CN211666110U - Go out roofing pipeline waterproof construction - Google Patents
Go out roofing pipeline waterproof construction Download PDFInfo
- Publication number
- CN211666110U CN211666110U CN201922464908.9U CN201922464908U CN211666110U CN 211666110 U CN211666110 U CN 211666110U CN 201922464908 U CN201922464908 U CN 201922464908U CN 211666110 U CN211666110 U CN 211666110U
- Authority
- CN
- China
- Prior art keywords
- layer
- roof
- pipeline
- slope
- waterproof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
The utility model relates to a roof pipeline waterproof structure, wherein a slope layer is laid on a roof plate, and a waterproof coiled material layer is adhered and laid on the slope layer; a covering geotextile layer is laid on the waterproof roll material layer, a roof protective layer is arranged on the geotextile layer positioned on the upper part of the slope finding layer, a quick-drying cement layer is arranged outside the embedded protective pipe, and a fourth sealing putty seam is arranged between the roof protective layer and the quick-drying cement layer; a pipeline slope protection layer is arranged on the outer layer of the quick-drying cement layer and positioned on the fourth sealing putty seam, the pipeline slope protection layer covers the fourth sealing putty seam in the horizontal direction, and a third sealing putty seam is arranged between the pipeline slope protection layer and the roof protection layer; the utility model discloses a roofing pipeline waterproof construction, the sealed putty of third and the sealed putty of fourth are covered by pipeline slope protection layer, can not be penetrated directly by sunshine, reduce ageing speed, reinforcing water-proof effects.
Description
Technical Field
The utility model belongs to the waterproof field of building, concretely relates to go out roofing pipeline waterproof construction.
Background
Many of the building constructions involve waterproofing. The proportion of waterproof engineering in the engineering of the industries is very large, and the overall quality of the corresponding engineering is directly influenced by the waterproof construction method and quality, so that the mastering of the construction technical theory and method of the waterproof engineering is very important.
The seam crossing between the slope protection of the pipeline on the roof and the surface layer of the roof is always provided with a sealing layer as an expansion joint, so that the contraction damage of the boundary area is avoided. However, the sealing layer is easy to age under the action of rainwater and sunlight, so that accumulated water directly enters the position below the roof surface layer, and the waterproof effect is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the technical problem who exists among the above-mentioned background art, providing a go out roofing pipeline waterproof construction.
In order to achieve the technical purpose, the utility model adopts the following technical scheme:
a waterproof structure of a roof pipeline comprises a roof plate, a slope finding layer, a pre-buried protective pipe, a waterproof roll material layer, a geotechnical cloth layer, a roof protective layer, a quick-drying cement layer and a pipeline slope protection layer.
The embedded protective pipe penetrates through and is fixed on a roof top plate, a slope finding layer is laid on the roof top plate, and the slope finding layer facilitates drainage of a roof. A waterproof coil layer is adhered and paved on the slope finding layer; the waterproof roll material layer covers the slope finding layer and the part of the embedded protective pipe protruding out of the roof top plate; the waterproofing roll layer provides the main body with a waterproofing effect. And laying a covering geotextile layer on the waterproof roll material layer, arranging a roof protective layer on the geotextile layer on the upper part of the slope finding layer, and taking the roof protective layer as a high-strength surface layer to protect the waterproof roll material layer and the geotextile layer. A quick-drying cement layer is arranged outside the embedded protective pipe, and a fourth sealing putty seam is arranged between the roof protective layer and the quick-drying cement layer; the fourth sealed putty seam is as roofing protective layer and quick-drying cement layer expansion joint, avoids juncture area's shrink damage. When the quick-drying cement layer and the roof protection layer are poured, the quick-drying cement layer can have strength quickly, and the die sleeved on the embedded protective pipe can be detached quickly, so that the fourth sealing putty joint is filled.
The outer position that is located the sealed putty seam of fourth in quick-drying cement layer is equipped with pipeline slope protection layer, pipeline slope protection layer covers the sealed putty seam of fourth on the horizontal direction, set up the sealed putty seam of third between pipeline slope protection layer and the roofing protective layer. After the roof protection layer has certain intensity, place the mould and pour pipeline slope protection layer, demolish the mould after pipeline slope protection layer has intensity, fill the sealed putty seam of third. The construction interval between the quick-drying cement layer and the pipeline slope protection layer can be shortened by using the quick-drying cement.
The third sealing putty seam and the fourth sealing putty seam increase the waterproof effect together, and water is prevented from directly entering the position below the roof protection layer. The third sealing putty seam and the fourth sealing putty seam are covered by the pipeline slope protection layer and cannot be directly irradiated by sunlight, the aging rate is reduced, and the waterproof effect is enhanced.
Preferably, the pipeline slope protection layer covers in the horizontal direction and exceeds the outer edge of the fourth sealing putty joint by 4cm, and therefore seeper is reduced from permeating into the third sealing putty joint.
Preferably, the height of the waterproof roll material layer covering the embedded protective pipe is 20-50 cm.
Preferably, waterproof coil material layer is fixed by the ferrule at the top of pre-buried pillar, reduces the infiltration.
Preferably, be equipped with first sealed putty seam between pre-buried pillar top and the roofing pipeline, reduce the infiltration.
The utility model provides a waterproof structure of the roofing pipeline, the third sealing putty joint and the fourth sealing putty joint increase the waterproof effect together, and prevent water from directly entering below the roofing protective layer; the fourth sealed greasy joint is used as an expansion joint between the roof protection layer and the quick-drying cement layer, so that the contraction damage of a junction area is avoided; the quick-drying cement layer shortens the construction interval; the third sealing putty seam and the fourth sealing putty seam are covered by the pipeline slope protection layer and cannot be directly irradiated by sunlight, the aging rate is reduced, and the waterproof effect is enhanced.
Drawings
FIG. 1 is a schematic sectional view of the waterproof structure of the roofing pipeline of the present invention;
reference numerals: roof (1), look for slope layer (2), pre-buried pillar (3), go out roofing pipeline (4), first sealed luting (5), waterproof roll material layer (6), geotechnological cloth layer (7), roofing protective layer (8), quick-drying cement layer (10), pipeline slope protection layer (11), the sealed luting of second (12), the sealed luting of third (13), the sealed luting of fourth (14), ferrule (15).
Detailed Description
The technical solution of the present invention will be described in detail with reference to the accompanying drawings and specific embodiments.
As shown in fig. 1, the roof-outlet pipeline waterproof structure comprises a roof slab 1, a slope finding layer 2, a pre-embedded protective pipe 3, a waterproof roll material layer 6, a geotextile layer 7, a roof protective layer 8, a quick-drying cement layer 10 and a pipeline slope protection layer 11.
The embedded protective pipe 3 penetrates through and is fixed on the roof top plate 1, the slope layer 2 is laid on the roof top plate 1, and the slope layer 2 facilitates drainage of the roof. A waterproof coil material layer 6 is adhered and paved on the slope finding layer 2; the waterproof roll material layer 6 covers the slope finding layer 2 and the part of the embedded protective pipe 3 protruding out of the roof top plate 1; the waterproofing web layer 6 provides a body waterproofing effect. A covering geotextile layer 7 is laid on the waterproof roll material layer 6, a roof protective layer 8 is arranged on the geotextile layer 7 on the upper portion of the slope finding layer 2, and the roof protective layer 8 serves as a high-strength surface layer to protect the waterproof roll material layer 6 and the geotextile layer 7. A quick-drying cement layer 10 is arranged outside the embedded protective pipe 3, and a fourth sealing putty seam 14 is arranged between the roof protective layer 8 and the quick-drying cement layer 10; the fourth sealing putty joint 14 is used as an expansion joint between the roof protection layer 8 and the quick-drying cement layer 10, so that the contraction damage of a junction area is avoided. When the quick-drying cement layer 10 and the roof protection layer 8 are poured, the quick-drying cement layer 10 can have strength quickly, and the die sleeved on the embedded protective pipe 3 can be detached quickly, so that the fourth sealing putty joint 14 is filled.
Quick-drying cement layer 10 outer is located fourth sealed putty seam 14 and is gone up to be equipped with pipeline slope protection layer 11, pipeline slope protection layer 11 covers and surpasss fourth sealed putty seam 14 outer edge 4cm in the horizontal direction, reduces ponding infiltration third sealed putty seam 13. And a third sealing putty joint 13 is arranged between the pipeline slope protection layer 11 and the roof protection layer 8. After the roof protection layer 8 has certain intensity, place the mould and pour pipeline revetment layer 11, demolish the mould after pipeline revetment layer 11 has intensity, fill third sealed putty seam 13. The construction interval between the quick-drying cement layer 10 and the pipeline slope protection layer 11 can be shortened by using the quick-drying cement.
The third sealing putty line 13 and the fourth sealing putty line 14 increase the waterproof effect together, and prevent water from directly entering below the roof protection layer 8. The third sealing putty joint 13 and the fourth sealing putty joint 14 are covered by the pipeline slope protection layer 11 and cannot be directly irradiated by sunlight, so that the aging rate is reduced, and the waterproof effect is enhanced.
In specific implementation, the height of the waterproof roll material layer 6 covering the embedded protective pipe 3 is 50 cm.
In the specific implementation, waterproof coil stock layer 6 is fixed by ferrule 15 at pre-buried pillar 3's top, reduces the infiltration.
In specific implementation, a first sealing putty joint 5 is arranged between the top of the embedded protective pipe 3 and the roof outlet pipeline 4, so that water seepage is reduced.
The use of "first," "second," and similar terms in the description and in the claims does not indicate any order, quantity, or importance, but rather is used to distinguish one element from another. Also, the use of the terms "a," "an," or "the" and similar referents do not denote a limitation of quantity, but rather denote the presence of at least one. The word "comprise" or "comprises", and the like, means that the element or item listed before "comprises" or "comprising" covers the element or item listed after "comprising" or "comprises" and its equivalents, and does not exclude other elements or items. "upper", "lower", "left", "right", and the like are used merely to indicate relative positional relationships, and when the absolute position of the object being described is changed, the relative positional relationships may also be changed accordingly.
The embodiment is only a single implementation manner of the present invention, and for those skilled in the art, other embodiments can be obtained according to the attached drawings without any creative effort, and are also within the protection scope of the present invention.
Claims (5)
1. The utility model provides a go out roofing pipeline waterproof construction which characterized in that: the roof slope protection layer comprises a roof top plate (1), a slope finding layer (2), a pre-buried protective pipe (3), a waterproof roll material layer (6), a geotechnical cloth layer (7), a roof protective layer (8), a quick-drying cement layer (10) and a pipeline slope protection layer (11);
the embedded protective pipe (3) penetrates through and is fixed on a roof top plate (1), a slope finding layer (2) is laid on the roof top plate (1), and a waterproof coil layer (6) is adhered and laid on the slope finding layer (2); the waterproof roll material layer (6) covers the slope finding layer (2) and the part of the embedded protective pipe (3) protruding out of the roof top plate (1); a covering geotextile layer (7) is laid on the waterproof roll material layer (6), a roof protective layer (8) is arranged on the geotextile layer (7) positioned on the upper part of the slope finding layer (2), a quick-drying cement layer (10) is arranged outside the embedded protective pipe (3), and a fourth sealing putty seam (14) is arranged between the roof protective layer (8) and the quick-drying cement layer (10);
quick-drying cement layer (10) outer position in the sealed putty seam of fourth (14) is equipped with pipeline slope protection layer (11), pipeline slope protection layer (11) cover the sealed putty seam of fourth (14) on the horizontal direction, set up sealed putty seam of third (13) between pipeline slope protection layer (11) and roofing protective layer (8).
2. The roofing channel waterproofing structure according to claim 1 wherein the channel layer (11) is horizontally overlaid and extends 4cm beyond the outer edge of the fourth sealing bead (14).
3. The roofing pipeline waterproof structure according to claim 1, wherein the height of the waterproof roll material layer (6) covering the embedded protection pipe (3) is 20-50 cm.
4. The roofing pipe water-proof structure according to claim 1, characterized in that the waterproof roll layer (6) is fixed by a metal hoop (15) on top of the embedded protection pipe (3).
5. The roof-outlet pipeline waterproof structure according to claim 1, wherein a first sealing putty joint (5) is arranged between the top of the embedded protection pipe (3) and the roof-outlet pipeline (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922464908.9U CN211666110U (en) | 2019-12-31 | 2019-12-31 | Go out roofing pipeline waterproof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922464908.9U CN211666110U (en) | 2019-12-31 | 2019-12-31 | Go out roofing pipeline waterproof construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211666110U true CN211666110U (en) | 2020-10-13 |
Family
ID=72736039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922464908.9U Active CN211666110U (en) | 2019-12-31 | 2019-12-31 | Go out roofing pipeline waterproof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211666110U (en) |
-
2019
- 2019-12-31 CN CN201922464908.9U patent/CN211666110U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102747750B (en) | Construction method for post-pouring settlement belt protective measures of basement top plates | |
CN103276858B (en) | Drainage structure for inverted roof and construction method of drainage structure | |
CN103046579B (en) | A kind of two-way eight track lakebed open cuts secretly bury tunnel structure | |
CN209457282U (en) | Ground library top plate planted roof deformation joint structure | |
CN105862928A (en) | Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof | |
CN109183844A (en) | A kind of construction method of piping lane bottom plate pre-installed and inverted adhered type TPO waterproof roll | |
CN202730786U (en) | Well-sealing waterproof construction structure of dewatering well | |
CN102912945A (en) | Roof compound seepage-proofing steam exhausting hole detail treatment technology | |
CN214614211U (en) | Anti-floating anchor rod combined waterproof structure | |
CN207419882U (en) | It is new to wear roof pipeline flashing loop device | |
CN210508097U (en) | Novel roof deformation joint structure | |
CN211666110U (en) | Go out roofing pipeline waterproof construction | |
CN103628506B (en) | Construction method for waterproof positions of foundation platform and pile head | |
CN113737809B (en) | Waterproof construction method for lattice column crossing pipe gallery | |
CN207079637U (en) | A kind of poured band of outer wall of basement water sealing structure | |
CN204040331U (en) | The waterproof construction of deformation joint of roof | |
CN203247838U (en) | Fully-buried basement side wall post-pouring belt advance water stop formwork | |
CN102926403B (en) | Roof construction method by cover-excavation method | |
CN211691115U (en) | Pre-buried device of roofing downspout | |
CN212453367U (en) | Plant roof height movement joint department and prevent root thorn connected node structure | |
CN211735533U (en) | Waterproof structure of post-cast strip of underground chamber roof | |
CN211898410U (en) | Put compound surface course supporting construction of slope soil nail wall | |
CN108071197A (en) | Roofing ultrastrong water-proof structure and construction method | |
CN113279299A (en) | Water-permeable municipal road and construction process thereof | |
CN212453379U (en) | Planting roofing tip outer wall department prevents root thorn connected node structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |