CN211735423U - Anti-backflushing orifice plugging structure after anchor cable final hole grouting - Google Patents

Anti-backflushing orifice plugging structure after anchor cable final hole grouting Download PDF

Info

Publication number
CN211735423U
CN211735423U CN201921969581.4U CN201921969581U CN211735423U CN 211735423 U CN211735423 U CN 211735423U CN 201921969581 U CN201921969581 U CN 201921969581U CN 211735423 U CN211735423 U CN 211735423U
Authority
CN
China
Prior art keywords
steel sheet
sand bag
utility
disconnect
stagnant water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921969581.4U
Other languages
Chinese (zh)
Inventor
王新泉
刁红国
崔允亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201921969581.4U priority Critical patent/CN211735423U/en
Application granted granted Critical
Publication of CN211735423U publication Critical patent/CN211735423U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a prevent backward gushing drill way block structure after anchor rope final bore slip casting, include: steel sheet termination, disconnect-type crown plate, inflation stagnant water sand bag and non-woven fabrics, equidistant welded fastening of disconnect-type crown plate is served in the steel sheet termination, inflation stagnant water sand bag is arranged in between the disconnect-type crown plate, and the outer parcel non-woven fabrics of inflation stagnant water sand bag is served and is fixed in the steel sheet termination, the steel sheet termination is fixed in on the waist rail through leading to long fixing screw. The utility model has the advantages that: the utility model adopts the pre-buried steel sleeve, which is beneficial to reducing the disturbance to the surrounding soil body in the drilling process, and is safe and reliable; the utility model adopts the steel plate end-capping and expansion water-stop sand bag with the separated ring plate, which is favorable for tight orifice plugging, ensures that no back-surge condition occurs after anchor cable final hole grouting, and has good plugging effect; the utility model discloses structural installation is convenient swift, can adopt the site material to assemble, but reuse practices thrift the cost.

Description

Anti-backflushing orifice plugging structure after anchor cable final hole grouting
Technical Field
The utility model relates to a prevent backward gushing drill way block structure after anchor rope final bore slip casting belongs to ground and foundation construction field, is applicable to foundation ditch engineering stake anchor construction engineering.
Background
Along with the development of cities, the utilization of underground spaces is more and more emphasized by people, the excavation depth of a foundation pit is more and more large, and ultra-deep foundation pit engineering appears. The ultra-deep foundation pits are often located in urban central areas, the surrounding environment conditions are complex, the protection requirements are high, and therefore the ultra-deep foundation pits are more and more emphasized by the engineering and academic circles.
In view of this, to the deficiency in the foundation ditch stock construction in the past, urgently need a new anchor rope end hole slip casting back to prevent gushing drill way block structure, prevent gushing effectually, improve the efficiency of construction, ensure that the construction is safe and reliable.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the not enough among the prior art, provide one kind and have prevent that the effect of kicking is showing, install and remove characteristics such as simple etc. prevent kicking the drill way block structure after the anchor rope final bore slip casting.
The anti-backflow orifice plugging structure comprises a steel plate end sealing end, a separated ring plate, an expansion water-stopping sand bag and non-woven fabrics, wherein the separated ring plate is welded and fixed on the steel plate end sealing end at equal intervals, the expansion water-stopping sand bag is arranged between the separated ring plates, the expansion water-stopping sand bag is wrapped with the non-woven fabrics and fixed on the steel plate end sealing end, and the steel plate end sealing end is fixed on a waist beam through a through-length fixing screw.
Preferably, the method comprises the following steps: the fender pile is driven into the foundation pit, the waist beam is connected with the fender pile, a steel sleeve is arranged at the drilling construction position, and a drill rod is arranged in the steel sleeve.
Preferably, the method comprises the following steps: the three separate ring plates are distributed in a triangular shape on the sealed end of the steel plate.
The utility model has the advantages that:
1) the utility model discloses a pre-buried steel casing pipe helps reducing the disturbance to the soil body on every side, safe and reliable at the in-process that creeps into.
2) The utility model discloses a take steel sheet end capping and the inflation stagnant water sand bag of disconnect-type crown plate, it is tight to be favorable to the drill way shutoff, does not appear the anti-circumstances of surging after guaranteeing anchor rope final bore slip casting, and the shutoff is effectual.
3) The utility model discloses structural installation is convenient swift, can adopt the site material to assemble, but reuse practices thrift the cost.
Drawings
FIG. 1 is a schematic diagram of a structure for blocking an anti-reverse-surge orifice after grouting of a final hole of an anchor cable;
FIG. 2 is a schematic view of a steel plate end-capping structure.
Description of reference numerals: 1-fender pile, 2-steel sleeve, 3-waist beam, 4-drill rod, 5-steel plate end sealing, 6-separating ring plate, 7-through long fixing screw, 8-expansion water-stop sand bag and 9-non-woven fabric.
Detailed Description
The present invention will be further described with reference to the following examples. The following description of the embodiments is merely provided to aid in understanding the invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.
As shown in fig. 1 to 2, the anchor cable terminal hole post-grouting back-flushing-proof orifice blocking structure comprises a steel plate end blocking 5, a separated ring plate 6, an expansion water-stopping sand bag 8 and a non-woven fabric 9, wherein the separated ring plate 6 is welded and fixed on the steel plate end blocking 5 at equal intervals, the expansion water-stopping sand bag 8 is arranged between the separated ring plates 6, the non-woven fabric 9 wraps the expansion water-stopping sand bag 8 and is fixed on the steel plate end blocking 5, and the steel plate end blocking 5 is fixed on a waist beam 3 through a through-length fixing screw 7.
As an improved specific implementation mode, the underground coal mine underground.
As a modified embodiment, three separate ring plates 6 are arranged in a triangular pattern on the steel plate end 5.

Claims (3)

1. The utility model provides an anchor rope terminal hole slip casting back prevents gushing drill way block structure which characterized in that: including steel sheet termination (5), disconnect-type crown plate (6), inflation stagnant water sand bag (8) and non-woven fabrics (9), equidistant welded fastening in steel sheet termination (5) is gone up in disconnect-type crown plate (6), inflation stagnant water sand bag (8) are arranged in between disconnect-type crown plate (6), and inflation stagnant water sand bag (8) outer parcel non-woven fabrics (9) are fixed in on steel sheet termination (5), steel sheet termination (5) are fixed in on waist rail (3) through leading to long set screw (7).
2. The anti-reverse-surge orifice blocking structure after anchor cable final hole grouting according to claim 1, characterized in that: the fender pile (1) is driven into a foundation pit, the waist beam (3) is connected with the fender pile (1), a steel sleeve (2) is arranged at the position of drilling construction, and a drill rod (4) is arranged in the steel sleeve (2).
3. The anti-reverse-surge orifice blocking structure after anchor cable final hole grouting according to claim 1, characterized in that: the three separated ring plates (6) are distributed in a triangular shape on the steel plate end sealing (5).
CN201921969581.4U 2019-11-14 2019-11-14 Anti-backflushing orifice plugging structure after anchor cable final hole grouting Active CN211735423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921969581.4U CN211735423U (en) 2019-11-14 2019-11-14 Anti-backflushing orifice plugging structure after anchor cable final hole grouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921969581.4U CN211735423U (en) 2019-11-14 2019-11-14 Anti-backflushing orifice plugging structure after anchor cable final hole grouting

Publications (1)

Publication Number Publication Date
CN211735423U true CN211735423U (en) 2020-10-23

Family

ID=72873348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921969581.4U Active CN211735423U (en) 2019-11-14 2019-11-14 Anti-backflushing orifice plugging structure after anchor cable final hole grouting

Country Status (1)

Country Link
CN (1) CN211735423U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463657A (en) * 2021-07-15 2021-10-01 北京地矿工程建设有限责任公司 Underwater anchor cable construction process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463657A (en) * 2021-07-15 2021-10-01 北京地矿工程建设有限责任公司 Underwater anchor cable construction process

Similar Documents

Publication Publication Date Title
CN106761790B (en) A kind of open type TBM crosses tunneling boring carbonaceous slate driving and method for protecting support
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN101560770B (en) Novel deep building foundation pit supporting system
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN109371980B (en) Deep foundation pit enclosure construction method combining spray anchor reverse construction and punched pile
CN205171500U (en) Native supporting construction between assembled stake
CN109024706A (en) A kind of foundation pit waterproof curtain breakthrough inside method for blocking
CN203924137U (en) A kind of diaphragm wall serious leakage plugging structure
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN109989407B (en) Roadbed pile tube curtain supporting structure behind newly-added two-line platform of railway
CN211735423U (en) Anti-backflushing orifice plugging structure after anchor cable final hole grouting
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN103215958A (en) Construction method of dewatering and retaining and protecting of deep foundation pit in expansive-soil area
CN205858371U (en) A kind of colliery big cross section digging laneway combined support structure
CN103343537A (en) Drilling machine of high-pressure rotary-spraying anchor rod and construction method of high-pressure rotary-spraying anchor rod
CN211144498U (en) Novel shield cutter head
CN111894598A (en) Shaft reinforcing method
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN109024621A (en) The compound retaining wall supporting construction of embankment high slope tubular pole and its construction method
CN104389609A (en) No-blasting mechanical digging method
CN211144525U (en) Water stopping structure of shield tunnel segment in middle air shaft
CN114592892A (en) Implementation method for pulling out anchor cable of shield tunnel in steel sleeve in soft soil area
CN102677724B (en) Mechanical steel sleeve installation device and mechanical steel sleeve installation method
CN203684235U (en) Novel combined type groove excavation supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant