CN211773822U - 锚杆植筋法光伏支架基础结构 - Google Patents
锚杆植筋法光伏支架基础结构 Download PDFInfo
- Publication number
- CN211773822U CN211773822U CN201921813949.8U CN201921813949U CN211773822U CN 211773822 U CN211773822 U CN 211773822U CN 201921813949 U CN201921813949 U CN 201921813949U CN 211773822 U CN211773822 U CN 211773822U
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- steel pipe
- reinforcing steel
- foundation
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本实用新型涉及一种锚杆植筋法光伏支架基础结构,其特征在于,包括在土石结构及中等分化岩结构上通过手电钻钻孔形成的基坑及钢管,在基坑内设有钢筋一,钢筋一的下部位于基坑内且通过混凝土与基坑结合为一体,钢筋一的上部露于基坑外,将钢筋一露于基坑外的部分定义为锚筋;钢管的下部沿周向均匀焊接有至少三根钢筋二,锚筋绕钢筋二绑扎形成环绕钢管的箍筋,通过混凝土将锚筋与钢管的下部浇筑为整体结构,钢管的上部露于整体结构外。本实用新型采用的锚杆植筋结构适用于山地光伏发电项目,本实用新型提供的锚杆植筋结构可以在任何区域施工。
Description
技术领域
本实用新型涉及一种适用于土石结构及中等分化岩结构的山地光伏支架基础结构。
背景技术
由于山地光伏所处地理位置之地势起伏较大,施工受到地形条件制约;由于光伏支架要求其桩基础必须垂直于水平面,且每组光伏支架的8个桩基相对位置要求精度高,采用机械成孔及灌注桩施工时因地形条件所限,所成孔的纵向、横向轴线存在较大偏差、混凝土灌注过程中,钢桩也会产生位移,出现相对位置偏差过大的问题,最终导致光伏支架安装时不能够达到设计要求的精度,甚至难以正常安装。现场实践表明,传统的机械钻机成孔会导致大量的返工,大大增加了施工成本。
发明内容
本实用新型解决的技术问题是:当山地光伏坡度超过25°时,机械钻机成孔及灌注无法作业,难以确保施工质量、安全。
为了解决上述技术问题,本实用新型的技术方案是提供了一种锚杆植筋法光伏支架基础结构,其特征在于,包括在土石结构及中等分化岩结构上通过手电钻钻孔形成的基坑及钢管,在基坑内设有钢筋一,钢筋一的下部位于基坑内且通过混凝土与基坑结合为一体,钢筋一的上部露于基坑外,将钢筋一露于基坑外的部分定义为锚筋;钢管的下部沿周向均匀焊接有至少三根钢筋二,锚筋绕钢筋二绑扎形成环绕钢管的箍筋,通过混凝土将锚筋与钢管的下部浇筑为整体结构,钢管的上部露于整体结构外。
优选地,在所述钢管的顶部穿设有两根穿管螺栓,两根穿管螺栓相互垂直,在每根穿管螺栓的两端分别设有一个加强片。
本实用新型采用的锚杆植筋结构适用于山地光伏发电项目。在坡度较大,常规施工机械无法确保桩基质量及安全风险极高的前提下,本实用新型提供的锚杆植筋结构可以在任何区域施工,从而既解决了施工难题,为国家节约了大量的土地利用面积,提高了施工可靠性,有效地解决山地光伏因地势环境的限制,克服了施工过程中的实际困难,具有山地普适性。采用本实用新型可以很好适应山地起伏地形,迅速定位,提高施工精度,减轻人力机械安全负担,在节约了土地利用率的同时,使得土石结构、岩石结构的施工处于可控状态。
附图说明
图1为本实用新型的结构示意图;
图2为本实用新型的俯视图。
具体实施方式
下面结合具体实施例,进一步阐述本实用新型。应理解,这些实施例仅用于说明本实用新型而不用于限制本实用新型的范围。此外应理解,在阅读了本实用新型讲授的内容之后,本领域技术人员可以对本实用新型作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
本实用新型提供一种应用于山地光伏坡度在25°角以上,土石结构及中等分化岩结构的支架基础结构。本实用新型的特点在于当山地坡度较大,牵引、卷扬等常规机械成孔设备无法正常投入,桩基础质量、安全没有保障时,采用本实用新型的结构就能够有效地解决上述施工难题,从而为国家节约了大量的土地占用面积。
如图1所示,本实用新型提供的一种锚杆植筋法光伏支架基础结构主要适用于土石结构及中等分化岩结构基础,包括利用手电钻钻孔并清空孔内浮土后形成的基坑1。将钢筋一2插入基坑1内,随后用高强灌浆料灌浆将钢筋一1灌注牢固于基坑1内。钢筋一2的上部外漏于基坑1外,形成锚筋3。本实用新型还包括四周预制焊接有钢筋二4的钢管5。锚筋3弯折后与钢筋二4绑扎牢固,形成环绕钢管5的箍筋6。在钢管5周边进行模板支护形成桩基础,对桩基础进行混凝土浇筑,使得锚筋6与钢管5成为一个完整的整体7。钢管5的顶部露于整体7外,在其上穿设有两根穿管螺栓8,两根穿管螺栓8相互垂直,在每根穿管螺栓的两端分别设有一个加强片9。
对本实用新型的锚杆植筋成桩试验,检测桩顶反力特征值如下:
1)水平力试验值为18KN以上;2)下压力试验值为28KN以上;3)上拔力试验值为28KN以上。
以上指标均超过设计要求值。
Claims (2)
1.一种锚杆植筋法光伏支架基础结构,其特征在于,包括在土石结构及中等分化岩结构上通过手电钻钻孔形成的基坑及钢管,在基坑内设有钢筋一,钢筋一的下部位于基坑内且通过混凝土与基坑结合为一体,钢筋一的上部露于基坑外,将钢筋一露于基坑外的部分定义为锚筋;钢管的下部沿周向均匀焊接有至少三根钢筋二,锚筋绕钢筋二绑扎形成环绕钢管的箍筋,通过混凝土将锚筋与钢管的下部浇筑为整体结构,钢管的上部露于整体结构外。
2.如权利要求1所述的一种锚杆植筋法光伏支架基础结构,其特征在于,在所述钢管的顶部穿设有两根穿管螺栓,两根穿管螺栓相互垂直,在每根穿管螺栓的两端分别设有一个加强片。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921813949.8U CN211773822U (zh) | 2019-10-25 | 2019-10-25 | 锚杆植筋法光伏支架基础结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921813949.8U CN211773822U (zh) | 2019-10-25 | 2019-10-25 | 锚杆植筋法光伏支架基础结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211773822U true CN211773822U (zh) | 2020-10-27 |
Family
ID=72933871
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921813949.8U Active CN211773822U (zh) | 2019-10-25 | 2019-10-25 | 锚杆植筋法光伏支架基础结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211773822U (zh) |
-
2019
- 2019-10-25 CN CN201921813949.8U patent/CN211773822U/zh active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106759448A (zh) | 一种下沉式农业大棚光伏支架基础结构及其施工方法 | |
CN106759442A (zh) | 一种单桩高位承台与锚索塔吊基础结构及其施工方法 | |
CN110130358A (zh) | 一种基坑支护的斜桩撑结构与施工方法 | |
CN111622268B (zh) | 基于电力管廊下穿大型刚性箱涵的保护施工方法 | |
CN201172830Y (zh) | 塔式起重机锚杆静压桩基础 | |
CN111411630A (zh) | 深基坑中的局部加深区域的支护方法 | |
CN108331015A (zh) | 软粘土地基毗邻高填路基综合管廊及其施工工艺 | |
CN109577322A (zh) | 一种用于土体内部既有桩基接桩的施工装置 | |
CN204590059U (zh) | 一种复合式塔吊基础结构 | |
CN210106749U (zh) | 一种软土地基超大断面顶管顶进作业的反力结构 | |
CN211773822U (zh) | 锚杆植筋法光伏支架基础结构 | |
CN208167770U (zh) | 装配式钻孔墩基础 | |
CN212358366U (zh) | 一种风机基础改造结构 | |
CN210507009U (zh) | 既有道路的路肩挡墙邦宽结构 | |
CN111455984B (zh) | 一种桩基护桩及施工方法 | |
CN209703493U (zh) | 一种用于土体内部既有桩基接桩的施工装置 | |
CN209555962U (zh) | 一种适用于钻孔灌注桩ⅲ类桩与承台连接结构 | |
CN108457200B (zh) | 一种曲线桥段桩基托换临时支撑结构与施工方法 | |
CN111636438A (zh) | 一种深基坑支护结构及其变形控制方法 | |
CN206693259U (zh) | 适用于输电线路建设的岩石基础结构 | |
CN212534232U (zh) | 电力管廊下穿大型刚性箱涵施工用保护装置 | |
CN213539053U (zh) | 一种半填半挖式路堤挡墙加固结构 | |
CN217461993U (zh) | 一种独立于杆塔基础主柱外侧的爬梯结构 | |
CN218643412U (zh) | 一种软弱地质条件下的桥梁施工塔吊基础结构 | |
CN110131479B (zh) | 一种软土地基超大断面顶管顶进作业的反力结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230424 Address after: West side of the second floor of Building 6, Lane 888, Tianlin Road, Minhang District, Shanghai, 201101 Patentee after: Shanghai Heyun Engineering Consulting Co.,Ltd. Address before: Room W-868, No. 559 Yueluo Road, Baoshan District, Shanghai, 2019 Patentee before: Shanghai Mucheng Engineering Supervision Co.,Ltd. |
|
TR01 | Transfer of patent right |