CN211689741U - Novel synthesize curb structure - Google Patents
Novel synthesize curb structure Download PDFInfo
- Publication number
- CN211689741U CN211689741U CN201922326948.7U CN201922326948U CN211689741U CN 211689741 U CN211689741 U CN 211689741U CN 201922326948 U CN201922326948 U CN 201922326948U CN 211689741 U CN211689741 U CN 211689741U
- Authority
- CN
- China
- Prior art keywords
- curb
- pipeline
- concrete blocks
- novel
- synthesize
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a pair of novel synthesize curb structure, curb mainly comprises a plurality of concrete blocks stack from bottom to top, lays vertical continuous channel in the concrete block. This synthesize curb structure utilizes inside vertical continuous passage to bury underground solid-state, liquid and gaseous pipeline, makes things convenient for the construction and the change of later stage pipeline or circuit, maintenance and maintenance buried underground of pipeline, when needing to maintain, open corresponding concrete piece as required can, the relevant construction that has significantly reduced is to the destruction of road and environment to and the influence to the traffic, avoided the waste simultaneously, practiced thrift the cost, have good economic nature and practical value.
Description
Technical Field
The utility model relates to a border stone in road surface especially relates to the novel comprehensive curb structure of laying solid-state, liquid and gaseous pipeline's town road or scenic spot road by the road.
Background
Solid, liquid and gaseous pipelines are often required to be laid beside municipal roads and scenic spot roads sidewalks, and the conventional method at present is that when solid, liquid and gaseous pipelines are newly built and laid, the pipelines are often directly laid in sidewalk subgrades, so that the following problems mainly exist:
(1) the existing pipeline is directly paved in a sidewalk roadbed, so that the smoothness and the straightness of the pipeline are difficult to ensure, and meanwhile, the existing pipeline is buried in soil for a long time, so that the corrosion of the pipeline is easy to accelerate;
(2) when the existing pipeline needs to be replaced, transformed and maintained, a large-area road surface needs to be excavated, and the problems of road surface structure damage, environment pollution, traffic influence, time and labor waste and the like exist;
(3) the existing kerbstone structure is mostly of a solid concrete structure, and has the problems of high material consumption, great weight, difficulty in installation and transportation, difficulty in replacement and low space utilization rate.
(4) There is currently no reliable method to avoid the above mentioned damage and waste.
Disclosure of Invention
To the problem that current structure and technique exist, the utility model provides a novel synthesize curb structure utilizes this to synthesize the curb structure, can effectual solution above-mentioned problem to reduce the cost of relevant work, bring economic income, have very big actual meaning, concrete scheme is as follows:
the utility model provides a novel synthesize curb structure, be equipped with vertical continuous channel in the curb, vertical continuous channel runs through in curb both ends, and curb one side is equipped with the branch pore.
Furthermore, the curb is mainly composed of a plurality of concrete blocks stacked from bottom to top, and longitudinal continuous channels are distributed in the concrete blocks.
Furthermore, the concrete blocks are E-shaped concrete blocks and/or clip-shaped concrete blocks, the grooves of the E-shaped concrete blocks are longitudinal continuous channels, and the hollow pore passages in the clip-shaped concrete blocks are longitudinal continuous channels.
And furthermore, the road comprises an original road and a sidewalk/side slope, a groove is arranged between one side of the original road and the sidewalk/side slope, the bottom of the curb stone is laid in the groove, and the top of the curb stone is exposed out of the surface of the original road.
Furthermore, a guide angle is arranged at the top of the kerb.
The utility model has the advantages that:
(1) the utility model discloses a comprehensive curb structure utilizes internal passage to bury solid-state pipeline, liquid pipeline, gaseous state pipeline underground, makes things convenient for the buried construction of pipeline such as roadside solid-state pipeline, liquid pipeline, gaseous state pipeline, can also the effective straight-ahead of guaranteeing each pipeline;
(2) adopt this novel curb structure of synthesizing, pipeline and external corrosive environment such as can effectual separation solid-state pipeline, liquid pipeline, gaseous state pipeline reduce or eliminate the corruption of pipeline.
(3) Adopt this novel curb structure of synthesizing, can the efficient improve the transmission of materials such as solid-state, liquid, gaseous state, communication line, each pipeline sets up the lateral conduit in the vertical continuous channel of being convenient for.
(4) Adopt this novel curb structure of synthesizing, the utilization ratio that can effectual improvement space and material alleviates the dead weight of curb, convenient to detach, installation and maintenance.
(5) Adopt this novel curb structure of synthesizing, maintenance and transformation that carry out solid-state, liquid and gaseous state transmission pipeline that can be convenient have avoided filling up greatly and have dug the operation, weaken or eliminated the influence of maintenance construction to traffic and environment.
(6) Adopt this novel synthesize curb structure, when pipelines such as solid-state pipeline, liquid pipeline, gaseous state pipeline need be changed, reform transform and maintain, do not need excavation road surface or gardens vegetation of large tracts of land, only need the part to be under construction on a plurality of blocks of curb, open corresponding concrete piece maintain can, the relevant construction that has significantly reduced is to the pollution and the destruction of road and environment, practices thrift the cost of manual work, equipment and material, has good economic nature and practical value.
Drawings
Fig. 1 is a usage state diagram of the novel comprehensive curb of the utility model.
Fig. 2 is a schematic structural view of the E-shaped concrete block of fig. 1.
Fig. 3 is a schematic structural view of the square concrete block of fig. 1.
Fig. 4 is a schematic view of the mounting structure of fig. 1.
In the figure:
1: a curb; 101: a longitudinally continuous channel; 102: e-type concrete blocks; 103: a square concrete block; 104: a branched duct; 105: a pipeline; 2: an original road; 3: sidewalks/slopes.
Detailed Description
The invention will be further explained and illustrated with reference to the drawings and the embodiments, which should be noted to limit the right of the invention.
As shown in fig. 1 and 2, a novel comprehensive curb structure comprises a curb 1, an original road 2 and a sidewalk/side slope 3, wherein a longitudinal continuous channel 101 is arranged in the curb 1, the longitudinal continuous channel 101 runs through two ends of the curb 1, and one side of the curb 1 is provided with a branch duct 104. Preferably, the curb 1 is mainly composed of a plurality of concrete blocks stacked from bottom to top, the concrete blocks are E-shaped concrete blocks 102 and/or zigzag concrete blocks 103, grooves of the E-shaped concrete blocks 102 are longitudinal continuous channels 101, hollow pore channels in the zigzag concrete blocks 102 are the longitudinal continuous channels 101, a pipeline 105 is respectively laid in each longitudinal continuous channel 101 according to actual requirements on site, and the pipelines 105 are solid pipelines, liquid pipelines and gaseous pipelines. The E-concrete block 102 and the clip-concrete block 103 serve to space the various pipes 105 apart, facilitate management, deployment and maintenance of the pipes 105, and prevent adverse effects caused by leakage of materials between the pipes 105. One side of each E-shaped concrete block 102 and/or the square concrete block 103 is provided with a branch duct 104, and the branch duct 104 is used for arranging various pipelines 105 laid in the longitudinal continuous channel 101 into branch ducts according to actual needs on site. The E-shaped concrete blocks 102 and/or the clip-shaped concrete blocks 103 are connected by adopting a snap connection or a bolt connection or concrete bonding, and the aim is to disassemble the E-shaped concrete blocks 102 and/or the clip-shaped concrete blocks 103 as required and install, maintain and repair various pipelines 105 in the longitudinal continuous channel 101.
A groove is formed between one side of an original road 2 and a sidewalk/side slope 3, one side of a curb 1 is connected with the sidewalk/side slope 3, the bottom of the curb 1 is laid in the groove, and the curb 1 is fixed between the original road 2 and the sidewalk/side slope 3 and is convenient to replace or transform. The top exposes original road surface and is parallel with 3 tops of pavement/side slope, and curb 1 top one side is equipped with the lead angle, and the during aim at rainy day, the unnecessary water of pavement/side slope 3 of being convenient for in time discharges. The shape of the kerb 1 is quadrilateral, polygonal or trapezoidal, the specific shape of which can also be customized according to the structure of the sidewalk or slope 3.
The working principle is as follows: the bottom of the kerbstone 1 is arranged in a groove arranged between the original road 2 and the sidewalk/side slope 3, after the kerbstone is arranged, a solid pipeline, a liquid pipeline and a gas pipeline are respectively paved in a longitudinal continuous channel 101, and branch pipelines are arranged through branch ducts 104 according to actual conditions.
Claims (4)
1. The utility model provides a novel synthesize curb structure, includes the curb, its characterized in that, be equipped with vertical continuous passageway in the curb, vertical continuous passageway runs through in the curb both ends, and curb one side is equipped with branch's pore, the curb mainly comprises a plurality of concrete blocks stack from bottom to top, lays vertical continuous passageway in the concrete block.
2. The novel comprehensive curb structure of claim 1, characterized in that the concrete blocks are E-shaped concrete blocks and/or zigzag concrete blocks, the grooves of the E-shaped concrete blocks are longitudinal continuous channels, and the hollow holes in the zigzag concrete blocks are longitudinal continuous channels.
3. The novel comprehensive curb structure of claim 1 or 2, comprising an original road and a sidewalk/side slope, wherein a groove is arranged between one side of the original road and the sidewalk/side slope, the bottom of the curb is laid in the groove, and the top of the curb is exposed out of the surface of the original road.
4. A novel composite kerb structure as claimed in claim 3 wherein the top of the kerb is chamfered.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922326948.7U CN211689741U (en) | 2019-12-23 | 2019-12-23 | Novel synthesize curb structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922326948.7U CN211689741U (en) | 2019-12-23 | 2019-12-23 | Novel synthesize curb structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211689741U true CN211689741U (en) | 2020-10-16 |
Family
ID=72793504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922326948.7U Expired - Fee Related CN211689741U (en) | 2019-12-23 | 2019-12-23 | Novel synthesize curb structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211689741U (en) |
-
2019
- 2019-12-23 CN CN201922326948.7U patent/CN211689741U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205062838U (en) | Combination cabin concrete structure is assembled to shallow utility tunnel of burying | |
CN104674847A (en) | Novel assembling type precast concrete urban comprehensive pipe gallery and construction method thereof | |
CN105113543A (en) | Assembled and combined cabin concrete structure of shallow-buried 0815-type underground comprehensive pipe gallery | |
CN103541310A (en) | Long-united bridge widening splicing structure and construction method thereof | |
CN105401593A (en) | Assembly type square underground pipe gallery | |
CN111236002B (en) | Novel pavement luminous mark embedding method | |
CN214831576U (en) | Prevent subsiding highway subgrade reinforced structure | |
CN103556672A (en) | Rainwater harvesting and water storage system for field road and construction method thereof | |
CN211689741U (en) | Novel synthesize curb structure | |
CN109826065A (en) | A kind of high-fill roadbed guard system and its construction method | |
CN109024673A (en) | A kind of sponge road surface-underground pipe gallery system and construction technology | |
CN106677207A (en) | Staggered type underground traffic pipe gallery car entrance and exit structure | |
AU2019202413A1 (en) | Improved concrete road pavement with more sustainability benefits | |
CN206916893U (en) | One kind circulation infiltration water storage sponge integral system | |
DE3244374A1 (en) | Collecting duct for urban service arrangements | |
CN212925640U (en) | Pin-connected panel ecological pipe gallery road based on solid waste rubbish renewable resources | |
CN105178134A (en) | Ditch cover and road green color transformation method | |
CN213114874U (en) | Urban road partition belt drainage structure | |
CN209923712U (en) | Urban road structure of type is laid to system module ization | |
CN204098066U (en) | The square underground pipe gallery of assembling | |
CN203530865U (en) | Long-connection bridge widening splicing structure | |
CN212388281U (en) | Novel comprehensive blind road structure | |
CN110714443A (en) | Comprehensive corridor arrangement structure for urban flood diversion | |
CN108923344B (en) | Comprehensive pipeline arrangement structure based on energy storage type tramcar engineering | |
CN206887797U (en) | Multifunctional road rhone |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201016 Termination date: 20211223 |
|
CF01 | Termination of patent right due to non-payment of annual fee |