CN211689941U - Hanging type construction platform for splicing steel box girder support method - Google Patents

Hanging type construction platform for splicing steel box girder support method Download PDF

Info

Publication number
CN211689941U
CN211689941U CN201922326140.9U CN201922326140U CN211689941U CN 211689941 U CN211689941 U CN 211689941U CN 201922326140 U CN201922326140 U CN 201922326140U CN 211689941 U CN211689941 U CN 211689941U
Authority
CN
China
Prior art keywords
steel box
box girder
platform
supporting beam
construction platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922326140.9U
Other languages
Chinese (zh)
Inventor
李勇
蒋德林
王安文
吴曼
薛飞
黄士鑫
张曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Steel Structure Branch Of Cccc Road And Bridge Construction Co ltd
Road and Bridge International Co Ltd
CCCC Ruitong Construction Engineering Co Ltd
Original Assignee
Steel Structure Branch Of Cccc Road And Bridge Construction Co ltd
Road and Bridge International Co Ltd
CCCC Ruitong Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Steel Structure Branch Of Cccc Road And Bridge Construction Co ltd, Road and Bridge International Co Ltd, CCCC Ruitong Construction Engineering Co Ltd filed Critical Steel Structure Branch Of Cccc Road And Bridge Construction Co ltd
Priority to CN201922326140.9U priority Critical patent/CN211689941U/en
Application granted granted Critical
Publication of CN211689941U publication Critical patent/CN211689941U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a hanging construction platform for concatenation of steel box girder support method has articulated 3 at least montants on the steel box girder assembles the horizontal bridge of support to two adjacent and high level flat link rods respectively, and the montant symmetry that articulates on two flat link rods sets up, along a montant vertical interval welding bracket of vertical every, sets up a supporting beam between two high brackets of equal height on two relative montants in the same direction as the bridge, lays the platform panel on the supporting beam. The utility model discloses platform height-adjustable adopts the assembled structure, and installation and dismantlement are fast, and material reuse rate is high.

Description

Hanging type construction platform for splicing steel box girder support method
Technical Field
The utility model relates to a construction technical field is assembled to bridge steel case roof beam, concretely relates to hanging welding operation platform that is used for construction is assembled to steel case roof beam support method festival section.
Background
The steel structure bridge is usually constructed by adopting a support method when steel box girders are spliced, supports are erected between piers, a plurality of prefabricated steel box girder segments are hung on the supports, and constructors weld the end parts of the adjacent steel box girders. During construction, a construction platform needs to be arranged on the support, and the height of the platform is usually set according to the height of a welder. The common construction platforms are welded on the support, once the construction platforms are arranged, the height of the construction platforms is fixed, and in the process of assembling and welding the steel box girder, the height of a welding part is changed, and in addition, the change of workers is large, and the operation platform with the fixed height brings inconvenience to construction; and the platform needs to be cut when being disassembled, so that the support and the platform material are damaged, and the material reuse rate is influenced.
Disclosure of Invention
The utility model aims at providing a hanging construction platform to the above-mentioned problem that present steel box girder welding construction platform exists, do not need the welding to fix on the support to platform height-adjustable, convenient construction.
The technical scheme of the utility model as follows:
the utility model provides a hanging construction platform that is used for steel box girder support method to splice which characterized in that: at least 3 vertical rods are respectively hung on two adjacent horizontal connecting rods with the same height in the transverse bridge direction of the steel box girder assembling support, the vertical rods hung on the two horizontal connecting rods are symmetrically arranged, a bracket is welded on each vertical rod at certain intervals along the longitudinal direction of the vertical rod, a supporting beam is erected between the brackets with the same height on two vertical rods opposite to the bridge direction, and a platform panel is laid on the supporting beam.
The utility model is a rod type assembly structure, which occupies smaller space when being stored, does not need welding construction when being installed, only needs to hang the vertical rod on the flat link rod of the bracket, screws up the fixing bolt, then sets up the beam on the bracket, and then lays the upper panel, thus completing the installation of the welding operation platform; in the welding operation process of the steel box girder, the cross girder can be erected on a bracket with a proper height on the vertical pole according to the operation height and the height of a welder, so that the height of the welding operation platform can be adjusted; when the platform is disassembled, the support structure and the platform component can not be damaged, the repeated utilization rate of materials is improved, and the construction cost is saved.
Drawings
Fig. 1 is a schematic structural view of the vertical face along the bridge direction of the present invention;
fig. 2 is a schematic view of the vertical structure of the transverse bridge of the present invention;
fig. 3 is a schematic plan view of the present invention;
FIG. 4 is a schematic view of the structure of the vertical rod;
fig. 5 is a schematic view of the usage state of the present invention.
Detailed Description
As shown in fig. 1, fig. 2 and fig. 3, the utility model discloses it has 3 at least montants 3 to articulate respectively on two adjacent and equal-height flat connecting rods 2 of support 1 cross bridge assembled at the steel box girder, and the 3 symmetry settings of montant that articulate on two flat connecting rods 2, along a montant longitudinal interval welding bracket 4 of vertical every on every montant 3, set up a supporting beam 5 between two equal-height brackets 4 on two relative montants in the same direction as the bridge supporting beam upper berth is equipped with platform panel 6.
The structure of the vertical rods 3 is as shown in fig. 4, a buckle 31 is arranged at the upper end of each vertical rod 3, and the buckle 31 is a frame-shaped structure with an opening at one side. The buckle card is on the support parallel connection, and fixing bolt 32 has been inserted between the upper and lower limit of buckle opening side.
The utility model discloses during the implementation, for guaranteeing a supporting beam stability, be equipped with the limiting plate 41 that makes progress outstanding in 4 both sides of every bracket, a supporting beam 5's tip supports at 4 top surfaces of bracket and inject between two limiting plates 41.
As shown in fig. 5, the utility model discloses during the installation, with the buckle card of every montant 3 upper end on the flat link rod 2 of support 1 is assembled to the steel box girder, preset the screw to wearing on buckle opening side's roof and the bottom plate, insert the bolt in the screw and screw up the nut at the bolt both ends, fix the montant on flat link rod. According to the height of the welding part of the steel box girder 7 and the height of constructors, a support beam 5 is selected to be erected on a bracket 4 with a proper height, and then a panel is laid on the support beam, so that the platform installation is completed. When the height of the platform needs to be adjusted, the supporting beams are adjusted to be supported on the other pair of brackets, and the panels are paved again. After the welding construction of the steel box girder of one construction point is completed, the platform can be disassembled and installed to the next construction point for continuous construction.

Claims (3)

1. The utility model provides a hanging construction platform that is used for steel box girder support method to splice which characterized in that: at least 3 vertical rods are respectively hung on two adjacent horizontal connecting rods with the same height in the transverse bridge direction of the steel box girder assembling support, the vertical rods hung on the two horizontal connecting rods are symmetrically arranged, a bracket is welded on each vertical rod at certain intervals along the longitudinal direction of the vertical rod, a supporting beam is erected between the brackets with the same height on two opposite vertical rods along the bridge direction, and a platform panel is laid on the supporting beam.
2. A hanging construction platform for splicing of steel box girder supports according to claim 1, characterized in that: the upper end of every montant is equipped with a buckle, the buckle is one side open-ended frame type structure, and the buckle card is on the support parallel connection, and the cartridge has fixing bolt between the upper and lower limit of buckle opening side.
3. A hanging construction platform for splicing of steel box girder supports according to claim 1, characterized in that: limiting plates protruding upwards are arranged on two sides of each bracket, and the end of the supporting beam is supported on the top surface of each bracket and is limited between the two limiting plates.
CN201922326140.9U 2019-12-20 2019-12-20 Hanging type construction platform for splicing steel box girder support method Active CN211689941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922326140.9U CN211689941U (en) 2019-12-20 2019-12-20 Hanging type construction platform for splicing steel box girder support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922326140.9U CN211689941U (en) 2019-12-20 2019-12-20 Hanging type construction platform for splicing steel box girder support method

Publications (1)

Publication Number Publication Date
CN211689941U true CN211689941U (en) 2020-10-16

Family

ID=72793452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922326140.9U Active CN211689941U (en) 2019-12-20 2019-12-20 Hanging type construction platform for splicing steel box girder support method

Country Status (1)

Country Link
CN (1) CN211689941U (en)

Similar Documents

Publication Publication Date Title
CN103898836B (en) Cable stayed bridge H type Sarasota height top rail steel battered leg prestress stent construction method
JP2008214940A (en) Movable suspension timbering
CN109707146A (en) Simple overhanging type slides scaffold construction method
CN104047233B (en) Method for construction of continuous beam linear segment without floor stand
CN112726411B (en) Integral dragging construction method for single-hole large cantilever steel truss girder
CN211689941U (en) Hanging type construction platform for splicing steel box girder support method
CN107190860B (en) Automatic jacking system for steel structure installation
CN110374011A (en) Across the operation platform closed up in a kind of continuous rigid frame bridge
CN215104731U (en) Triangular bracket structure
CN210032670U (en) Mounting device for steel truss
CN104499435A (en) Bracket used for mounting self-anchored suspension bridge splay saddle base
CN211201112U (en) Sectional steel tower mounted assembly type construction platform
CN210658421U (en) Large anchor bolt group mounting bracket of high-strength anchor bolt
CN210031746U (en) Steel casing drilling platform for bridge construction
CN110005210A (en) The mounting device and its construction method of steel truss
CN103043521A (en) Moving sidewalk and upper head guide-rail ladder way for same
CN219117946U (en) Steel box girder processing production and safe storage device for assembled viaduct ramp turning part
CN216379183U (en) Temporary support for high-altitude closure of bridge steel box girder by section hoisting
CN216586142U (en) Temporary support for erecting bridge precast beam
CN205382428U (en) Whole cast -in -place roof beam formwork support frame of falling triangle in hole
CN211547104U (en) Suspension type is stand for monorail transit
CN218893971U (en) Assembled steel bracket system for cast-in-situ pier top beam construction
CN220337665U (en) Desulfurizing pipe support
CN215164708U (en) Combined bracket suitable for construction of double-column pier large-cantilever large-span bent cap
CN219240303U (en) Continuous combined steel groove beam suspension bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant