CN211693820U - Through type mounting structure of pre-buried frame of blow off pipe - Google Patents
Through type mounting structure of pre-buried frame of blow off pipe Download PDFInfo
- Publication number
- CN211693820U CN211693820U CN202020247133.XU CN202020247133U CN211693820U CN 211693820 U CN211693820 U CN 211693820U CN 202020247133 U CN202020247133 U CN 202020247133U CN 211693820 U CN211693820 U CN 211693820U
- Authority
- CN
- China
- Prior art keywords
- floor
- embedded
- pipe
- fixedly connected
- positioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 claims abstract description 13
- 238000009434 installation Methods 0.000 claims description 14
- 239000010865 sewage Substances 0.000 claims description 8
- 238000003780 insertion Methods 0.000 claims description 7
- 230000037431 insertion Effects 0.000 claims description 7
- 239000004033 plastic Substances 0.000 claims description 4
- 239000004568 cement Substances 0.000 description 5
- 230000006978 adaptation Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002351 wastewater Substances 0.000 description 1
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
The utility model discloses a through mounting structure of pre-buried frame of blow off pipe, including the building body, the building body is inside including first floor, and first floor upper end fixedly connected with wall body, wall body upper end fixedly connected with second floor on the first floor, and pass through wall body fixedly connected with third floor on the second floor, the embedded groove has been seted up to first floor, second floor and third floor inside, and the inside fixedly connected with built-in fitting body of embedded groove, the inside detachable blow off pipe body that is connected with of built-in fitting body, and the blow off pipe body runs through first floor, second floor and third floor through the built-in fitting body. This through-type mounting structure of pre-buried frame of blow off pipe, the utility model discloses need not look for the position repeatedly, also need not to use repeatedly the measuring instrument counterpoint and measure, the power consumption is littleer, and more the key is that the repair material that uses still less, has effectively reduced the use of material, has practiced thrift the resource.
Description
Technical Field
The utility model relates to a blow off pipe technical field specifically is a through mounting structure of pre-buried frame of blow off pipe.
Background
The drainage pipeline refers to a system consisting of a pipeline for collecting and discharging sewage, wastewater and rainwater and auxiliary facilities thereof, and comprises a main pipe, branch pipes and pipelines leading to a treatment plant, the pipelines are built on a street or any other place, as long as the pipelines play a drainage role, the pipelines are used as drainage pipelines for statistics, and the drainage pipes are used for drainage of floors.
But the blow off pipe of current building floor is from the direct bottom of top building, consequently need to each floor board trompil, and the trompil very easily leads to the position of hole not right respectively, need adjust the position and the size of drilling repeatedly, so need use more instrument measurement, when consumeing manpower and materials, also increased the loss of measuring instrument, the trompil that also leads to each layer at last is far greater than direct tub of external diameter, consequently need repair the benefit and fill, the consumptive material power consumption, and the cohesion of direct pipe and cement benefit and fill is relatively poor, whole practicality has been reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a through mounting structure of pre-buried frame of blow off pipe, through setting up the pre-buried built-in fitting body that is greater than direct external diameter of pipe of trompil department, avoid repeated adjustment drilling position and size, reduce the energy consumption, also avoided using more repair materials, practiced thrift the use of resources.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a blow off pipe pre-buried frame through type mounting structure, includes the building body, the inside first floor that is including of building body, and first floor upper end fixedly connected with wall body, the wall body upper end fixedly connected with second floor on the first floor, and the second floor upper end is through wall body fixedly connected with third floor, the embedded groove has been seted up to first floor, second floor and third floor inside, and the inside fixedly connected with built-in fitting body of embedded groove, the constant head tank has been seted up to embedded groove inside, the fixedly connected with locating piece in the built-in fitting body outside, and locating piece and the mutual block of constant head tank, the inside blow off pipe body that can dismantle of built-in fitting body is connected with, and the blow off pipe body runs through first floor, second floor and third floor through the built-in fitting body.
Preferably, the embedded groove is matched with the embedded part body in shape and size, the positioning block on the outer side of the embedded part body is matched with the positioning block inside the embedded groove in shape and size, and three groups of the embedded groove and the embedded part body are distributed corresponding to the first floor, the second floor and the third floor.
Preferably, the inserting groove is formed in the embedded part body, the inserting groove is located on the outer side of the sewage discharge pipe body, the clamping block is detachably connected in the inserting groove, the upper end of the clamping block is fixedly connected with the pipeline fixing part, and the pipeline groove is formed in the pipeline fixing part.
Preferably, the outer side of the clamping block is fixedly connected with a positioning clamping block, a positioning clamping groove is formed in the inserting groove, and the positioning clamping block and the positioning clamping groove are clamped with each other.
Preferably, the pipeline fixing parts are symmetrically distributed about a horizontal center line of the embedded part body, the clamping blocks are matched with the inserting grooves in shape and size, and the clamping blocks are made of high-elasticity plastic materials.
Preferably, the positioning clamping blocks are matched with the positioning clamping grooves in shape and size, and the positioning clamping blocks are made of high-elasticity rubber materials.
Compared with the prior art, the beneficial effects of the utility model are that:
1. according to the through type installation structure of the pre-buried frame of the drain pipe, the pre-buried part body with the diameter larger than the outer diameter of the through pipe is pre-buried at the opening part, so that the through pipe is directly connected with each floor in a penetrating way without repeatedly finding the position, the bonding force between cement and the pre-buried part body is better, the measurement instrument is not required to be repeatedly used for measuring the position, the energy consumption is smaller, more importantly, the used repairing materials are fewer, the use of the materials is effectively reduced, the resources are saved, and the utility model has high construction efficiency, so that the pipeline can be conveniently and integrally installed;
2. according to the through type installation structure of the pre-buried frame of the sewage discharge pipe, the pipeline joint is fixed by using the pipeline clamping piece, so that stable installation can be conveniently and integrally carried out, cement edge sealing can be conveniently carried out on the whole, the stability of integral connection is improved, the whole is convenient to fix, and the whole practicability is improved;
3. this through-type mounting structure of pre-buried frame of blow off pipe, through the convenient pipe mounting of pegging graft each other that uses inserting groove and block, the diameter according to the pipeline of the while convenience is changed the pipe mounting to fix whole through the mutual block of positioning channel section and positioning fixture block, thereby make things convenient for whole installation, increased whole practicality.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the three-dimensional structure of the pre-buried groove of the present invention;
FIG. 3 is a schematic view of the split structure of the embedded part body of the present invention;
fig. 4 is the schematic diagram of the internal structure of the pressure embedded part body of the present invention.
In the figure: 1. a building body; 2. a first floor; 3. a wall body; 4. a second floor; 5. a third floor; 6. pre-burying a groove; 7. an embedded part body; 8. positioning a groove; 9. positioning blocks; 10. a blow-off pipe body; 11. inserting grooves; 12. a clamping block; 13. a pipe fixing member; 14. a pipe chase; 15. positioning a fixture block; 16. and a positioning clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a blow off pipe embedded frame through type mounting structure, including building body 1, building body 1 is inside including first floor 2, and 2 upper end fixedly connected with wall bodies 3 of first floor, 3 upper end fixedly connected with second floor 4 of wall bodies on the first floor 2, and pass through 3 fixedly connected with third floor 5 of wall bodies on the 4 upper ends of second floor, first floor 2, embedded groove 6 has been seted up to second floor 4 and the inside fixedly connected with built-in fitting body 7 of third floor 5, and 6 inside fixedly connected with built-in fitting bodies 7 of embedded groove, constant head tank 8 has been seted up to 6 inside of embedded groove, 7 outside fixedly connected with locating piece 9 of built-in fitting body, and locating piece 9 and the mutual block of constant head tank 8, 7 inside detachable connections of built-in fitting body have blow off pipe body 10, and blow off pipe body 10 runs through first floor 2 through built-in fitting body 7, second floor 4 and third floor 5.
Further, pre-buried groove 6 and the big or small looks adaptation of the shape of pre-buried part body 7, and the locating piece 9 in the pre-buried part body 7 outside and the big or small looks adaptation of the inside locating piece 9 shape of pre-buried groove 6, pre-buried groove 6 and pre-buried part body 7 correspond first floor 2, second floor 4 and third floor 5 and distribute and have three groups, conveniently carry out through installation to whole, increased holistic practicality.
Further, the inserting groove 11 has been seted up to built-in fitting body 7 inside, and inserting groove 11 is located the blow off pipe body 10 outside, and inserting groove 11 is inside can dismantle and be connected with block 12, and block 12 upper end fixedly connected with pipeline mounting 13 to pipeline mounting 13 is inside to seted up the pipe chute 14, makes things convenient for pipeline mounting 13 to fix a position the installation to the pipeline, thereby conveniently fixes wholly, has increased holistic practicality.
Furthermore, a positioning fixture block 15 is fixedly connected to the outer side of the clamping block 12, a positioning slot 16 is formed in the insertion slot 11, the positioning fixture block 15 and the positioning slot 16 are clamped with each other, and the positioning fixture block 15 and the positioning slot 16 can be clamped with each other, so that the pipeline fixing member 13 can be stably installed.
Furthermore, the pipeline fixing pieces 13 are symmetrically distributed about the horizontal center line of the embedded part body 7, the clamping blocks 12 are matched with the insertion grooves 11 in shape and size, the clamping blocks 12 are made of high-elasticity plastic materials, the clamping blocks 12 made of the high-elasticity plastic materials are conveniently inserted into the insertion grooves 11, the whole assembly and disassembly are convenient, and the whole flexibility is improved.
Furthermore, the positioning fixture blocks 15 are matched with the positioning fixture grooves 16 in shape and size, the positioning fixture blocks 15 are made of high-elasticity rubber, and the positioning fixture blocks 15 made of the high-elasticity rubber are conveniently clamped with the positioning fixture grooves 16, so that the overall practicability is improved.
The working principle is as follows: firstly, pre-embedded grooves 6 are arranged in a first floor 2, a second floor 4 and a third floor 5, so that the pre-embedded part body 7 can be pre-embedded conveniently, and a positioning block 9 outside the pre-embedded part body 7 is clamped with a positioning groove 8, so that the installation stability of the pre-embedded part body 7 is improved, the overall practicability is improved, before the blow-off pipe body 10 is installed, a pipeline fixing part 13 with the same specification is selected through the diameter of the blow-off pipe body 10, a clamping block 12 outside the pipeline fixing part 13 is mutually inserted into an insertion groove 11, the overall pre-installation is convenient, a positioning clamping block 15 is clamped with a positioning clamping groove 16, the overall clamping stability is improved, the overall cement pouring is convenient to be carried out integrally, the overall practicability is improved, the direct-through pipe can directly penetrate through each floor without repeated positioning, the bonding force of cement and the pre-embedded part body 7 is better, and the construction efficiency is high, thereby facilitating the installation of the pipeline as a whole.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a through mounting structure of pre-buried frame of blow off pipe, includes the building body, its characterized in that: the building comprises a building body and is characterized in that the building body is internally provided with a first floor, a wall body is fixedly connected to the upper end of the first floor, a second floor is fixedly connected to the upper end of the wall body on the first floor, a third floor is fixedly connected to the upper end of the second floor through the wall body, embedded grooves are formed in the first floor, the second floor and the third floor, embedded parts are fixedly connected to the inside of the embedded grooves, positioning grooves are formed in the embedded grooves, positioning blocks are fixedly connected to the outer sides of the embedded parts and are clamped with the positioning grooves, a blow-off pipe body is detachably connected to the inside of the embedded parts, and the blow-off pipe body penetrates through the first floor, the second floor and the third floor through the embedded parts.
2. The through type installation structure of the embedded frame of the sewage drain pipe as claimed in claim 1, which is characterized in that: the embedded groove is matched with the embedded part body in shape and size, the positioning blocks outside the embedded part body are matched with the positioning blocks inside the embedded groove in shape and size, and three groups of embedded grooves and the embedded part body are distributed corresponding to the first floor, the second floor and the third floor.
3. The through type installation structure of the embedded frame of the sewage drain pipe as claimed in claim 1, which is characterized in that: the embedded part body is internally provided with an insertion groove, the insertion groove is positioned outside the blow-off pipe body, the insertion groove is internally detachably connected with a clamping block, the upper end of the clamping block is fixedly connected with a pipeline fixing part, and the pipeline groove is formed in the pipeline fixing part.
4. The through type installation structure of the embedded frame of the sewage drain pipe as claimed in claim 3, which is characterized in that: the clamping block is fixedly connected with a positioning clamping block on the outer side, a positioning clamping groove is formed in the inserting groove, and the positioning clamping block and the positioning clamping groove are clamped mutually.
5. The through type installation structure of the embedded frame of the sewage drain pipe as claimed in claim 3, which is characterized in that: the pipeline fixing pieces are symmetrically distributed about the horizontal center line of the embedded part body, the clamping blocks are matched with the inserting grooves in shape and size, and the clamping blocks are made of high-elasticity plastic materials.
6. The through type installation structure of the embedded frame of the sewage drain pipe as claimed in claim 4, which is characterized in that: the positioning clamping blocks are matched with the positioning clamping grooves in shape and size, and the positioning clamping blocks are made of high-elasticity rubber materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020247133.XU CN211693820U (en) | 2020-03-04 | 2020-03-04 | Through type mounting structure of pre-buried frame of blow off pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020247133.XU CN211693820U (en) | 2020-03-04 | 2020-03-04 | Through type mounting structure of pre-buried frame of blow off pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211693820U true CN211693820U (en) | 2020-10-16 |
Family
ID=72777757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020247133.XU Expired - Fee Related CN211693820U (en) | 2020-03-04 | 2020-03-04 | Through type mounting structure of pre-buried frame of blow off pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211693820U (en) |
-
2020
- 2020-03-04 CN CN202020247133.XU patent/CN211693820U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211693820U (en) | Through type mounting structure of pre-buried frame of blow off pipe | |
CN210459312U (en) | Middle-buried steel-edge water stop belt mounting and fixing device | |
CN111576632B (en) | Movable board house convenient to equipment | |
CN219450786U (en) | Underground diaphragm wall structure | |
CN213598720U (en) | Pipeline fixing device | |
CN216042557U (en) | Built-in type scaffold is wall spare even | |
CN202430814U (en) | Embedded pipe joint | |
CN211257217U (en) | Drainage pipe connecting device for municipal works | |
CN212657406U (en) | Cement pipe structure convenient to connect | |
CN211057855U (en) | Comprehensive pipe gallery is with unilateral formwork frock | |
CN210976098U (en) | Underground pipe gallery pre-buried support | |
CN211951763U (en) | Reinforced concrete pipeline installation location stable structure | |
CN213449199U (en) | Light steel house drainage system | |
CN206208657U (en) | A kind of bellows tensile test device | |
CN211774409U (en) | Drainage inspection shaft | |
CN210597381U (en) | Hot dipping is moulded and is assembled corrugated steel utility tunnel | |
CN220747165U (en) | Pipe culvert repairing device | |
CN214301057U (en) | Environment-friendly water permeable brick | |
CN220727423U (en) | Connecting structure for municipal drainage pipe | |
CN212716300U (en) | Plastic steel section bar with reinforced structure | |
CN211118009U (en) | Water supply and drainage pipeline stop device | |
CN113789693B (en) | Brick is used in construction of sponge city road surface and processingequipment thereof | |
CN218671006U (en) | Drain pipe connecting structure | |
CN214674979U (en) | Photovoltaic support built-in fitting with leveling function | |
CN210165037U (en) | Municipal administration water supply and drainage pipeline connecting piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201016 |