CN211665761U - Novel hydraulic engineering concrete chute - Google Patents
Novel hydraulic engineering concrete chute Download PDFInfo
- Publication number
- CN211665761U CN211665761U CN201922081107.4U CN201922081107U CN211665761U CN 211665761 U CN211665761 U CN 211665761U CN 201922081107 U CN201922081107 U CN 201922081107U CN 211665761 U CN211665761 U CN 211665761U
- Authority
- CN
- China
- Prior art keywords
- main part
- plate
- hydraulic engineering
- drainage plate
- concrete chute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a novel hydraulic engineering concrete chute belongs to the hydraulic engineering field, including the main part, the main part sets up to "U" shape groove body, and the top fixedly connected with guard plate of main part, the inboard fixed surface of main part set up the recess, and the inboard fixedly connected with buffering drainage plate of main part, the bottom fixedly connected with connecting bottom plate of main part, the protruding piece of top fixedly connected with second of connecting bottom plate, the fixed spud pile that sets up in both sides of connecting bottom plate, the fixed surface of buffering drainage plate sets up first protruding piece. Through buffering drainage plate and the recess that corresponds the setting, when the user carries out a plurality of concatenations installation uses with this device, the effectual drainage of buffering to the inside cement of main part of drainage plate that is the arc setting, cushions the drainage plate simultaneously and as the concatenation part, each main part of effectual cooperation groove connection, convenient to use, when the concatenation, it is inboard that the buffering drainage plate is in two main parts, cushions cement.
Description
Technical Field
The utility model relates to a water conservancy technical field, more specifically relates to a novel hydraulic engineering concrete chute.
Background
At present, when the concrete pouring construction of the engineering such as a bridge, a frame bridge, a culvert, a house building and the like is carried out, the concrete pouring amount is large, the geological condition of a pouring site is not good, particularly the pouring construction of the edge of a foundation pit is mostly carried out by pumping concrete by using a concrete pump truck, but the pouring cost is greatly increased by using the concrete pump truck, the cost of the pouring concrete is also increased, the pumped concrete generally has the characteristic of large slump, the apparent performance and the structural function of the concrete are seriously influenced, the height of the cantilever crane of the concrete pump truck is high, the influence on the construction is very large due to the limitation of construction site space in some construction sections, particularly, the local limitation is greatly enhanced when the existing bridge is constructed or an existing railway line or other dangerous structures are close to the existing bridge, and the difficulty and the danger coefficient are multiplied, therefore, when the combined chute is used for pouring concrete, the cost for pouring concrete by using the pump truck can be greatly reduced, the cost is greatly saved, the danger coefficient of large-scale mechanical operation is eliminated, the labor force is reasonably used, and the production efficiency is improved.
Current concrete chute all adopts welded mode with steel pipe or plate fixed mounting, leads to demolising very troublesome after the construction operation finishes, simultaneously because the concrete is from the eminence toward low landing, at the in-process of landing, the speed of concrete can be bigger and bigger, can sputter everywhere when falling down, be not convenient for collect and use.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problem in the background to provide a novel hydraulic engineering concrete chute.
In order to achieve the above object, the utility model provides a following technical scheme: including the main part, the main part sets up to "U" shape cell body, the top fixedly connected with guard plate of main part, the inboard fixed surface of main part sets up the recess, the inboard fixedly connected with buffering drainage plate of main part, the bottom fixedly connected with connecting bottom plate of main part, the protruding piece of top fixedly connected with second of connecting bottom plate, the fixed spud pile that sets up in both sides of connecting bottom plate, the fixed surface of buffering drainage plate sets up first protruding piece, first protruding piece and recess gomphosis are connected, the top horizontal position of main part sets up the inner groovy, a plurality of trompils are seted up on the inner groovy surface.
Preferably, the guard plate is perpendicular with the main part and is connected, and the guard plate inner is the arc setting, and the totality is the triangle-shaped.
Preferably, the grooves are formed in the surfaces of the two sides of the rear end of the main body and correspond to the buffering drainage plates.
Preferably, the buffering drainage plate transversely protrudes out of the main body, the buffering drainage plate is arranged as a triangular plate, the surface of the outer end of the buffering drainage plate is arc-shaped, and the buffering drainage plate is inclined by 10-15 degrees from outside to inside.
Preferably, the connecting bottom plate is arranged according to the radian of the bottom end of the main body and horizontally protrudes out of the bottom of the main body.
Preferably, the second protruding blocks are arranged in the same row, and clamping grooves are correspondingly formed in the bottom surface of the main body.
Preferably, the fixing pile is arranged in a cone shape, the surfaces of two sides of the fixing pile are concave, and the concave position is convexly provided with an inverted triangle.
The utility model provides a novel hydraulic engineering concrete chute, following beneficial effect has:
1. this kind of neotype hydraulic engineering concrete chute through the guard plate, when carrying out cement transportation, along with the speed of cement whereabouts accelerates gradually, the inner is the effectual reduction in curved surface and the dynamics of offeing of cement, reaches the buffering, prevents to spatter the effect that falls.
2. This kind of novel hydraulic engineering concrete chute through buffering drainage plate and the recess that corresponds the setting, when the user carries out a plurality of concatenations installation uses with this device, the effectual drainage of buffering to the inside cement of main part of drainage plate that is the arc setting, cushions the drainage plate simultaneously and as splicing part, each main part of effectual cooperation groove connection, convenient to use, in the concatenation, it is inboard that the buffering drainage plate is in two main parts, cushions cement.
3. This kind of neotype hydraulic engineering concrete chute through the protruding piece of second on connecting bottom plate and top, when splicing and using this device, effectually splices the main part.
4. This kind of neotype hydraulic engineering concrete chute reaches the effect of installation fixed this device through the spud pile, and the triangle of falling that the indent position set up simultaneously strengthens being connected with ground.
Drawings
Fig. 1 is a plan view of the overall structure of the present invention.
Fig. 2 is a schematic view of the main structure of the present invention.
Fig. 3 is the schematic diagram of the main body splicing structure of the present invention.
In FIGS. 1-3: the method comprises the following steps of 1-a main body, 2-a protection plate, 3-a groove, 4-a buffering drainage plate, 5-a connecting bottom plate, 6-a fixing pile, 7-a first protruding block, 8-a second protruding block and 9-an inner groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1 to 3, in the embodiment of the utility model, a novel hydraulic engineering concrete chute, including main part 1, main part 1 sets up to "U" shape cell body, main part 1's top fixedly connected with guard plate 2, main part 1's inboard fixed surface sets up recess 3, main part 1's inboard fixedly connected with buffering drainage plate 4, main part 1's bottom fixedly connected with connecting bottom plate 5, connecting bottom plate 5's the protruding piece 8 of top fixedly connected with second, connecting bottom plate 5's both sides are fixed and are set up spud pile 6, buffering drainage plate 4's fixed surface sets up first protruding piece 7, first protruding piece 7 and recess 3 gomphosis are connected, main part 1's top horizontal position sets up inner groovy 9, a plurality of trompils are seted up on inner groovy 9 surface.
In this embodiment, guard plate 2 is perpendicular with main part 1 and is connected, and 2 the inner arc settings that are of guard plate, and the totality is three horn shapes, through guard plate 2, when carrying out cement transportation, along with the speed of cement whereabouts accelerates gradually, the inner is the effectual reduction in curved surface and the dynamics of offeing of cement, reaches the buffering, prevents to spatter the effect that falls.
In this embodiment, the groove 3 is located on the surfaces of the two sides of the rear end of the main body 1 and corresponds to the buffering drainage plate 4.
In this embodiment, the horizontal salient main part 1 of buffering drainage plate 4 sets up, and buffering drainage plate 4 sets up to the set-square, the outer end surface is the arc, buffering drainage plate 4 totality outside-in is 10-15 slope settings, through buffering drainage plate 4 and the recess 3 that corresponds the setting, when the user carries out a plurality of concatenations installation uses with this device, the effectual drainage of buffering to the inside cement of main part 1 of buffering drainage plate 4 that is the arc setting, buffering drainage plate 4 is as the concatenation part simultaneously, each main part 1 is connected to effectual cooperation recess 3, and convenient to use, in the concatenation, buffering drainage plate 4 is located two main part 1 inboards, cushion cement.
In this embodiment, the connection bottom plate 5 is disposed according to the radian of the bottom end of the main body 1 and horizontally protrudes from the bottom of the main body 1.
In this embodiment, the second protruding piece 8 is arranged for the same row, and the bottom surface of main part 1 corresponds and sets up the draw-in groove, and through the second protruding piece 8 on connecting bottom plate 5 and top, when splicing and using this device, the effectual main part 1 that splices.
In this embodiment, spud pile 6 is the taper setting, and both sides surface is concave shape, and the protrusion of indent position sets up the triangle of falling, reaches the effect of installation fixed this device through spud pile 6, and the triangle of falling that the indent position set up simultaneously strengthens being connected with ground.
Use the utility model relates to a novel hydraulic engineering concrete chute during, at first, when the user of service connects this device again and uses, make 1 inboard buffering drainage plate 4 of every main part correspond 1 inboard recess 3 of main part and carry out the gomphosis, later make 1 bottoms of main part correspond connecting bottom plate 5 and connect, make 1 embedding of main part in ground before here, the top both sides of main part 1 are as supporting part, it is fixed to use outside fixing bolt to install main part 1 again, when using this device, cement at first contacts 1 inboard buffering drainage plate 4 of main part, it is inboard to flow in main part 1, all there is a set of buffering drainage plate 4 between the main part 1 after connecting, cushion the drainage to cement, the user of service once dismantle the main part 1 of concatenation after finishing.
The above is only the preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, without departing from the concept of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent.
Claims (7)
1. The utility model provides a novel hydraulic engineering concrete chute, includes main part (1), its characterized in that: main part (1) sets up to "U" shape cell body, top fixedly connected with guard plate (2) of main part (1), recess (3) are seted up to the inboard fixed surface of main part (1), inboard fixedly connected with buffering drainage plate (4) of main part (1), the bottom fixedly connected with connecting bottom plate (5) of main part (1), the protruding piece of top fixedly connected with second (8) of connecting bottom plate (5), the fixed spud pile (6) that sets up in both sides of connecting bottom plate (5), the fixed surface of buffering drainage plate (4) sets up first protruding piece (7), first protruding piece (7) and recess (3) gomphosis are connected, the top horizontal position of main part (1) sets up inner groovy (9), a plurality of trompils are seted up on inner groovy (9) surface.
2. The novel hydraulic engineering concrete chute of claim 1, characterized in that: protection plate (2) are perpendicular connection with main part (1), and protection plate (2) inner is the arc setting, and the totality is triangle-shaped.
3. The novel hydraulic engineering concrete chute of claim 1, characterized in that: the groove (3) is positioned on the surfaces of two sides of the rear end of the main body (1) and corresponds to the buffering drainage plate (4).
4. The novel hydraulic engineering concrete chute of claim 1, characterized in that: buffering drainage plate (4) transversely bulge main part (1) set up, and buffering drainage plate (4) set up to the set-square, and the outer end surface is the arc, and buffering drainage plate (4) totality outside-in is 10-15 slope settings.
5. The novel hydraulic engineering concrete chute of claim 1, characterized in that: the connecting bottom plate (5) is arranged according to the radian of the bottom end of the main body (1) and horizontally protrudes out of the bottom of the main body (1).
6. The novel hydraulic engineering concrete chute of claim 1, characterized in that: the second protruding blocks (8) are arranged in the same row, and clamping grooves are correspondingly formed in the bottom surface of the main body (1).
7. The novel hydraulic engineering concrete chute of claim 1, characterized in that: the fixing pile (6) is arranged in a conical shape, the surfaces of two sides of the fixing pile are concave, and the concave position is convexly provided with an inverted triangle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922081107.4U CN211665761U (en) | 2019-11-27 | 2019-11-27 | Novel hydraulic engineering concrete chute |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922081107.4U CN211665761U (en) | 2019-11-27 | 2019-11-27 | Novel hydraulic engineering concrete chute |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211665761U true CN211665761U (en) | 2020-10-13 |
Family
ID=72732045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922081107.4U Active CN211665761U (en) | 2019-11-27 | 2019-11-27 | Novel hydraulic engineering concrete chute |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211665761U (en) |
-
2019
- 2019-11-27 CN CN201922081107.4U patent/CN211665761U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11920313B2 (en) | Aqueduct leakage repairing method | |
CN110565655A (en) | frame beam unit for slope reinforcement and assembled frame beam | |
CN211665761U (en) | Novel hydraulic engineering concrete chute | |
CN202577363U (en) | H-shaped steel joint structure of underground diaphragm wall | |
CN211815626U (en) | Temporary buttress leveling device for hoisting assembled bridge subsection capping beam | |
CN202644543U (en) | Combined recyclable foundation pit supporting inner supporting upright column | |
CN210315607U (en) | Concrete cofferdam construction template | |
CN209260667U (en) | Side slope anti-scouring system | |
CN103015459A (en) | Construction method for underwater baring platform steel cover box on storm surge river mouth | |
CN214832743U (en) | Stable supporting foundation pit supporting structure | |
CN215925648U (en) | Temporary hoisting point device for steel-concrete combined tower section | |
CN104901247A (en) | Wide span cable tray | |
CN204793910U (en) | Large -span cable testing bridge | |
CN110512652B (en) | Heavy nodular cast iron well lid capable of bearing F900 | |
CN210263093U (en) | Highway bridge construction cofferdam device | |
CN209779658U (en) | Steel-concrete combined negative pressure barrel structure | |
CN210289224U (en) | Steel wire cloth reinforced structure for building restoration | |
CN210684729U (en) | Frame beam unit for slope reinforcement and assembled frame beam | |
CN209760149U (en) | Hydraulic engineering slope bearing structure | |
CN217653411U (en) | Recycled concrete pipe with high bearing performance | |
CN217460226U (en) | Can have enough to meet need pin-connected panel landing stage steel apron | |
CN211690211U (en) | Channel steel supporting structure without lower cross beam | |
CN220013395U (en) | Pier column eccentric compression steel pipe column structure is exempted from to weak foundation section | |
CN219825268U (en) | Connecting structure of straight diagonal bracing in steel sheet pile supporting form | |
CN215165528U (en) | Novel public road bridge roof beam foundation pile is consolidated device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220824 Address after: 20th Floor, Block A, Building 1, Baida Yueshang West City, Shangyuan Road, High-tech Zone, Kunming City, Yunnan Province, 650101 Patentee after: Yunnan Hongshun Construction Group Co.,Ltd. Address before: 431800 17 Yashan Road, Jingshan County, Jingmen City, Hubei Province Patentee before: Yu Yue |
|
TR01 | Transfer of patent right |