CN211689958U - Cast-in-place pier construction platform - Google Patents

Cast-in-place pier construction platform Download PDF

Info

Publication number
CN211689958U
CN211689958U CN202020078048.5U CN202020078048U CN211689958U CN 211689958 U CN211689958 U CN 211689958U CN 202020078048 U CN202020078048 U CN 202020078048U CN 211689958 U CN211689958 U CN 211689958U
Authority
CN
China
Prior art keywords
construction platform
cast
steel
place
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020078048.5U
Other languages
Chinese (zh)
Inventor
张忠伟
何洋
王丹
张传政
葛彤
王润强
刘子旗
任强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 3 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN202020078048.5U priority Critical patent/CN211689958U/en
Application granted granted Critical
Publication of CN211689958U publication Critical patent/CN211689958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a construction field specifically is cast-in-place pier construction platform. Including outrigger structure and lay the die block template on the outrigger, the outrigger structure includes crossbeam, couple bolt, the crossbeam is construction platform and whole template and superstructure's bearing structure, the crossbeam is two, sets up respectively on interim joist frame, and interim joist frame welding is on the steel of bored concrete pile protects a section of thick bamboo, and two crossbeams are all hung on the steel protects a section of thick bamboo wall through hanging the couple bolt of establishing at the steel top surface of protecting, couple bolt end passes the crossbeam bottom to it is fixed through the high strength nut, two couple bolt upper ends welding, the buoy is connected to the crossbeam upper end. The utility model relates to a cast-in-place pier construction platform mainly is to the operating mode that pier design standard height is too low, and it is easy to set up the preparation, and is easy and simple to handle, can save a large amount of cost of labor, material cost and time cost.

Description

Cast-in-place pier construction platform
Technical Field
The utility model relates to a construction field specifically is cast-in-place pier construction platform.
Background
The traditional pier construction platform building process is a bracket and transverse and longitudinal beam type bearing bottom die mode, a project with too low pier design standard is aimed at, the welded bracket is seriously affected by damp, if the process is applied to the project, the construction efficiency is too low, manpower and material resources are consumed, and the requirement of an owner on the construction period cannot be met.
SUMMERY OF THE UTILITY MODEL
For solving above problem, the utility model discloses to the operating mode that pier design standard height is too low, provide a cast-in-place pier construction platform of simple and easy design, can improve cast-in-place pier platform and set up the efficiency of construction, practice thrift construction cost by a wide margin.
The utility model discloses a realize that the technical scheme that above-mentioned purpose adopted is: cast-in-place pier construction platform, its characterized in that: the cantilever beam structure comprises two cross beams and hook bolts, the cross beams are supporting structures of a construction platform, a whole template and an upper structure, the two cross beams are hung on the steel protective cylinder wall through the hook bolts hung on the top surface of the steel protective cylinder, the tail ends of the hook bolts penetrate through the bottom of the cross beams and are fixed through high-strength nuts, the upper ends of the two hook bolts are welded, and the upper ends of the cross beams are connected with buoys.
The wall thickness of the steel casing is 16mm, and the diameter is 1600 mm.
The hook bolt is diameter 45mm round steel, and the material is 35CrMoA, and with the steel protect between the section of thick bamboo adopt spacing shelves welding reinforcement, adopt two-sided full weld between the hook bolt, welding seam length 300 mm.
The limiting gear is a steel plate with the thickness of 2.5 cm.
The cross beam is a double-spliced I-shaped steel 32b, and the temporary beam supporting frame is an I-shaped steel 12.
The bottom die template is a batten of 10cm x 15 cm.
The utility model relates to a cast-in-place pier construction platform mainly is to the operating mode that pier design standard height is too low, and it is easy to set up the preparation, and is easy and simple to handle, can save a large amount of cost of labor, material cost and time cost.
Drawings
Fig. 1 is a schematic plan view of the present invention;
FIG. 2 is a sectional view taken along line 1-1 of FIG. 1;
in the figure: the device comprises a cross beam 1, a hook bolt 2, a high-strength nut 3, a steel casing 4, a limiting stop 5, a bottom die template 6 and a buoy 7.
Detailed Description
The present invention will be further described with reference to the accompanying drawings, but the present invention is not limited to the specific embodiments.
Examples
As shown in fig. 1 and 2, the cast-in-place pier construction platform comprises a cantilever structure and a bottom die template laid on the cantilever, wherein the cantilever structure comprises a cross beam 1 and hook bolts 2, the cross beam 1 is a support structure of the construction platform, the whole template and an upper structure, the cross beams 1 are two and are respectively erected on temporary beam supports, the temporary beam supports are welded on a steel pile casing 4 of a cast-in-place pile, the two cross beams 1 are all hung on the steel pile casing wall through the hook bolts 2 hung on the top surface of the steel pile casing 4, the tail ends of the hook bolts 2 penetrate through the bottom of the cross beam 1 and are fixed through high-strength nuts 3, the upper ends of the two hook bolts 2 are welded, and the upper ends of the cross beams are connected with buoys 7.
The wall thickness of the steel casing 4 is 16mm, and the diameter is 1600 mm.
Couple bolt 2 is diameter 45mm round steel, and the material is 35CrMoA, and with steel protect between the section of thick bamboo 4 adopt spacing shelves 5 to consolidate, adopt two-sided full weld between couple bolt 2, welding seam length 300 mm.
The limiting stop 5 is a steel plate with the thickness of 2.5 cm.
The beam 1 is a double-spliced I-shaped steel 32b, and the temporary beam supporting frame is an I-shaped steel 12.
The bottom die template 6 is a batten of 10cm x 15 cm.
Description of the working principle of the cast-in-place pier construction platform:
the cross beam is used as a supporting structure of a construction platform, the whole template and an upper structure, the temporary bracket is welded by means of a steel casing after construction, and the temporary bracket mainly supports the cross beam temporarily. The cross beam is erected on the temporary bracket, supported through the hook bolt on the wall of the steel pile casing and then reinforced through the high-strength nut, and a cantilever beam structure is formed. The steel protects and welds through spacing shelves between a section of thick bamboo and the couple bolt, prevents to lead to the couple unbalance loading among the concrete placement process, lays die block, welding guardrail on the crossbeam afterwards, and the platform forms, is convenient for dismantle after the construction.
The utility model relates to a cast-in-place pier construction platform mainly crosses lowly to pier design elevation, if adopt the construction process of traditional bracket, horizontal girder formula bearing die block, the welding bracket receives the moist water influence seriously, and the efficiency of construction is too low. The novel cast-in-place pier construction platform is easy to erect and manufacture, simple and convenient to operate, and capable of saving a large amount of labor cost, material cost and time cost.

Claims (6)

1. Cast-in-place pier construction platform, its characterized in that: the cantilever beam structure comprises two cross beams and hook bolts, the cross beams are supporting structures of a construction platform, a whole template and an upper structure, the two cross beams are hung on the steel protective cylinder wall through the hook bolts hung on the top surface of the steel protective cylinder, the tail ends of the hook bolts penetrate through the bottom of the cross beams and are fixed through high-strength nuts, the upper ends of the two hook bolts are welded, and the upper ends of the cross beams are connected with buoys.
2. The cast-in-place abutment construction platform of claim 1, wherein: the wall thickness of the steel casing is 16mm, and the diameter is 1600 mm.
3. The cast-in-place abutment construction platform of claim 1, wherein: the hook bolt is diameter 45mm round steel, and the material is 35CrMoA, and with the steel protect between the section of thick bamboo adopt spacing shelves welding reinforcement, adopt two-sided full weld between the hook bolt, welding seam length 300 mm.
4. The cast-in-place abutment construction platform of claim 3, wherein: the limiting gear is a steel plate with the thickness of 2.5 cm.
5. The cast-in-place abutment construction platform of claim 1, wherein: the cross beam is a double-spliced I-shaped steel 32b, and the temporary beam supporting frame is an I-shaped steel 12.
6. The cast-in-place abutment construction platform of claim 1, wherein: the bottom die template is a batten of 10cm x 15 cm.
CN202020078048.5U 2020-01-15 2020-01-15 Cast-in-place pier construction platform Active CN211689958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020078048.5U CN211689958U (en) 2020-01-15 2020-01-15 Cast-in-place pier construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020078048.5U CN211689958U (en) 2020-01-15 2020-01-15 Cast-in-place pier construction platform

Publications (1)

Publication Number Publication Date
CN211689958U true CN211689958U (en) 2020-10-16

Family

ID=72771830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020078048.5U Active CN211689958U (en) 2020-01-15 2020-01-15 Cast-in-place pier construction platform

Country Status (1)

Country Link
CN (1) CN211689958U (en)

Similar Documents

Publication Publication Date Title
CN103993739B (en) The construction method of granulation tower spraying layer stiff beam
CN207062778U (en) Antidumping rod iron support for cantilever bent cap concreting
CN212105120U (en) A exempt from to support template component for cast-in-place seam of superimposed sheet
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN211689958U (en) Cast-in-place pier construction platform
CN211666206U (en) Overhanging and landing dual-purpose scaffold
CN106193101B (en) Tower crane steel platform pile foundation and its construction method
CN111809654A (en) Assembled tower crane foundation structure
CN113957919B (en) Gravity type round caisson concrete breast wall bottom die supporting system
CN115341701B (en) Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate
CN216809608U (en) Wet seam template piece supporting device
CN205917726U (en) Stake girder construction integral type tower crane foundation structure
CN211312544U (en) Tubular pile and steel pipe combination formula underground structure
CN211895796U (en) Core cylinder movable arm type tower crane installation climbing structure
CN208884770U (en) A kind of steel plate shear force wall anchor bolt fixing bracket system
CN212200050U (en) Assembled reinforced concrete side anti-collision guardrail for connecting bridge
CN203160513U (en) Floorboard
CN206070554U (en) Tower crane steel platform pile foundation
CN215926949U (en) Steel leaning tower force rod type support structure system
CN219732106U (en) Hoop clamp device adopting prefabricated pipe piles as anchor piles
CN214302556U (en) Novel steel pipe concrete beam
CN213979017U (en) Raft board split heads muscle structure of foundation
CN214994597U (en) Building super large door opening transformation construction structure
CN209740565U (en) Tower crane wall-attached anchoring structure for old-fashioned buildings
CN220035215U (en) A hang mould support that is used for bridge main tower mound top to pour

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant