CN211772502U - Assembled road surface structure - Google Patents

Assembled road surface structure Download PDF

Info

Publication number
CN211772502U
CN211772502U CN202020398816.5U CN202020398816U CN211772502U CN 211772502 U CN211772502 U CN 211772502U CN 202020398816 U CN202020398816 U CN 202020398816U CN 211772502 U CN211772502 U CN 211772502U
Authority
CN
China
Prior art keywords
hoisting
pavement
rod
hole
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020398816.5U
Other languages
Chinese (zh)
Inventor
张卫强
周鹏
李龙舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
CCCC First Highway Engineering Co Ltd
Original Assignee
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haiwei Engineering Construction Co Ltd of FHEC of CCCC filed Critical Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Priority to CN202020398816.5U priority Critical patent/CN211772502U/en
Application granted granted Critical
Publication of CN211772502U publication Critical patent/CN211772502U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to the technical field of building engineering, in particular to an assembled pavement structure, which comprises a pavement slab, a hoisting piece and a connecting piece, wherein the thickness surface of the pavement slab is provided with a hoisting preformed hole; the quantity of pavement slab is two at least, and the connecting piece can be dismantled with hoist and mount preformed hole and be connected to link together two adjacent pavement slabs. The utility model discloses a set up the invention conception of "a hole is dual-purpose" of hoist and mount preformed hole at the thickness face of road surface plate, not only can not influence the driving, but also more pleasing to the eye.

Description

Assembled road surface structure
Technical Field
The utility model belongs to the technical field of the building engineering technique and specifically relates to an assembled road surface structure is related to.
Background
The existing fabricated pavement structure for laying temporary pavement is characterized in that lifting hooks are arranged on the upper surface of a pavement slab for lifting convenience, and in order not to influence a travelling crane, four grooves are usually arranged on the upper surface of the rectangular pavement slab, and the lifting hooks are arranged in the grooves to finish four-point lifting. In order to prevent sundries from falling into the grooves, the grooves need to be additionally plugged, and when the pavement slab needs to be dismantled, the pavement slab can be lifted by taking out plugging objects. In addition, two adjacent road plates are not connected together, and in the use process, the gap between the two adjacent road plates is easy to be overlarge.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an assembled road surface structure to alleviate that exists among the prior art and need carry out the shutoff with the lifting hook setting in the recess of the upper surface of pavement slab, and two adjacent pavement slabs do not link together, cause the too big technical problem in gap between two adjacent pavement slabs easily.
Based on the purpose, the utility model provides an assembled pavement structure, including pavement slab, hoist and mount spare and connecting piece, the thickness face of pavement slab is provided with hoist and mount preformed hole, hoist and mount spare with hoist and mount preformed hole can dismantle the connection, hoist and mount spare is used for being connected with hoisting equipment;
the quantity of pavement slab is two at least, the connecting piece with the connection can be dismantled to hoist and mount preformed hole to two adjacent pavement slab links together.
Further, in some optional embodiments, the hoisting preformed hole is a threaded hole, the hoisting member includes a transverse rod and a vertical rod, the transverse rod is fixedly connected with the vertical rod, the transverse rod is provided with an external thread matched with the threaded hole, the vertical rod is provided with a hoisting hole, and the hoisting hole is used for being connected with a hoisting rope of the hoisting device.
Further, in certain optional embodiments, the length of the vertical rod is no greater than the distance between the center of the threaded hole and the lower surface of the road deck.
Further, in some optional embodiments, the road slab is a concrete road slab, an upper layer of reinforcing mesh and a lower layer of reinforcing mesh are arranged inside the concrete road slab, a pre-buried pipe is arranged between the upper layer of reinforcing mesh and the lower layer of reinforcing mesh, and the inner wall of the pre-buried pipe is provided with threads to form the threaded hole.
Further, in certain alternative embodiments, the connecting member includes a connecting plate provided with a first connecting hole and a second connecting hole, a first bolt, and a second bolt; in two adjacent pavement boards, the first bolt passes through the first connecting hole and is connected with the hoisting reserved hole on one pavement board, and the second bolt passes through the second connecting hole and is connected with the hoisting reserved hole on the other pavement board.
Further, in some optional embodiments, the connecting member comprises a connecting rod, a first blocking rod and a second blocking rod, one end of the connecting rod is fixedly connected with the first blocking rod, and the other end of the connecting rod is fixedly connected with the second blocking rod; in two adjacent pavement boards, the first plugging rod can be inserted into the hoisting preformed hole on one pavement board, and the second plugging rod can be inserted into the hoisting preformed hole on the other pavement board.
Further, in certain alternative embodiments, both the first and second plugging rods are sheathed with a protective sheath.
Further, in some optional embodiments, the material of the protective sleeve is rubber or foam.
Further, in some optional embodiments, the pavement slab is rectangular, and the thickness surface of the short side of the pavement slab is provided with a hoisting reserved hole.
Further, in certain alternative embodiments, the length of the long side of the road panel is 4 m.
Compared with the prior art, the beneficial effects of the utility model mainly include:
the utility model provides an assembled pavement structure, including pavement slab, hoist and mount piece and connecting piece, the thickness face of pavement slab is provided with hoist and mount preformed hole, hoist and mount piece with hoist and mount preformed hole can dismantle the connection, hoist and mount piece is used for being connected with hoisting equipment; the quantity of pavement slab is two at least, the connecting piece with the connection can be dismantled to hoist and mount preformed hole to two adjacent pavement slab links together.
Based on the structure, the utility model provides an assembled road surface structure has adopted the invention conception of "a hole is dual-purpose" that sets up hoist and mount preformed hole at the thickness face of road surface plate, not only can not influence the driving, but also more pleasing to the eye. During hoist and mount, will hoist and mount the piece and install in hoist and mount preformed hole, adopt lifting device to place the curb plate in the assigned position, a plurality of curb plates hoist and mount the back that targets in place, lay and form the road surface, will hoist and mount the piece and demolish, then adopt the connecting piece to cooperate with hoist and mount preformed hole, link together two adjacent curb plates, can also play the effect of shutoff hoist and mount preformed hole simultaneously, prevent that debris from getting into in the hoist and mount preformed hole. When the pavement is required to be dismantled, the connecting piece can be dismantled from the hoisting preformed hole, then the hoisting piece is installed in the hoisting preformed hole, and the pavement slab is hoisted away by adopting hoisting equipment.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a pavement slab in an assembled pavement structure according to an embodiment of the present invention;
fig. 2 is a schematic view of an internal structure of an assembled pavement structure according to a first embodiment of the present invention;
fig. 3 is a schematic view of two adjacent road slabs in a connection state according to a first embodiment of the present invention;
fig. 4 is a schematic structural diagram of a connecting member according to a second embodiment of the present invention;
fig. 5 is a schematic view of two adjacent road slabs in the second embodiment of the present invention in a connection state.
Icon: 100-road panels; 101-short side; 102-long side; 103-hoisting the preformed hole; 104-a transverse bar; 105-a vertical bar; 106-upper layer reinforcing mesh; 107-lower layer reinforcing mesh; 108-split heads ribs; 109-a pre-buried pipe; 110-internal threads; 111-a first bolt; 112-a second bolt; 113-a connecting plate; 114-a first plugging rod; 115-a second plugging rod; 116-a connecting rod; 117-protective sheath; 118-hoisting ropes; 119-lifting hole.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to fig. 1 to 3, the embodiment provides an assembled pavement structure, including a pavement slab 100, a hoisting member and a connecting member, wherein a thickness surface of the pavement slab 100 is provided with a hoisting reserved hole 103, the hoisting member is detachably connected with the hoisting reserved hole 103, and the hoisting member is used for being connected with a hoisting device; the number of the road deck boards 100 is at least two, and the connecting pieces are detachably connected with the hoisting preformed holes 103 so as to connect two adjacent road deck boards 100 together.
Based on the structure, the fabricated pavement structure provided by the embodiment adopts the invention concept of 'one hole for two purposes' of arranging the hoisting reserved hole 103 on the thickness surface of the pavement slab 100, so that the traveling crane is not influenced, and the fabricated pavement structure is more attractive. During the hoist and mount, will hoist and mount the piece and install in hoist and mount preformed hole 103, adopt lifting device to place pavement slab 100 in the assigned position, a plurality of pavement slabs 100 hoist and mount the back that targets in place, lay and form the road surface, will hoist and mount the piece and demolish, then adopt the connecting piece to cooperate with hoist and mount preformed hole 103, link together two adjacent pavement slabs 100, can also play the effect of shutoff hoist and mount preformed hole 103 simultaneously, prevent that debris from getting into in hoist and mount preformed hole 103. When the pavement needs to be dismantled, the connecting piece can be dismantled from the hoisting preformed hole 103, then the hoisting piece is installed in the hoisting preformed hole 103, and the pavement slab 100 is hoisted away by adopting hoisting equipment.
In this embodiment, the pavement slab 100 is rectangular, and the thickness surface of the short side 101 of the pavement slab 100 is provided with a hoisting prepared hole 103.
In this embodiment, the pavement slab 100 has two short sides 101 that set up relatively, and every short side 101 sets up two hoist and mount preformed holes 103, and the position that sets up of hoist and mount preformed hole 103 is with the requirement that can satisfy four-point hoist and mount as the standard.
In this embodiment, the number of the connecting members is two, that is, two adjacent road panels 100 are connected by two connecting members. One connection piece is provided on each short side 101 of the road deck 100.
Further, in some optional embodiments, the hoisting prepared hole 103 is a threaded hole, the hoisting member includes a transverse rod 104 and a vertical rod 105, the transverse rod 104 is fixedly connected with the vertical rod 105, the transverse rod 104 is provided with an external thread matched with the threaded hole, the vertical rod 105 is provided with a hoisting hole 119, and the hoisting hole 119 is used for being connected with a hoisting rope 118 of the hoisting device.
Referring to fig. 2, one end of the transverse rod 104 is fixedly connected with one end of the vertical rod 105, and optionally, the transverse rod 104 and the vertical rod 105 are integrally formed. Before hoisting, the transverse bar 104 is screwed into the threaded hole, and during screwing the transverse bar 104 into the threaded hole, a constructor can perform fine adjustment, so that after most of the transverse bar 104 is screwed into the threaded hole, the vertical bar 105 is approximately vertical to the plate surface of the pavement slab 100, and the hoisting hole 119 is positioned above the transverse bar 104. In this way, not only the connection strength between the transverse rod 104 and the road slab 100 can be satisfied, but also the hoisting requirement can be satisfied.
Set the hoist and mount piece to the L type, can avoid adopting the hoist and mount rope 118 that exists when current linear type hoist and mount piece hoists to ensnare the pavement slab 100 easily, cause the problem of pavement slab 100 or hoist and mount rope 118 damage. Meanwhile, the length of the hoisting piece extending out of the short side 101 of the pavement slab 100 can be reduced, so that the hoisting piece is better stressed.
Further, in certain alternative embodiments, the length of the vertical rod 105 is no greater than the distance between the center of the threaded hole and the lower surface of the road deck 100.
When the pavement slab 100 is hoisted in place, the hoisting member needs to be removed, and in particular, the transverse rod 104 needs to be rotated to separate the transverse rod 104 from the threaded hole. Since the pavement slab 100 is already positioned on the foundation, the vertical rods 105 are also rotated together when the horizontal rods 104 are rotated, and in order to ensure that the vertical rods 105 are smoothly rotated, the length of the vertical rods 105 in this embodiment is not greater than the distance between the centers of the threaded holes and the lower surface of the pavement slab 100, in such a manner that the vertical rods 105 do not contact the foundation when the horizontal rods 104 are rotated.
Optionally, the distance from the center of the threaded hole to the upper surface of the road deck 100 in this embodiment is equal to the distance from the center of the threaded hole to the lower surface of the road deck 100, and the length of the vertical rod 105 in this embodiment is not greater than half the thickness of the road deck 100.
It should be noted that the threaded hole may also be disposed at a position slightly close to the upper surface of the road deck 100, and in this case, the length of the vertical rod 105 may also be slightly greater than half of the thickness of the road deck 100.
Further, in some alternative embodiments, the pavement slab 100 is a concrete pavement slab, an upper layer of reinforcing mesh 106 and a lower layer of reinforcing mesh 107 are arranged inside the concrete pavement slab, a pre-embedded pipe 109 is arranged between the upper layer of reinforcing mesh 106 and the lower layer of reinforcing mesh 107, and the inner wall of the pre-embedded pipe 109 is provided with threads to form a threaded hole.
In this embodiment, referring to fig. 2, a split bar 108 is provided between the upper mesh reinforcement 106 and the lower mesh reinforcement 107 to ensure the space between the upper mesh reinforcement 106 and the lower mesh reinforcement 107.
In this embodiment, the embedded pipes 109 are fixedly connected between the upper-layer reinforcing mesh 106 and the lower-layer reinforcing mesh 107, and the pipe openings of the embedded pipes 109 are located on the thickness surface of the short side 101 of the pavement slab 100.
Further, in certain alternative embodiments, the connection member includes a connection plate 113, a first bolt 111, and a second bolt 112, the connection plate 113 being provided with a first connection hole and a second connection hole; in two adjacent road panels 100, a first bolt 111 passes through the first connecting hole and is connected with the hoisting reserved hole 103 on one road panel 100, and a second bolt 112 passes through the second connecting hole and is connected with the hoisting reserved hole 103 on the other road panel 100.
Referring to fig. 3, after two adjacent road panels 100 are hoisted in place, the thickness surfaces of the long sides 102 of the two adjacent road panels 100 are attached. After the hoisting piece is taken down, the first bolt 111 is inserted through the first connecting hole, the second bolt 112 is inserted through the second connecting hole, then the first bolt 111 is screwed into the hoisting reserved hole 103 on one of the pavement boards 100, and the second bolt 112 is screwed into the hoisting reserved hole 103 on the other pavement board 100.
The connection plate 113 may be made of metal.
Further, in certain alternative embodiments, the long side 102 of the road panel 100 has a length of 4 m.
In this embodiment, the length of the long side 102 of the road deck 100 is the width of the paved road, the width of the road is 4m, it can be ensured that the road deck 100 is only paved along the length direction of the road on a straight road, and the normal traffic of the vehicle can be ensured without paving the road decks 100 side by side in the width direction of the road.
Compared with the prior art, the assembled pavement structure that this embodiment provided, because hoist and mount piece and hoist and mount preformed hole 103 can dismantle the connection, need not to all set up hoist and mount piece on every pavement board 100, also can satisfy the hoist and mount demand, saved the cost. For example, in a paving operation, only two sets of hoisting members are adopted, after one pavement slab 100 is hoisted in place, the hoisting members are removed, then the second pavement slab 100 is hoisted, meanwhile, the hoisting members which are just removed are installed on the third pavement slab 100, after the second pavement slab 100 is hoisted in place, the hoisting members on the second pavement slab 100 are removed, meanwhile, the third pavement slab 100 can be hoisted, and the like until the operation is finished.
Example two
Referring to fig. 4 and 5, the present embodiment also provides a fabricated pavement structure, the fabricated pavement structure of the present embodiment describes another implementation scheme of the connecting element, and the technical solution of the first embodiment in addition to the above also belongs to the embodiment, and the description is not repeated here. The same reference numerals are used for the same components as in the first embodiment, and reference is made to the description of the first embodiment.
In certain alternative embodiments, referring to fig. 4, the connecting member comprises a connecting rod 116, a first plugging rod 114 and a second plugging rod 115, one end of the connecting rod 116 is fixedly connected with the first plugging rod 114, and the other end of the connecting rod 116 is fixedly connected with the second plugging rod 115; referring to fig. 5, in two adjacent road panels 100, a first blocking rod 114 can be inserted into the hoisting prepared hole 103 on one of the road panels 100, and a second blocking rod 115 can be inserted into the hoisting prepared hole 103 on the other road panel 100.
Specifically, one end of the connecting rod 116 and one end of the first blocking rod 114 are integrally formed, and the other end of the connecting rod 116 and the other end of the second blocking rod 115 are integrally formed, which is favorable for improving the overall structural strength of the connecting member, so that two adjacent road slabs 100 can be more firmly connected together.
Further, in certain alternative embodiments, both the first blocking rod 114 and the second blocking rod 115 are sheathed with a protective sheath 117.
In order to prevent the internal thread 110 of the pre-buried pipe 109 from being worn and to provide plugging performance, a boot 117 is provided around each of the first plugging rod 114 and the second plugging rod 115.
The material of the boot 117 in this embodiment is rubber.
The material of the protective cover 117 may also be foam or other material.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (10)

1. An assembled pavement structure is characterized by comprising a pavement slab, a hoisting piece and a connecting piece, wherein a hoisting reserved hole is formed in the thickness surface of the pavement slab, the hoisting piece is detachably connected with the hoisting reserved hole, and the hoisting piece is used for being connected with hoisting equipment;
the quantity of pavement slab is two at least, the connecting piece with the connection can be dismantled to hoist and mount preformed hole to two adjacent pavement slab links together.
2. The fabricated pavement structure according to claim 1, wherein the hoisting preformed holes are threaded holes, the hoisting member comprises a transverse rod and a vertical rod, the transverse rod is fixedly connected with the vertical rod, the transverse rod is provided with external threads matched with the threaded holes, the vertical rod is provided with hoisting holes, and the hoisting holes are used for being connected with hoisting ropes of the hoisting equipment.
3. An assembled pavement structure as set forth in claim 2, wherein said vertical rod has a length no greater than the distance between the center of said threaded hole and the lower surface of said pavement slab.
4. An assembled pavement structure as claimed in claim 2, wherein the pavement slab is a concrete pavement slab, an upper layer of reinforcing mesh and a lower layer of reinforcing mesh are arranged inside the concrete pavement slab, a pre-buried pipe is arranged between the upper layer of reinforcing mesh and the lower layer of reinforcing mesh, and the inner wall of the pre-buried pipe is provided with screw threads to form the screw holes.
5. The fabricated pavement structure according to claim 1, wherein the connection member includes a connection plate provided with a first connection hole and a second connection hole, a first bolt, and a second bolt; in two adjacent pavement boards, the first bolt passes through the first connecting hole and is connected with the hoisting reserved hole on one pavement board, and the second bolt passes through the second connecting hole and is connected with the hoisting reserved hole on the other pavement board.
6. An assembled pavement structure according to claim 1, wherein the connecting member includes a connecting rod, a first blocking rod and a second blocking rod, one end of the connecting rod is fixedly connected to the first blocking rod, and the other end of the connecting rod is fixedly connected to the second blocking rod; in two adjacent pavement boards, the first plugging rod can be inserted into the hoisting preformed hole on one pavement board, and the second plugging rod can be inserted into the hoisting preformed hole on the other pavement board.
7. Fabricated pavement structure according to claim 6, characterized in that both the first and the second plugging rod are sheathed with a protective jacket.
8. An assembled pavement structure as set forth in claim 7 wherein said protective sleeve is of rubber or foam.
9. An assembled pavement structure as set forth in any one of claims 1 to 8, wherein the pavement slab is rectangular, and hoisting prepared holes are provided on the thickness surface of the short sides of the pavement slab.
10. An assembled pavement structure according to claim 9, wherein the length of the long side of the pavement slab is 4 m.
CN202020398816.5U 2020-03-25 2020-03-25 Assembled road surface structure Active CN211772502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020398816.5U CN211772502U (en) 2020-03-25 2020-03-25 Assembled road surface structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020398816.5U CN211772502U (en) 2020-03-25 2020-03-25 Assembled road surface structure

Publications (1)

Publication Number Publication Date
CN211772502U true CN211772502U (en) 2020-10-27

Family

ID=72932005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020398816.5U Active CN211772502U (en) 2020-03-25 2020-03-25 Assembled road surface structure

Country Status (1)

Country Link
CN (1) CN211772502U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609527A (en) * 2020-12-16 2021-04-06 中铁十一局集团第五工程有限公司 Invisible joint and hoisting hole site steel fiber concrete pavement slab and fabricated pavement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112609527A (en) * 2020-12-16 2021-04-06 中铁十一局集团第五工程有限公司 Invisible joint and hoisting hole site steel fiber concrete pavement slab and fabricated pavement

Similar Documents

Publication Publication Date Title
CN104631674B (en) Composite floor slab and construction method thereof
CN211772502U (en) Assembled road surface structure
CN105298040A (en) Light assembly type stairway and construction method thereof
CN103243906A (en) Support device for pouring shear wall
CN103485281A (en) Construction method of assembly-type external transverse prestressed hollow plate bridge
CN104947846A (en) Assembled integral type frame filling light weight inner wallboard and preparation method thereof
CN205291219U (en) Reinforced concrete mould
CN110644662A (en) Prefabricated flat slab composite slab based on stress and splitting method thereof
CN101793068B (en) Precast spliced concrete slab wall body
CN108018877B (en) Prefabricated assembly type pipe gallery assembling device and assembling method
CN106120871B (en) A kind of poured band of outer wall of basement outboard template construction method
CN111691264B (en) Mounting structure and mounting method of landscape induction brick
CN206396584U (en) Gradient free type curb protective block
CN210657851U (en) Precast concrete pavement slab capable of being hoisted quickly
CN210713568U (en) Parapet component of prefabricated building
CN210596877U (en) Assembled concrete structural slab of interim road of foundation ditch
CN211286164U (en) Self-compaction regeneration block concrete superimposed shear wall
CN110714442A (en) Slope protection plate and flexible connection surface protection system
CN205857489U (en) Bamboo in-core puts module and cast-in-situ concrete hollow building roof precast construction
CN220131718U (en) Superimposed sheet installation hoisting accessory
CN201649311U (en) Prefabricated plate connected combination device
CN218436445U (en) Prefabricated special-shaped adjustable temporary construction sidewalk
CN209836719U (en) Recyclable concrete panel
CN211848692U (en) Assembled cement concrete pavement structure
CN213295937U (en) Assembled road slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201119

Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd.

Patentee after: HAIWEI ENGINEERING CONSTRUCTION CO LTD OF FIRST HIGHWAY ENGINEERING Co.,Ltd. OF CCCC

Address before: 101100 Beijing City, Tongzhou District Road No. 568 Building No. 1 Xu

Patentee before: HAIWEI ENGINEERING CONSTRUCTION CO LTD OF FIRST HIGHWAY ENGINEERING Co.,Ltd. OF CCCC