CN214994597U - Building super large door opening transformation construction structure - Google Patents

Building super large door opening transformation construction structure Download PDF

Info

Publication number
CN214994597U
CN214994597U CN202121669528.XU CN202121669528U CN214994597U CN 214994597 U CN214994597 U CN 214994597U CN 202121669528 U CN202121669528 U CN 202121669528U CN 214994597 U CN214994597 U CN 214994597U
Authority
CN
China
Prior art keywords
steel
door opening
building
wall body
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121669528.XU
Other languages
Chinese (zh)
Inventor
揭保如
揭建刚
姚志勇
姚宇昕
陈玉春
陶武金
何鑫
章志刚
夏磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fenghe Yingzao Group Inc
Original Assignee
Fenghe Yingzao Group Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fenghe Yingzao Group Inc filed Critical Fenghe Yingzao Group Inc
Priority to CN202121669528.XU priority Critical patent/CN214994597U/en
Application granted granted Critical
Publication of CN214994597U publication Critical patent/CN214994597U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a door opening of building reforms transform structure, especially a reform transform construction structures of super large door opening. A building oversized door opening transformation construction structure comprises a plurality of upright columns and steel beams, wherein the upright columns are respectively arranged on the inner side and the outer side of a wall body of a door opening to be transformed, and one end of each upright column is arranged on the ground/foundation; two steel beams are provided, and two ends of each steel beam are respectively fixed with the upright post or the top of the upright post; both are limited by the tie bars/bolts penetrating through the wall body; when the device is disassembled, the device is disassembled from two sides to the middle section. The utility model has the advantages of as follows: 1. the safety of the building can be ensured, and the conversion of functions is realized; 2. the purposes of energy conservation and emission reduction can be achieved, a large amount of expenses are saved, the modification period is shortened, the device is put into use in advance, and the economic value after modification is fully reflected.

Description

Building super large door opening transformation construction structure
Technical Field
The utility model relates to a door opening of building reforms transform structure, especially a reform transform construction structures of super large door opening.
Background
The use function design of the building is continuously changed along with the social and economic development, and for the reconstruction of the door opening, the wall body at the position of the door opening is firstly dismantled and a door frame supporting device is installed at present; the method has the advantages of higher construction risk, larger disturbance to the original structure, higher technical requirement, longer construction period and great potential safety hazard to later-stage wall body use if the method is not implemented properly.
Disclosure of Invention
The utility model aims at solving the problem that exists among the prior art, provide a building super large door opening and reform transform construction structure, make it can ensure the safety of building, can reach energy saving and emission reduction's purpose again.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a building oversized door opening transformation construction structure comprises a plurality of upright columns and steel beams, wherein the upright columns are respectively arranged on the inner side and the outer side of a wall body of a door opening to be transformed, and one end of each upright column is arranged on the ground/foundation; two steel beams are provided, and two ends of each steel beam are respectively fixed with the upright post or the top of the upright post; both are limited by the tie bars/bolts penetrating through the wall body; when the device is disassembled, the device is disassembled from two sides to the middle section.
Preferably, a steel base plate is arranged between the upright column and the ground/foundation, the steel base plate is fixed on the ground/foundation, and the end part of the upright column is fixed with the steel base plate.
Further, still include the bracing, the bracing installation is fixed between stand and girder steel.
Preferably, the included angle between the inclined strut and the upright column or the steel beam is 45 degrees.
Further, still include the steel sheet, after cutting a hole on the wall body of girder steel bottom, place the steel sheet in between girder steel and the hole top wall body, and the upper surface of steel sheet is fixed through the super glue with the wall body, and its lower surface is fixed with the girder steel.
Compared with the prior art, the utility model has the advantages of as follows:
1. the safety of the building can be ensured, and the conversion of functions is realized;
2. the purposes of energy conservation and emission reduction can be achieved, a large amount of expenses are saved, the modification period is shortened, the device is put into use in advance, and the economic value after modification is fully reflected.
Drawings
FIG. 1 is a schematic structural view of an embodiment of the present invention (without diagonal bracing and steel plate);
FIG. 2 is a schematic structural view (including diagonal bracing) of an embodiment of the present invention;
FIG. 3 is a schematic structural view of the embodiment of the present invention (after the door opening is removed);
FIG. 4 is an enlarged view of view a-a of FIG. 3;
FIG. 5 is a perspective view of the embodiment of the present invention (after the door opening is removed);
in the figure, 1, a steel column; 2. a steel beam; 3. tying the reinforcing steel bars; 4. bracing; 5. and (3) a steel plate.
Detailed Description
It should be noted that, in the present embodiment, the directional words "upper", "lower", "top", "bottom", etc. are all described according to the drawings, and do not constitute a limitation of the present invention.
The present invention will be described in further detail with reference to the accompanying drawings 1-5: a reconstruction construction structure for an oversized door opening of a building comprises a steel column 1 and a steel beam 2; as shown in fig. 1, a plurality of steel columns are respectively arranged on the inner side and the outer side of the wall body of the door opening to be reconstructed, and one end of each steel column is arranged on the ground/foundation; two steel beams are provided, and two ends of each steel beam are respectively fixed with the upright post or the top of the upright post; both are limited by the tie bars/bolts penetrating through the wall body; a steel base plate is arranged between the steel column 1 and the ground/foundation, the steel base plate is fixed on the ground/foundation, and the end part of the steel column is fixed with the steel base plate; when the device is disassembled, the device is disassembled from two sides to the middle section.
As a preferred embodiment of the present embodiment, as shown in fig. 2, an inclined strut 4 is fixed between a steel column 1 and a steel beam 2, wherein an included angle between the inclined strut 4 and the steel column 1 or the steel beam 2 is 45 °.
As a preferred embodiment of this embodiment, as shown in fig. 3-5, the steel plate 5 is further included, after a hole is drilled in the wall at the bottom of the steel beam 2, the steel plate 5 is placed between the steel beam 2 and the wall above the hole, the upper surface of the steel plate 5 is fixed to the wall through the super glue, and the lower surface of the steel plate 5 is fixed to the steel beam.
According to the size of the modified door opening of the building and the load condition of the upper structure, the structural steel is adopted to implement modification and reinforcement so as to ensure the uniformity of the safety and the function after the modification of the building. For example, in this embodiment, the height of the door opening to be modified is 4200mm, and the specific modification steps are as follows:
1. when a building surface layer is reformed and a door opening is enlarged, selected steel columns 1 (section steel sandwich wall columns) steel backing plates are padded on the ground/foundation on the inner side and the outer side of a wall according to a design drawing, high-strength expansion bolts or high-strength steel planting bar glue are used for fixing the positions, and the next construction is carried out after the bolts are firmly combined with the ground/foundation;
2. drilling a plurality of holes in a steel column 1 of a sandwich wall along the length direction of the steel column according to a design drawing, welding and positioning the bottom of the steel column 1 and a steel backing plate, forming holes in the wall bodies on two sides of the steel column 1, cleaning residues in the holes of the wall bodies, coating bar planting glue on tie bars 3 to fix the steel column 1 (the section steel sandwich wall column), and so on;
3. after the steel column 1 (the section steel sandwich wall column) is fixed, drilling holes on the prepared steel beam 2 according to a design drawing, placing the steel beam 2 on the position or the top end of the steel column 1 specified by the design drawing by using a crane, welding the steel beam with the steel column 1, then drilling holes on the steel beam one by one along the drilled holes, drilling the wall body one by using an impact hammer, and coating a bar planting adhesive on a tie bar 3 to clamp and fix the steel beam 2; according to design requirements, a 45-degree inclined strut 4 is additionally arranged between the steel beam 2 and the steel column 1 and is welded and fixed;
4. according to the wall material selection condition and the wall thickness, the wall is disassembled from two sides to the middle in a segmented mode, the length is controlled to be 650mm, the height is controlled to be within 500mm, the wall is disassembled downwards from the position 5mm above a steel beam 2, after the wall is disassembled, a steel plate 5 is added to be welded with the steel beam 2, the steel plate is adhered to the upper wall through the cloud mud glue, a jack is used for jacking the steel beam to be firmly adhered to the upper wall, the next section of wall is disassembled, finally, a tie bar or a steel pipe is used for being fixedly connected with the steel beams on the two sides in a pulling mode, after all the steel plates 5 are firmly adhered to the wall, an inclined strut is welded, and the jack is removed; then, the direction is changed, holes are cut in the wall body at the other end of the beam bottom, and the steel plates are alternately fixed to the beam bottom of the sandwich wall one by one until all the holes of the wall body are cut;
5. cutting the wall to be dismantled along the edge of the steel column by using a cutting machine according to the design requirements of a drawing, and dismantling the masonry layer by layer from top to bottom from the wall;
6. if a door or a window is in the range of the removed wall body, the door and window holes are firstly reinforced before large-area beam column reinforcement is implemented so as to ensure the safety during removal.
The above embodiments are merely preferred embodiments of the present invention, and do not limit the present invention. Any extension, modification and equivalent replacement made by those skilled in the art without departing from the principle of the present invention shall be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a building super large door opening reforms transform construction structures, includes stand, girder steel, its characterized in that: a plurality of upright columns are respectively arranged at the inner side and the outer side of the wall body of the door opening to be reformed, and one end of each upright column is arranged on the ground/foundation; two steel beams are provided, and two ends of each steel beam are respectively fixed with the upright post or the top of the upright post; both are limited by the tie bars/bolts penetrating through the wall body; when the device is disassembled, the device is disassembled from two sides to the middle section.
2. The reconstruction structure of the oversized door opening of the building as recited in claim 1, characterized in that: a steel base plate is arranged between the upright post and the ground/foundation, the steel base plate is fixed on the ground/foundation, and the end part of the upright post is fixed with the steel base plate.
3. The reconstruction structure of the oversized door opening of the building as recited in claim 1, characterized in that: still include the bracing, the bracing installation is fixed between stand and girder steel.
4. The reconstruction structure of the oversized door opening of the building as recited in claim 3, characterized in that: the inclined angle between the inclined strut and the upright post or the steel beam is 45 degrees.
5. The reconstruction structure of the oversized door opening of the building as recited in claim 1, characterized in that: the steel plate is arranged between the steel beam and the wall body above the hole after the hole is drilled in the wall body at the bottom of the steel beam, the upper surface of the steel plate is fixed with the wall body through strong glue, and the lower surface of the steel plate is fixed with the steel beam.
CN202121669528.XU 2021-07-22 2021-07-22 Building super large door opening transformation construction structure Active CN214994597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121669528.XU CN214994597U (en) 2021-07-22 2021-07-22 Building super large door opening transformation construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121669528.XU CN214994597U (en) 2021-07-22 2021-07-22 Building super large door opening transformation construction structure

Publications (1)

Publication Number Publication Date
CN214994597U true CN214994597U (en) 2021-12-03

Family

ID=79123977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121669528.XU Active CN214994597U (en) 2021-07-22 2021-07-22 Building super large door opening transformation construction structure

Country Status (1)

Country Link
CN (1) CN214994597U (en)

Similar Documents

Publication Publication Date Title
US9016025B2 (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN207268073U (en) Novel flexible formwork bearing frame
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN111101731B (en) Integral synchronous lifting method for historic building timber structure
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN209025103U (en) For building the pile-column foundation structure of escape truck or emergency bridge
CN203200745U (en) Strengthening support of underground diaphragm wall in inverse construction method
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
CN212897482U (en) Construction platform for high-rise building overhanging structural layer
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN111809654A (en) Assembled tower crane foundation structure
CN214994597U (en) Building super large door opening transformation construction structure
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN109837910B (en) Foundation pit construction method combining reverse construction method and steel support
CN106639151A (en) Built-in X-shaped opposite-pulling steel plate type welded rectangular concrete filled steel tubular column and construction method
CN207376945U (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system
CN210395394U (en) Steel structure foundation for long-distance construction of large modular structure
CN210887229U (en) Irregular foundation pit assembled steel strutting arrangement
CN213572930U (en) Self-locking hinged elevator shaft construction platform device
CN211547754U (en) High slope anchor bolt support working platform
CN107816132B (en) High-level tower crane single-row frame attachment structure without floor slab and construction method thereof
CN107060093A (en) The support system and assembling method of large-scale oblique braiding gusset plate latticed shell structure
CN220317326U (en) Lifting structure for integrally lifting steel truss
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant