CN211714550U - Double-deck construction platform of storage tank - Google Patents

Double-deck construction platform of storage tank Download PDF

Info

Publication number
CN211714550U
CN211714550U CN201921705606.XU CN201921705606U CN211714550U CN 211714550 U CN211714550 U CN 211714550U CN 201921705606 U CN201921705606 U CN 201921705606U CN 211714550 U CN211714550 U CN 211714550U
Authority
CN
China
Prior art keywords
platform
double
shaped steel
storage tank
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921705606.XU
Other languages
Chinese (zh)
Inventor
蒋勇
闻杰
石强
黄云国
朱国平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial and Energy Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial and Energy Engineering Group Co Ltd filed Critical China Construction Industrial and Energy Engineering Group Co Ltd
Priority to CN201921705606.XU priority Critical patent/CN211714550U/en
Application granted granted Critical
Publication of CN211714550U publication Critical patent/CN211714550U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of storage tank installation, and discloses a storage tank double-layer construction platform, two groups of people can simultaneously construct the double-layer platform main body through the upper platform and the lower platform, the upper platform carries out wallboard assembly, the lower platform can weld two layers of wallboards, the wallboard installation efficiency is improved, twelve electric hoists work simultaneously, the twelve electric hoists are connected in series and controlled in a unified way, the levelness of the double-layer platform main body can be ensured, meanwhile, the double-layer platform main body is ensured to be stable in the ascending process, so that the double-layer construction platform has the advantage of high efficiency, the double-layer platform can be ensured to be firmly contacted with the H-shaped steel upright post through the rollers, guarantee double-deck platform walking from top to bottom steadily simultaneously, the pneumatic cylinder starts to drive calliper and fixes double-deck platform on H nature steel stand surface, and the rethread alarm device can respond to double-deck platform's functioning speed to it has the safety advantage to reach double-deck construction platform.

Description

Double-deck construction platform of storage tank
Technical Field
The utility model relates to a storage tank installation technical field specifically is a double-deck construction platform of storage tank.
Background
The steel sealed container for storing liquid or gas is the steel storage tank, and the steel storage tank engineering is an essential and important infrastructure in the industries of petroleum, chemical engineering and the like. The existing storage tank installation technology mainly comprises a flip-chip method and a normal installation method. The normal installation method of the storage tank is divided into a scaffold internal building method and an external hanging method. The internal overlapping method has the defects that a large amount of labor and materials are consumed for arranging the scaffold, and the cost is high. The construction of the external hanging method is simple, but the external hanging safety risk of the scaffold is high. It is therefore necessary to use a safe and efficient tank installation technique.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a double-deck construction platform of storage tank possesses double-deck construction platform and has safety, efficient advantage, has solved double-deck construction platform and can not possess safety and efficient problem.
(II) technical scheme
Possess double-deck construction platform for realizing the aforesaid and have safety, high-efficient purpose, the utility model provides a following technical scheme: a double-layer construction platform of a storage tank comprises an upper platform, wherein a connecting piece is fixedly arranged at the bottom of the upper platform, a lower platform is fixedly arranged at the bottom of the connecting piece, a pedestrian vertical ladder is fixedly arranged between the two upper platforms and the lower platform, an H-shaped steel stand column is fixedly connected to the inner side of the upper platform, the storage tank is fixedly connected to the inner part of the H-shaped steel stand column, a wall plate is movably connected to the surface of the storage tank, an electric hoist is fixedly arranged at the top of the H-shaped steel stand column, a pulley is fixedly arranged at the right side of the H-shaped steel stand column, a steel wire rope is movably connected between the two electric hoists and the pulley, a machine case and a brake mechanism are respectively fixedly arranged at one side of the H-shaped steel stand column, a traveling mechanism is slidably connected to one side of the H-, the top fixed mounting of arrestment mechanism has the support, the top fixed mounting of support has the pneumatic cylinder, the output shaft fixed mounting of pneumatic cylinder has calliper, two the outside swing joint has first connecting rod and second connecting rod respectively between the gyro wheel.
Preferably, the number of the H-shaped steel stand columns is twelve, and the H-shaped steel stand columns are respectively distributed around the storage tank at equal intervals, so that the levelness of the double platforms in the lifting process is guaranteed.
Preferably, the number of the electric hoists is twelve, and the electric hoists are fixedly connected with the upper platform through steel wire ropes, so that the electric hoists can drive the double-layer platform to move up and down.
Preferably, two connect through the cable between the electric block, the tip of cable has the control box through linear connection, guarantees the stability of double-deck platform.
Preferably, the number of the rollers is eight, and the rollers are uniformly and fixedly arranged on two sides of the H-shaped steel upright column at equal intervals respectively, so that the stability of the travelling mechanism in the travelling process can be ensured.
Preferably, the callipers evenly distributed are in the both sides of H shaped steel stand, ensure under the platform stop condition that callipers action, press from both sides tight H shaped steel stand additional, guarantee the steady of two platforms.
Preferably, the upper platform and the lower platform are evenly distributed around the storage tank at equal intervals, the diameter of the upper platform and the diameter of the lower platform are equal to the diameter of the storage tank, high efficiency of the double platforms is guaranteed, the double platforms can be adjusted according to different storage tank diameters, the height between the upper platform and the lower platform is equal to the height of the wall plate, and stability and safety between the double platforms are guaranteed.
Three beneficial effects
Compared with the prior art, the utility model provides a double-deck construction platform of storage tank possesses following beneficial effect:
1. this double-deck construction platform of storage tank, through the middle and upper platform of double-deck platform main part, lower platform can supply two sets of personnel to be under construction simultaneously, and the upper platform carries out the wallboard group and to right, and lower platform can weld two-layer wallboard, improves wallboard installation effectiveness, by twelve electric block simultaneous working, twelve electric block series connection are unified to be controlled, can guarantee double-deck platform main part levelness, thereby guarantee simultaneously that the double-deck platform main part is steady at the in-process that rises and ensure that double-deck construction platform has high-efficient advantage.
2. This double-deck construction platform of storage tank can guarantee double-deck platform and H shaped steel stand firm contact through the gyro wheel, guarantees simultaneously that double-deck platform walks from top to bottom steadily, and the pneumatic cylinder starts to drive calliper and fixes double-deck platform on H shaped steel stand surface, and rethread alarm device can respond to the functioning speed of double-deck platform to it has safe advantage to reach double-deck construction platform.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the walking mechanism of the present invention;
FIG. 3 is a schematic view of the structural braking mechanism of the present invention;
fig. 4 is a schematic view of the structure of the present invention from a top view.
In the figure: 1-upper platform, 2-lower platform, 3-pedestrian vertical ladder, 4-connecting piece, 5-walking mechanism, 6-braking mechanism, 7-H shaped steel column, 8-wall plate, 9-electric block, 10-pulley, 11-steel wire rope, 12-alarm device, 13-storage tank, 14-roller, 15-first connecting rod, 16-second connecting rod, 17-support, 18-hydraulic cylinder, 19-caliper and 20-cabinet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a storage tank double-deck construction platform comprises an upper platform 1, a connecting piece 4 is fixedly installed at the bottom of the upper platform 1, a lower platform 2 is fixedly installed at the bottom of the connecting piece 4, pedestrian vertical ladders 3 are fixedly installed between the two upper platforms 1 and the lower platform 2, an H-shaped steel upright post 7 is fixedly connected to the inner side of the upper platform 1, a storage tank 13 is fixedly connected to the inner part of the H-shaped steel upright post 7, the number of the H-shaped steel upright posts 7 is twelve, the H-shaped steel upright posts 7 are respectively and equidistantly distributed around the storage tank 13 to ensure the levelness of the double platforms in the lifting process, a wall plate 8 is movably connected to the surface of the storage tank 13, when two groups of people with large upper platforms 1 and lower platforms 2 are simultaneously constructed, the upper platform 1 forms a group of wall plates 8, the lower platform 2 can weld the two layers of wall plates 8, the installation efficiency of the wall plates 8 can be improved, the diameter of the upper platform 1 and the diameter of the lower platform 2 are equal to the diameter of the storage tank 13, so that high efficiency of the double platforms is ensured, the double platforms can be adjusted according to different diameters of the storage tank 13, the height between the upper platform 1 and the lower platform 2 is equal to the height of the wall plate 8, stability and safety between the double platforms are ensured, the top of the H-shaped steel upright post 7 is fixedly connected with an electric hoist 9, the maximum weight of the electric hoist 9 which can be hoisted is ten tons, the two electric hoists 9 are connected through a cable, the end part of the cable is linearly connected with a control box, stability of the double platforms is ensured, a pulley 10 is fixedly arranged on the right side of the H-shaped steel upright post 7, a steel wire rope 11 is movably connected between the two electric hoists 9 and the pulley 10, the electric hoists 9 are twelve electric hoists 9 and are fixedly connected with the upper platform 1 through, a pulley 10 is used in the middle to fix the trend of a steel wire rope 11, a chassis 20 and a brake mechanism 6 are respectively and fixedly installed on one side of an H-shaped steel upright 7, a traveling mechanism 5 is slidably connected on one side of the H-shaped steel upright 7, rollers 14 are movably connected inside the traveling mechanism 5, the number of the rollers 14 is eight, the rollers are respectively and uniformly and fixedly installed on two sides of the H-shaped steel upright 7 at equal intervals, the stability of the traveling mechanism 5 in the traveling process can be ensured, an alarm device 12 is movably installed on the surface of the chassis 20, a trigger element, a power supply, an alarm and a terminator are contained in the alarm device 12, when the alarm device 12 is in an emergency situation of movement, a hydraulic cylinder 18 and a caliper 19 can be automatically triggered to enable a double-platform to be emergently stopped, the safety of construction personnel is ensured, a support 17 is fixedly installed on the top of, the uniform distribution of calliper 19 is in the both sides of H shaped steel stand 7, ensure under the platform shut down condition, calliper 19 moves, add and press from both sides tight H shaped steel stand 7, guarantee the steady of double-deck platform, the outside is swing joint has first connecting rod 15 and second connecting rod 16 respectively between two gyro wheels 14, the effect of first connecting rod 15 and second connecting rod 16 is all in order to ensure the stability of gyro wheel 14, prevent that gyro wheel 14 can drop, H shaped steel stand 7, electric block 9, pulley 10 and wire rope 11 constitute electric hoisting mechanism jointly, the inside of running gear 5 includes gyro wheel 14 respectively, pneumatic cylinder 18, calliper 19 and alarm device 12, running gear 5 generally installs the below upper mounting platform 1 and lower platform 2, running gear 5 fixed mounting is on H shaped steel stand 7, and through gyro wheel 14, pneumatic cylinder 18 and calliper 19 brake, double-deck platform includes upper mounting platform 1, lower platform 2, Connecting piece 4 and pedestrian vertical ladder 3, wherein upper mounting plate 1 all adopts angle steel, round steel, band steel and steel grating to weld with lower platform 2, and connecting piece 4 adopts the channel-section steel to make, forms with upper mounting plate 1 and lower platform 2 through the welded method, and pedestrian vertical ladder 3 is connected with upper mounting plate 1 and lower platform 2 through the welded method welding, and this is for the convenience operation personnel walk from top to bottom.
The working principle is as follows: two groups of people can simultaneously construct the upper platform 1 and the lower platform 2 in the double-layer platform main body, the upper platform 1 can assemble the wallboards 8, the lower platform 2 can weld the two layers of wallboards 8, the installation efficiency of the wallboards 8 is improved, twelve electric hoists 9 work simultaneously, the twelve electric hoists 9 are connected in series and controlled in a unified way, the levelness of the double-layer platform main body can be ensured, meanwhile, the stability of the double-layer platform main body in the ascending process is ensured so as to ensure that the double-layer construction platform has the advantage of high efficiency, the double-layer construction platform of the storage tank can ensure that the double-layer platform is firmly contacted with the H-shaped steel upright post 7 through the roller 14, meanwhile, the double-layer platform is guaranteed to walk up and down stably, the hydraulic cylinder 18 is started to drive the calipers 19 to fix the double-layer platform on the surface of the H-shaped steel upright post 7, and the running speed of the double-layer platform can be sensed through the alarm device 12, so that the double-layer construction platform has the advantage of safety.
In conclusion, the double-deck construction platform of the storage tank can be used for two groups of people to construct simultaneously through the upper platform 1 and the lower platform 2 in the main body of the double-deck platform, the upper platform 1 can assemble the wallboards 8, the lower platform 2 can weld the two layers of wallboards 8, the installation efficiency of the wallboards 8 is improved, twelve electric hoists 9 work simultaneously, the twelve electric hoists 9 are connected in series and controlled in a unified way, the levelness of the main body of the double-deck platform can be ensured, the stability of the main body of the double-deck platform in the ascending process is ensured, the high efficiency of the double-deck construction platform is ensured, the double-deck construction platform of the storage tank can be ensured by the rollers 14 to be in firm contact with the H-shaped steel upright post 7, the stable up-and-down walking of the double-deck platform is ensured, the hydraulic cylinder, thereby achieving the safety advantage of the double-layer construction platform.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a double-deck construction platform of storage tank, includes upper mounting plate (1), its characterized in that: the bottom of the upper platform (1) is fixedly provided with a connecting piece (4), the bottom of the connecting piece (4) is fixedly provided with a lower platform (2), two pedestrian vertical ladders (3) are fixedly arranged between the upper platform (1) and the lower platform (2), the inner side of the upper platform (1) is fixedly connected with an H-shaped steel column (7), the inner part of the H-shaped steel column (7) is fixedly connected with a storage tank (13), the surface of the storage tank (13) is movably connected with a wallboard (8), the top of the H-shaped steel column (7) is fixedly connected with an electric hoist (9), the right side of the H-shaped steel column (7) is fixedly provided with a pulley (10), two electric hoists (9) are movably connected with a steel wire rope (11) between the pulley (10), one side of the H-shaped steel column (7) is respectively and fixedly provided with a case (20) and a braking mechanism (6), one side sliding connection of H shaped steel stand (7) has running gear (5), the inside swing joint of running gear (5) has gyro wheel (14), the movable surface mounting of quick-witted case (20) has alarm device (12), the top fixed mounting of arrestment mechanism (6) has support (17), the top fixed mounting of support (17) has pneumatic cylinder (18), the output shaft fixed mounting of pneumatic cylinder (18) has calliper (19), two the outside difference swing joint has first connecting rod (15) and second connecting rod (16) between gyro wheel (14).
2. The double-deck construction platform of claim 1, wherein: the number of the H-shaped steel upright posts (7) is twelve, and the H-shaped steel upright posts are respectively distributed around the storage tank (13) at equal intervals.
3. The double-deck construction platform of claim 1, wherein: the number of the electric hoists (9) is twelve, and the electric hoists are fixedly connected with the upper platform (1) through steel wire ropes (11).
4. The double-deck construction platform of claim 1, wherein: the two electric hoists (9) are connected through a cable, and the end part of the cable is connected with a control box through a linear mode.
5. The double-deck construction platform of claim 1, wherein: the number of the rollers (14) is eight, and the rollers are uniformly and fixedly arranged on two sides of the H-shaped steel upright post (7) at equal intervals.
6. The double-deck construction platform of claim 1, wherein: the calipers (19) are uniformly distributed on two sides of the H-shaped steel upright post (7).
7. The double-deck construction platform of claim 1, wherein: the upper platform (1) and the lower platform (2) are evenly distributed around the storage tank (13) at equal intervals, the diameter of the upper platform (1) is equal to that of the lower platform (2) and the storage tank (13), and the height between the upper platform (1) and the lower platform (2) is equal to that of the wall plate (8).
CN201921705606.XU 2019-10-12 2019-10-12 Double-deck construction platform of storage tank Active CN211714550U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921705606.XU CN211714550U (en) 2019-10-12 2019-10-12 Double-deck construction platform of storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921705606.XU CN211714550U (en) 2019-10-12 2019-10-12 Double-deck construction platform of storage tank

Publications (1)

Publication Number Publication Date
CN211714550U true CN211714550U (en) 2020-10-20

Family

ID=72812772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921705606.XU Active CN211714550U (en) 2019-10-12 2019-10-12 Double-deck construction platform of storage tank

Country Status (1)

Country Link
CN (1) CN211714550U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113064453A (en) * 2021-02-21 2021-07-02 武汉市燃气热力规划设计院有限公司 System and method for controlling the level of the upper surface of a tank during the manufacture of the tank

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113064453A (en) * 2021-02-21 2021-07-02 武汉市燃气热力规划设计院有限公司 System and method for controlling the level of the upper surface of a tank during the manufacture of the tank
CN113064453B (en) * 2021-02-21 2023-10-10 武汉市燃气热力规划设计院有限公司 System and method for controlling levelness of upper surface of storage tank in storage tank manufacturing process

Similar Documents

Publication Publication Date Title
US11629033B2 (en) Integral lifting system and lifting method for assembled members
CN106284955A (en) The construction method of planer-type building-construction lifting device
CN201411900Y (en) Hydraulic die lifter for chimneys
CN101566005B (en) Chimney hydraulic mould lifting device
CN211714550U (en) Double-deck construction platform of storage tank
CN204873602U (en) Portal slewing crane
CN100417586C (en) Integral lifting method of large bridge crane and its appts
CN103274315A (en) Installing and hoisting device for side plate and upright of gas chamber
CN103306218B (en) Bottom width overhaul hanging basket of bridge
CN110565937A (en) Door type integral lifting steel platform
CN204531348U (en) Electronic independent-lifting discharging platform
CN202729645U (en) Tower crane with elevator
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN216476267U (en) Hanging basket frame in ring rail hanging form
CN211257773U (en) Door type integral lifting steel platform
CN110668332A (en) High stability cantilever crane for building
CN210856930U (en) Maintenance system of cable-stay bridge inverted Y-shaped tower column
CN203452004U (en) Bottom width overhaul hanging basket of bridge
CN203499232U (en) Attached lifting scaffold
CN106629438A (en) Pneumatic device for hanging basket
CN112897283A (en) Wind power generation tower cylinder maintenance and repair device
CN210558923U (en) Steel structure hoisting machine tool for concrete tower elevator shaft
CN112125244A (en) Working platform capable of ascending and descending along arc dome and installation method thereof
CN117569556B (en) Comprehensive working platform for large storage tank construction
CN219990959U (en) Hoisting equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant