CN211719227U - Project progress display device expected by construction cost - Google Patents

Project progress display device expected by construction cost Download PDF

Info

Publication number
CN211719227U
CN211719227U CN202020695504.0U CN202020695504U CN211719227U CN 211719227 U CN211719227 U CN 211719227U CN 202020695504 U CN202020695504 U CN 202020695504U CN 211719227 U CN211719227 U CN 211719227U
Authority
CN
China
Prior art keywords
avris
display device
board
forms
show board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020695504.0U
Other languages
Chinese (zh)
Inventor
李婷
方志敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020695504.0U priority Critical patent/CN211719227U/en
Application granted granted Critical
Publication of CN211719227U publication Critical patent/CN211719227U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

The utility model belongs to the technical field of the show dress technique and specifically relates to a prospective project progress display device of engineering cost, including loop bar and magnetic sheet, the avris of loop bar is provided with the cotter, and the avris of cotter is provided with the lifter, the avris of lifter is provided with first show board, and the avris of first show board installs the fixture block, the pivot is installed to the avris of fixture block, and the dead lever is installed to the avris of spiral shell rotation axle, the internally mounted of first show board has the slide bar, the outside of slide bar is provided with the slider, the magnetic sheet is installed in the below of slider, and the avris of magnetic sheet is provided with first bull stick. This anticipated project progress display device of engineering cost is provided with the lifter, and first show board passes through to constitute elevation structure between lifter and the loop bar to when display device is publishing information, prevent to have the barrier to keep off the content on display device because of highly inconvenient to adjust, lead to the information transfer not rapid, influence the transmission of information in display device the place ahead.

Description

Project progress display device expected by construction cost
Technical Field
The utility model relates to a mechanical industry technical field specifically is a project progress display device is expected to engineering cost.
Background
The project schedule plan is a plan which is drawn up according to the corresponding project amount and the construction period requirement on the basis of drawing up the investment in the year or the implementation stage, and the start and stop time and the mutual connection coordination relation of each work, and the supply of labor, materials and equipment required by each work is specifically arranged.
Present display device on the market, be not convenient for show board altitude mixture control when using and be not convenient for accomodate after display device uses, lead to accomodating and occupy a large amount of spaces, be not convenient for receive and deposit, design a project progress display device is expected to engineering cost for this purpose present case.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a project progress display device is expected to engineering cost to propose current display device on the market among the solution above-mentioned background art, be not convenient for show board altitude mixture control when using and be not convenient for accomodate after display device uses, lead to accomodating and occupy a large amount of spaces, be not convenient for receive the problem of depositing.
In order to achieve the above object, the utility model provides a following technical scheme: a project progress display device for project cost expectation comprises a loop bar and a magnetic plate, wherein a pin bolt is arranged on the side of the loop bar, and the side of the pin bolt is provided with a lifting rod, the side of the lifting rod is provided with a first display plate, the side of the first display plate is provided with a fixture block, the side of the fixture block is provided with a rotating shaft, and the side of the screw shaft is provided with a fixed rod, the inside of the first display board is provided with a slide rod, the outer side of the slide rod is provided with a slide block, the magnetic plate is arranged below the slide block, and the side of the magnetic plate is provided with a first rotating rod, a limiting rod is arranged above the first display plate, and the side of the limiting rod is provided with a pulley, the bottom of the pulley is provided with a second display board, the top of the second display board is provided with a fluorescent lamp, the second bull stick is installed to the avris of second show board, and the pillar is installed to the avris of second bull stick.
Preferably, the loop bar forms a clamping structure through the pin bolt and the lifting rod, and the first display board forms a lifting structure through the lifting rod and the loop bar.
Preferably, the fixture block forms a rotating structure with the fixing rod through the rotating shaft, and the fixing rod forms a clamping structure with the rotating shaft through the fixture block.
Preferably, the magnetic plate forms a sliding structure through the sliding block and the sliding rod, and the magnetic plate forms a rotating structure through the first rotating rod and the sliding block.
Preferably, the second display board forms a sliding structure with the first display board through the pulley, and the second display board forms a clamping structure with the first display board through the limiting rod.
Preferably, the support post and the second display board form a rotating structure through the second rotating rod, and the fluorescent lamps are distributed at equal intervals along the horizontal direction of the second display board.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this anticipated project progress display device of engineering cost is provided with the lifter, and first show board passes through to constitute elevation structure between lifter and the loop bar to when display device is publishing information, prevent to have the barrier to keep off the content on display device because of highly inconvenient to adjust, lead to the information transfer not rapid, influence the transmission of information in display device the place ahead.
2. This anticipated project progress display device of engineering cost is provided with the magnetic sheet, states the magnetic sheet and passes through to constitute sliding structure between slider and the slide bar to the bulletin is convenient for change the bulletin to the show board, also can adjust the position of magnetic sheet according to the variation in size of bulletin and fix the bulletin, and the magnetic sheet can adsorb on display device, prevents that the bulletin of show from dropping.
3. This anticipated project progress display device of engineering cost is provided with the pulley, and the second show board passes through to constitute sliding construction between pulley and the first show board to two show boards of display device can carry out parallel folding, prevent that display device from not using the folding of being not convenient for, occupy a large amount of spaces when leading to accomodating, the not storage of being convenient for show board.
Drawings
FIG. 1 is a schematic view of the front view of the internal structure of the present invention;
FIG. 2 is a schematic view of the connection structure of the magnetic plate and the slider of the present invention;
fig. 3 is a schematic view of the connection structure of the first display board and the second display board of the present invention.
In the figure: 1. a loop bar; 2. a pin; 3. a lifting rod; 4. a first display board; 5. a clamping block; 6. a rotating shaft; 7. fixing the rod; 8. a slide bar; 9. a slider; 10. a magnetic plate; 11. a first rotating lever; 12. a limiting rod; 13. a pulley; 14. a second display board; 15. a fluorescent lamp; 16. a second rotating rod; 17. and a support pillar.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a project progress display device for expecting engineering cost comprises a loop bar 1, a pin bolt 2, a lifting rod 3, a first display board 4, a clamping block 5, a rotating shaft 6, a fixed rod 7, a sliding rod 8, a sliding block 9, a magnetic board 10, a first rotating rod 11, a limiting rod 12, a pulley 13, a second display board 14, a fluorescent lamp 15, a second rotating rod 16 and a support column 17, wherein the pin bolt 2 is arranged on the side of the loop bar 1, the lifting rod 3 is arranged on the side of the pin bolt 2, the first display board 4 is arranged on the side of the lifting rod 3, the clamping block 5 is arranged on the side of the first display board 4, the rotating shaft 6 is arranged on the side of the clamping block 5, the fixed rod 7 is arranged on the side of the rotating shaft 6, the sliding rod 8 is arranged inside the first display board 4, the sliding block 9 is arranged on the outer side of the sliding rod 8, the magnetic board 10 is arranged below the sliding block 9, the first rotating rod 11 is arranged on the side of the, a pulley 13 is arranged on the side of the limiting rod 12, a second display board 14 is arranged at the bottom of the pulley 13, a fluorescent lamp 15 is arranged at the top of the second display board 14, a second rotating rod 16 is arranged on the side of the second display board 14, and a support column 17 is arranged on the side of the second rotating rod 16;
further, loop bar 1 constitutes block structure through between 2 and the lifter 3 of cotter, and first show board 4 constitutes elevation structure through between lifter 3 and the loop bar 1 to when display device is publishing information, prevent to have the barrier to keep off the content on display device because of highly be not convenient for adjust, lead to information transfer not rapid, influence the transmission of information in display device the place ahead.
Furthermore, a rotating structure is formed between the clamping block 5 and the fixing rod 7 through the rotating shaft 6, and the fixing rod 7 forms a clamping structure between the clamping block 5 and the rotating shaft 6, so that when the display device is used on two sides, the clamping block 5 can fix the rotating angle of the display board, and the phenomenon that the rotating angle of the display board is inaccurate, so that published information is blocked and the transmission of the information is influenced is prevented;
furthermore, the magnetic plate 10 forms a sliding structure between the sliding block 9 and the sliding rod 8, and the magnetic plate 10 forms a rotating structure between the first rotating rod 11 and the sliding block 9, so that the bulletin board is convenient to replace, the position of the magnetic plate 10 can be adjusted according to the size of the bulletin board, and the magnetic plate 10 can be adsorbed on the bulletin board to prevent the bulletin board from falling off;
furthermore, the second display board 14 forms a sliding structure with the first display board 4 through the pulley 13, and the second display board 14 forms a clamping structure with the first display board 4 through the limiting rod 12, so that the display device can be folded conveniently, and the display device is prevented from occupying a large amount of space during storage and being inconvenient to store due to the fact that the display device is not used and is inconvenient to fold;
further, pillar 17 passes through to constitute revolution mechanic between second bull stick 16 and the second show board 14, and fluorescent lamp 15 distributes along equidistance on the horizontal direction of second show board 14 to fluorescent lamp 15 can throw light on to the show board under the dim circumstances of light, prevents that light dim from leading to the inside on the display device can not be seen clearly, influences the transmission of information.
The working principle is as follows: the using process of the project progress display device for expecting engineering cost includes that according to the picture 1-3, firstly, the height of the display device is adjusted according to the actual condition of the display device, the first display plate 4 forms a lifting structure through the lifting rod 3 and the loop bar 1, the situation that the obstacle in front of the display device is blocked on the display device due to the fact that the height is inconvenient to adjust is prevented, information transmission is not rapid, information transmission is affected, the loop bar 1 forms a clamping structure through the pin bolt 2 and the lifting rod 3, the height of the lifting rod 3 can be fixed, the lifting rod 3 is prevented from sliding downwards, the fixing rod 7 forms a clamping structure through the clamping block 5 and the rotating shaft 6, when the display device is used on two sides, the clamping block 5 can fix the rotating angle of the display plate, the rotating angle of the display plate is prevented from being inaccurate, published information is prevented from being blocked, and information, the magnetic plate 10 forms a rotating structure with the sliding block 9 through the first rotating rod 11, so that the bulletin can be conveniently replaced on the display board, the position of the magnetic plate 10 can be adjusted according to the size of the bulletin, the magnetic plate 10 can be adsorbed on the display device to prevent the bulletin displayed from falling off, and the fluorescent lamps 15 are distributed at equal intervals along the horizontal direction of the second display board 14, so that the fluorescent lamps 15 can illuminate the display board under the condition of dim light, and the phenomenon that the interior of the display device cannot be clearly seen due to dim light is prevented, and the information transmission is influenced;
according to fig. 3, the second display board 14 is then slid by the sliding wheels 13 to the first display board 4, so that the display device can be folded conveniently, and the display device is prevented from being inconvenient to fold when not in use, occupying a large space when being stored, and being inconvenient to store the display board, thereby completing the use process of the project schedule display device for engineering cost.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A project progress display device for project expected by construction cost comprises a loop bar (1) and a magnetic plate (10), and is characterized in that: the avris of loop bar (1) is provided with cotter (2), and the avris of cotter (2) is provided with lifter (3), the avris of lifter (3) is provided with first show board (4), and the avris of first show board (4) installs fixture block (5), pivot (6) are installed to the avris of fixture block (5), and dead lever (7) are installed to the avris of spiral shell rotation axle (6), the internally mounted of first show board (4) has slide bar (8), the outside of slide bar (8) is provided with slider (9), install in the below of slider (9) magnetic sheet (10), and the avris of magnetic sheet (10) is provided with first bull stick (11), the top of first show board (4) is provided with gag lever post (12), and pulley (13) are installed to the avris of gag lever post (12), second show board (14) is installed to the bottom of pulley (13), and fluorescent lamp (15) are installed at the top of second show board (14), second bull stick (16) is installed to the avris of second show board (14), and pillar (17) are installed to the avris of second bull stick (16).
2. The project schedule display device of claim 1, characterized in that: the loop bar (1) forms a clamping structure with the lifting rod (3) through the pin bolt (2), and the first display board (4) forms a lifting structure with the loop bar (1) through the lifting rod (3).
3. The project schedule display device of claim 1, characterized in that: the fixture block (5) forms a rotating structure with the fixed rod (7) through the rotating shaft (6), and the fixed rod (7) forms a clamping structure with the rotating shaft (6) through the fixture block (5).
4. The project schedule display device of claim 1, characterized in that: the magnetic plate (10) forms a sliding structure with the sliding rod (8) through the sliding block (9), and the magnetic plate (10) forms a rotating structure with the sliding block (9) through the first rotating rod (11).
5. The project schedule display device of claim 1, characterized in that: the second display board (14) forms a sliding structure with the first display board (4) through a pulley (13), and the second display board (14) forms a clamping structure with the first display board (4) through a limiting rod (12).
6. The project schedule display device of claim 1, characterized in that: the support columns (17) form a rotating structure through the second rotating rods (16) and the second display board (14), and the fluorescent lamps (15) are distributed at equal distances in the horizontal direction of the second display board (14).
CN202020695504.0U 2020-04-30 2020-04-30 Project progress display device expected by construction cost Expired - Fee Related CN211719227U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020695504.0U CN211719227U (en) 2020-04-30 2020-04-30 Project progress display device expected by construction cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020695504.0U CN211719227U (en) 2020-04-30 2020-04-30 Project progress display device expected by construction cost

Publications (1)

Publication Number Publication Date
CN211719227U true CN211719227U (en) 2020-10-20

Family

ID=72835941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020695504.0U Expired - Fee Related CN211719227U (en) 2020-04-30 2020-04-30 Project progress display device expected by construction cost

Country Status (1)

Country Link
CN (1) CN211719227U (en)

Similar Documents

Publication Publication Date Title
CN207999759U (en) A kind of liftable dual-purpose type solar street light
CN206284721U (en) A kind of dress designing sample display stand with all-directional rotation
CN111981382B (en) Angle-adjustable street lamp
CN211719227U (en) Project progress display device expected by construction cost
CN215495897U (en) Advertisement design is with show shelf that has classification structure
CN209672214U (en) A kind of New LED solar street light
CN207609222U (en) Parking systems
CN217359659U (en) SMT screen plate detection system
CN206025651U (en) Adjustable thing cabinet of putting
CN214008942U (en) Road detection LED lamp spotlight lighting device
CN220643952U (en) Safety warning equipment for road traffic construction
CN221004556U (en) Lamp board mounting rack with lifting structure
CN218720947U (en) Energy-concerving and environment-protective type solar street lamp
CN213118823U (en) Lighting device for construction convenient to adjust
CN219567406U (en) Jack convenient to illumination
CN216047493U (en) Landscape energy-saving lamp with adjustable lighting angle
CN213339511U (en) Information display board for city planning
CN220410152U (en) Photosensitive luminous artwork ornament
CN212869560U (en) Street lamp pole of comprehensive utilization among intelligent city
CN219797094U (en) Outdoor lamp with adjustable irradiation angle
CN216211978U (en) Warning sign is used in power communication maintenance
CN202733648U (en) Mobile projection lamp
CN206018485U (en) A kind of light of stage with heat sinking function
CN210227455U (en) Horizontal-standing angle-adjustable drawing board frame
CN212156981U (en) Combined solar street lamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201020