invention is described with reference to fig. 1 to 3, and the specific steps are as follows:
in the concrete pouring stage of the precast concrete outer wall, a plurality of overhanging type pipeline supports are pre-buried according to the design positions of the rainwater pipes, wherein the pre-buried ends of the supporting frames 30 of the overhanging type pipeline supports are embedded in the precast concrete outer wall, the extending ends of the supporting frames 30 extend out of the precast concrete outer wall, the sliding groove 10 is transversely connected with the extending ends of the supporting frames 30, the length of the extending ends of the supporting frames 30 needs to ensure that the distance between the sliding groove 10 and the outer surface of the outer wall after construction meets the construction requirement, one end of the hoop connecting piece 20 is buckled in the sliding groove 10 and can horizontally slide along the sliding groove 10, and the other end of the hoop connecting piece; after the concreting is condensed, an outer heat-insulating layer and a decorative surface layer of the precast concrete outer wall are installed from inside to outside, the horizontal position of the hoop is adjusted to enable the center of the hoop to be located on the same vertical line, and the pipeline is fixed to the hoop.
To sum up, at first, pre-buried overhanging type pipeline bracket in the concrete placement stage of precast concrete outer wall, spout 10 horizontal rigid coupling in overhanging type pipeline bracket's the extension end of support frame 30, the one end buckle of staple bolt connecting piece 20 just can follow spout 10 horizontal slip in spout 10, its other end connects the staple bolt, after concrete condenses and has installed outer heat preservation and architectural surface, again with the pipeline fixed in staple bolt, this construction method has avoided the destruction to concrete wall, outer heat preservation and architectural surface, and convenient operation is swift, not only improves the efficiency of construction, but also has guaranteed the installation quality of pipeline.
The above steps further include that the hoop connector 20 includes: the external pipeline support is embedded in the groove opening 11 of the sliding groove 10, and one end of the screw rod 23 rotatably penetrates through a threaded interface of the internal gasket 21 and abuts against the bottom of the sliding groove 10; after the overhanging type pipeline bracket is pre-buried, the horizontal position of the screw rod 23 is adjusted in a left-right sliding mode, so that the screw rods 23 on the upper floor and the lower floor are in the same vertical line, then the external gasket 22 and the nut 24 are sequentially sleeved on the screw rod 23, and the nut 24 is screwed to lock and fix the screw rod 23.
The steps further include that after the overhanging type pipeline bracket is pre-buried, an end cover 32 is installed at the extending end of the support frame 30 for plugging.
The above steps further include, after the installation of the overhanging type pipe bracket is completed, filling the chute 10 with a waterproof material.
The above description is only for the purpose of describing the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention, so that any changes and modifications made by those skilled in the art according to the above disclosure are all within the scope of the appended claims.

Claims (6)

1. An outrigger pipe mount, comprising:
the pair of supporting frames comprise embedded ends embedded in the precast concrete outer wall and extending ends extending out of the precast concrete outer wall;
the sliding chute is transversely and fixedly connected to the extending end of the supporting frame;
and one end of the hoop connecting piece is buckled in the sliding groove and can horizontally slide along the sliding groove, and the other end of the hoop connecting piece is connected with the hoop of the pipeline.
2. The outrigger duct mount of claim 1, wherein the hoop connector comprises: the screw rod is fixedly locked by a nut sleeved on the screw rod, and the other end of the screw rod is in threaded connection with the hoop.
3. The outrigger pipe mount of claim 2, wherein: the middle part of the built-in gasket is provided with a threaded interface matched with the external thread of the screw rod, the middle part of the external gasket is provided with a through hole corresponding to the threaded interface, and one end of the screw rod penetrates through the through hole of the external gasket and is in threaded connection with the built-in gasket.
4. The outrigger pipe mount of claim 1, wherein: the supporting frame and the sliding groove are both made of section steel with a C-shaped cross section, and two ends of the sliding groove are respectively embedded and fixedly connected in a pair of grooves formed in the supporting frame in an opposite mode.
5. The outrigger pipe mount of claim 1, wherein: the extending end of the supporting frame also comprises an end cover which is blocked at the end part of the supporting frame.
6. The outrigger pipe mount of claim 1, wherein: the embedded end of the support frame also comprises an embedded gasket vertically connected to the end part of the support frame.
CN201922226340.7U 2019-12-10 2019-12-10 Overhanging type pipeline bracket Active CN211775200U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922226340.7U CN211775200U (en) 2019-12-10 2019-12-10 Overhanging type pipeline bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922226340.7U CN211775200U (en) 2019-12-10 2019-12-10 Overhanging type pipeline bracket

Publications (1)

Publication Number Publication Date
CN211775200U true CN211775200U (en) 2020-10-27

Family

ID=72980951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922226340.7U Active CN211775200U (en) 2019-12-10 2019-12-10 Overhanging type pipeline bracket

Country Status (1)

Country Link
CN (1) CN211775200U (en)

Similar Documents

Publication Publication Date Title
CN206815838U (en) A kind of easy-to-mount mortar leakage prevention sizing mould bases
CN104863290B (en) A kind of assembled wall of single dry wall section and construction method
CN102536044B (en) Steel auxiliary frame
CN105256896B (en) It is a kind of to be used for Side fascia and the metal connecting piece of agent structure
CN211775200U (en) Overhanging type pipeline bracket
CN202131676U (en) Quake-proof steel tie bar embedded part
CN204456428U (en) A kind of entirety being installed on composite wallboard is waftd window
CN207499451U (en) Outer wall of basement single-face support mold apparatus
CN203654999U (en) Embedded aluminum alloy window
CN201614665U (en) Air conditioner mounting plate connecting joint
CN209556239U (en) A kind of half-connection grout sleeve of adjustable in length
CN110984488A (en) Embedded pipeline bracket and construction method thereof
CN211775201U (en) Embedded pipeline bracket
CN110984487A (en) Overhanging type pipeline bracket and construction method thereof
CN114086726A (en) Plugging structure for pipeline out of roof and construction method thereof
CN204753895U (en) Combination wall body of single prefabricated wall section
KR100944335B1 (en) Waterproof plate sleeve for concrete construct
CN215291357U (en) Drawknot fixing structure of external protection frame of gable of fabricated building
CN112609963B (en) Installation anchoring device of composite heat-insulation template and use method thereof
CN115506488A (en) Method for connecting prefabricated sandwich heat-insulation peripheral retaining wall
CN209799375U (en) Wear floor drain built-in fitting fixing device
CN209876194U (en) Drain pipe pre-embedding device
CN110778028A (en) Grouting sleeve assembly and construction method thereof
CN207017511U (en) A kind of ceramic plate curtain wall with splash guard installation connects system
CN201924582U (en) Pre-embedded piece for wall connecting component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant