CN110374011A - Across the operation platform closed up in a kind of continuous rigid frame bridge - Google Patents
Across the operation platform closed up in a kind of continuous rigid frame bridge Download PDFInfo
- Publication number
- CN110374011A CN110374011A CN201910664096.4A CN201910664096A CN110374011A CN 110374011 A CN110374011 A CN 110374011A CN 201910664096 A CN201910664096 A CN 201910664096A CN 110374011 A CN110374011 A CN 110374011A
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- closed
- steel
- rigid frame
- operation platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
The invention discloses, across the operation platform closed up, be related to technical field of bridge engineering in a kind of continuous rigid frame bridge.Across the operation platform closed up in the continuous rigid frame bridge, including bottom plate, angle steel with holes is fixedly connected with by screw rod on the bottom plate, the bottom plate is fixedly connected with side plate and baffle by angle steel with holes, fining twisted steel is provided at the top of the bottom plate, the quantity of the fining twisted steel is four and is divided into two groups.Across the operation platform closed up in the continuous rigid frame bridge, pass through being used cooperatively for the components such as bottom plate, side plate, baffle and angle steel with holes, it can be very good to guarantee in bridge across the construction quality closed up, reinforce the safety of operator, and the whole of operating platform is promoted and is declined, greatly save the construction time, all kinds of steel plates of composition operating platform flexibly can be assembled and be removed, it is reusable, have good economic benefit, avoid due to construction error it is larger caused by bridge integral linear and aesthetics be affected.
Description
Technical field
The present invention relates to technical field of bridge engineering, across the operation platform closed up in specially a kind of continuous rigid frame bridge.
Background technique
In the engineering constructions such as high-grade highway, town road, continuous rigid frame bridge is important as one kind of continuous bridge
Form, since its girder and bridge pier are consolidations, whole good seismic performance therefore is widely adopted, when multispan continuous rigid frame
When bridge uses construction cradle, the stress system before and after closure of bridge structure changes, thus in across to close up be Construction control
Emphasis, integral linear and aesthetics for bridge have important influence.
In the prior art, it constructs using only the mode of mechanically actuated manual-alignment, without corresponding operation platform
To guarantee the quality and working efficiency of construction, difficulty of construction is increased while increasing cost, while being easy to appear due to construction
The integral linear of bridge and aesthetics are affected caused by error is larger.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides, across the operation platform closed up, solve in a kind of continuous rigid frame bridge
In the prior art, it constructs using only the mode of mechanically actuated manual-alignment, without corresponding operation platform to guarantee
The quality and working efficiency of construction, increase cost while increase difficulty of construction, while be easy to appear due to construction error compared with
The problem of integral linear of bridge and aesthetics are affected caused by big.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: across closing up in a kind of continuous rigid frame bridge
Operation platform, including bottom plate is fixedly connected with angle steel with holes by screw rod on the bottom plate, and the bottom plate passes through angle steel with holes
It is fixedly connected with side plate and baffle, fining twisted steel is provided at the top of the bottom plate, the quantity of the fining twisted steel is four
It is a and be divided into two groups, cantilever beam to be closed up, the table of the fining twisted steel are arranged between every group of two fining twisted steels
Face and be located at cantilever beam to be closed up above be arranged with jack.
Preferably, headblock is provided between the cantilever beam and jack to be closed up.
Preferably, support is provided at the top of the bottom plate.
Preferably, the bottom plate is the steel plate with a thickness of 4cm, and length is greater than closure segment construction length 3 to 4m, and width is greater than
For closure segment width of main beam 1 to 2m, the side plate is the steel plate with a thickness of 3cm, totally two pieces, positioned at the two sides in width of main beam direction,
The baffle is the steel plate with a thickness of 3cm, totally four pieces, positioned at the surrounding of bottom plate, is placed along girder cross-sectional direction.
Preferably, the quantity of the support is 24 pieces, and it is 10cm, the square steel branch with a thickness of 2cm that support, which is side length,
Support, is welded on bottom plate.
(3) beneficial effect
The present invention provides in a kind of continuous rigid frame bridge across the operation platform closed up.Have following the utility model has the advantages that this is continuous
It can be very by being used cooperatively for the components such as bottom plate, side plate, baffle and angle steel with holes across the operation platform closed up in rigid frame bridge
Across the construction quality closed up in good guarantees bridge, reinforce the safety of operator, and the whole promotion of operating platform and under
Drop greatly saves the construction time, and all kinds of steel plates for forming operating platform flexibly can be assembled and be removed, reusable,
Have good economic benefit, avoid due to construction error it is larger caused by bridge integral linear and aesthetics by shadow
It rings.
Detailed description of the invention
Fig. 1 is the schematic three dimensional views of structure of the invention;
Fig. 2 is the elevation of structure of the invention;
Fig. 3 is the cross-sectional view of structure of the invention.
In figure: 1, bottom plate;2, side plate;3, baffle;4, angle steel with holes;5, screw rod;6, fining twisted steel;7, jack;8,
Headblock;9, it supports;10, cantilever beam to be closed up.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention provides a kind of technical solution: across the operation platform closed up in a kind of continuous rigid frame bridge,
Including bottom plate 1, bottom plate 1 is the steel plate with a thickness of 4cm, and length is greater than closure segment and constructs length 3 to 4m, and width is greater than closure segment master
For beam width 1 to 2m, side plate 2 is the steel plate with a thickness of 3cm, and totally two pieces, positioned at the two sides in width of main beam direction, baffle 3 is thickness
For the steel plate of 3cm, totally four pieces, positioned at the surrounding of bottom plate 1, placed along girder cross-sectional direction, the top of bottom plate 1 is provided with support
9, supporting 9 quantity is 24 pieces, and it is 10cm, the square bracing members with a thickness of 2cm that support 9, which is side length, is welded on bottom plate 1
On, angle steel 4 with holes is fixedly connected with by screw rod 5 on bottom plate 1, bottom plate 1 is fixedly connected with side plate 2 and gear by angle steel 4 with holes
Plate 3, the top of bottom plate 1 are provided with fining twisted steel 6, and the quantity of fining twisted steel 6 is four and is divided into two groups, two of every group
It is arranged with cantilever beam 10 to be closed up between fining twisted steel 6, is provided with headblock between cantilever beam 10 and jack 7 to be closed up
8, the surface of fining twisted steel 6 and be located at cantilever beam 10 to be closed up top be arranged with jack 7.
Detailed process when work is as follows:
First, in closure construction the last week, bottom plate 1, side plate 2 and baffle 3 are produced in advance, in the position for needing to penetrate screw rod 5
Reserving hole is set, and is properly saved after the assay was approved.
Second, when cantilever beam cradle construction, leaves the hole for wearing fining twisted steel 6 in advance, to concreting of cantilever beton to should be closed
After holding together the position of section construction, Hanging Basket is removed.
Third places headblock 8 and jack 7 on girder, by fining twisted steel 6 by wearing under jack 7, and transfers to
Minimum point.
4th, on ground, bottom plate 1 and side plate 2 are linked together by angle steel 4 with holes, screw rod 5.
5th, by fining twisted steel 6 and 1 firm welding of bottom plate, then baffle 3 is installed, if bridge height is not more than 20m,
This step can be completed on ground, if bridge height is greater than 20m, need to lift bottom plate and side plate by ladder or high-altitude operation vehicle
Suitable height is risen to, then carries out welding and the installation of baffle 3.
6th, entire operation platform is promoted by jack 7, after reaching the height that can be constructed, starts binding and closes up
Reinforcing bar, installation template and the casting concrete of section.
7th, after the completion of closure segment construction, form removal will be hung under operation platform with jack 7, then remove baffle
3, it cuts fining twisted steel 6, remove side plate 2 and bottom plate 1.
In conclusion across the operation platform closed up in the continuous rigid frame bridge, pass through bottom plate 1, side plate 2, baffle 3 and with angle of spot hole
The components such as steel 4 are used cooperatively, and can be very good to guarantee to reinforce the safety of operator across the construction quality closed up in bridge,
And the whole of operating platform is promoted and is declined, and greatly saves the construction time, and all kinds of steel plates for forming operating platform can spirit
Assembling and dismounting living, it is reusable, have good economic benefit, avoid due to construction error it is larger caused by bridge
Integral linear and aesthetics be affected.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (5)
1. across the operation platform closed up, including bottom plate (1) in a kind of continuous rigid frame bridge, it is characterised in that: lead on the bottom plate (1)
Screw rod (5) is crossed to be fixedly connected with angle steel with holes (4), the bottom plate (1) by angle steel with holes (4) be fixedly connected with side plate (2) and
Baffle (3) is provided with fining twisted steel (6) at the top of the bottom plate (1), the quantity of the fining twisted steel (6) be four and
It is divided into two groups, is arranged with cantilever beam to be closed up (10), the fining twisted steel between every group of two fining twisted steels (6)
(6) surface and it is located above cantilever beam (10) to be closed up and is arranged with jack (7).
2. across the operation platform closed up in a kind of continuous rigid frame bridge according to claim 1, it is characterised in that: described wait close
Headblock (8) are provided between the cantilever beam (10) held together and jack (7).
3. across the operation platform closed up in a kind of continuous rigid frame bridge according to claim 1, it is characterised in that: the bottom plate
(1) support (9) are provided at the top of.
4. across the operation platform closed up in a kind of continuous rigid frame bridge according to claim 1, it is characterised in that: the bottom plate
It (1) is steel plate with a thickness of 4cm, length is greater than closure segment and constructs length 3 to 4m, and width is greater than closure segment width of main beam 1 to 2m,
The side plate (2) is the steel plate with a thickness of 3cm, and totally two pieces, positioned at the two sides in width of main beam direction, the baffle (3) is thickness
For the steel plate of 3cm, totally four pieces, it is located at the surrounding of bottom plate (1), is placed along girder cross-sectional direction.
5. across the operation platform closed up in a kind of continuous rigid frame bridge according to claim 3, it is characterised in that: the support
(9) quantity is 24 pieces, and it is 10cm, the square bracing members with a thickness of 2cm that support (9), which is side length, is welded on bottom plate (1)
On.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910664096.4A CN110374011A (en) | 2019-07-23 | 2019-07-23 | Across the operation platform closed up in a kind of continuous rigid frame bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910664096.4A CN110374011A (en) | 2019-07-23 | 2019-07-23 | Across the operation platform closed up in a kind of continuous rigid frame bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110374011A true CN110374011A (en) | 2019-10-25 |
Family
ID=68254930
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910664096.4A Pending CN110374011A (en) | 2019-07-23 | 2019-07-23 | Across the operation platform closed up in a kind of continuous rigid frame bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110374011A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110685227A (en) * | 2019-11-02 | 2020-01-14 | 中铁七局集团有限公司 | Construction method of formwork support system of obstacle-crossing wide-width swivel bridge closure segment hanging bracket method |
CN114457688A (en) * | 2022-02-14 | 2022-05-10 | 中建七局安装工程有限公司 | Bridge closes up a section assembled operation platform |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0847471A1 (en) * | 1995-07-25 | 1998-06-17 | Paul Kristen, Inc. | Bridge platform |
EP1012397A1 (en) * | 1997-02-28 | 2000-06-28 | Manufacturers Equity Trust | Modular span multi-cell box girder bridge system |
CN101691742A (en) * | 2009-10-10 | 2010-04-07 | 中铁十一局集团第四工程有限公司 | Construction method for back cable-balancing single-side cantilever concreted beam bodies of slant-legged rigid frame bridges |
CN203393638U (en) * | 2013-07-29 | 2014-01-15 | 中建八局第二建设有限公司 | Cradle structure for closure segment construction for continuous beams of rigid frameworks |
CN204080650U (en) * | 2014-10-29 | 2015-01-07 | 中铁建大桥工程局集团第五工程有限公司 | A kind of end bay for road and bridge construction closes up suspension bracket |
CN105970814A (en) * | 2016-05-20 | 2016-09-28 | 中建三局基础设施工程有限公司 | Construction method of existing railway line-spanned swing bridge closure segment |
-
2019
- 2019-07-23 CN CN201910664096.4A patent/CN110374011A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0847471A1 (en) * | 1995-07-25 | 1998-06-17 | Paul Kristen, Inc. | Bridge platform |
EP1012397A1 (en) * | 1997-02-28 | 2000-06-28 | Manufacturers Equity Trust | Modular span multi-cell box girder bridge system |
CN101691742A (en) * | 2009-10-10 | 2010-04-07 | 中铁十一局集团第四工程有限公司 | Construction method for back cable-balancing single-side cantilever concreted beam bodies of slant-legged rigid frame bridges |
CN203393638U (en) * | 2013-07-29 | 2014-01-15 | 中建八局第二建设有限公司 | Cradle structure for closure segment construction for continuous beams of rigid frameworks |
CN204080650U (en) * | 2014-10-29 | 2015-01-07 | 中铁建大桥工程局集团第五工程有限公司 | A kind of end bay for road and bridge construction closes up suspension bracket |
CN105970814A (en) * | 2016-05-20 | 2016-09-28 | 中建三局基础设施工程有限公司 | Construction method of existing railway line-spanned swing bridge closure segment |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110685227A (en) * | 2019-11-02 | 2020-01-14 | 中铁七局集团有限公司 | Construction method of formwork support system of obstacle-crossing wide-width swivel bridge closure segment hanging bracket method |
CN114457688A (en) * | 2022-02-14 | 2022-05-10 | 中建七局安装工程有限公司 | Bridge closes up a section assembled operation platform |
CN114457688B (en) * | 2022-02-14 | 2023-06-02 | 中建七局安装工程有限公司 | Bridge folding section assembly type operation platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103114681A (en) | To-be-poured structure and construction method of high-altitude large-span reinforced concrete beam | |
CN108678398B (en) | Pre-assembly method for steel structure truss of reinforced layer of super high-rise building | |
CN110374011A (en) | Across the operation platform closed up in a kind of continuous rigid frame bridge | |
CN104328734A (en) | Multi-connection and multi-span continuous steel truss girder bridge and construction method thereof | |
CN104070316B (en) | A kind of assembled group of welded H section steel is to device and using method thereof | |
CN208201664U (en) | Corbel type bracket for the installation of high pier stud binder template | |
CN104047234A (en) | Self load bearing side span closure construction method for corrugated steel web plate continuous rigid frame bridge | |
CN210066504U (en) | Large-span cantilever truss type bent cap support system | |
CN102587649B (en) | Template profiled bar supporting system of high and large cantilever structure | |
CN215166467U (en) | Be suitable for under steel construction of segmentation promotion construction to hang piping lane | |
CN205804178U (en) | Scalable without holder device for the liftable of bridge coping construction | |
CN214402368U (en) | Detachment-free truss plate | |
CN208792806U (en) | A kind of floor of steel structure transformation node | |
CN211172409U (en) | Steel construction bracket | |
CN108517970A (en) | A kind of large-span truss hanging method | |
CN108843043A (en) | A kind of people's air defense doorframe support replacement bracing means and its construction method | |
CN211846865U (en) | Device for hoisting corrugated pipe | |
CN103741857A (en) | Floor system with U-shaped steel beams, steel bar trusses and floor bearing plates | |
CN208201670U (en) | A kind of assembled T-type back liter auxiliary steel member | |
CN104153386B (en) | Pile foundation support table periphery facade bed course tool-type punching block and construction method thereof | |
CN103103923B (en) | A kind of window hinge joint method of Steel Truss Stiffening Girder of Suspension Bridge erection | |
CN206846097U (en) | A kind of Men Gangyu frameworks separately-loaded pipeline support structure | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN202299458U (en) | Jig frame for high-altitude large-span rod piece | |
CN211689941U (en) | Hanging type construction platform for splicing steel box girder support method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191025 |