- CN211696202U CN211696202U CN202020568386.7U CN202020568386U CN211696202U CN 211696202 U CN211696202 U CN 211696202U CN 202020568386 U CN202020568386 U CN 202020568386U CN 211696202 U CN211696202 U CN 211696202U
- Authority
- CN
- China
- Prior art keywords
- survey
- mobile jib
- surveying
- under water
- fighting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model relates to a measure device of pile concrete placement surface course degree of depth under water, including being used for surveying the detection mechanism of pile concrete placement surface course under water, being used for hanging the flexible stay cord of detection mechanism, detection mechanism includes that the survey of cylinder fights the survey of mobile jib, the fretwork of the shape of a conical surface and fights, survey and fight the rigid coupling on the mobile jib, and survey the opening end of fighting up, the bottom of surveying the mobile jib of fighting is equipped with the conical head, the top rigid coupling of surveying the mobile jib of fighting has rings, the one end system of flexible stay cord is on rings. The utility model has the advantages that: through set up the funnel of fretwork on surveying the fill mobile jib, make survey fill when weighing down in the stake hole under water, can pass through water layer and laitance layer smoothly, then blocked by the graded rubble in the stake concrete surface course under water to detect the position of stake concrete surface course under water, solved the difficult problem of confirming of stake concrete surface course top elevation under water.
Description
Technical Field
The utility model relates to a building technical field especially relates to a measure device of pile concrete placement surface course degree of depth under water.
Background
At present, in the construction process of underwater piles, an important task is to determine whether the elevation of the top of underwater cast concrete meets the specified requirement. On site, construction operators generally tie the hoisting ropes marked with scales on thick reinforcing steel bars with the length of 30cm to manufacture simple hoisting hammers, and judge the height of a concrete pouring surface according to experience. The result error of the measurement treatment of the method is very large, and the influence of the laitance on the pile top cannot be eliminated.
In the process of underwater pile concrete pouring, the height of the top surface of the concrete and the depth of the embedded pipe of the guide pipe are measured in time, and the guide pipe is lifted and removed in time. However, for the experience judgment of the existing simple steel bar as the hanging hammer, the actual height of the poured concrete surface cannot be accurately measured, and the situation that the pile is broken due to excessive pipe drawing or the pouring is difficult due to too short pipe drawing often occurs. After the pile body is poured to the designed elevation, the specification and the design drawing also require a part of concrete to be over-poured, so that the concrete quality of the pile body is ensured. However, due to the fact that the existing judging method is large in error, only the laitance is generated after the pile is broken to the specified elevation, and the condition that pile connection has to be dug for quality safety of the pile is guaranteed, so that no problem exists, concrete is usually poured more, and concrete waste is caused invisibly. Therefore, a simple device for measuring the depth of a concrete pouring surface layer of an underwater pile is needed to facilitate construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the above problem that prior art exists, provide a measure device of stake concrete placement surface course degree of depth under water, solve the concrete surface course top elevation problem of confirming the difficulty that exists at the concrete placement in-process of stake under water at present.
For realizing above-mentioned technical purpose, reach above-mentioned technological effect, the utility model discloses a following technical scheme realizes:
the utility model provides a measure device of pile concrete placement surface course degree of depth under water, is including being used for surveying the detection mechanism of pile concrete placement surface course under water, the flexible stay cord that is used for hanging detection mechanism, detection mechanism includes that surveying of cylinder fights the survey of mobile jib, the fretwork of awl shape of face shape and fights, survey and fight the rigid coupling on surveying the mobile jib, and survey the opening end of fighting up, the bottom of surveying the mobile jib of fighting is equipped with the conical head, the top rigid coupling of surveying the mobile jib of fighting has rings, the one end system of flexible stay cord is on rings.
Further, survey the fill and include many use survey the fill mobile jib as the down tube of center pin arranging according to ring array, a plurality of from down the connection ring that up diameter increases in proper order, every connection ring all with whole down tube rigid couplings, every the center pin of connecting the ring with survey the center pin collineation of fighting the mobile jib.
Furthermore, the length and the width of a gap enclosed by the diagonal rod, the main rod of the measuring bucket and the connecting circular ring positioned at the bottom are all less than 5 mm.
Furthermore, a scale ring for marking the length is sleeved on the flexible pull rope in an interference manner.
The utility model has the advantages that: through the funnel that sets up the fretwork on surveying the fill mobile jib, make survey fill when the drop-in is in the stake hole under water, can pass through water layer and laitance layer smoothly, then blocked by the graded rubble in the stake concrete surface course under water and intercept to detect the position of stake concrete surface course under water, solved the problem of stake concrete surface course top elevation confirmation difficulty under water, simultaneously the utility model discloses should not break, the scale sign is clear, stand wear and tear.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without undue limitation to the invention. In the drawings:
fig. 1 is a schematic structural diagram of an apparatus according to an embodiment of the present invention.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
As shown in fig. 1, a measure device of pile concrete placement surface course degree of depth under water, including being used for surveying the detection mechanism of pile concrete placement surface course under water, a flexible stay cord 1 for hanging detection mechanism, flexible stay cord 1 is the inelastic rope, the length of the flexible stay cord 1 of unit weight is unchangeable in use and storage process, detection mechanism includes the survey of cylinder and fights mobile jib 2, survey of the fretwork of the toper shape and fight 3, 3 rigid couplings of surveying the fill are on survey the mobile jib 2, and the opening end of surveying the fill 3 faces up, the bottom of surveying the fill mobile jib 2 is equipped with conical head 4, the top rigid coupling of surveying the fill mobile jib 2 has rings 5, one end system of flexible stay cord 1 is on rings 5.
The bottom of the diagonal rod 31 is welded with the outer side of the main rod 2 of the measuring bucket, and the connecting ring 32 is welded with the diagonal rod 31. The length and the width of the gap enclosed between the inclined rod 31, the main rod 2 of the measuring hopper and the connecting circular ring 32 positioned at the bottom are both less than 5mm, so that the sand and the cement paste in the concrete can smoothly pass through, and the two stones are intercepted, thereby ensuring that the measuring hopper 3 can smoothly pass through a water layer and a laitance layer.
The utility model discloses a theory of operation: an operator drops the detection mechanism into the underwater pile hole through the portable flexible pull rope until the measuring bucket of the detection mechanism is intercepted by graded broken stones of an underwater pile concrete surface layer, when the flexible pull rope just begins to loose, the length h1 of the flexible pull rope stretching into the underwater pile hole is recorded, the length h2 between the top end of the measuring bucket and the hanging ring is obtained through measurement by a ruler, the sum of h1 and h2 is the height difference between the underwater pile concrete surface layer and the orifice of the underwater pile hole, and then whether the height of the underwater pile concrete surface layer reaches the height required by design is known. Because concrete and mud are not uniform in weight, the concrete and mud have strong viscous feeling. When the viscous feeling disappears and the detection device stably sinks, the detection device stops releasing, and an operator records the scale of the label on the flexible pull rope at the moment. And lifting and placing the probe up and down for 3 seconds, and then lifting the probe out. And observing whether the measuring hopper has stones in the concrete or not, and if yes, recording the depth as the effective depth of the underwater concrete pouring surface layer. If not, the secondary extraction measurement needs to be deepened.
The utility model discloses a measuring bucket volume is got the concrete stone degree of depth and is judged concreting concrete surface layer degree of depth under water, has avoidd and has leaned on the operation workman viscous to feel the experience problem of subjective definite concrete surface, has also avoided the laitance layer to the influence that the concrete interface judges. When the stones are taken out, the reading of the flexible measuring rope is the effective depth of the underwater concrete pouring surface layer, the underwater concrete pouring device is objective and convenient, the height of the underwater pile is greatly reduced under the condition of ensuring the reliable quality of the pile, and the waste of concrete and the subsequent pile breaking engineering quantity are further reduced.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.
Claims (4)
1. The utility model provides a measure device of pile concrete placement surface course degree of depth under water which characterized in that: including being used for surveying the detection mechanism of pile concrete placement surface course under water, being used for hanging detection mechanism's flexible stay cord, detection mechanism includes that the survey of cylinder fights the mobile jib, the survey of the fretwork of awl shape of face and fights, survey to fight the rigid coupling on surveying the mobile jib of fighting, and survey the opening end of fighting up, the bottom of surveying the mobile jib of fighting is equipped with the conical head, the top rigid coupling of surveying the mobile jib of fighting has rings, the one end system of flexible stay cord is on rings.
2. The device for measuring the depth of the concrete pouring surface layer of the underwater pile according to claim 1, is characterized in that: survey the fill and include many use survey fill mobile jib as the down tube of center pin according to the down connection ring that up diameter increases in proper order, a plurality of follow, every connection ring all with whole down tube rigid coupling, every the center pin of connecting the ring and the center pin collineation of surveying the fill mobile jib.
3. The device for measuring the depth of the concrete pouring surface layer of the underwater pile according to claim 2, is characterized in that: the length and the width of a gap enclosed by the inclined rod, the main rod of the measuring bucket and the connecting circular ring positioned at the bottom are all less than 5 mm.
4. The device for measuring the depth of the concrete pouring surface layer of the underwater pile according to claim 1, is characterized in that: and a scale ring for marking the length is sleeved on the flexible pull rope in an interference manner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020568386.7U CN211696202U (en) | 2020-04-16 | 2020-04-16 | Device for measuring depth of concrete pouring surface layer of underwater pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020568386.7U CN211696202U (en) | 2020-04-16 | 2020-04-16 | Device for measuring depth of concrete pouring surface layer of underwater pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211696202U true CN211696202U (en) | 2020-10-16 |
Family
ID=72782928
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020568386.7U Active CN211696202U (en) | 2020-04-16 | 2020-04-16 | Device for measuring depth of concrete pouring surface layer of underwater pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211696202U (en) |
-
2020
- 2020-04-16 CN CN202020568386.7U patent/CN211696202U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109629455B (en) | Construction method for reconstructing bridge of highway | |
CN110206493B (en) | Construction process of full-sleeve full-rotation bored pile | |
CN112900450A (en) | Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method | |
CN104110028B (en) | A kind of dry operation boring is without the cast-in-place pile construction method of water law concrete perfusion | |
CN112411574A (en) | Old bridge pile position original site impact drill matched rotary drilling hole forming construction method | |
CN109837891A (en) | A kind of tubular pole filling core construction | |
CN211696202U (en) | Device for measuring depth of concrete pouring surface layer of underwater pile | |
CN113404042A (en) | Bridge pile position construction method | |
CN210151746U (en) | Underwater replacement construction device for different-strength concrete of pile column in concrete-filled steel tube support column | |
CN115404880A (en) | Supporting pile construction process | |
CN108775036A (en) | A kind of construction method for replacing bored concrete pile | |
CN110714459A (en) | Construction method of cast-in-situ bored pile | |
CN108360524A (en) | One kind preventing superfilled device and its application method | |
CN110485413B (en) | Combined type protection rapid hole forming method for pile foundation of viaduct adjacent to subway | |
CN108396734A (en) | A kind of device of control Punching Borehole Cast-in-place Concrete Pile stake top concrete casting elevation | |
CN107675700A (en) | The construction method of diaphram wall | |
CN107246010A (en) | Karst area Percussion Piles construction | |
CN111691426A (en) | Comprehensive construction method for non-occluded water stop pile of deep foundation pit drilling support structure | |
CN112302039A (en) | Tunnel portal shallow-buried slope collapse volume treatment construction method | |
CN111335305A (en) | Double-casing zero-friction static load detection construction method based on uplift pile | |
CN216737128U (en) | Steel stand hoisting accessory | |
CN211200488U (en) | Hole bottom slurry taking device for diaphragm wall and cast-in-place pile | |
CN205116240U (en) | Bored concrete pile laitance thickness detecting device under water | |
CN104264667A (en) | Construction method for pre-stress bamboo joint piles | |
CN215562629U (en) | Over-filling prevention device for cast-in-place pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |