CN211691480U - Building engineering construction pouring template - Google Patents

Building engineering construction pouring template Download PDF

Info

Publication number
CN211691480U
CN211691480U CN202020019580.XU CN202020019580U CN211691480U CN 211691480 U CN211691480 U CN 211691480U CN 202020019580 U CN202020019580 U CN 202020019580U CN 211691480 U CN211691480 U CN 211691480U
Authority
CN
China
Prior art keywords
template
roof
building engineering
fixture block
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020019580.XU
Other languages
Chinese (zh)
Inventor
陈志鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Chunlong Fire Engineering Co ltd
Original Assignee
Guangzhou Chunlong Fire Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Chunlong Fire Engineering Co ltd filed Critical Guangzhou Chunlong Fire Engineering Co ltd
Priority to CN202020019580.XU priority Critical patent/CN211691480U/en
Application granted granted Critical
Publication of CN211691480U publication Critical patent/CN211691480U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a template is pour in building engineering construction relates to the building engineering field, comprising a base plate, the top of bottom plate is provided with the template, and one side of template installs the pneumatic cylinder, the top of template is connected with first roof, and one side of first roof is connected with the second roof, the top of second roof is connected with the fixture block, and one side of fixture block is connected with the baffle, the internal connection of fixture block has the bolt. The utility model discloses a bottom plate, template, fixture block, bolt, baffle that set up have realized that the multiunit baffle is located the inside of template, can become multiunit individuality with the whole partition of template to can separate the template cavity of different length, and then can make the concrete work piece of different length, reduce the operation of making the template again, reduce economic loss.

Description

Building engineering construction pouring template
Technical Field
The utility model relates to a building engineering field specifically is a building engineering construction pouring template.
Background
The concrete pouring refers to a process of pouring concrete into a mold until the concrete is plasticized, in the civil engineering and building engineering, materials such as concrete are put into the mold to form a preset shape, the free height of the concrete is not more than 2m when the concrete is poured, and corresponding measures are taken when the free height of the concrete exceeds 3 m.
The existing pouring template is fixed in structure and can not be changed and disassembled, the template needs to be manufactured again when the size of a workpiece needing to be poured inside changes, the operation process is troublesome, economic waste can be caused, the existing pouring template can not move the template, and demolding is difficult.
Disclosure of Invention
The utility model aims to provide a: in order to solve the fixed dismantlement that can not change of current template structure of pouring, the work piece size that need pour when inside changes just need make the template again, and the operation process is troublesome and can cause economic waste, and the current template of pouring can not remove the template, the problem of drawing of patterns difficulty provides a building engineering construction and pours template.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a template is pour in building engineering construction, includes the bottom plate, the top of bottom plate is provided with the template, and one side of template installs the pneumatic cylinder, the top of template is connected with first roof, and one side of first roof is connected with the second roof, the top of second roof is connected with the fixture block, and one side of fixture block is connected with the baffle, the internal connection of fixture block has the bolt.
Preferably, the quantity of pneumatic cylinder is two sets of, two sets of the pneumatic cylinder all is located one side of bottom plate, and two sets of the pneumatic cylinder all is connected with the template is articulated.
Preferably, one side of the top end of the bottom plate is located at the bottom end of the template and is connected with a hinge, and the bottom plate is rotatably connected with the template through the hinge.
Preferably, the number of the first top plate and the second top plate is two, wherein the top end of the first top plate is connected with a rotating shaft, and the first top plate is rotatably connected with a cover plate through the rotating shaft.
Preferably, the top of second roof is connected with the scale, and the top of second roof is located one side of scale and is connected with the screw hole, the bolt runs through the fixture block and can dismantle with the screw hole and be connected.
Preferably, the number of the partition plates is multiple, and the partition plates are movably connected with the second top plate through clamping blocks and bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model realizes that a plurality of groups of clapboards are positioned inside the formwork through the arranged bottom plate, the formwork, the fixture blocks, the bolts and the clapboards, and can separate the whole formwork into a plurality of groups of individuals, thereby separating formwork cavities with different lengths, further manufacturing concrete workpieces with different lengths, reducing the operation of re-manufacturing the formwork and reducing the economic loss;
2. the utility model discloses a bottom plate, template, hinge, the pneumatic cylinder that sets up, when having realized needing the drawing of patterns, can start the pneumatic cylinder for the pneumatic cylinder drives the whole slope of template, because one side of template bottom is provided with the hinge, thereby makes the whole drawing of patterns that can incline of template, reaches the convenient purpose of drawing of patterns, reduces the drawing of patterns degree of difficulty.
Drawings
Fig. 1 is a top view of the present invention;
fig. 2 is a side cross-sectional view of the present invention;
fig. 3 is a front view of the separator of the present invention.
In the figure: 1. a base plate; 2. a template; 3. a hinge; 4. a hydraulic cylinder; 5. a first top plate; 6. a second top plate; 7. a rotating shaft; 8. a cover plate; 9. calibration; 10. a clamping block; 11. a bolt; 12. a partition plate; 13. a threaded bore.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The hydraulic cylinder (the model is LcLbV) mentioned in the utility model can be obtained by market or private ordering.
Referring to fig. 1-3, a building engineering construction pouring formwork comprises a bottom plate 1, a formwork 2 is arranged at the top end of the bottom plate 1, a hydraulic cylinder 4 is installed at one side of the formwork 2, a first top plate 5 is connected to the top end of the formwork 2, a second top plate 6 is connected to one side of the first top plate 5, a clamping block 10 is connected to the top end of the second top plate 6, a partition plate 12 is connected to one side of the clamping block 10, and a bolt 11 is connected to the inside of the clamping block 10.
The utility model discloses a bottom plate 1, template 2, fixture block 10, bolt 11, baffle 12 that set up have realized that multiunit baffle 12 is located the inside of template 2, can become multiunit individuality with 2 whole partitions of template to can separate the template cavity of different length, and then can make the concrete work piece of different length, reduce the operation of refabrication template, reduce economic loss.
Please refer to fig. 1, the number of the hydraulic cylinders 4 is two, the two sets of hydraulic cylinders 4 are both located at one side of the bottom plate 1, the two sets of hydraulic cylinders 4 are both hinged to the form 2, and the hydraulic cylinders 4 are obliquely installed at one side of the bottom plate 1.
Please refer to fig. 2, one side of the top end of the bottom plate 1 is connected to the bottom end of the form 2 by a hinge 3, and the bottom plate 1 is rotatably connected to the form 2 by the hinge 3, so that the hydraulic cylinder 4 is driven to tilt rather than lift the form 2 when being started.
Please refer to fig. 2, the number of the first top plates 5 and the second top plates 6 is two, wherein the top end of one of the first top plates 5 is connected to the rotating shaft 7, and the one of the first top plates 5 is rotatably connected to the cover plate 8 through the rotating shaft 7, so that the cover plate 8 can prevent other impurities and dust from entering the concrete workpiece during the setting time of the concrete workpiece.
Please refer to fig. 1, the top end of the second top plate 6 is connected with a scale 9, and one side of the top end of the second top plate 6, which is located at the scale 9, is connected with a threaded hole 13, the bolt 11 penetrates through the fixture block 10 and is detachably connected with the threaded hole 13, the connection is performed through the threaded hole 13 and the bolt 11, so that the installation and the disassembly are convenient, and the position of the partition plate 12 is convenient to change.
Please refer to fig. 3, the number of the partition plates 12 is plural, the partition plates 12 are movably connected to the second top plate 6 through the fastening blocks 10 and the bolts 11, the partition plates 12 and the form 2 are both made of metal, and the partition plates 12 are matched with the form 2.
The working principle is as follows: when the device is used, the size of a workpiece to be manufactured is adjusted according to needs, the partition plate 12 can be determined in the installation position by observing the scale 9, after the size of the workpiece is determined, the fixture block 10 is clamped at the top end of the second top plate 6, then the bolt 11 is screwed, the bolt 11 enters the threaded hole 13 at the top end of the second top plate 6, then the fixture block 10 and the second top plate 6 are fixed, concrete is poured into a cavity in the formwork 2, the rotating shaft 7 is rotated, the cover plate 8 is turned over at the top end of the formwork 2, dust and impurities are prevented from entering the interior of the formwork within the concrete setting time, the cover plate 8 is rotated to be opened after the concrete part is formed, then the hydraulic cylinder 4 is started, the output end of the hydraulic cylinder 4 drives the formwork 2 to ascend, and because one side of the bottom end of the formwork 2 is connected with the hinge 3, the ascending motion, after the template 2 is turned over to a certain angle, the concrete part in the template 2 is easy to fall off, and the demolding is convenient.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a template is pour in building engineering construction, includes bottom plate (1), its characterized in that: the top of bottom plate (1) is provided with template (2), and one side of template (2) installs pneumatic cylinder (4), the top of template (2) is connected with first roof (5), and one side of first roof (5) is connected with second roof (6), the top of second roof (6) is connected with fixture block (10), and one side of fixture block (10) is connected with baffle (12), the internal connection of fixture block (10) has bolt (11).
2. The building engineering construction pouring template according to claim 1, characterized in that: the quantity of pneumatic cylinder (4) is two sets of, two sets of pneumatic cylinder (4) all are located one side of bottom plate (1), and two sets of pneumatic cylinder (4) all are connected with template (2) are articulated.
3. The building engineering construction pouring template according to claim 1, characterized in that: one side on bottom plate (1) top is located the bottom of template (2) and is connected with hinge (3), and bottom plate (1) rotates with template (2) through hinge (3) and is connected.
4. The building engineering construction pouring template according to claim 1, characterized in that: the number of the first top plate (5) and the second top plate (6) is two, wherein one group of the top end of the first top plate (5) is connected with a rotating shaft (7), and one group of the first top plate (5) is rotatably connected with a cover plate (8) through the rotating shaft (7).
5. The building engineering construction pouring template according to claim 1, characterized in that: the top of second roof (6) is connected with scale (9), and the top of second roof (6) is located one side of scale (9) and is connected with screw hole (13), bolt (11) run through fixture block (10) and can dismantle with screw hole (13) and be connected.
6. The building engineering construction pouring template according to claim 1, characterized in that: the number of the partition plates (12) is multiple, and the partition plates (12) are movably connected with the second top plate (6) through fixture blocks (10) and bolts (11).
CN202020019580.XU 2020-01-06 2020-01-06 Building engineering construction pouring template Expired - Fee Related CN211691480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020019580.XU CN211691480U (en) 2020-01-06 2020-01-06 Building engineering construction pouring template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020019580.XU CN211691480U (en) 2020-01-06 2020-01-06 Building engineering construction pouring template

Publications (1)

Publication Number Publication Date
CN211691480U true CN211691480U (en) 2020-10-16

Family

ID=72799180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020019580.XU Expired - Fee Related CN211691480U (en) 2020-01-06 2020-01-06 Building engineering construction pouring template

Country Status (1)

Country Link
CN (1) CN211691480U (en)

Similar Documents

Publication Publication Date Title
CN211691480U (en) Building engineering construction pouring template
CN113070986B (en) Aluminum alloy template for building concrete pouring forming
CN219054792U (en) Concrete experimental device
CN215202525U (en) Prefabricated part horizontal molding device for architectural decoration
CN201002303Y (en) Model for producing gypsum auxiliary building block
CN2489024Y (en) Elevator shaft mould in type of drawing in and drawing out integrally
CN220699966U (en) Modular concrete pouring die splicing structure
CN216127433U (en) Novel high-efficient drawing of patterns mould of aerated building block
CN216465322U (en) Fixed frock of mobilizable pc component built-in fitting
CN215848781U (en) Prefabricated prestressed wallboard mould
CN211729637U (en) Production mould for aerated concrete bricklaying
CN213226781U (en) Mould is used in wallboard production for assembly type structure
CN219808269U (en) Hanging box for bridge
CN220052211U (en) Green building materials concrete prefabricated section mould
CN217967543U (en) Concrete prefabricated part forming die
CN220219027U (en) Novel assembled concrete inner wall sets up mould
CN214819453U (en) Aerated concrete pouring mold frame
CN2670086Y (en) Multi-round wallboard extruding and vacuum forming apparatus
CN217195951U (en) Dry-hanging ceramic tile forming equipment
CN215549554U (en) Granite-like PC brick forming die
CN220241826U (en) Prefabricated electric power enclosure pouring die capable of forming chamfer angles
CN206248413U (en) A kind of wall-building brick experiment mould
CN220840744U (en) Plug-in type standard brick mold convenient to position
CN215395878U (en) Self-opening and closing building block production mold
CN213320727U (en) Energy-saving hydraulic brick making device for autoclaved fly ash bricks

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201016

Termination date: 20220106