CN211732836U - Device for transporting slope materials - Google Patents

Device for transporting slope materials Download PDF

Info

Publication number
CN211732836U
CN211732836U CN201922140736.XU CN201922140736U CN211732836U CN 211732836 U CN211732836 U CN 211732836U CN 201922140736 U CN201922140736 U CN 201922140736U CN 211732836 U CN211732836 U CN 211732836U
Authority
CN
China
Prior art keywords
slide rail
slope
bottom plate
side slope
round platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922140736.XU
Other languages
Chinese (zh)
Inventor
邓思文
陈恩瑜
张宏山
曹启鹏
张金龙
邢秦智
孟祥宇
谷江洪
田博
刘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 3 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 3 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 3 Engineering Co Ltd filed Critical China Gezhouba Group No 3 Engineering Co Ltd
Priority to CN201922140736.XU priority Critical patent/CN211732836U/en
Application granted granted Critical
Publication of CN211732836U publication Critical patent/CN211732836U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a device for side slope material transportation, including fortune material dolly, slide rail, power device, wheel hub, support and bottom plate, the bottom plate is fixed on the side slope, the top of bottom plate is provided with two the slide rail, two slide rail along side slope direction parallel arrangement, two be provided with the interval between the slide rail, the bottom of fortune material dolly is connected with wheel hub, wheel hub installs two between the slide rail, wheel hub can follow two the slide rail slides, power device is used for the drive fortune material dolly reciprocates along the side slope. The utility model discloses can realize the transportation of material under the condition that does not use large-scale mechanical equipment, the device low cost, preparation are simple and convenient, the conveying efficiency is high, can use widely.

Description

Device for transporting slope materials
Technical Field
The utility model belongs to the technical field of material transportation system in the side slope construction, concretely relates to a device for side slope material transport.
Background
In the slope construction practice, the situation that construction needs to be carried out on the upper portion of a slope after slope cutting is completed often occurs, materials need to be conveyed to the upper portion of the slope, the traditional conveying mode is generally manual conveying or vertical conveying of a crane, however, the manual conveying is low in efficiency and high in danger, and the vertical conveying cost of the crane is high. Therefore, a need exists for a device for slope material transport.
SUMMERY OF THE UTILITY MODEL
To the technical problem among the prior art, the utility model provides a device for side slope material transport can realize the transportation of material under the condition that does not use large-scale mechanical equipment, and the device low cost, preparation are simple and convenient, the conveying efficiency is high, can use widely.
In order to solve the technical problem, the utility model discloses a following technical scheme realizes:
the utility model provides a device for side slope material transportation, includes fortune material dolly, slide rail, power device, wheel hub, support and bottom plate, the bottom plate is fixed on the side slope, the up end of bottom plate is provided with two the slide rail, two slide rail is along side slope direction parallel arrangement, two be provided with the interval between the slide rail, the bottom of fortune material dolly is connected with wheel hub, wheel hub arranges two in the track that forms between the slide rail, wheel hub can follow two the slide rail slides, power device is used for the drive fortune material dolly reciprocates along the side slope.
Furthermore, the power device is a winch, a pull rope is wound on the winch, and one end of the pull rope is connected with the material conveying trolley.
Further, still include the fixed pulley, hoist engine fixed mounting is in the side slope bottom, the stay cord is walked around the fixed pulley with the fortune material dolly is connected.
Further, the winch is equipped with a bidirectional emergency stop switch.
Furthermore, each sliding rail is connected with the bottom plate through a plurality of supports, one end of each support is vertically connected with the bottom plate, the other end of each support is vertically connected with the sliding rail, and the length of each support is 20cm-25 cm.
Furthermore, a plurality of the supports are uniformly distributed along the slide rail, and the distance between every two adjacent supports is 100cm-150 cm.
Further, the hub comprises a first circular truncated cone and a second circular truncated cone, the diameter of the first circular truncated cone is larger than that of the second circular truncated cone, one end of the first circular truncated cone is connected with the bottom of the material conveying trolley, and the other end of the first circular truncated cone is connected with one end of the second circular truncated cone; the second round platform card is in two between the slide rail, and with two slide rail clearance fit, first round platform presses two the up end of slide rail.
Furthermore, one side of the bottom plate, which is in contact with the side slope, is connected with a dowel, and the dowel is inserted into the side slope.
Furthermore, the sliding rail is made of a round steel pipe, and the pull rope is made of a steel wire rope.
Compared with the prior art, the utility model discloses following beneficial effect has at least: the utility model relates to a device for side slope material transportation, when the construction position on the side slope needs the material, the fortune material dolly removes to the side slope bottom along the slide rail, gets the material back, will transport the material dolly drive to the construction position through control power device, and the constructor of construction position can be convenient get the material, and is visible, the utility model discloses can realize the transportation of material under the condition that does not use large-scale mechanical equipment, the device low cost, preparation are simple and convenient, the conveying efficiency is high, can use widely.
Furthermore, the power device is a winch, a pull rope is wound on the winch, one end of the pull rope is connected with the material conveying trolley, the requirement on the power device is not high, the cost is low, and the operation is simple and easy.
Furthermore, the winch is fixedly installed at the bottom of the side slope, the pull rope is connected with the material conveying trolley by bypassing the fixed pulley, and a constructor at the bottom of the side slope can conveniently control the starting and stopping of the winch, so that the construction efficiency is improved.
Furthermore, the winch is provided with a bidirectional emergency stop switch, and when the transport device has an emergency dangerous accident, the power supply can be cut off rapidly by controlling the emergency stop switch, so that the accident can be prevented from continuing as much as possible.
Furthermore, each sliding rail is connected with the bottom plate through a plurality of supports, one end of each support is vertically connected with the bottom plate, the other end of each support is vertically connected with the corresponding sliding rail, and the length of each support is 20cm-25 cm.
Furthermore, the plurality of supports are uniformly distributed along the slide rail, and the distance between every two adjacent supports is 100-150 cm, so that the smoothness, the straightness and the stability of the slide rail can be ensured, and the overall safety of the conveying device is ensured.
Further, wheel hub includes first round platform and second round platform, the diameter of first round platform is greater than the diameter of second round platform, the one end of first round platform is connected with the bottom of fortune material dolly, the other end is connected with the one end of second round platform, second round platform card is between two slide rails, and with two slide rail clearance fit, first round platform presses the up end at two slide rails, when having guaranteed that the second round platform can follow the slide rail and slide from top to bottom, can effectually prevent again that wheel hub from breaking away from the slide rail, fine improvement conveyer's security.
Furthermore, one side of the bottom plate, which is in contact with the side slope, is connected with a joint bar, and the joint bar is inserted into the side slope, so that the firmness of the transportation device is ensured.
In order to make the aforementioned and other objects, features and advantages of the present invention comprehensible, preferred embodiments accompanied with figures are described in detail below.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a front view of the present invention;
FIG. 3 is a schematic view showing the fit between the wheel hub and the slide rail;
fig. 4 is a big sample drawing of the wheel hub and the slide rail of the utility model.
In the figure: 1-a material conveying trolley; 2-a slide rail; 3-fixed pulley; 4-a power plant; 5-a hub; 51-a first truncated cone; 52-a second circular table; 6-a scaffold; 7-a bottom plate; 8-inserting the steel bar; 9-pulling rope.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As a certain embodiment of the utility model, combine fig. 1, fig. 2, fig. 3 and fig. 4 to show, a device for side slope material transportation, including fortune material dolly 1, slide rail 2, fixed pulley 3, power device 4, wheel hub 5, support 6, bottom plate 7, dowel bar 8 and stay cord 9, bottom plate 7 is fixed on the side slope, and smooth steel sheet is chooseed for use to bottom plate 7, and is concrete, as shown in fig. 2, weld with one side of side slope contact on the bottom plate 7 and the one end welding of a plurality of dowel bars 8, and the pre-buried pouring of dowel bar 8 is in the side slope, ensures conveyer's whole steadiness, and then ensures safe in utilizationly.
As shown in fig. 1, the upper end surface of the bottom plate 7 is connected with two slide rails 2, the slide rails 2 are formed by welding circular steel tubes, the two slide rails 2 are arranged in parallel along the slope direction of the side slope, one ends of the two slide rails 2 extend to the bottom of the side slope, the other ends of the two slide rails 2 extend to the top of the side slope, an interval is arranged between the two slide rails 2, and the interval between the slide rails 2 is specifically determined according to the size of the hub 5. Specifically, each sliding rail 2 is connected with a bottom plate 7 through a plurality of brackets 6, the brackets 6 are uniformly distributed along the sliding rail 2, the brackets 6 are made of angle steel, one end of each bracket 6 is vertically connected with the bottom plate 7 in a welding mode, the other end of each bracket 6 is vertically connected with the corresponding sliding rail 2 in a welding mode, the distance between every two adjacent brackets 6 is 100-150 cm, and the arrangement of the distance can ensure the smoothness and the stability of the sliding rails; the length of each support 6 is 20cm-25cm, and the range not only ensures that a space for the wheel hub 5 to extend out is reserved between the sliding rail 2 and the bottom plate 7, but also ensures the stability of the sliding rail 2, thereby ensuring the safe operation of the material conveying trolley 1. The specific dimension of the length of the bracket 6 can be adjusted within this range according to the size of the hub 5, and in this embodiment a bracket with a length of 22cm is used.
As shown in fig. 1 to 4, the material conveying trolley 1 is formed by welding steel plates, the bottom of the material conveying trolley 1 is connected with two wheel hubs 5 in a welding mode, the wheel hubs 5 are made of steel, the wheel hubs 5 are mounted between two slide rails 2, the wheel hubs 5 can slide along the two slide rails 2, and the power device 4 is used for driving the material conveying trolley 1 to move up and down along a side slope. Specifically, as shown in fig. 3 and 4, the hub 5 includes a first circular truncated cone 51 and a second circular truncated cone 52, a diameter of the first circular truncated cone 51 is greater than a diameter of the second circular truncated cone 52, one end of the first circular truncated cone 51 is connected to the bottom of the material conveying trolley 1, and the other end of the first circular truncated cone 51 is connected to one end of the second circular truncated cone 52. Second round platform 52 card is between two slide rails 2, and with two slide rails 2 clearance fit, first round platform 51 presses at the up end of two slide rails 2, can guarantee the firm cooperation between wheel hub 5 and the slide rail 2 like this, avoids taking place the emergence of wheel hub 5 derail phenomenon, ensures construction safety.
As shown in fig. 1 and 2, power device 4 in this embodiment is the hoist engine, hoist engine fixed mounting is in the side slope bottom, make things convenient for the constructor to operate opening and stopping of control conveyer in the side slope bottom, the winding has stay cord 9 on the hoist engine, stay cord 9 adopts wire rope, fixed pulley 3 passes through the mount and installs the top at the side slope, stay cord 9 bypasses fixed pulley 3 and is connected with fortune material dolly 1, for guaranteeing construction safety, the hoist engine still is equipped with two-way emergency stop switch, when taking place danger, can reduce dangerous further extension development through pressing emergency stop switch.
The utility model discloses a theory of operation does: when the construction position on the side slope needs the material, send fortune material dolly 1 to the side slope bottom through controlling the hoist engine, after packing into the material for in the fortune material dolly 1, pull fortune material dolly 1 to the construction position through controlling the hoist engine through stay cord 9, constructor of construction position can be convenient get the material and use the material. The utility model discloses a conveyer has realized the perpendicular transportation of material under the condition that does not use large-scale mechanical equipment, and the practicality is strong, low cost, preparation are simple and convenient, conveying efficiency is high, and economic benefits is obvious.
Finally, it should be noted that: the above-mentioned embodiments are only specific embodiments of the present invention, and are not intended to limit the technical solution of the present invention, and the protection scope of the present invention is not limited thereto, although the present invention is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: those skilled in the art can still modify or easily conceive of changes in the technical solutions described in the foregoing embodiments or make equivalent substitutions for some technical features within the technical scope of the present disclosure; such modifications, changes or substitutions do not substantially depart from the spirit and scope of the embodiments of the present invention, and are intended to be included within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (9)

1. A device for slope material transportation which characterized in that: including fortune material dolly (1), slide rail (2), power device (4), wheel hub (5), support (6) and bottom plate (7), bottom plate (7) are fixed on the side slope, the up end of bottom plate (7) is provided with two slide rail (2), two slide rail (2) are along side slope direction parallel arrangement, two be provided with the interval between slide rail (2), the bottom of fortune material dolly (1) is connected with wheel hub (5), two are arranged in wheel hub (5) in the track that forms between slide rail (2), two can be followed in wheel hub (5) slide rail (2), power device (4) are used for the drive fortune material dolly (1) reciprocates along the side slope.
2. A device for slope material transport according to claim 1, wherein: the power device (4) is a winch, a pull rope (9) is wound on the winch, and one end of the pull rope (9) is connected with the material conveying trolley (1).
3. A device for slope material transport according to claim 2, wherein: still include fixed pulley (3), hoist engine fixed mounting is in the side slope bottom, stay cord (9) are walked around fixed pulley (3) with fortune material dolly (1) is connected.
4. A device for slope material transport according to claim 3, wherein: the winch is provided with a bidirectional emergency stop switch.
5. A device for slope material transport according to claim 1, wherein: every slide rail (2) with bottom plate (7) are through a plurality of support (6) are connected, the one end of support (6) with bottom plate (7) are connected perpendicularly, and the other end is connected perpendicularly with slide rail (2), every the length of support (6) is 20cm-25 cm.
6. A device for slope material transport according to claim 5, wherein: the plurality of the brackets (6) are uniformly distributed along the sliding rail (2), and the distance between every two adjacent brackets (6) is 100cm-150 cm.
7. A device for slope material transport according to claim 1, wherein: the hub (5) comprises a first round platform (51) and a second round platform (52), the diameter of the first round platform (51) is larger than that of the second round platform (52), one end of the first round platform (51) is connected with the bottom of the material conveying trolley (1), and the other end of the first round platform (51) is connected with one end of the second round platform (52); the second round platform (52) is clamped between the two slide rails (2) and is in clearance fit with the two slide rails (2), and the first round platform (51) is pressed on the upper end faces of the two slide rails (2).
8. A device for slope material transport according to claim 1, wherein: one side of the bottom plate (7) contacting with the side slope is connected with a joint bar (8), and the joint bar (8) is inserted into the side slope.
9. A device for slope material transport according to claim 3, wherein: the sliding rail (2) is made of a round steel pipe, and the pull rope (9) is made of a steel wire rope.
CN201922140736.XU 2019-12-03 2019-12-03 Device for transporting slope materials Active CN211732836U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922140736.XU CN211732836U (en) 2019-12-03 2019-12-03 Device for transporting slope materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922140736.XU CN211732836U (en) 2019-12-03 2019-12-03 Device for transporting slope materials

Publications (1)

Publication Number Publication Date
CN211732836U true CN211732836U (en) 2020-10-23

Family

ID=72875018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922140736.XU Active CN211732836U (en) 2019-12-03 2019-12-03 Device for transporting slope materials

Country Status (1)

Country Link
CN (1) CN211732836U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112849981A (en) * 2021-01-27 2021-05-28 中国铁建重工集团股份有限公司 Material transporting device
CN113928999A (en) * 2021-10-13 2022-01-14 王新林 Slope construction inclined transportation tool for mountain highway

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112849981A (en) * 2021-01-27 2021-05-28 中国铁建重工集团股份有限公司 Material transporting device
CN113928999A (en) * 2021-10-13 2022-01-14 王新林 Slope construction inclined transportation tool for mountain highway
CN113928999B (en) * 2021-10-13 2023-03-14 王新林 Slope construction inclined transportation tool for mountain highway

Similar Documents

Publication Publication Date Title
CN211732836U (en) Device for transporting slope materials
CN214143073U (en) Turning device for rail mobile train
CN109335980B (en) High-slope stone transportation device and method
CN210236891U (en) Subway gantry crane
CN107500109A (en) A kind of overhead crane with electric hoists
CN103527243A (en) Incline hoist transportation system for subway construction and setup method thereof
CN101920920A (en) Movable small mould lifting machine
CN206554524U (en) A kind of construction discharging platform
CN206705598U (en) A kind of jack-up unit rack-and-pinion lift
CN210113232U (en) Stacker crane with steering structure
CN211226046U (en) Monorail crane bearing trolley device
CN204823877U (en) Travelling crane with walking dolly and hoisting gear
CN214653119U (en) Prevent hoist that rocks
CN204211305U (en) A kind of elevator adjustable guide rail support being convenient to fix
CN211110746U (en) Slope moving platform hoisting device
CN210262742U (en) Large cantilever bent cap template demolishs device
CN202953695U (en) Novel lifting tool for lifting tubular pile steel cage
CN203048442U (en) Double-layered travelling crane for allocating and transporting mould
KR20150014187A (en) Trolley rotating device for crane
CN202897450U (en) Material lifting framework
CN214358225U (en) Stacker safety mechanism
CN204038465U (en) A kind of belt conveyer Novel supporting roller car
CN205930457U (en) Electric power engineering construction wrecking truck
CN111115461A (en) Reinforcing steel bar and mould transportation and automatic assembling equipment
CN204751995U (en) Gantry crane with electric hoist

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant