CN211266254U - Support frame suitable for electric power capital construction job site interim cable supports - Google Patents
Support frame suitable for electric power capital construction job site interim cable supports Download PDFInfo
- Publication number
- CN211266254U CN211266254U CN202020242564.7U CN202020242564U CN211266254U CN 211266254 U CN211266254 U CN 211266254U CN 202020242564 U CN202020242564 U CN 202020242564U CN 211266254 U CN211266254 U CN 211266254U
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- support frame
- electric power
- threaded rod
- left end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title abstract description 25
- 238000009440 infrastructure construction Methods 0.000 claims abstract description 11
- 230000001681 protective effect Effects 0.000 claims description 3
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 abstract description 2
- 238000009413 insulation Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 125000003003 spiro group Chemical group 0.000 description 1
Images
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model relates to the technical field of electric power infrastructure, in particular to a support frame suitable for temporary cable support in an electric power infrastructure construction site, which can freely adjust the support height, can carry out cable support operation in construction sites with different conditions and reduce the use limitation; including the chassis, the screwed pipe, the threaded rod, fixation nut, first connecting plate, a pedestal, connecting block and insulating bracket, be provided with the mounting groove on the chassis, be provided with the bearing in the mounting groove, the bottom of screwed pipe inserts and is fixed inside to the inner circle of bearing, the screwed pipe is inside be provided with threaded rod assorted screw thread, the bottom of threaded rod inserts and spiral shell dress to the top of screwed pipe inside, fixation nut spiral shell dress cover is established on the threaded rod, and fixation nut's bottom pastes tightly with the top of screwed pipe, the bottom of first connecting plate is connected with the top of threaded rod.
Description
Technical Field
The utility model relates to a technical field of electric power capital construction especially relates to a support frame suitable for electric power capital construction job site interim cable supports.
Background
As is well known, a support frame suitable for supporting a temporary cable in an electric power infrastructure construction site is an auxiliary device for supporting the temporary cable in the electric power infrastructure construction site, and is widely used in the field of electric power infrastructure, generally, the support frame for supporting the cable cannot adjust the support height, can only be used for supporting jobs in a construction site with single conditions, is greatly limited by the height of the support frame, and causes high use limitation.
SUMMERY OF THE UTILITY MODEL
For solving the technical problem, the utility model provides a can freely adjust supporting height to can carry out the cable at the job site of different conditions and support the operation, reduce the support frame that is applicable to the interim cable support of electric power capital construction job site who uses the limitation.
The utility model discloses a support frame suitable for electric power capital construction job site interim cable supports, which comprises a base, the screwed pipe, the threaded rod, fixation nut, first connecting plate, a pedestal, connecting block and insulating bracket, be provided with the mounting groove on the chassis, be provided with the bearing in the mounting groove, the bottom of screwed pipe is inserted and is fixed to inside the inner circle of bearing, the screwed pipe is inside be provided with threaded rod assorted screw thread, the bottom of threaded rod is inserted and spiral shell dress to the top of screwed pipe inside, fixation nut spiral shell suit establishes on the threaded rod, and fixation nut's bottom pastes tightly with the top of screwed pipe, the bottom of first connecting plate is connected with the top of threaded rod, the bottom of base is connected with the top of first connecting plate, the bottom of connecting block is connected with the top of base, the bottom of insulating bracket is connected with the top.
The utility model discloses a support frame suitable for interim cable support of electric power capital construction job site, still include first link, the second connecting plate, first fixed spring, the second link, third connecting plate and second fixed spring, the bottom of first link is connected with the top left side of first connecting plate, the left end of second connecting plate is connected with the right-hand member upside of first link, the left end of first fixed spring is connected with the right-hand member of second connecting plate, the right-hand member of first fixed spring is provided with first insulating splint, the bottom of second link is connected with the top right side of first connecting plate, the right-hand member of third connecting plate is connected with the left end upside of second link, the right-hand member of second fixed spring is connected with the left end of third connecting plate, the left end of second fixed spring is provided with second insulating splint.
The utility model discloses a support frame suitable for interim cable support of electric power capital construction job site still includes four group's pulleys, and four group's pulleys are installed respectively in left front side, left rear side, right front side and the right rear side of chassis bottom.
The utility model discloses a support frame suitable for electric power capital construction job site interim cable supports, still include first telescopic link and second telescopic link, the left end of first telescopic link is connected with the right-hand member of second connecting plate, the right-hand member of first telescopic link is connected with the left end of first insulation splint, and first telescopic link is located first fixed spring's inside, the right-hand member of second telescopic link is connected with the left end of third connecting plate, the left end of second telescopic link is connected with the right-hand member of second insulation splint, and the second telescopic link is located the inside of second fixed spring.
The utility model discloses a support frame suitable for interim cable support of electric power capital construction job site, left front side, left rear side, right front side and the right rear side of chassis all are provided with the screw hole, and the bottom of four group's screws is threaded insert to four group's threaded holes of chassis respectively.
The utility model discloses a support frame suitable for electric power capital construction job site interim cable supports still includes the protection casing, and the fixed cover dress of protection casing is in the outside of bearing.
The utility model discloses a support frame suitable for electric power capital construction job site interim cable supports, the left end and the right-hand member of screwed pipe all set up the first in command.
The utility model discloses a support frame suitable for electric power capital construction job site interim cable supports still includes the connecting seat, and the right-hand member of connecting seat is connected with the left end of chassis, and the rotatable connecting rod that is provided with on the connecting seat, the top of connecting rod are provided with the second handle.
Compared with the prior art, the beneficial effects of the utility model are that: through rotating the screwed pipe, adjust first connecting plate to suitable height, then rotate fixation nut, make fixation nut's bottom and the top of screwed pipe paste tightly, the height of fixed first connecting plate, later support the cable through insulating bracket can, the realization is to the free adjustment of support height, can carry out the cable support operation at the job site of different conditions, reduces and uses the limitation.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a partially enlarged view of the portion A in FIG. 1;
FIG. 3 is a partially enlarged view of the portion B in FIG. 1;
FIG. 4 is a partially enlarged view of the portion C of FIG. 1;
in the drawings, the reference numbers: 1. a chassis; 2. a bearing; 3. a threaded pipe; 4. a threaded rod; 5. fixing a nut; 6. a first connecting plate; 7. a base; 8. connecting blocks; 9. an insulating bracket; 10. a first connecting frame; 11. a second connecting plate; 12. a first fixed spring; 13. a first insulating clamp plate; 14. a second link frame; 15. a third connecting plate; 16. a second fixed spring; 17. a second insulating clamp plate; 18. a pulley; 19. a first telescopic rod; 20. a second telescopic rod; 21. a screw; 22. a protective cover; 23. a first handle; 24. a connecting seat; 25. a connecting rod; 26. a second handle.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
As shown in fig. 1 to 4, the utility model discloses a support frame suitable for temporary cable support in electric power capital construction site, including chassis 1, screwed pipe 3, threaded rod 4, fixation nut 5, first connecting plate 6, base 7, connecting block 8 and insulating bracket 9, be provided with the mounting groove on chassis 1, be provided with bearing 2 in the mounting groove, the bottom of screwed pipe 3 inserts and fixes to the inside of the inner circle of bearing 2, be provided with the screw thread that matches with threaded rod 4 inside screwed pipe 3, the bottom of threaded rod 4 inserts and spiral shell dress to the inside of the top of screwed pipe 3, fixation nut 5 spiral shell dress is established on threaded rod 4, and the bottom of fixation nut 5 pastes tightly with the top of screwed pipe 3, the bottom of first connecting plate 6 is connected with the top of threaded rod 4, the bottom of base 7 is connected with the top of first connecting plate 6, the bottom of connecting block 8 is connected with the top of base 7, the bottom end of the insulating bracket 9 is connected with the top end of the connecting block 8; through rotating the screwed pipe, adjust first connecting plate to suitable height, then rotate fixation nut, make fixation nut's bottom and the top of screwed pipe paste tightly, the height of fixed first connecting plate, later support the cable through insulating bracket can, the realization is to the free adjustment of support height, can carry out the cable support operation at the job site of different conditions, reduces and uses the limitation.
The utility model is suitable for temporary cable support in the construction site of electric power infrastructure, and also comprises a first connecting frame 10, a second connecting plate 11 and a first fixed spring 12, the bottom end of the first connecting frame 10 is connected with the left side of the top end of the first connecting plate 6, the left end of the second connecting plate 11 is connected with the upper side of the right end of the first connecting frame 10, the left end of the first fixing spring 12 is connected with the right end of the second connecting plate 11, the right end of the first fixing spring 12 is provided with a first insulating clamp plate 13, the bottom end of the second connecting frame 14 is connected with the right side of the top end of the first connecting plate 6, the right end of the third connecting plate 15 is connected with the upper side of the left end of the second connecting frame 14, the right end of the second fixing spring 16 is connected with the left end of the third connecting plate 15, and the left end of the second fixing spring 16 is provided with a second insulating clamp plate 17; through the setting, under the effect of first fixed spring and second fixed spring, first insulating splint and second insulating splint paste tightly with the left end and the right-hand member of cable respectively, effectively strengthen the fixed to the cable, improve stability in use.
The utility model discloses a support frame suitable for electric power capital construction job site temporary cable supports still includes four groups of pulleys 18, and four groups of pulleys 18 are installed respectively in the left front side, left rear side, right front side and the right rear side of chassis 1 bottom; through setting up four group's pulleys, be convenient for remove whole assigned position, improve the practicality.
The utility model discloses a support frame suitable for electric power capital construction job site interim cable support still includes first telescopic link 19 and second telescopic link 20, the left end of first telescopic link 19 is connected with the right-hand member of second connecting plate 11, the right-hand member of first telescopic link 19 is connected with the left end of first insulating splint 13, and first telescopic link 19 is located the inside of first fixed spring 12, the right-hand member of second telescopic link 20 is connected with the left end of third connecting plate 15, the left end of second telescopic link 20 is connected with the right-hand member of second insulating splint 17, and second telescopic link 20 is located the inside of second fixed spring 16; through setting up first telescopic link and second telescopic link, prevent that first fixed spring and second fixed spring from taking place vertical skew at fixed in-process, improving stability in use.
The utility model discloses a support frame suitable for electric power capital construction job site temporary cable supports, the left front side, the left rear side, the right front side and the right rear side of chassis 1 all are provided with the screw hole, and the bottom of four group's screws 21 is the spiro union insert to four group's screw holes of chassis 1 respectively; by rotating the four groups of screws, the bottom ends of the four groups of screws are all inserted into the ground, the whole position is fully fixed, and the use stability is improved.
The utility model discloses a support frame suitable for electric power capital construction job site temporary cable supports still includes protection casing 22, and protection casing 22 is fixed to be covered in the outside of bearing 2; through setting up the protection casing, prevent that the foreign matter from entering into in the bearing, improve the safety in utilization.
The utility model discloses a support frame suitable for electric power capital construction job site temporary cable supports, the left end and the right-hand member of screwed pipe 3 all set up the first in command 23; through setting up two sets of first handlebars, just with rotate the screwed pipe, improve the convenience in use.
The utility model discloses a support frame suitable for electric power capital construction job site interim cable support still includes connecting seat 24, and the right-hand member of connecting seat 24 is connected with the left end of chassis 1, and rotatable connecting rod 25 that is provided with on connecting seat 24, the top of connecting rod 25 is provided with second handle 26; through setting up connecting seat, connecting rod and second handle, be convenient for promote the bulk movement, improve the convenience of use.
The utility model discloses a support frame suitable for interim cable of electric power capital construction job site supports, it is at the during operation, through rotating the screwed pipe, adjust first connecting plate to being fit for the height, then rotate fixation nut, make fixation nut's bottom and the top of screwed pipe paste tightly, the height of fixed first connecting plate, later support the cable through insulating bracket, and under first fixation spring and second fixation spring's effect, first insulation splint and second insulation splint paste tightly with the left end and the right-hand member of cable respectively, strengthen the fixed to the cable.
The utility model discloses a support frame suitable for interim cable support of electric power capital construction job site, its mounting means, connected mode or the mode of setting up are common mechanical type, as long as can reach all can implement of its beneficial effect.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.
Claims (8)
1. The support frame is suitable for supporting temporary cables in an electric power infrastructure construction site and is characterized by comprising an underframe (1), a threaded pipe (3), a threaded rod (4), a fixing nut (5), a first connecting plate (6), a base (7), a connecting block (8) and an insulating bracket (9), wherein a mounting groove is formed in the underframe (1), a bearing (2) is arranged in the mounting groove, the bottom end of the threaded pipe (3) is inserted into and fixed in an inner ring of the bearing (2), threads matched with the threaded rod (4) are arranged in the threaded pipe (3), the bottom end of the threaded rod (4) is inserted into and screwed into the top end of the threaded pipe (3), the fixing nut (5) is sleeved on the threaded rod (4) in a screwed mode, the bottom end of the fixing nut (5) is tightly attached to the top end of the threaded pipe (3), the bottom end of the first connecting plate (6) is connected with the top end of the threaded rod (4, the bottom of base (7) is connected with the top of first connecting plate (6), and the bottom of connecting block (8) is connected with the top of base (7), and the bottom of insulating bracket (9) is connected with the top of connecting block (8).
2. The support frame for temporary cable support in the power infrastructure construction site as claimed in claim 1, further comprising a first connecting frame (10), a second connecting plate (11), a first fixing spring (12), a second connecting frame (14), a third connecting plate (15) and a second fixing spring (16), wherein the bottom end of the first connecting frame (10) is connected with the left side of the top end of the first connecting plate (6), the left end of the second connecting plate (11) is connected with the upper side of the right end of the first connecting frame (10), the left end of the first fixing spring (12) is connected with the right end of the second connecting plate (11), the right end of the first fixing spring (12) is provided with a first insulating clamp plate (13), the bottom end of the second connecting frame (14) is connected with the right side of the top end of the first connecting plate (6), the right end of the third connecting plate (15) is connected with the upper side of the left end of the second connecting frame (14), the right end of the second fixed spring (16) is connected with the left end of the third connecting plate (15), and the left end of the second fixed spring (16) is provided with a second insulating clamping plate (17).
3. A support frame adapted for temporary cable support at a power infrastructure construction site as claimed in claim 2, further comprising four sets of pulleys (18), wherein the four sets of pulleys (18) are respectively installed at the left front side, the left rear side, the right front side and the right rear side of the bottom end of the underframe (1).
4. The support frame for temporary cable support in electric power infrastructure construction sites as claimed in claim 3, further comprising a first telescopic rod (19) and a second telescopic rod (20), wherein the left end of the first telescopic rod (19) is connected with the right end of the second connecting plate (11), the right end of the first telescopic rod (19) is connected with the left end of the first insulating clamp plate (13), and the first telescopic rod (19) is located inside the first fixing spring (12), the right end of the second telescopic rod (20) is connected with the left end of the third connecting plate (15), the left end of the second telescopic rod (20) is connected with the right end of the second insulating clamp plate (17), and the second telescopic rod (20) is located inside the second fixing spring (16).
5. A support frame adapted for temporary cable support in electric power infrastructure construction sites as claimed in claim 4, wherein the left front side, the left rear side, the right front side and the right rear side of the base frame (1) are provided with threaded holes, and the bottom ends of the four sets of screws (21) are respectively screwed into the four sets of threaded holes of the base frame (1).
6. A support frame adapted for temporary cable support at a power infrastructure construction site as claimed in claim 5, further comprising a protective cover (22), the protective cover (22) being fixedly attached to the outside of the bearing (2).
7. A support frame adapted for temporary cable support at a power infrastructure construction site as claimed in claim 6, wherein the threaded pipe (3) is provided with a first handle (23) at both its left and right ends.
8. A support frame suitable for temporary cable support in an electric power infrastructure construction site as claimed in claim 7, further comprising a connecting base (24), wherein the right end of the connecting base (24) is connected with the left end of the underframe (1), a connecting rod (25) is rotatably arranged on the connecting base (24), and a second handle (26) is arranged at the top end of the connecting rod (25).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020242564.7U CN211266254U (en) | 2020-03-03 | 2020-03-03 | Support frame suitable for electric power capital construction job site interim cable supports |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202020242564.7U CN211266254U (en) | 2020-03-03 | 2020-03-03 | Support frame suitable for electric power capital construction job site interim cable supports |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211266254U true CN211266254U (en) | 2020-08-14 |
Family
ID=71956938
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202020242564.7U Active CN211266254U (en) | 2020-03-03 | 2020-03-03 | Support frame suitable for electric power capital construction job site interim cable supports |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211266254U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111355194A (en) * | 2020-04-17 | 2020-06-30 | 山东鼎盛电气设备有限公司 | Cable support frame device convenient to adjust |
| CN112688219A (en) * | 2021-01-20 | 2021-04-20 | 邵阳学院 | Electrical cabinet temporary manufacturing device based on electrical engineering building construction site |
-
2020
- 2020-03-03 CN CN202020242564.7U patent/CN211266254U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111355194A (en) * | 2020-04-17 | 2020-06-30 | 山东鼎盛电气设备有限公司 | Cable support frame device convenient to adjust |
| CN112688219A (en) * | 2021-01-20 | 2021-04-20 | 邵阳学院 | Electrical cabinet temporary manufacturing device based on electrical engineering building construction site |
| CN112688219B (en) * | 2021-01-20 | 2022-12-02 | 邵阳学院 | A temporary production device for electrical cabinets based on electrical engineering building construction sites |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211266254U (en) | Support frame suitable for electric power capital construction job site interim cable supports | |
| CN206398316U (en) | A kind of tablet personal computer fixture | |
| CN110492416A (en) | A kind of power supply and distribution of electric power fixes device with aerial insulated cable | |
| CN106764336A (en) | A kind of panel computer fixture | |
| CN210069312U (en) | Damping device of hanging direct current screen | |
| CN208670538U (en) | A kind of steady holder of weight adjustable cardioid camera increasing | |
| CN107762246A (en) | A kind of fixing device of communication tower | |
| CN209929881U (en) | Mounting rack for special cable | |
| CN211504069U (en) | Measuring device for outer diameter of cylindrical processed product | |
| CN206553161U (en) | A kind of architectural electricity equipment construction device | |
| CN212377620U (en) | Wireless terminal signal acquisition device convenient to adjust | |
| CN214867792U (en) | Adjustable tapping auxiliary table | |
| CN212456018U (en) | Direction-invariant height-adjustable support frame | |
| CN116689830A (en) | Electrical switchgear electrified drilling anti-splashing device | |
| CN202037458U (en) | Adjustable supporting device of machine tool | |
| CN222802438U (en) | Adjustable cable bracket | |
| CN210938917U (en) | Building tubular product clamping device with adjustable | |
| CN222215549U (en) | A protective cover suitable for automobile friction generator | |
| CN207304790U (en) | The set-top box installing mechanism being easily installed | |
| CN104964138A (en) | Universal tablet personal computer support | |
| CN212706388U (en) | Machine part clamping mechanism | |
| CN221323986U (en) | Thin oil vibration exciter | |
| CN210524907U (en) | Diaphragm coupling processing fixing device | |
| CN215173601U (en) | Surveying instrument adjusting device for engineering | |
| CN210600928U (en) | Fuel injection pump bracket |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |