CN211686429U - Steel pipe for building engineering - Google Patents
Steel pipe for building engineering Download PDFInfo
- Publication number
- CN211686429U CN211686429U CN202020276284.8U CN202020276284U CN211686429U CN 211686429 U CN211686429 U CN 211686429U CN 202020276284 U CN202020276284 U CN 202020276284U CN 211686429 U CN211686429 U CN 211686429U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe main
- plate
- electro
- main part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 59
- 239000010959 steel Substances 0.000 title claims abstract description 59
- 238000009434 installation Methods 0.000 claims abstract description 16
- 238000010276 construction Methods 0.000 claims abstract description 9
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 238000013016 damping Methods 0.000 claims description 4
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 229910052751 metal Inorganic materials 0.000 claims description 3
- 230000008878 coupling Effects 0.000 abstract description 3
- 238000010168 coupling process Methods 0.000 abstract description 3
- 238000005859 coupling reaction Methods 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 description 2
- 239000004566 building material Substances 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Vibration Prevention Devices (AREA)
Abstract
The utility model discloses a steel pipe for building engineering relates to the building engineering field, the camera includes a supporting plate, the intermediate position department at the top of backup pad is provided with the steel pipe main part, and backup pad top both sides are connected with the curb plate, and the internally mounted of curb plate has the electro-magnet, one side of electro-magnet is connected with the spring, and the spring keeps away from the one end of electro-magnet and even has the fixed plate, the outside of steel pipe main part is provided with the support frame, and the top of support frame is connected with first installation piece. The utility model discloses a backup pad, curb plate, electro-magnet, spring and fixed plate that set up, the fixed plate inter attraction of electro-magnet circular telegram and spring coupling in the application curb plate for the fixed plate loosens fixed steel pipe main part, makes steel pipe main part fixed by the fixed plate with the electro-magnet outage, has avoided the collision to make the steel pipe main part of placing take place to drop and the potential safety hazard that produces, makes the security of construction improve, and the staff of being convenient for take of steel pipe main part.
Description
Technical Field
The utility model relates to a building engineering field specifically is a steel pipe for building engineering.
Background
The steel pipe is a building material commonly used in the building industry, and is a building material circular steel pipe essential for building construction, and the application of the circular steel pipe in building engineering is very wide: the net rack, the net shell, the truss and other various structural forms are mainly formed by round steel pipes.
But current steel pipe for building when using, for directly placing subaerial, the steel pipe is piled up inconvenient transportation together, and collides easily for the steel pipe landing has certain potential safety hazard to construction, and current steel pipe does not set up fine anti-shake device when connecting, sells the influential to the use of steel pipe.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problem that the steel pipe is inconvenient to transport, has placed the potential safety hazard among the prior art and does not set up fine anti-shake device, provide a steel pipe for building engineering.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel pipe for building engineering, includes the backup pad, the intermediate position department at the top of backup pad is provided with the steel pipe main part, and backup pad top both sides are connected with the curb plate, and the internally mounted of curb plate has the electro-magnet, one side of electro-magnet is connected with the spring, and the spring keeps away from the one end of electro-magnet and even has the fixed plate, the outside of steel pipe main part is provided with the support frame, and the top of support frame is connected with first installation piece, the inside of first installation piece is provided with first fastening bolt, the both sides of support frame are connected with the connecting rod, and one side of connecting rod is connected with the second installation piece, the inside of second installation piece is provided with second fastening bolt.
Preferably, one side of the fixing plate, which is far away from the spring, is connected with an anti-slip layer, the anti-slip layer is made of rubber, and the fixing plate is made of metal iron.
Preferably, the support frame is detachably connected with the steel pipe main body through a first fastening bolt, and a damping rubber ring is arranged on the outer side of the first fastening bolt.
Preferably, one side of the supporting plate is provided with an interface, the interface is electrically connected with a battery, and the battery is electrically connected with the electromagnet.
Preferably, the connecting rod is connected with the support frame in a welding mode, and the number of the connecting rod, the second mounting block and the second fastening bolt is two.
Preferably, the bottom of backup pad is connected with the universal wheel, and the quantity of universal wheel is four groups, four groups the universal wheel all is in fixed connection about the four corners position department of backup pad bottom.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a backup pad, curb plate, electro-magnet, spring and fixed plate that set up, the fixed plate that utilizes the electro-magnet circular telegram in the curb plate and spring coupling attracts each other for the fixed plate loosens fixed steel pipe main part, cuts off the power supply of electro-magnet and makes steel pipe main part fixed by the fixed plate, has avoided the collision to make the steel pipe main part of placing take place to drop and the potential safety hazard that produces, makes the security of construction improve, and is convenient for the staff to take to the steel pipe main part;
2. through the support frame that sets up, first installation piece, connecting rod, second installation piece, first fastening bolt and second fastening bolt, the application steel pipe main part outside is provided with the support frame, and the connecting rod that the support frame is connected is fixed with the external world through the second damping bolt in the second installation piece to what reduced the steel pipe main part when the installation and produced rocks the harm that causes the steel pipe, improved the life of steel pipe.
Drawings
Fig. 1 is a top view of the present invention;
fig. 2 is a side cross-sectional view of the present invention;
fig. 3 is a cross-sectional view of the support frame of the present invention.
In the figure: 1. a support plate; 2. a side plate; 3. a steel pipe body; 4. a support frame; 5. a first mounting block; 6. a connecting rod; 7. a second mounting block; 8. a first fastening bolt; 9. a second fastening bolt; 10. an electromagnet; 11. a spring; 12. a fixing plate; 13. an anti-slip layer; 14. a battery; 15. an interface; 16. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a steel pipe for building engineering, including a supporting plate 1, a steel pipe main body 3 is disposed at a middle position of a top of the supporting plate 1, side plates 2 are connected to two sides of the top of the supporting plate 1, an electromagnet 10 is mounted inside the side plates 2, one side of the electromagnet 10 is connected to a spring 11, a fixing plate 12 is connected to one end, away from the electromagnet 10, of the spring 11, a supporting frame 4 is disposed outside the steel pipe main body 3, a first mounting block 5 is connected to the top of the supporting frame 4, a first fastening bolt 8 is disposed inside the first mounting block 5, a connecting rod 6 is connected to two sides of the supporting frame 4, a second mounting block 7 is connected to one side of the connecting rod 6, a second fastening bolt 9 is disposed inside the second mounting block 7, and a battery 14 is.
The device improves the safety of building construction and is convenient for workers to take the steel pipe main body 3 through the supporting plate 1, the side plate 2, the electromagnet 10, the spring 11 and the fixing plate 12; through the support frame 4, first installation piece 5, connecting rod 6, second installation piece 7, first fastening bolt 8 and the second fastening bolt 9 that set up, reduced the harm that rocks that produces when the installation of steel pipe main part 3 caused the steel pipe, improved the life of steel pipe.
Please refer to fig. 2, the anti-slip layer 13 is connected to a side of the fixing plate 12 away from the spring 11, the anti-slip layer 13 is made of rubber, the fixing plate 12 is made of metal iron, and the anti-slip layer 13 made of rubber increases the friction coefficient of the steel pipe body 3.
Please refer to fig. 3, the supporting frame 4 is detachably connected to the steel pipe main body 3 through a first fastening bolt 8, and a damping rubber ring is disposed outside the first fastening bolt 8 and made of rubber.
Please refer to fig. 2, an interface 15 is disposed on one side of the supporting plate 1, the interface 15 is electrically connected to the battery 14, the battery 14 is electrically connected to the electromagnet 10, and the interface 15 is connected to an external power source to transmit the electric energy to the battery 14 for storage.
Please refer to fig. 3, the connecting rods 6 are welded to the supporting frame 4, and the number of the connecting rods 6, the second mounting blocks 7 and the second fastening bolts 9 is two, and the two sets of connecting rods 6 make the installation of the steel pipe main body 3 more stable.
Please refer to fig. 2, the bottom of the supporting plate 1 is connected with four sets of universal wheels 16, the four sets of universal wheels 16 are all fixedly connected with the four corners of the bottom of the supporting plate 1, and the universal wheels 16 are self-locking universal wheels.
The working principle is as follows: during the use, battery 14 in application interface 15 holds full electric energy with backup pad 1, when needs place steel pipe main part 3, at first with the electro-magnet 10 circular telegram in curb plate 2, electro-magnet 10 circular telegram and spring coupling's fixed plate 12 inter attraction, make fixed plate 12 drive spring 11 compression to the direction removal of electro-magnet 10, place steel pipe main part 3 again in backup pad 1, with electro-magnet 10 outage, make spring 11 resume deformation drive fixed plate 12 fixed with steel pipe main part 3, when steel pipe main part 3 is installed, first fastening bolt 8 in the first installation piece 5 that application support frame 4 connects makes support frame 4 be connected with steel pipe main part 3, second fastening bolt 9 in the second installation piece 7 that application connecting rod 6 connects again makes support frame 4 fixed with external mounted position, make steel pipe main part 3 more stable when using.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. A steel pipe for construction engineering, comprising a support plate (1), characterized in that: a steel pipe main body (3) is arranged in the middle of the top of the supporting plate (1), and the two sides of the top of the supporting plate (1) are connected with side plates (2), an electromagnet (10) is arranged in the side plate (2), one side of the electromagnet (10) is connected with a spring (11), and one end of the spring (11) far away from the electromagnet (10) is connected with a fixed plate (12), the outer side of the steel pipe main body (3) is provided with a support frame (4), the top of the supporting frame (4) is connected with a first mounting block (5), a first fastening bolt (8) is arranged inside the first mounting block (5), two sides of the supporting frame (4) are connected with connecting rods (6), and one side of the connecting rod (6) is connected with a second mounting block (7), a second fastening bolt (9) is arranged in the second mounting block (7), and a battery (14) is arranged in the support plate (1).
2. The steel pipe for construction engineering according to claim 1, characterized in that: one side of the fixing plate (12) far away from the spring (11) is connected with an anti-slip layer (13), the anti-slip layer (13) is made of rubber, and the fixing plate (12) is made of metal iron.
3. The steel pipe for construction engineering according to claim 1, characterized in that: the support frame (4) is detachably connected with the steel pipe main body (3) through a first fastening bolt (8), and a damping rubber ring is arranged on the outer side of the first fastening bolt (8).
4. The steel pipe for construction engineering according to claim 1, characterized in that: one side of backup pad (1) is provided with interface (15), and interface (15) and battery (14) electric connection, battery (14) and electro-magnet (10) electric connection.
5. The steel pipe for construction engineering according to claim 1, characterized in that: connecting rod (6) and support frame (4) welded connection, and the quantity of connecting rod (6), second installation piece (7) and second fastening bolt (9) all is two sets of.
6. The steel pipe for construction engineering according to claim 1, characterized in that: the bottom of backup pad (1) is connected with universal wheel (16), and the quantity of universal wheel (16) is four groups, four groups universal wheel (16) all are all about the four corners position department fixed connection of backup pad (1) bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020276284.8U CN211686429U (en) | 2020-03-09 | 2020-03-09 | Steel pipe for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020276284.8U CN211686429U (en) | 2020-03-09 | 2020-03-09 | Steel pipe for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211686429U true CN211686429U (en) | 2020-10-16 |
Family
ID=72780001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020276284.8U Active CN211686429U (en) | 2020-03-09 | 2020-03-09 | Steel pipe for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211686429U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112849021A (en) * | 2021-02-22 | 2021-05-28 | 杨亚娜 | Express delivery case protection device of AGV intelligence letter sorting dolly |
-
2020
- 2020-03-09 CN CN202020276284.8U patent/CN211686429U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112849021A (en) * | 2021-02-22 | 2021-05-28 | 杨亚娜 | Express delivery case protection device of AGV intelligence letter sorting dolly |
CN112849021B (en) * | 2021-02-22 | 2023-12-26 | 杨亚娜 | Express delivery case protection device of AGV intelligent sorting dolly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211686429U (en) | Steel pipe for building engineering | |
CN211568803U (en) | PCCP pipeline transportation fixing device | |
CN210268860U (en) | Strain beam of highway plate type weighing sensor | |
CN213209129U (en) | Fan inspection data management system | |
CN213448920U (en) | Novel shock attenuation formula connection structure for building | |
CN211923753U (en) | High-voltage power transmission tower | |
CN214607380U (en) | High-speed circuit breaker support | |
CN111805516A (en) | Artificial intelligence arm protection equipment | |
CN201489948U (en) | Installation and fixation structure for transformer | |
CN212356255U (en) | Road and bridge door machine landing leg connecting device | |
CN210029718U (en) | Hoist is used in various steel sheet transportation | |
CN213117017U (en) | Combined furniture connecting piece | |
CN108946521B (en) | Tower type hoisting device capable of effectively reducing corrosion of connecting bolt of crane boom | |
CN214659218U (en) | High-rise building anti-vibration device | |
CN205016331U (en) | Shockproof noise reduction mounting structure of transformer | |
CN211449079U (en) | Vertical fire pump with high stability | |
CN211494248U (en) | General chassis of food delivery robot | |
CN210710399U (en) | Hoist electric hoist anti-falling protection device with buffer device | |
CN202586615U (en) | Shock-absorbing seat of draught fan and motor | |
CN220264914U (en) | Lifting protection structure for diesel generator | |
CN215513699U (en) | Long-distance full-working-condition storage battery transport trolley | |
CN204738863U (en) | Urea case protector | |
CN218751105U (en) | Dedicated wheeled wall climbing robot of wind power tower cylinder | |
CN220065938U (en) | Bridge crane battery pack fixing device | |
CN215470868U (en) | Dismounting device of graphite heat exchanger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220412 Address after: 223001 No. 19, Tongshun Road, Yanhe Town, qingjiangpu District, Huai'an City, Jiangsu Province Patentee after: Huai'an Tiezhou warehousing and Logistics Co.,Ltd. Address before: 322204 Zhongcun, Huangzhai Town, Pujiang County, Jinhua City, Zhejiang Province Patentee before: Zhong Naicong |
|
TR01 | Transfer of patent right |