CN211745663U - A building structure for greening on the top of a building - Google Patents

A building structure for greening on the top of a building Download PDF

Info

Publication number
CN211745663U
CN211745663U CN202020104808.5U CN202020104808U CN211745663U CN 211745663 U CN211745663 U CN 211745663U CN 202020104808 U CN202020104808 U CN 202020104808U CN 211745663 U CN211745663 U CN 211745663U
Authority
CN
China
Prior art keywords
rotating shaft
water tank
building
fixedly installed
greening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020104808.5U
Other languages
Chinese (zh)
Inventor
孟连营
王建生
曹晓明
刘海冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjia Jiansheng Construction Engineering Group Co ltd
Zhongqing Jianan Construction Group Co Ltd
Original Assignee
Zhongqing Jianan Construction Group Co Ltd
Qingdao Zhongjia Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqing Jianan Construction Group Co Ltd, Qingdao Zhongjia Construction Group Co Ltd filed Critical Zhongqing Jianan Construction Group Co Ltd
Priority to CN202020104808.5U priority Critical patent/CN211745663U/en
Application granted granted Critical
Publication of CN211745663U publication Critical patent/CN211745663U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00—Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108—Rainwater harvesting

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model belongs to the technical field of building structure, especially a building structure for building roof greening, does not have any protection mechanism to current building roof greening, and in bad weather such as heavy rain or hail, greenery plant is very easily flooded or pounded bad problem, the following scheme is proposed, which comprises a bottom plate, the top of the bottom plate is fixedly provided with a planting groove and a water tank, both sides of the water tank are fixedly provided with a fixing plate, one side of the two fixing plates which are close to each other is rotatably provided with a first rotating shaft and a second rotating shaft, the outer side of the first rotating shaft is fixedly provided with a box cover which is matched with the water tank, the outer side of the second rotating shaft is fixedly provided with a baffle which is positioned above the planting groove, the top of the baffle is provided with a water collecting groove, the utility model discloses can shelter the planting groove, prevent the plant in the planting groove from being damaged, meanwhile, rainwater can be collected, and the rainwater collecting device is simple in structure and convenient to use.

Description

一种用于建筑物顶面绿化的建筑结构A building structure for greening on the top of a building

技术领域technical field

本实用新型涉及建筑结构技术领域,尤其涉及一种用于建筑物顶面绿化的建筑结构。The utility model relates to the technical field of building structures, in particular to a building structure for greening the top surface of buildings.

背景技术Background technique

建筑物顶面绿化可以广泛地理解为在各类古今建筑物、构筑物、城围、桥梁等的屋顶、露台、天台、阳台或大型人工假山山体上进行造园,种植树木花卉的统称。Greening on the top of buildings can be widely understood as a general term for gardening and planting trees and flowers on the roofs, terraces, rooftops, balconies or large artificial rockeries of various ancient and modern buildings, structures, city walls, bridges, etc.

现有技术中,建筑物顶面绿化没有任何防护机构,在大雨或冰雹等恶劣天气,绿化植物很容易被淹或砸坏,因此我们提出了一种用于建筑物顶面绿化的建筑结构,用于解决上述问题。In the prior art, the greening on the top of the building does not have any protective mechanism. In severe weather such as heavy rain or hail, the greening plants are easily flooded or smashed. Therefore, we propose a building structure for greening on the top of the building. used to solve the above problems.

实用新型内容Utility model content

本实用新型的目的是为了解决建筑物顶面绿化没有任何防护机构,在大雨或冰雹等恶劣天气,绿化植物很容易被淹或砸坏的缺点,而提出的一种用于建筑物顶面绿化的建筑结构。The purpose of the utility model is to solve the shortcoming that the greening on the top of the building does not have any protective mechanism, and the greening plants are easily flooded or smashed in bad weather such as heavy rain or hail. building structure.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:

一种用于建筑物顶面绿化的建筑结构,包括底板,所述底板的顶部固定安装有种植槽和水箱,所述水箱的两侧均固定安装有固定板,两个固定板相互靠近的一侧转动安装有第一转轴和第二转轴,所述第一转轴的外侧固定安装有箱盖,箱盖与水箱相配合,所述第二转轴的外侧固定安装有挡板,挡板位于种植槽的上方,所述挡板的顶部开设有集水槽,集水槽的底部内壁上固定连通有软管的一端,软管的另一端与水箱固定连通。A building structure for greening the top surface of a building, comprising a bottom plate, a planting tank and a water tank are fixedly installed on the top of the bottom plate, fixed plates are fixedly installed on both sides of the water tank, and one of the two fixed plates is close to each other. A first rotating shaft and a second rotating shaft are installed laterally, a box cover is fixedly installed on the outer side of the first rotating shaft, the box cover is matched with the water tank, a baffle plate is fixedly installed on the outside of the second rotating shaft, and the baffle plate is located in the planting groove The top of the baffle is provided with a water collecting tank, one end of the hose is fixedly connected to the bottom inner wall of the water collecting tank, and the other end of the hose is fixedly connected to the water tank.

优选的,两个固定板中的一个固定板的一侧固定安装有保护罩,保护罩的一侧内壁上固定安装有电机,电机的输出轴与第二转轴的一端固定连接。Preferably, a protective cover is fixedly installed on one side of one of the two fixed plates, a motor is fixedly installed on an inner wall of one side of the protective cover, and the output shaft of the motor is fixedly connected to one end of the second rotating shaft.

优选的,两个固定板相互靠近的一侧均开设有第一柱形槽和第二柱形槽,第一转轴的外侧与两个第一柱形槽的侧壁滑动连接,第二转轴的外侧与两个第二柱形槽的侧壁滑动连接。Preferably, a first cylindrical groove and a second cylindrical groove are provided on the sides of the two fixing plates that are close to each other, the outer side of the first rotating shaft is slidably connected with the side walls of the two first cylindrical grooves, and the second rotating shaft The outer side is slidably connected with the side walls of the two second cylindrical grooves.

优选的,所述固定板上开设有腔体,腔体与第一柱形槽和第二柱形槽相连通,第一转轴和第二转轴的外侧均固定套设有位于腔体内的链轮,两个链轮上啮合有同一个链条。Preferably, a cavity is formed on the fixing plate, the cavity is communicated with the first cylindrical groove and the second cylindrical groove, and the outer sides of the first rotating shaft and the second rotating shaft are fixedly sleeved with a sprocket located in the cavity , the two sprockets are meshed with the same chain.

优选的,所述水箱的一侧固定安装有支撑板,支撑板的顶部与挡板的底部接触,水箱上设有排污管,排污管上设有阀门。Preferably, a support plate is fixedly installed on one side of the water tank, the top of the support plate is in contact with the bottom of the baffle plate, the water tank is provided with a sewage pipe, and the sewage pipe is provided with a valve.

与现有技术相比,本实用新型的优点在于:Compared with the prior art, the advantages of the present utility model are:

(1)本方案使用时,大雨等恶劣天气时,通过开关启动电机,电机带动第二转轴转动,第二转轴转动时通过链轮和链条的传动作用使第一转轴同时转动,通过第一转轴带动箱盖打开,通过第二转轴带动挡板由竖直变成水平状态,通过挡板对种植槽进行遮挡,防止种植槽内的植物受破坏,通过集水槽对雨水进行收集,雨水经软管流到水箱内,箱盖打开同样可以使水箱对雨水进行收集,在晴朗的天气,电机反转,进而使箱盖对水箱进行关闭,较少水箱内水分的蒸发,挡板被立起,减少对种植槽的遮挡,可以使种植槽内的植物进行光合作用;(1) When this solution is used, in severe weather such as heavy rain, the motor is turned on by the switch, and the motor drives the second shaft to rotate. When the second shaft rotates, the first shaft rotates at the same time through the transmission of the sprocket and the chain, and the first shaft rotates through the first shaft. Drive the box cover to open, and drive the baffle from vertical to horizontal through the second rotating shaft. The baffle shields the planting trough to prevent the plants in the planting trough from being damaged. It flows into the water tank, and the tank cover can also be opened to collect rainwater. In fine weather, the motor is reversed, and the tank cover is closed to the water tank, reducing the evaporation of water in the water tank, and the baffle is erected to reduce The shading of the planting trough can enable the plants in the planting trough to perform photosynthesis;

(2)本实用新型能够对种植槽进行遮挡,防止种植槽内的植物受破坏,同时可以对雨水进行收集,结构简单,使用方便。(2) The utility model can shield the planting trough, prevent the plants in the planting trough from being damaged, and can collect rainwater at the same time, with simple structure and convenient use.

附图说明Description of drawings

图1为本实用新型提出的一种用于建筑物顶面绿化的建筑结构的结构示意图;Fig. 1 is the structural representation of a kind of architectural structure for building top greening proposed by the utility model;

图2为本实用新型提出的一种用于建筑物顶面绿化的建筑结构的部分俯视结构示意图;FIG. 2 is a partial top-view structural schematic diagram of a building structure for greening on the top surface of a building proposed by the utility model;

图3为本实用新型提出的一种用于建筑物顶面绿化的建筑结构的A部分的结构示意图。FIG. 3 is a schematic structural diagram of part A of a building structure for greening on the top surface of a building proposed by the present invention.

图中:1底板、2种植槽、3水箱、4固定板、5第一转轴、6第二转轴、7箱盖、8挡板、9集水槽、10软管、11链轮、12链条、13保护罩、14电机。In the picture: 1 bottom plate, 2 planting tank, 3 water tank, 4 fixed plate, 5 first rotating shaft, 6 second rotating shaft, 7 tank cover, 8 baffle plate, 9 water collecting tank, 10 hose, 11 sprocket, 12 chain, 13 protective cover, 14 motor.

具体实施方式Detailed ways

下面将结合本实施例中的附图,对本实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实施例一部分实施例,而不是全部的实施例。The technical solutions in this embodiment will be clearly and completely described below with reference to the accompanying drawings in this embodiment. Obviously, the described embodiments are only a part of the embodiments of this embodiment, but not all of the embodiments.

实施例一Example 1

参照图1-3,一种用于建筑物顶面绿化的建筑结构,包括底板1,底板1的顶部固定安装有种植槽2和水箱3,水箱3的两侧均固定安装有固定板4,两个固定板4相互靠近的一侧转动安装有第一转轴5和第二转轴6,第一转轴5的外侧固定安装有箱盖7,箱盖7与水箱3相配合,第二转轴6的外侧固定安装有挡板8,挡板8位于种植槽2的上方,挡板8的顶部开设有集水槽9,集水槽9的底部内壁上固定连通有软管10的一端,软管10的另一端与水箱3固定连通。Referring to Figures 1-3, a building structure for greening the top surface of a building includes a base plate 1, a planting tank 2 and a water tank 3 are fixedly installed on the top of the base plate 1, and a fixing plate 4 is fixedly installed on both sides of the water tank 3, A first rotating shaft 5 and a second rotating shaft 6 are rotatably installed on one side of the two fixing plates 4 that are close to each other, and a box cover 7 is fixedly installed on the outer side of the first rotating shaft 5. The box cover 7 is matched with the water tank 3, and the second rotating shaft 6 A baffle 8 is fixedly installed on the outside, the baffle 8 is located above the planting tank 2, a water collecting tank 9 is opened on the top of the baffle 8, and one end of the hose 10 is fixedly connected to the bottom inner wall of the water collecting tank 9, and the other end of the hose 10 is connected. One end is in fixed communication with the water tank 3 .

本实施例中,两个固定板4中的一个固定板4的一侧固定安装有保护罩13,保护罩13的一侧内壁上固定安装有电机14,电机14的输出轴与第二转轴6的一端固定连接,电机14用来驱动第二转轴6。In this embodiment, a protective cover 13 is fixedly installed on one side of one of the two fixed plates 4 , and a motor 14 is fixedly installed on one inner wall of the protective cover 13 . The output shaft of the motor 14 is connected to the second rotating shaft 6 One end is fixedly connected, and the motor 14 is used to drive the second rotating shaft 6 .

本实施例中,两个固定板4相互靠近的一侧均开设有第一柱形槽和第二柱形槽,第一转轴5的外侧与两个第一柱形槽的侧壁滑动连接,第二转轴6的外侧与两个第二柱形槽的侧壁滑动连接,第一柱形槽和第二柱形槽的设置使第一转轴5和第二转轴6稳定的转动。In this embodiment, a first cylindrical groove and a second cylindrical groove are provided on the sides of the two fixing plates 4 that are close to each other, and the outer side of the first rotating shaft 5 is slidably connected with the side walls of the two first cylindrical grooves. The outer side of the second rotating shaft 6 is slidably connected with the side walls of the two second cylindrical grooves. The arrangement of the first cylindrical groove and the second cylindrical groove enables the first rotating shaft 5 and the second rotating shaft 6 to rotate stably.

本实施例中,固定板4上开设有腔体,腔体与第一柱形槽和第二柱形槽相连通,第一转轴5和第二转轴6的外侧均固定套设有位于腔体内的链轮11,两个链轮11上啮合有同一个链条12,第二转轴6转动时通过链轮11和链条12的传动作用使第一转轴5同时转动。In this embodiment, the fixing plate 4 is provided with a cavity, and the cavity is communicated with the first cylindrical groove and the second cylindrical groove. The two sprockets 11 are meshed with the same chain 12. When the second rotating shaft 6 rotates, the first rotating shaft 5 rotates at the same time through the transmission action of the sprocket 11 and the chain 12.

本实施例中,水箱3的一侧固定安装有支撑板,支撑板的顶部与挡板8的底部接触,水箱3上设有排污管,排污管上设有阀门,支撑板可以对挡板8进行支撑,排污管可以在对水箱3进行清洗时排出污水。In this embodiment, a support plate is fixedly installed on one side of the water tank 3, the top of the support plate is in contact with the bottom of the baffle plate 8, the water tank 3 is provided with a sewage pipe, and the sewage pipe is provided with a valve, and the support plate can support the baffle plate 8. By supporting, the sewage pipe can discharge sewage when cleaning the water tank 3 .

实施例二Embodiment 2

参照图1-3,一种用于建筑物顶面绿化的建筑结构,包括底板1,底板1的顶部通过螺丝固定安装有种植槽2和水箱3,水箱3的两侧均通过螺丝固定安装有固定板4,两个固定板4相互靠近的一侧转动安装有第一转轴5和第二转轴6,第一转轴5的外侧通过螺丝固定安装有箱盖7,箱盖7与水箱3相配合,第二转轴6的外侧通过螺丝固定安装有挡板8,挡板8位于种植槽2的上方,挡板8的顶部开设有集水槽9,集水槽9的底部内壁上固定连通有软管10的一端,软管10的另一端与水箱3固定连通。Referring to Figures 1-3, a building structure for greening on the top surface of a building includes a base plate 1, the top of the base plate 1 is fixedly installed with a planting tank 2 and a water tank 3 by screws, and both sides of the water tank 3 are fixed and installed by screws. The fixing plate 4, the first rotating shaft 5 and the second rotating shaft 6 are rotatably installed on the side of the two fixing plates 4 that are close to each other, and the outer side of the first rotating shaft 5 is fixedly installed with a box cover 7, and the box cover 7 is matched with the water tank 3 , the outer side of the second rotating shaft 6 is fixedly installed with a baffle 8 by screws, the baffle 8 is located above the planting tank 2, the top of the baffle 8 is provided with a water collection tank 9, and a hose 10 is fixedly connected to the bottom inner wall of the water collection tank 9. One end of the hose 10 is in fixed communication with the water tank 3 .

本实施例中,两个固定板4中的一个固定板4的一侧通过螺丝固定安装有保护罩13,保护罩13的一侧内壁上通过螺丝固定安装有电机14,电机14的输出轴与第二转轴6的一端固定连接,电机14用来驱动第二转轴6。In this embodiment, a protective cover 13 is installed on one side of one of the two fixed plates 4 by screws, and a motor 14 is fixed on the inner wall of one side of the protective cover 13 by screws. The output shaft of the motor 14 is connected to the One end of the second rotating shaft 6 is fixedly connected, and the motor 14 is used to drive the second rotating shaft 6 .

本实施例中,两个固定板4相互靠近的一侧均开设有第一柱形槽和第二柱形槽,第一转轴5的外侧与两个第一柱形槽的侧壁滑动连接,第二转轴6的外侧与两个第二柱形槽的侧壁滑动连接,第一柱形槽和第二柱形槽的设置使第一转轴5和第二转轴6稳定的转动。In this embodiment, a first cylindrical groove and a second cylindrical groove are provided on the sides of the two fixing plates 4 that are close to each other, and the outer side of the first rotating shaft 5 is slidably connected with the side walls of the two first cylindrical grooves. The outer side of the second rotating shaft 6 is slidably connected with the side walls of the two second cylindrical grooves. The arrangement of the first cylindrical groove and the second cylindrical groove enables the first rotating shaft 5 and the second rotating shaft 6 to rotate stably.

本实施例中,固定板4上开设有腔体,腔体与第一柱形槽和第二柱形槽相连通,第一转轴5和第二转轴6的外侧均固定套设有位于腔体内的链轮11,两个链轮11上啮合有同一个链条12,第二转轴6转动时通过链轮11和链条12的传动作用使第一转轴5同时转动。In this embodiment, the fixing plate 4 is provided with a cavity, and the cavity is communicated with the first cylindrical groove and the second cylindrical groove. The two sprockets 11 are meshed with the same chain 12. When the second rotating shaft 6 rotates, the first rotating shaft 5 rotates at the same time through the transmission action of the sprocket 11 and the chain 12.

本实施例中,水箱3的一侧通过螺丝固定安装有支撑板,支撑板的顶部与挡板8的底部接触,水箱3上设有排污管,排污管上设有阀门,支撑板可以对挡板8进行支撑,排污管可以在对水箱3进行清洗时排出污水。In this embodiment, a support plate is installed on one side of the water tank 3 by screws, the top of the support plate is in contact with the bottom of the baffle plate 8, the water tank 3 is provided with a sewage pipe, and the sewage pipe is provided with a valve, and the support plate can block The plate 8 is supported, and the sewage pipe can discharge the sewage when the water tank 3 is cleaned.

本实施例中,使用时,通过螺丝将地板1固定在建筑物顶面,大雨等恶劣天气时,通过开关启动电机14,电机14带动第二转轴6转动,第二转轴6转动时通过链轮11和链条12的传动作用使第一转轴5同时转动,通过第一转轴5带动箱盖7打开,通过第二转轴6带动挡板8由竖直变成水平状态,通过挡板8对种植槽2进行遮挡,防止种植槽2内的植物受破坏,通过集水槽9对雨水进行收集,雨水经软管10流到水箱3内,箱盖7打开同样可以使水箱3对雨水进行收集,在晴朗的天气,电机14反转,进而使箱盖7对水箱3进行关闭,较少水箱3内水分的蒸发,挡板8被立起,减少对种植槽2的遮挡,可以使种植槽2内的植物进行光合作用。In this embodiment, when in use, the floor 1 is fixed on the top surface of the building by screws. In severe weather such as heavy rain, the motor 14 is turned on by a switch, and the motor 14 drives the second rotating shaft 6 to rotate. When the second rotating shaft 6 rotates, the sprocket passes through the 11 and the transmission of the chain 12 make the first shaft 5 rotate at the same time, the first shaft 5 drives the box cover 7 to open, the second shaft 6 drives the baffle 8 from vertical to horizontal, and the baffle 8 adjusts the planting trough. 2. Shade to prevent the plants in the planting tank 2 from being damaged. The rainwater is collected by the water collecting tank 9, and the rainwater flows into the water tank 3 through the hose 10. The tank cover 7 can also be opened to allow the water tank 3 to collect rainwater. In the weather, the motor 14 is reversed, and the tank cover 7 closes the water tank 3, which reduces the evaporation of water in the water tank 3, and the baffle 8 is erected to reduce the shielding of the planting tank 2, which can make the water in the planting tank 2. Plants perform photosynthesis.

以上所述,仅为本实施例较佳的具体实施方式,但本实施例的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实施例揭露的技术范围内,根据本实施例的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实施例的保护范围之内。The above descriptions are only preferred specific implementations of this embodiment, but the protection scope of this embodiment is not limited to this. The equivalent replacement or modification of the technical solution and the utility model concept of the embodiment should be included within the protection scope of the present embodiment.

Claims (5)

1.一种用于建筑物顶面绿化的建筑结构,包括底板(1),其特征在于,所述底板(1)的顶部固定安装有种植槽(2)和水箱(3),所述水箱(3)的两侧均固定安装有固定板(4),两个固定板(4)相互靠近的一侧转动安装有第一转轴(5)和第二转轴(6),所述第一转轴(5)的外侧固定安装有箱盖(7),箱盖(7)与水箱(3)相配合,所述第二转轴(6)的外侧固定安装有挡板(8),挡板(8)位于种植槽(2)的上方,所述挡板(8)的顶部开设有集水槽(9),集水槽(9)的底部内壁上固定连通有软管(10)的一端,软管(10)的另一端与水箱(3)固定连通。1. A building structure for greening on the top surface of a building, comprising a bottom plate (1), characterized in that a planting groove (2) and a water tank (3) are fixedly installed on the top of the bottom plate (1), and the water tank Both sides of (3) are fixedly installed with a fixing plate (4), and a first rotating shaft (5) and a second rotating shaft (6) are rotatably installed on the side of the two fixing plates (4) that are close to each other. A box cover (7) is fixedly installed on the outside of (5), the box cover (7) is matched with the water tank (3), and a baffle plate (8) is fixedly installed on the outside of the second rotating shaft (6). The baffle plate (8) ) is located above the planting tank (2), the top of the baffle plate (8) is provided with a water collecting tank (9), and the bottom inner wall of the water collecting tank (9) is fixedly connected with one end of the hose (10), the hose ( The other end of 10) is in fixed communication with the water tank (3). 2.根据权利要求1所述的一种用于建筑物顶面绿化的建筑结构,其特征在于,两个固定板(4)中的一个固定板(4)的一侧固定安装有保护罩(13),保护罩(13)的一侧内壁上固定安装有电机(14),电机(14)的输出轴与第二转轴(6)的一端固定连接。2. A kind of building structure for greening on the top surface of buildings according to claim 1, is characterized in that, one side of one fixing plate (4) in the two fixing plates (4) is fixedly installed with a protective cover ( 13), a motor (14) is fixedly installed on one inner wall of the protective cover (13), and the output shaft of the motor (14) is fixedly connected with one end of the second rotating shaft (6). 3.根据权利要求1所述的一种用于建筑物顶面绿化的建筑结构,其特征在于,两个固定板(4)相互靠近的一侧均开设有第一柱形槽和第二柱形槽,第一转轴(5)的外侧与两个第一柱形槽的侧壁滑动连接,第二转轴(6)的外侧与两个第二柱形槽的侧壁滑动连接。3. A kind of building structure for building top greening according to claim 1, is characterized in that, the one side of two fixing plates (4) that are close to each other is provided with the first column groove and the second column The outer side of the first rotating shaft (5) is slidably connected with the side walls of the two first cylindrical grooves, and the outer side of the second rotating shaft (6) is slidably connected with the side walls of the two second cylindrical grooves. 4.根据权利要求1所述的一种用于建筑物顶面绿化的建筑结构,其特征在于,所述固定板(4)上开设有腔体,腔体与第一柱形槽和第二柱形槽相连通,第一转轴(5)和第二转轴(6)的外侧均固定套设有位于腔体内的链轮(11),两个链轮(11)上啮合有同一个链条(12)。4. A building structure for greening the top surface of a building according to claim 1, wherein a cavity is provided on the fixing plate (4), and the cavity is connected with the first cylindrical groove and the second cylindrical groove. The cylindrical grooves are connected to each other, the outer sides of the first rotating shaft (5) and the second rotating shaft (6) are fixedly sleeved with a sprocket (11) located in the cavity, and the two sprockets (11) are engaged with the same chain ( 12). 5.根据权利要求1所述的一种用于建筑物顶面绿化的建筑结构,其特征在于,所述水箱(3)的一侧固定安装有支撑板,支撑板的顶部与挡板(8)的底部接触,水箱(3)上设有排污管,排污管上设有阀门。5. A building structure for greening the top of a building according to claim 1, wherein a support plate is fixedly installed on one side of the water tank (3), and the top of the support plate and the baffle plate (8 ), the water tank (3) is provided with a sewage pipe, and the sewage pipe is provided with a valve.
CN202020104808.5U 2020-01-17 2020-01-17 A building structure for greening on the top of a building Expired - Fee Related CN211745663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020104808.5U CN211745663U (en) 2020-01-17 2020-01-17 A building structure for greening on the top of a building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020104808.5U CN211745663U (en) 2020-01-17 2020-01-17 A building structure for greening on the top of a building

Publications (1)

Publication Number Publication Date
CN211745663U true CN211745663U (en) 2020-10-27

Family

ID=72894192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020104808.5U Expired - Fee Related CN211745663U (en) 2020-01-17 2020-01-17 A building structure for greening on the top of a building

Country Status (1)

Country Link
CN (1) CN211745663U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114303815A (en) * 2021-12-30 2022-04-12 深圳贵人生态建设有限公司 Domatic ecological remediation system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114303815A (en) * 2021-12-30 2022-04-12 深圳贵人生态建设有限公司 Domatic ecological remediation system

Similar Documents

Publication Publication Date Title
CN208009733U (en) A kind of green building roof
CN111608229A (en) A rainwater collection and reuse system for green buildings
CN118481308B (en) A green building structure and method for energy saving and emission reduction
CN202089463U (en) Rainwater collecting and drinking device
CN212911109U (en) A rainwater collection device for gardens
CN221298302U (en) A green building wall structure
CN112780159B (en) Energy-concerving and environment-protective chinese style archaize window
CN222822709U (en) Architectural design of roof eaves waterproof rapid diversion device
CN212866148U (en) Green land is planted and is used rainwater supply structure
CN218587754U (en) Winter-heating type thin-film solar photovoltaic vegetable greenhouse
CN113062534A (en) A integral type rainwater collection processing apparatus for green building roofing
CN218933291U (en) Roof greening water supply and drainage device for energy-saving building
CN218713700U (en) Ecological tree pool retaining irrigation structure
CN217949214U (en) Roof rainwater collecting device
CN217407175U (en) Rainwater collecting and irrigating device for roof based on building ecological greening
CN116830923A (en) A garden adjustable flower stand
CN209891587U (en) House rainwater collecting system
CN222847896U (en) Outdoor sun room with waterproof drainage structure
CN208095342U (en) A kind of green building roof for facilitating plantation
CN220814597U (en) Waterproof construction of gutter, eaves gutter
CN222148341U (en) Planting groove with drainage structures
CN113187078A (en) Rainwater treatment device
CN210373225U (en) Solar powered light that collects rainwater
CN221843143U (en) Circulating water supply device for greening
CN220247070U (en) Rainwater collecting and filtering device for saving water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 266000 Room 302, Building 29, 171 Jinshui Road, Licang District, Qingdao City, Shandong Province

Patentee after: Zhongjia Jiansheng Construction Engineering Group Co.,Ltd.

Patentee after: ZHONGQING JIANAN CONSTRUCTION GROUP Co.,Ltd.

Address before: 266000 Room 302, Building 29, 171 Jinshui Road, Licang District, Qingdao City, Shandong Province

Patentee before: QINGDAO ZHONGJIA CONSTRUCTION GROUP Co.,Ltd.

Patentee before: ZHONGQING JIANAN CONSTRUCTION GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201027