CN114086726A - Plugging structure for pipeline out of roof and construction method thereof - Google Patents

Plugging structure for pipeline out of roof and construction method thereof Download PDF

Info

Publication number
CN114086726A
CN114086726A CN202111446529.2A CN202111446529A CN114086726A CN 114086726 A CN114086726 A CN 114086726A CN 202111446529 A CN202111446529 A CN 202111446529A CN 114086726 A CN114086726 A CN 114086726A
Authority
CN
China
Prior art keywords
pipeline
coupling assembling
cave
connecting portion
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111446529.2A
Other languages
Chinese (zh)
Inventor
张利伟
王志禹
吴长德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA 22MCC GROUP TIANJIN CONSTRUCTION CO LTD
Original Assignee
CHINA 22MCC GROUP TIANJIN CONSTRUCTION CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA 22MCC GROUP TIANJIN CONSTRUCTION CO LTD filed Critical CHINA 22MCC GROUP TIANJIN CONSTRUCTION CO LTD
Priority to CN202111446529.2A priority Critical patent/CN114086726A/en
Publication of CN114086726A publication Critical patent/CN114086726A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/14Junctions of roof sheathings to chimneys or other parts extending above the roof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/061Non-reusable forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to construction of a pipeline out of a roof, in particular to a plugging structure of the pipeline out of the roof and a construction method thereof. Including the pipeline, the floor is equipped with the reservation entrance to a cave, is equipped with buried sleeve in the reservation entrance to a cave, is equipped with coupling assembling on reservation entrance to a cave and the buried sleeve, and coupling assembling expands the structure outward for the toper, and coupling assembling includes the tubular last connecting portion of circle, the tubular lower connecting portion of awl section of thick bamboo portion and circle, and the pipeline is passed by coupling assembling and buried sleeve, pipeline and coupling assembling's last connecting portion sealing connection. The sealing material such as sealant between the embedded casing and the pipeline is saved, the cost is reduced, the time and the labor are saved, the sealing performance is improved, and the project progress and quality are accelerated.

Description

Plugging structure for pipeline out of roof and construction method thereof
Technical Field
The invention relates to construction of a pipeline out of a roof, in particular to a plugging structure of the pipeline out of the roof and a construction method thereof.
Background
At present, in the building construction, a common method for pipeline construction is to place a pipeline embedded sleeve at a fixed position in the floor formwork erecting and reinforcing steel bar binding processes, install a water stop ring, form a pipeline reserved hole after concrete pouring, and plug a gap between a pipeline and the embedded sleeve through sealant after the pipeline is installed. The invention discloses a waterproof method for a metal roof panel roofing pipeline, which is characterized in that a hole-sealing waterproof cover piece is firstly manufactured, glue is coated on the lower portion of an aluminum sheet of the hole-sealing waterproof cover piece, the hole-sealing waterproof cover piece and the metal roof panel are tightly pressed, and the aluminum sheet and the metal roof panel are fastened by self-tapping screws. The invention is time-consuming and labor-consuming, and is easy to leak water and seep water.
Disclosure of Invention
The invention aims to solve the technical problems and provides a roof outlet pipeline plugging structure and a construction method thereof, which are time-saving and labor-saving and can accelerate the progress and quality of engineering.
The invention solves the technical problem, and adopts the technical scheme that:
the utility model provides a go out roofing pipeline block structure, includes the pipeline, and the floor is equipped with reserves the entrance to a cave, is equipped with buried sleeve in the reservation entrance to a cave, is equipped with coupling assembling on reservation entrance to a cave and the buried sleeve, and coupling assembling expands the structure outward for the toper, and coupling assembling includes the tubular last connecting portion of circle, the tubular lower connecting portion of awl section of thick bamboo and circle, and the pipeline passes in coupling assembling and the buried sleeve, pipeline and coupling assembling's last connecting portion sealing connection.
A method of constructing a rooftop pipeline plugging structure according to claim 1, comprising the steps of:
A. after the floor slab is poured, a support rod is installed in the embedded sleeve;
B. the connecting component is inserted on the supporting rod, and the lower connecting part of the connecting component is poured in the concrete of the floor slab;
C. after the concrete is solidified, taking out the supporting rod, and installing a plugging cap at the port of the upper connecting part of the connecting component;
D. and taking down the plugging cap, inserting the pipeline into the connecting assembly and the embedded sleeve, and connecting the pipeline with the upper connecting part of the connecting assembly in a sealing manner.
Compared with the prior art, the invention adopting the technical scheme has the beneficial effects that:
the connecting assembly is directly placed on the reserved hole and the embedded sleeve after the floor slab is poured, the lower connecting portion of the connecting assembly is poured into the floor slab, sealing materials such as sealing glue are saved, cost is reduced, time and labor are saved, sealing performance is improved, and project progress and quality are accelerated.
Drawings
FIG. 1 is a perspective view of an embodiment of the present invention;
FIG. 2 is a perspective view of a connection assembly of an embodiment of the present invention;
FIG. 3 is a perspective view of a pipeline block according to an embodiment of the present invention;
fig. 4 is a cross-sectional view of the present invention.
In the figure: a pipeline 1; a connecting assembly 2; an upper connecting part 2-1; a cone part 2-2; a lower connecting part 2-3; embedding a sleeve 3; a floor slab 4.
Detailed Description
The invention is further described in detail below with reference to the figures and examples.
Referring to fig. 1-4, this embodiment is a pipeline plugging structure for a roof, where a floor slab 4 of a roof is provided with a pre-buried opening for a pipeline 1 to pass through, and the floor slab 4 places a pre-buried sleeve 3 in the pre-buried opening designated by design in a formwork erecting and reinforcing steel bar binding process. The connecting assembly 2 is placed on the reserved hole and the embedded sleeve 3, the connecting assembly 2 is of a conical outward-expanding structure and is composed of an upper connecting portion 2-1 in a circular tube shape, a conical barrel portion 2-2 and a lower connecting portion 2-3 in the circular tube shape, the axis of the connecting assembly 2 is overlapped with the axis of the embedded sleeve 3, the pipeline 1 penetrates through the connecting assembly 2 and the embedded sleeve, and the pipeline 1 is connected with the upper connecting portion 2-1 of the connecting assembly 2 in a sealing mode. The inclined section of the cone cylinder part 2-2 has a slope, so that water can be dispersed and kept away, and outside rainwater can be shielded. The material of coupling assembling 2 is the same with pipeline 1's material, and when pipeline 1 was the PVC pipe, pipeline 1 closed with modes such as hot melt with coupling assembling 2 and is connected, and when pipeline 1 was the steel pipe, pipeline 1 adopted welded connection with coupling assembling 2, had saved pipeline 1 and embedded sleeve 3's packing sealing material, prevented the infiltration of house between pipeline 1 and embedded sleeve 3.
The construction method of the embodiment is carried out according to the following steps:
A. after the concrete is poured into the floor slab, a support (not shown in the figure) is arranged in the embedded sleeve 3;
B. the connecting component 2 is inserted on the supporting rod, the lower connecting part 2-3 of the connecting component 2 is poured in the concrete of the floor slab, and the lower end of the lower connecting part 2-3 is positioned 3-5 cm below the upper plate surface of the floor slab;
C. after the concrete is solidified, taking out the supporting rod, and installing a plugging cap at the port of the upper connecting part 2-1 of the connecting component 2;
D. and taking down the plugging cap, inserting the pipeline 1 into the connecting component 2 and the embedded sleeve 3, and hermetically connecting the pipeline 1 with the upper connecting part 2-1 of the connecting component 2.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the scope of the present invention, which is defined in the appended claims.

Claims (2)

1. The utility model provides a go out roofing pipeline block structure, includes the pipeline, and the floor is equipped with reserves the entrance to a cave, is equipped with buried sleeve in advance in the reservation entrance to a cave, its characterized in that: be equipped with coupling assembling on reservation entrance to a cave and the buried sleeve pipe, coupling assembling is the toper structure that expands outward, and coupling assembling includes the tubular last connecting portion of circle, awl section of thick bamboo portion and the tubular lower connecting portion of circle, and the pipeline is passed by coupling assembling and buried sleeve pipe-in, pipeline and coupling assembling's last connecting portion sealing connection.
2. A method of constructing a rooftop pipeline plugging structure according to claim 1, comprising the steps of:
A. after the floor slab is poured, a support rod is installed in the embedded sleeve;
B. the connecting component is inserted on the supporting rod, and the lower connecting part of the connecting component is poured in the concrete of the floor slab;
C. after the concrete is solidified, taking out the supporting rod, and installing a plugging cap at the port of the upper connecting part of the connecting component;
D. and taking down the plugging cap, inserting the pipeline into the connecting assembly and the embedded sleeve, and connecting the pipeline with the upper connecting part of the connecting assembly in a sealing manner.
CN202111446529.2A 2021-11-30 2021-11-30 Plugging structure for pipeline out of roof and construction method thereof Pending CN114086726A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111446529.2A CN114086726A (en) 2021-11-30 2021-11-30 Plugging structure for pipeline out of roof and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111446529.2A CN114086726A (en) 2021-11-30 2021-11-30 Plugging structure for pipeline out of roof and construction method thereof

Publications (1)

Publication Number Publication Date
CN114086726A true CN114086726A (en) 2022-02-25

Family

ID=80306117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111446529.2A Pending CN114086726A (en) 2021-11-30 2021-11-30 Plugging structure for pipeline out of roof and construction method thereof

Country Status (1)

Country Link
CN (1) CN114086726A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961135A (en) * 2022-04-23 2022-08-30 中国五冶集团有限公司 Construction method of rain cover of industrial pipeline out of roof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961135A (en) * 2022-04-23 2022-08-30 中国五冶集团有限公司 Construction method of rain cover of industrial pipeline out of roof

Similar Documents

Publication Publication Date Title
CN101705697B (en) Diaphragm wall joint flexible water stop installing device and method
CN114086726A (en) Plugging structure for pipeline out of roof and construction method thereof
CN210713156U (en) Prefabricated assembled sump pit structure
CN210797910U (en) Prefabricated plate prefabricated with waterproof structure
CN210482785U (en) Anti-leakage umbrella-shaped joint of ventilation vertical pipe on roof
CN204551694U (en) A kind of pre-buried type balcony floor drain
CN214171641U (en) Go out roofing sleeve pipe mounting structure
CN106368215B (en) Pre-buried slip casting pipe assembly
CN212176341U (en) Side income formula rainwater fill construction structures
CN211775200U (en) Overhanging type pipeline bracket
CN220377734U (en) Concrete cap structure
CN112628477A (en) Drain pipe pre-embedding device with stretching and water drainage preventing functions and installation method
CN2814074Y (en) Device for sealing up pipe in the wall
CN212743144U (en) Structural steel column with internal drainage device
CN217537605U (en) Waterproof roofing connected node structure of building is worn to pipeline
CN219344030U (en) Pre-buried opposite-pulling screw device for lining wall
CN212176338U (en) Parapet side drainage construction structures
CN219931724U (en) Mounting structure for vertical pipe in house old-change engineering
KR102495883B1 (en) Concrete panel with finishing function
CN216276695U (en) Novel prefabricated flue of roofing
CN220521780U (en) Embedded rainwater hopper for roof rainwater drainage
CN209891335U (en) Novel floor downcomer embedded sleeve
CN211523554U (en) Prefabricated outer wall window hole waterproof node of assembly type structure
CN215635439U (en) Drain pipe pre-embedding device with telescopic and waterproof functions
CN217232438U (en) Assembled roofing drain device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination