CN211667392U - Building construction pipeline protector - Google Patents
Building construction pipeline protector Download PDFInfo
- Publication number
- CN211667392U CN211667392U CN201921659628.7U CN201921659628U CN211667392U CN 211667392 U CN211667392 U CN 211667392U CN 201921659628 U CN201921659628 U CN 201921659628U CN 211667392 U CN211667392 U CN 211667392U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- main
- bevel gear
- construction pipeline
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)
Abstract
The utility model discloses a construction pipeline protector, including main protecting tube and inferior protecting tube, the equal fixedly connected with heat preservation in inside of main protecting tube and inferior protecting tube, the outside one side fixed mounting of main protecting tube has main lag, the outside one side fixed mounting of inferior protecting tube has inferior lag, the bottom fixedly connected with connecting block of main protecting tube, and the bottom threaded connection of connecting block has the turning block, the bottom fixed mounting of turning block has the sleeve pipe. The utility model discloses a main protecting tube, connecting block, turning block, twist grip, first bevel gear, second bevel gear that set up grab the ground with the rotation and bore, can make the rotation of first bevel gear bottom grab the ground and bore the rotation and enter into earth ground or slope on, main protecting tube is firmly fixed on earth ground or slope with the intraductal construction pipeline of inferior protecting tube, is suitable for the slope, places when the land, rotates out the turning block and can dismantle, and it is comparatively convenient to use.
Description
Technical Field
The utility model relates to a protector technical field especially relates to a construction pipeline protector.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The construction site is called as a construction site or construction site, also called as a construction site, and is often used for connecting and laying on-site facilities during construction.
Present building construction pipeline protector is in the middle of the process of using, when the construction pipeline was placed on earth ground or slope, construction pipeline protector can receive the influence of environment, protector can appear crooked or gliding phenomenon, can not be suitable for the slope, construction pipeline protector can not be applicable to the construction pipeline of different diameters a bit, outdoor pressure causes extrusion and damage to the construction pipeline easily, causes economic loss, consequently, need to design a building construction pipeline protector to solve above-mentioned problem urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a building construction pipeline protection device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a building construction pipeline protection device comprises a main protection pipe and a secondary protection pipe, wherein heat preservation layers are fixedly connected inside the main protection pipe and the secondary protection pipe, a main protection sleeve is fixedly installed on one side outside the main protection pipe, a secondary protection sleeve is fixedly installed on one side outside the secondary protection pipe, a connecting block is fixedly connected to the bottom of the main protection pipe, a rotating block is in threaded connection with the bottom of the connecting block, a sleeve is fixedly installed on the bottom of the rotating block, a fixed bearing is fixedly installed on the bottom of the sleeve, a rotary ground grabbing drill is rotatably connected to the inside of the fixed bearing, a first bevel gear is fixedly connected to the top of the rotary ground grabbing drill, a connecting bearing is fixedly connected to one side of the sleeve, a rotating handle is rotatably connected to the inside of the connecting bearing, an anti-skidding sleeve is fixedly sleeved at one end of the rotating handle, and a second bevel gear is fixedly connected to the end, threaded holes are formed in the main protective pipe and the secondary protective pipe, a threaded rod is connected in the threaded hole in a rotating mode, one side of the outer portion of the threaded rod is connected with a fastening bolt in a rotating mode, a protective bearing is arranged at the bottom of the threaded rod, and a sleeve plate is fixedly connected to the bottom of the protective bearing.
Further, the bottom fixed mounting of heat preservation has the fixed plate, the equal fixedly connected with compression spring in both sides of fixed plate bottom, and compression spring's bottom is connected with the top of lagging.
Further, the inside of main lag and the outside of time lag all seted up the screw thread, and the one end threaded connection of time lag is in the one end of main lag.
Further, the first bevel gear and the second bevel gear are both arranged inside the sleeve, and the first bevel gear is meshed with the surface of the second bevel gear.
Furthermore, the fixed plate and the sleeve plate are both in a semi-arc structure, and the bottom of the rotary ground grabbing drill is in a conical structure.
Furthermore, the diameter of the main protective pipe is equal to that of the secondary protective pipe, and the number of the threaded rods is four.
The utility model has the advantages that:
1. through the main protective tube that sets up, connecting block, turning block, twist grip, first bevel gear, second bevel gear and rotation grab the ground and bore, can make the rotation of first bevel gear bottom grab the ground and bore the rotation and enter into earth ground or slope on, the construction pipeline in main protective tube and the time protective tube is firmly fixed on earth ground or slope, is suitable for the slope, places when flat ground, rotates out the turning block and can dismantle, and it is comparatively convenient to use.
2. Through the threaded rod, fastening bolt, lagging and the compression spring that set up, through adjusting the distance between two lagging, can be applicable to the construction pipeline of different diameters, make things convenient for the use of construction pipeline, it is comparatively simple during the operation.
3. Through the main lag and the time lag that set up, can reduce the construction pipeline and place when main protective pipe is managed with time protective pipe is inside, outdoor pressure causes extrusion and damage to the construction pipeline, effectually protects the construction pipeline.
Drawings
Fig. 1 is a schematic structural view of a building construction pipeline protection device provided by the utility model;
fig. 2 is a schematic structural section view of a building construction pipeline protection device provided by the utility model;
fig. 3 is the utility model provides a building construction pipeline protector's local structure schematic diagram.
In the figure: the protective device comprises a main protective pipe 1, a secondary protective pipe 2, a main protective sleeve 3, a secondary protective sleeve 4, a heat-insulating layer 5, a threaded rod 6, a fastening bolt 7, a fixing plate 8, a compression spring 9, a protective bearing 10, a sleeve plate 11, a connecting block 12, a rotating block 13, a sleeve 14, a rotary ground-grasping drill 15, a first bevel gear 16, a second bevel gear 17, a connecting bearing 18, a rotating handle 19 and a fixed bearing 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When a component is referred to as being "connected" to another component, it can be directly connected to the other component or intervening components may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1 to 3, a building construction pipeline protection device includes a main protection pipe 1 and a secondary protection pipe 2, the interiors of the main protection pipe 1 and the secondary protection pipe 2 are fixedly connected with a heat preservation layer 5, the heat preservation layer 5 preserves heat of a construction pipeline, so as to prevent the construction pipeline from frost crack in cold seasons, one side of the exterior of the main protection pipe 1 is fixedly provided with a main protection sleeve 3, one side of the exterior of the secondary protection pipe 2 is fixedly provided with a secondary protection sleeve 4, the main protection sleeve 3 and the secondary protection sleeve 4 can protect the construction pipeline, the bottom of the main protection pipe 1 is fixedly connected with a connecting block 12, the bottom of the connecting block 12 is in threaded connection with a rotating block 13, the rotating block 13 is rotated to be detachable, the bottom of the rotating block 13 is fixedly provided with a sleeve 14, the bottom of the sleeve 14 is fixedly provided with a fixed bearing 20, the interior of the fixed bearing 20 is rotatably connected with a, the rotary ground grabbing drill 15 rotates to enter soil or a slope, a first bevel gear 16 is fixedly connected to the top of the rotary ground grabbing drill 15, a connecting bearing 18 is fixedly connected to one side of a sleeve 14, a rotary handle 19 is rotatably connected to the inside of the connecting bearing 18, an anti-skidding sleeve is fixedly sleeved at one end of the rotary handle 19 and prevents hands from skidding when the rotary handle 19 rotates, a second bevel gear 17 is fixedly connected to the end of the rotary handle 19, threaded holes are formed in the main protective pipe 1 and the secondary protective pipe 2, a threaded rod 6 is rotatably connected in each threaded hole, a fastening bolt 7 is rotatably connected to one side of the outer portion of the threaded rod 6, a protective bearing 10 is arranged at the bottom of the threaded rod 6, a sleeve plate 11 is fixedly connected to the bottom of the protective bearing 10, the fastening bolt 7 is fixedly connected to the outer portion of one end of the rotary threaded rod 6, and the, when the threaded rod 6 rotates towards the outside of the main protective pipe 1, the sleeve plates 11 are close to the pipe wall of the main protective pipe 1, and the distance between the two sleeve plates 11 is adjusted.
Further, the bottom fixed mounting of heat preservation 5 has fixed plate 8, the equal fixedly connected with compression spring 9 in both sides of fixed plate 8 bottom, and compression spring 9's bottom is connected with the top of lagging 11, and compression spring 9 compresses, makes the construction pipeline enter into the inside of main protecting pipe 1 and inferior protecting pipe 2.
Further, the inside of main lag 3 and the outside of inferior lag 4 are all seted up threadedly, and the one end threaded connection of inferior lag 4 is in the one end of main lag 3, and main lag 3 can reduce the construction pipeline with setting up of inferior lag 4 and place when main protecting pipe 1 is inside with inferior protecting pipe 2, and outdoor pressure causes the extrusion and damages to the construction pipeline, effectually protects the construction pipeline.
Further, the first bevel gear 16 and the second bevel gear 17 are both arranged inside the casing 14, the surfaces of the first bevel gear 16 and the second bevel gear 17 are engaged, the rotating handle 19 rotates to drive the second bevel gear 17 at the end portion thereof, and the second bevel gear 17 drives the first bevel gear 16 to rotate, so that the rotating ground grabbing drill 15 at the bottom of the first bevel gear 16 rotates to enter soil or an inclined slope.
Further, fixed plate 8 and lagging 11 are half arc structure, and the bottom of rotating and grabbing ground auger 15 is conical structure, and the conical structure of the bottom of rotating and grabbing ground auger 15 can be quick creep into on muddy soil or slope.
Further, the diameter of main protective tube 1 equals with the diameter of inferior protective tube 2, and the number of threaded rod 6 is four, and through adjusting threaded rod 6, the tube wall that the lagging 11 is close to main protective tube 1, and compression spring 9 compresses, can be applicable to the construction pipeline of different diameters, facilitates the use.
The working principle is as follows: when the protective device is used, the bottom of the connecting block 12 at the bottom of the main protective pipe 1 is rotatably connected with the rotating block 13, the rotating handle 19 at one side of the sleeve 14 is rotated, the rotating handle 19 rotates to drive the second bevel gear 17 at the end part of the rotating handle, the second bevel gear 17 is meshed with the outside of the first bevel gear 16, the second bevel gear 17 drives the first bevel gear 16 to rotate, the rotating ground grabbing drill 15 at the bottom of the first bevel gear 16 rotates to enter soil or a slope, the construction pipeline in the main protective pipe 1 and the secondary protective pipe 2 is stably fixed on the soil or the slope, when the protective device is not suitable for the slope, the rotating block 13 is rotated out and can be detached, the use is convenient, the fastening bolt 7 outside one end of the threaded rod 6 rotates towards the outside of the main protective pipe 1, the sleeve plate 11 is close to the pipe wall of the main protective pipe 1, and the compression spring 9 is compressed, one end of the construction pipeline enters the main protection pipe 1 through two sleeve plates 11, the distance between the two sleeve plates 11 is adjusted, the construction pipeline is applicable to construction pipelines with different diameters, the use is convenient, the secondary protection sleeve 4 of one end of the secondary protection pipe 2 is rotated to enter the main protection sleeve 3, the main protection pipe 1 is connected with the secondary protection pipe 2, the construction pipeline enters the main protection pipe 1 and the secondary protection pipe 2 through adjusting the distance between the two sleeve plates 11 inside the secondary protection pipe 2, the main protection sleeve 3 and the secondary protection sleeve 4 are arranged to reduce the construction pipeline to be placed inside the main protection pipe 1 and the secondary protection pipe 2, the outdoor pressure causes extrusion and damage to the construction pipeline, and the construction pipeline is effectively protected.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The building construction pipeline protection device comprises a main protection pipe (1) and a secondary protection pipe (2), and is characterized in that a heat preservation layer (5) is fixedly connected inside the main protection pipe (1) and the secondary protection pipe (2), a main protection sleeve (3) is fixedly installed on one side of the outside of the main protection pipe (1), a secondary protection sleeve (4) is fixedly installed on one side of the outside of the secondary protection pipe (2), a connecting block (12) is fixedly connected to the bottom of the main protection pipe (1), a rotating block (13) is in threaded connection with the bottom of the connecting block (12), a sleeve (14) is fixedly installed at the bottom of the rotating block (13), a fixed bearing (20) is fixedly installed at the bottom of the sleeve (14), a rotary ground grabbing drill (15) is rotatably connected to the inside of the fixed bearing (20), and a first bevel gear (16) is fixedly connected to the top of the rotary ground grabbing drill (15), one side fixedly connected with connecting bearing (18) of sleeve pipe (14), and the inside rotation of connecting bearing (18) is connected with turning handle (19), and the fixed cover of one end of turning handle (19) is equipped with anti-skidding sleeve pipe, the tip fixedly connected with second bevel gear (17) of turning handle (19), main protecting tube (1) all sets up threaded hole with the inside of inferior protecting tube (2), threaded hole internal rotation is connected with threaded rod (6), and outside one side of threaded rod (6) is rotated and is connected with fastening bolt (7), the bottom of threaded rod (6) is provided with protective bearing (10), and the bottom fixedly connected with lagging (11) of protective bearing (10).
2. The building construction pipeline protection device according to claim 1, wherein a fixing plate (8) is fixedly installed at the bottom of the heat insulation layer (5), compression springs (9) are fixedly connected to both sides of the bottom of the fixing plate (8), and the bottoms of the compression springs (9) are connected with the top of the sleeve plate (11).
3. A building construction pipeline protection device according to claim 1, characterized in that the inside of the primary protection sleeve (3) and the outside of the secondary protection sleeve (4) are both threaded, and one end of the secondary protection sleeve (4) is threaded at one end of the primary protection sleeve (3).
4. A construction pipeline protector according to claim 1 wherein the first bevel gear (16) and the second bevel gear (17) are both disposed inside the sleeve (14) and the first bevel gear (16) engages with the surface of the second bevel gear (17).
5. The building construction pipeline protection device according to claim 2, wherein the fixing plate (8) and the sleeve plate (11) are both in a semi-arc structure, and the bottom of the rotary ground grabbing drill (15) is in a conical structure.
6. The building construction pipeline protection device according to claim 1, wherein the diameter of the primary protection pipe (1) is equal to that of the secondary protection pipe (2), and the number of the threaded rods (6) is four.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921659628.7U CN211667392U (en) | 2019-10-01 | 2019-10-01 | Building construction pipeline protector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921659628.7U CN211667392U (en) | 2019-10-01 | 2019-10-01 | Building construction pipeline protector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211667392U true CN211667392U (en) | 2020-10-13 |
Family
ID=72730068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921659628.7U Expired - Fee Related CN211667392U (en) | 2019-10-01 | 2019-10-01 | Building construction pipeline protector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211667392U (en) |
-
2019
- 2019-10-01 CN CN201921659628.7U patent/CN211667392U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211667392U (en) | Building construction pipeline protector | |
CN203066886U (en) | Multiple-start thread quick connecting type well drilling water-proof/sand-proof pipe | |
CN103643976A (en) | Recyclable nylon split combination anchor rod and anchor rod installing and recycling method | |
CN203668920U (en) | Underground supporting vertical column with reinforcing device | |
CN104947662B (en) | A kind of soil-nail wall support system based on the recyclable technique of assembled | |
CN202363825U (en) | Sealing device for utward-separated cable penetration | |
CN211347483U (en) | Environment monitoring soil sampler | |
CN208517975U (en) | A kind of inspection well cover | |
CN216429508U (en) | Drilling device for hydrogeology drilling capable of cleaning up drill rod adhesion soil | |
KR20210043035A (en) | Insulated Anchor Support with Drill and Anchor Bolt Structure using It | |
CN202895113U (en) | Pick-out device for locking ring assembly of well logging during drilling instrument | |
CN109339021B (en) | Standard sand recovery device in test for determining pavement compactness by sand filling method and use method thereof | |
CN212456213U (en) | Fixed base | |
CN204053010U (en) | A kind of tunnel cloth eye prevents from training off device | |
CN208396660U (en) | A kind of Multifunctional drill | |
CN209818961U (en) | Energy-concerving and environment-protective prefabricated insulating tube of direct burial of ultralow heat waste | |
CN207160574U (en) | It is a kind of to utilize integral type sleeve pipe suitable for the repeatable of aluminum dipping form system | |
CN208563419U (en) | A kind of set digging device | |
CN112359828A (en) | Concrete pipe pile extension device | |
CN207739284U (en) | A kind of steel cover plate of manhole | |
CN212896926U (en) | Novel civil engineering shock attenuation device | |
CN217683517U (en) | Tool for opening and closing valve in inspection well | |
CN214330530U (en) | Rock scraping drill bit | |
CN206972153U (en) | The power head device of rig | |
CN204113260U (en) | Fracturing wellhead device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201013 Termination date: 20211001 |