CN211736245U - Auxiliary tool for installing decorative ceiling suspender - Google Patents
Auxiliary tool for installing decorative ceiling suspender Download PDFInfo
- Publication number
- CN211736245U CN211736245U CN201922192794.7U CN201922192794U CN211736245U CN 211736245 U CN211736245 U CN 211736245U CN 201922192794 U CN201922192794 U CN 201922192794U CN 211736245 U CN211736245 U CN 211736245U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- angle steel
- equilateral angle
- dwang
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses decorate furred ceiling jib installation appurtenance, including sleeve, equilateral angle steel and dwang, the inboard through-hole of sleeve is regular hexagon, and sleeve one side is equipped with the opening that runs through its inboard through-hole, and the open-ended width equals with the hexagon side length of regular hexagon through-hole, and equilateral angle steel fixed connection does not establish opening one side outer wall at the sleeve, and the dwang is the circular steel tube that equals with the equilateral angle steel width basic, and dwang one end is connected with one of them pterygoid lamina external fixed surface of equilateral angle steel. Adopt this instrument construction convenience swift, can not only effectively carry jib installation quality, reduce safe risk, still realize jib installation instrumentization construction, instrument reuse.
Description
Technical Field
The utility model relates to a construction technical field, in particular to decorate appurtenance of furred ceiling jib installation.
Background
At present, decorate the furred ceiling and adopt traditional spanner to install usually, traditional spanner installation jib need set up operation platform, and the installer stands and operates on operation platform, and this construction method construction process is many, has the aerial work, and the potential safety hazard is big. Because the traditional construction method is limited by the operation space, the installation progress and the quality are also influenced to a certain extent. The method has the following disadvantages: 1. in the traditional installation process, a worker needs to stand on an operation platform, a nut is screwed by rotating a wrench to reach a fastening expansion bolt, the worker needs to operate on a higher construction platform during construction, and the danger coefficient is higher; 2. workers adopt the traditional method for installation, when the wrench is rotated, the installation quality is difficult to guarantee due to the limitation of space; 3. the construction process is adopted, the number of working procedures is large, personnel need to operate the platform continuously, labor and time are wasted, the construction labor intensity is high, and the potential safety hazard is large.
Disclosure of Invention
The utility model aims at the defect that above-mentioned prior art exists, provide a decorate furred ceiling jib installation appurtenance, adopt this instrument construction convenience swift, can not only effectively carry jib installation quality, reduce safe risk, still realize jib installation instrumentization construction, instrument repeatedly usable.
The utility model discloses a realize that the technical scheme that above-mentioned purpose adopted is: the utility model provides a decorate furred ceiling jib installation appurtenance, includes sleeve, equilateral angle steel and dwang, and the inboard through-hole of sleeve is regular hexagon, and sleeve one side is equipped with the opening that runs through its inboard through-hole, and equilateral angle steel fixed connection does not establish opening one side outer wall at the sleeve, and the dwang is the circular steel tube that equals with equilateral angle steel width basic, dwang one end and one of them pterygoid lamina surface fixed connection of equilateral angle steel.
The utility model discloses a further technical scheme is: the width of the opening is equal to the side length of the hexagon of the regular hexagon through hole.
The utility model discloses decorate furred ceiling jib installation appurtenance has following beneficial effect:
1. the utility model discloses an open longitudinal opening at the sleeve side, the opening size can satisfy the jib and freely pass in and out, and accessible sleeve card owner expansion bolts nut rotates the dwang, makes sleeve swivel nut twist solid expansion bolts, reaches the purpose of installation jib, compares with traditional technology, adopts the utility model discloses instrument installation jib solves traditional construction method and receives space restriction and eminence operation scheduling problem, has ensured the construction quality of jib, has improved the one-time installation qualification rate, and has eliminated the danger of workman's eminence operation, has ensured workman's personal safety.
2. Adopt the utility model discloses the instrument is compared with traditional construction method, and easy operation, efficiency of construction are high, have effectively ensured quality, safety, the time limit for a project of engineering, practice thrift artifical, the cost is reduced, has better economic benefits.
3. Use the utility model discloses the instrument simple manufacture, but reuse, economic cost is also more cheap.
The present invention will be further described with reference to the drawings and examples.
Drawings
FIG. 1 is a schematic structural view of an auxiliary tool for installing a decorative suspended ceiling boom according to the present invention;
the reference numbers illustrate: 1-sleeve, 2-through hole, 3-opening, 4-equilateral angle steel and 5-rotating rod.
Detailed Description
As shown in fig. 1, the utility model discloses decorate furred ceiling jib installation appurtenance, including sleeve, equilateral angle steel and dwang, the inboard through-hole of sleeve is regular hexagon, and sleeve one side is equipped with the opening that runs through its inboard through-hole, and the opening size can satisfy the jib and freely pass in and out, nevertheless can not too big, and in this embodiment, the open-ended width equals with the hexagon side length of regular hexagon through-hole. The equilateral angle steel is fixedly connected to the outer wall of the side, without the opening, of the sleeve, the direction of the opening defined by the two wing plates of the equilateral angle steel is basically the same as that of the opening of the sleeve, the equilateral angle steel is 30 multiplied by 4 equilateral angle steel, and the length of the equilateral angle steel is 200 mm. The dwang is the galvanized round steel pipe that equals with equilateral angle steel width basic, and dwang one end passes through welding mode fixed connection with one of them pterygoid lamina surface of equilateral angle steel, and the length of dwang can be according to the installation height of difference suitably adjusts.
During construction, firstly, drilling holes in the roof: according to the diameter of the suspender (or the specification of the expansion bolt), a large-size drill bit is selected to drill a hole on the roof of the appointed suspender mounting point, and the drilling depth is determined according to the length of the expansion bolt. The drilling device that adopts the ground operation to carry out the drilling during drilling, drilling device does not the utility model discloses the invention point does not do its structure here and describes in detail, and the drilling process will be paid attention to the axis of controlling the drilling and should be perpendicular with the floor face, guarantees the straightness that hangs down of follow-up installation jib.
Installing an expansion bolt and a nut on the suspender: an expansion bolt (containing a nut) is arranged at one end of a suspender (not shown in the figure), the nut is arranged preferably in a way that the expansion part of the expansion bolt is not loosened or slightly loosened, and the nut is not arranged too tightly so as to prevent the expansion part from expanding and influencing the subsequent construction. After the part is installed, the placed hanging rod is placed into the sleeve from the opening of the side edge of the sleeve, and the nut is clamped in the hexagonal through hole in the sleeve.
Installing and fixing the suspender: through jib mounting tool, install expansion bolts one end with the jib and put into appointed good hole of boring, rotate the nut through the dwang, make expansion bolts inflation part expand because of the tightening of nut, reach the fastening effect, make the jib firmly fix on the roof. When the expansion bolt is installed, the nut on the expansion bolt is screwed until the nut is not screwed, the expansion part is completely expanded, and the expansion part tightly presses the hole wall to achieve the anchoring effect.
Take off the quick mounting tool of jib: after the boom is installed, the rotating rod is moved downwards to separate the sleeve from the nut, and the opening of the sleeve is aligned with the screw rod to separate the device from the boom, so that the tool is taken down. During operation, the hanger rod is taken out from the sleeve opening to prevent the hanger rod from being dragged askew and influencing the installation of the rear main keel.
The above embodiments are only preferred embodiments of the present invention, the structure of the present invention is not limited to the forms illustrated in the above embodiments, and any modifications, equivalent substitutions and the like made within the spirit and principle of the present invention should be included within the scope of the present invention.
Claims (2)
1. The utility model provides a decorate furred ceiling jib installation appurtenance, a serial communication port, including sleeve (1), equilateral angle steel (4) and dwang (5), sleeve (1) inboard through-hole (2) are regular hexagon, and sleeve (1) one side is equipped with opening (3) that run through its inboard through-hole (2), equilateral angle steel (4) fixed connection does not establish opening one side outer wall in sleeve (1), dwang (5) are the circular steel tube that equals with equilateral angle steel (4) width basic, dwang (5) one end and one of them pterygoid lamina surface fixed connection of equilateral angle steel (4).
2. An auxiliary tool for the installation of a decorative suspended ceiling boom according to claim 1, wherein the width of the opening (3) is equal to the hexagonal side length of the regular hexagonal through hole (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922192794.7U CN211736245U (en) | 2019-12-10 | 2019-12-10 | Auxiliary tool for installing decorative ceiling suspender |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922192794.7U CN211736245U (en) | 2019-12-10 | 2019-12-10 | Auxiliary tool for installing decorative ceiling suspender |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211736245U true CN211736245U (en) | 2020-10-23 |
Family
ID=72875801
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922192794.7U Active CN211736245U (en) | 2019-12-10 | 2019-12-10 | Auxiliary tool for installing decorative ceiling suspender |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211736245U (en) |
-
2019
- 2019-12-10 CN CN201922192794.7U patent/CN211736245U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211736245U (en) | Auxiliary tool for installing decorative ceiling suspender | |
CN201695682U (en) | Anchorage | |
CN115492535B (en) | Combined drill drop prevention matched equipment and method | |
CN215025468U (en) | Hole face sky operation safety belt linkage | |
CN204676756U (en) | The fastener of top board furred ceiling | |
CN205976180U (en) | Hanger rod installation device | |
CN202299074U (en) | Novel expandable long boom | |
CN201362948Y (en) | Steel hanger installer | |
CN210548286U (en) | Electric drill support capable of adjusting drilling depth | |
CN210884890U (en) | Hoop type adjustable hoisting clamp for pipe well air pipe | |
CN207921064U (en) | A kind of construction of railways scene Special precision instrument top lifting device | |
CN218747525U (en) | Hang convenient instrument of muscle installation | |
CN103556813B (en) | Steel pipe scaffold wall-connecting piece | |
CN104907980A (en) | Device and method for tightening ceiling rib expansion bolt | |
CN210508001U (en) | Quick mounting device for fixing hanger rod | |
CN211849582U (en) | Multifunctional lifting hook of comprehensive pipe rack | |
CN203956804U (en) | A kind of suspension rod quick-mounting instrument | |
CN216798529U (en) | Continuous suspension combined suit for safety belt for high-altitude operation | |
CN203742185U (en) | Hanging bar mounting operating rod | |
CN205077826U (en) | Suspension rod mounting tool | |
CN218541392U (en) | Simple tool for efficiently fixing ceiling screw | |
CN204716264U (en) | A kind of forestope temporary lining | |
CN218479831U (en) | Manual telescopic type front canopy supporting device | |
CN216341116U (en) | Steel structure beam safety belt fixing device | |
CN211114893U (en) | Suspender installation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |