CN211709422U - Water and electricity installation is with scalding a tub device - Google Patents

Water and electricity installation is with scalding a tub device Download PDF

Info

Publication number
CN211709422U
CN211709422U CN201921839925.XU CN201921839925U CN211709422U CN 211709422 U CN211709422 U CN 211709422U CN 201921839925 U CN201921839925 U CN 201921839925U CN 211709422 U CN211709422 U CN 211709422U
Authority
CN
China
Prior art keywords
bottom end
pipe
front side
rear side
hydroelectric installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921839925.XU
Other languages
Chinese (zh)
Inventor
范恒远
宋时超
丁秋菊
卢诚
谢蕊蕊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hongjie Intelligent Technology Co.,Ltd.
Original Assignee
Jiangsu Hongjie Electromechanical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hongjie Electromechanical Engineering Co ltd filed Critical Jiangsu Hongjie Electromechanical Engineering Co ltd
Priority to CN201921839925.XU priority Critical patent/CN211709422U/en
Application granted granted Critical
Publication of CN211709422U publication Critical patent/CN211709422U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of hydroelectric installation, in particular to a pipe ironing device for hydroelectric installation, which effectively improves the cutting precision of water pipes and the practicability; including work platform, the connecting seat, the link, hydraulic telescoping rod, motor and scale, the left front side of work platform bottom, left rear side, right front side and right rear side all are provided with the spliced pole, the bottom of connecting seat is connected with the right side on work platform top, the link is installed on the connecting seat, hydraulic telescoping rod's top and link are connected, hydraulic telescoping rod's bottom is provided with the linking arm, the bottom of linking arm is provided with the connecting plate, the top of motor is connected with the bottom of connecting plate, the right part output of motor is provided with the pivot, be provided with the cutting knife in the pivot, the bottom and the work platform's of scale bottom are connected, the left end and the right-hand member symmetry of scale are provided with anchor clamps.

Description

Water and electricity installation is with scalding a tub device
Technical Field
The utility model relates to a technical field of water and electricity installation especially relates to a water and electricity installation is with scalding a tub device.
Background
As is well known, a pipe ironing device for hydroelectric installation is a pipe ironing auxiliary device for hydroelectric installation, which is widely used in the field of hydroelectric installation. When scalding the water pipe and connect, because the length of single water pipe is limited, often need the water pipe of different length to scald and connect, and what often taken when intercepting the water pipe of different length at ordinary times is the mode of artifical manual cutting, often can cause the deviation in the precision to there is certain potential safety hazard, leads to the practicality relatively poor.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides an effectively improve the cutting accuracy of water pipe, improve the water and electricity installation of practicality with scalding a tub device.
The utility model discloses a water and electricity installation is with scalding pipe device, including work platform, the connecting seat, the link, hydraulic telescoping rod, motor and scale, the left front side, the left rear side, right front side and the right rear side of work platform bottom all are provided with the spliced pole, the bottom of connecting seat is connected with the right side on work platform top, the link is installed on the connecting seat, hydraulic telescoping rod's top is connected with the link, hydraulic telescoping rod's bottom is provided with the linking arm, the bottom of linking arm is provided with the connecting plate, the top of motor is connected with the bottom of connecting plate, the right part output of motor is provided with the pivot, be provided with the cutting knife in the pivot, the bottom of scale is connected with the top of work platform, the left end and the right-hand member symmetry of scale are; the bottom end of the mounting frame is connected with the left side of the top end of the working platform, a supporting rod is arranged on the mounting frame, and the top end of the supporting rod is connected with the connecting frame.
The utility model discloses a water and electricity installation is with scalding pipe device is provided with the opening on the work platform, and the open-ended top is provided with the grid board, and open-ended bottom intercommunication is provided with down the hopper, and the bottom intercommunication of hopper is provided with the discharging pipe down.
The utility model discloses a water and electricity installation is with scalding a tub device, the bottom of four group's spliced poles all is provided with the cushion.
The utility model discloses a water and electricity installation is with boiling hot tub of device still includes the receipts storage bucket, receives the storage bucket and arranges the below of discharging pipe bottom in.
The utility model discloses a water and electricity installation is with scalding a tub device, the left front side, left rear side, right front side and the right rear side of receiving the bottom barrel end all are provided with the gyro wheel.
The utility model discloses a water and electricity installation is with scalding a tub device still includes four threaded rods of group, and the left front side, left rear side, right front side and the right rear side of receiving the bucket bottom all are provided with the screwed pipe, and inside the top of four threaded rods of group inserted the bottom to four screwed pipes of group respectively the spiral shell dress, the bottom of four threaded rods of group all was provided with the bottom piece.
The utility model discloses a water and electricity installation is with boiling hot pipe device, the right-hand member upside of receiving bucket is provided with the pushing hands.
Compared with the prior art, the beneficial effects of the utility model are that: at first with the water pipe through scale adjustment cutting position, then fix the water pipe through two sets of anchor clamps, later open the motor, the motor drives pivot and cutting knife and rotates, then hydraulic telescoping rod drives pivoted cutting knife and descends, cut the water pipe can to use cutting device to replace manual cutting, effectively improve cutting accuracy, reduce the emergence of potential safety hazard, improve the practicality.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is an enlarged schematic view of the connection between the motor and the shaft;
FIG. 3 is an enlarged schematic view of the connection of the hopper and the discharge pipe;
FIG. 4 is a partially enlarged view of portion A of FIG. 1;
in the drawings, the reference numbers: 1. a working platform; 2. connecting columns; 3. a connecting seat; 4. a connecting frame; 5. A hydraulic telescopic rod; 6. a connecting arm; 7. a connecting plate; 8. a motor; 9. a rotating shaft; 10. a cutting knife; 11. a graduated scale; 12. a clamp; 13. a mounting frame; 14. a support bar; 15. a grid plate; 16. feeding a hopper; 17. a discharge pipe; 18. cushion blocks; 19. a material receiving barrel; 20. a roller; 21. A threaded pipe; 22. a threaded rod; 23. a bottom block; 24. and (6) pushing the hand.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
As shown in figures 1 to 4, the utility model relates to a tube ironing device for hydroelectric installation, which comprises a working platform 1, a connecting seat 3, a connecting frame 4 and a hydraulic telescopic rod 5, the cutting device comprises a motor 8 and a graduated scale 11, wherein connecting columns 2 are arranged on the left front side, the left rear side, the right front side and the right rear side of the bottom end of a working platform 1, the bottom end of a connecting seat 3 is connected with the right side of the top end of the working platform 1, a connecting frame 4 is installed on the connecting seat 3, the top end of a hydraulic telescopic rod 5 is connected with the connecting frame 4, a connecting arm 6 is arranged at the bottom end of the hydraulic telescopic rod 5, a connecting plate 7 is arranged at the bottom end of the connecting arm 6, the top end of the motor 8 is connected with the bottom end of the connecting plate 7, a rotating shaft 9 is arranged at the right output end of the motor 8, a cutting knife 10 is arranged on the rotating shaft 9, the bottom end of; at first with the water pipe through scale adjustment cutting position, then fix the water pipe through two sets of anchor clamps, later open the motor, the motor drives pivot and cutting knife and rotates, then hydraulic telescoping rod drives pivoted cutting knife and descends, cut the water pipe can to use cutting device to replace manual cutting, effectively improve cutting accuracy, reduce the emergence of potential safety hazard, improve the practicality.
The utility model discloses a water and electricity installation is with scalding a tub device, still include mounting bracket 13, the bottom of mounting bracket 13 is connected with the top left side of work platform 1, is provided with bracing piece 14 on mounting bracket 13, the top of bracing piece 14 is connected with link 4; through setting up mounting bracket and bracing piece, strengthen the support to the link, improve stability in use.
The utility model discloses a boiling hot pipe device for water and electricity installation, the working platform 1 is provided with an opening, the top end of the opening is provided with a grid plate 15, the bottom end of the opening is communicated with a discharging hopper 16, and the bottom end of the discharging hopper 16 is communicated with a discharging pipe 17; the garrulous end that produces passes the grid of grid board and outwards discharges through lower hopper and discharging pipe in the cutting process, effectively reduces the continuous piling up of cutting garrulous end, improves the practicality.
In the pipe ironing device for hydroelectric installation, the bottom ends of the four groups of connecting columns 2 are provided with cushion blocks 18; through setting up four groups of cushion, increase the area of contact with ground, improve stability in use.
The utility model discloses a water and electricity installation is with scalding a tub device, still include the receiving bucket 19, the receiving bucket 19 is arranged in the lower side of the 17 bottom ends of discharging pipes; through setting up the receiving bucket, conveniently accomodate the cutting bits end, improve the convenience of use.
The utility model discloses a water and electricity installation is with scalding a tub device, the left front side, the left rear side, the right front side and the right rear side of receiving bucket 19 bottom all are provided with gyro wheel 20; through setting up four group's gyro wheels, conveniently remove the receipts storage bucket and to be fit for the position, improve the practicality.
The utility model discloses a water and electricity installation is with scalding a tub device still includes four group's threaded rods 22, and the left front side, the left rear side, the right front side and the right rear side of receiving 19 bottoms of material bucket all are provided with screwed pipe 21, and the top of four group's threaded rods 22 is respectively the spiral shell dress and is inserted to the inside bottom of four group's screwed pipe 21, and the bottom of four group's threaded rods 22 all is provided with bottom block 23; by rotating the four groups of threaded rods, the four groups of rollers leave the ground, the position of the material receiving barrel is convenient to fix, and the use stability is improved.
The utility model discloses a tube ironing device for hydroelectric installation, wherein a push handle 24 is arranged on the upper side of the right end of a material receiving barrel 19; through setting up the pushing hands, be convenient for promote the receipts storage bucket and remove, improve the convenience of use.
The utility model discloses a water and electricity installation is with scalding a tub device, it is at the during operation, at first pass through scale adjustment cutting position with the water pipe, then fix the water pipe through two sets of anchor clamps, later open the motor, the motor drives pivot and cutting knife and rotates, then hydraulic telescoping rod drives the pivoted cutting knife and descends, cut the water pipe, later scald to the water pipe of accomplishing the cutting connect can, the garrulous end that produces at last cutting process passes the grid of grid board and outwards discharges to receiving in the storage bucket through lower hopper and discharging pipe.
The pipe ironing device for hydroelectric installation of the utility model adopts common mechanical modes, such as installation mode, connection mode or setting mode, and can be implemented as long as beneficial effects are achieved; the utility model discloses a water and electricity installation is with scalding motor of pipe device for purchase on the market, this industry technical staff only need according to its subsidiary service instruction install and operate can.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.

Claims (7)

1. A tube ironing device for hydroelectric installation is characterized by comprising a working platform (1), a connecting seat (3), a connecting frame (4), a hydraulic telescopic rod (5), a motor (8) and a graduated scale (11), wherein the left front side, the left rear side, the right front side and the right rear side of the bottom end of the working platform (1) are respectively provided with a connecting post (2), the bottom end of the connecting seat (3) is connected with the right side of the top end of the working platform (1), the connecting frame (4) is installed on the connecting seat (3), the top end of the hydraulic telescopic rod (5) is connected with the connecting frame (4), the bottom end of the hydraulic telescopic rod (5) is provided with a connecting arm (6), the bottom end of the connecting arm (6) is provided with a connecting plate (7), the top end of the motor (8) is connected with the bottom end of the connecting plate (7), the right output end of the motor (8) is provided with a rotating shaft, the bottom end of the graduated scale (11) is connected with the top end of the working platform (1), and the left end and the right end of the graduated scale (11) are symmetrically provided with clamps (12); the mounting structure is characterized by further comprising a mounting frame (13), the bottom end of the mounting frame (13) is connected with the left side of the top end of the working platform (1), a supporting rod (14) is arranged on the mounting frame (13), and the top end of the supporting rod (14) is connected with the connecting frame (4).
2. The pipe ironing device for hydroelectric installation as claimed in claim 1, wherein the working platform (1) is provided with an opening, the top end of the opening is provided with a grid plate (15), the bottom end of the opening is communicated with a discharging hopper (16), and the bottom end of the discharging hopper (16) is communicated with a discharging pipe (17).
3. A tubular ironing device for hydroelectric installation according to claim 2, characterized in that the four groups of connecting posts (2) are provided with pads (18) at their bottom ends.
4. The pipe ironing device for hydroelectric installation as claimed in claim 3, further comprising a receiving barrel (19), wherein the receiving barrel (19) is arranged below the bottom end of the discharging pipe (17).
5. A tube ironing device for hydroelectric installation according to claim 4, characterised in that the left front side, the left rear side, the right front side and the right rear side of the bottom end of the receiving bucket (19) are provided with rollers (20).
6. The pipe ironing device for hydroelectric installation as claimed in claim 5, further comprising four sets of threaded rods (22), wherein the left front side, the left rear side, the right front side and the right rear side of the bottom end of the material receiving barrel (19) are respectively provided with a threaded pipe (21), the top ends of the four sets of threaded rods (22) are respectively inserted into the bottom ends of the four sets of threaded pipes (21) in a screw-in manner, and the bottom ends of the four sets of threaded rods (22) are respectively provided with a bottom block (23).
7. The pipe ironing device for hydroelectric installation as claimed in claim 6, wherein the upper side of the right end of the receiving barrel (19) is provided with a push handle (24).
CN201921839925.XU 2019-10-29 2019-10-29 Water and electricity installation is with scalding a tub device Active CN211709422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921839925.XU CN211709422U (en) 2019-10-29 2019-10-29 Water and electricity installation is with scalding a tub device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921839925.XU CN211709422U (en) 2019-10-29 2019-10-29 Water and electricity installation is with scalding a tub device

Publications (1)

Publication Number Publication Date
CN211709422U true CN211709422U (en) 2020-10-20

Family

ID=72814143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921839925.XU Active CN211709422U (en) 2019-10-29 2019-10-29 Water and electricity installation is with scalding a tub device

Country Status (1)

Country Link
CN (1) CN211709422U (en)

Similar Documents

Publication Publication Date Title
CN206445274U (en) A kind of fixed length pipe cutting machine of adjustable withdrawing distance
CN107626858A (en) Construction multi-functional bar cutter device
CN206360363U (en) A kind of aluminum alloy pattern plate bracing device
CN211709422U (en) Water and electricity installation is with scalding a tub device
CN207686300U (en) Reinforcement type aluminum alloy pattern plate diagonal brace mechanism
CN211266254U (en) Support frame suitable for electric power capital construction job site interim cable supports
CN211464993U (en) Tubular product cutting device for construction
CN209435912U (en) A kind of novel reproducing area seedling protective device
CN106087670B (en) Linear variable concrete blinding
CN209969268U (en) Full-automatic numerical control titanium pipe bender
CN209723602U (en) A kind of architectural engineering reinforced support device
CN213329072U (en) Water conservancy construction cofferdam device
CN212652720U (en) Drilling equipment is used in production of low pressure injection mold
CN210149979U (en) Pipeline placement mechanism for building site
CN211304600U (en) Steel bar cutting device for bridge building engineering
CN210246243U (en) Double-sliding-tube bus hardware bracket
CN209268107U (en) A kind of tree-shaped correction tool
CN210587933U (en) Nonrust steel pipe welding position device
CN209671247U (en) A kind of easy to disassemble and maintenance electronics station-service high-efficiency and energy-saving type exhaust fan
CN211940809U (en) Packer equipment fixed equipment
CN217713072U (en) Negative pressure type silt discharging device
CN213842896U (en) Strength detection device for reinforcing steel bar material for building
CN213361333U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN211122919U (en) Rotary propeller type flow velocity meter convenient to position
CN209272618U (en) A kind of cutter device of hydraulic engineering Pipe installing convenient to use

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 6 / F, No.12 standard workshop, 225 Huajin Road, Tong'an Town, Suzhou high tech Zone, 215000 Jiangsu Province

Patentee after: Jiangsu Hongjie Intelligent Technology Co.,Ltd.

Address before: 215000 NO.666 Tongyuan Road, Suzhou Industrial Park, Jiangsu Province

Patentee before: JIANGSU HONGJIE ELECTROMECHANICAL ENGINEERING Co.,Ltd.

CP03 Change of name, title or address