CN211647549U - Electric power engineering construction is with device of rectifying - Google Patents

Electric power engineering construction is with device of rectifying Download PDF

Info

Publication number
CN211647549U
CN211647549U CN201921809719.4U CN201921809719U CN211647549U CN 211647549 U CN211647549 U CN 211647549U CN 201921809719 U CN201921809719 U CN 201921809719U CN 211647549 U CN211647549 U CN 211647549U
Authority
CN
China
Prior art keywords
chassis
electric power
righting
power engineering
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921809719.4U
Other languages
Chinese (zh)
Inventor
叶凝福
林平
吴祥赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Aidisheng Power Technology Co ltd
Original Assignee
Fujian Aidisheng Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Aidisheng Power Technology Co ltd filed Critical Fujian Aidisheng Power Technology Co ltd
Priority to CN201921809719.4U priority Critical patent/CN211647549U/en
Application granted granted Critical
Publication of CN211647549U publication Critical patent/CN211647549U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Current-Collector Devices For Electrically Propelled Vehicles (AREA)

Abstract

The utility model discloses an inclination correction device for electric power engineering construction in the technical field of electric power engineering, which comprises a chassis, four groups of movable wheels are arranged at the bottom of the chassis, first hydraulic cylinders are fixedly arranged at four corners of the bottom of the chassis, a supporting foot plate is fixedly connected at the bottom of the first hydraulic cylinder, a hinge block is fixedly connected at the front side of the top of the chassis, a support column is hinged at the top of the hinge block, a second hydraulic cylinder is hinged between the lower right side of the support column and the top of the chassis, a wire fixing lug is fixedly connected at the upper left side of the support column, and a motor is fixedly arranged at the left side of the top of the chassis. And is also beneficial to improving the operation efficiency.

Description

Electric power engineering construction is with device of rectifying
Technical Field
The utility model relates to an electric power engineering technical field specifically is an electric power engineering construction is with rectifying device.
Background
Electric power engineering, i.e. engineering related to the production, transmission, distribution of electric energy, also broadly includes engineering of electricity as a power and energy source for applications in various fields. Meanwhile, the method can be understood to the transmission and transformation business expansion project. In the engineering operation of electric wire netting construction, the wire pole is indispensable, and the wire pole uses the back for a long time, because external factors such as the pressure of wire net and blowing power of wind take place the slope very easily, the wire pole of slope can produce very big potential safety hazard to resident on every side, and the wire pole slope back needs to use the device of rectifying to right, and current device of rectifying does not possess the removal function for its convenience of use is lower.
For example, chinese patent application No. CN201820807709.6, specifically contains: a rectification device for electric power engineering construction comprises a base, a boosting device and a pulling device, wherein the base comprises a left base and a right base; the boosting device comprises a telescopic rod, a supporting rod and a left fixing necklace, and the telescopic rod is obliquely arranged on the left base; draw and drag the device and include right fixed neck ring, rope, threaded rod, fixed plate and motor, the fixed plate setting is equipped with the screw hole that runs through on the right base on the fixed plate, threaded rod and screw hole threaded connection, the one end and the motor of threaded rod are connected, the other end and the rope that sets up at right fixed neck ring of threaded rod are connected.
Although the telescopic rod is started, the telescopic rod pushes the inclined telegraph pole to move reversely, so that the rectification device for the electric power engineering construction is beneficial to correcting the telegraph pole; meanwhile, the motor is started, the motor drives the screw rod to rotate, the screw rod can drive the rope to rotate, the screw rod moves towards the motor along the threaded hole in the fixing plate, the motor can move towards the reverse direction along the sliding rail under the action of the screw rod, the rope converts the rotating torque of the screw rod into horizontal tension, and the inclined telegraph pole is corrected under the action of the tension. The utility model discloses a mode that pushes away, draws the combination is rectified the wire pole of slope, and efficiency promotes greatly, is fit for extensive construction operation and uses, has solved current wire pole rectification device and has mostly manual operation, and for one-way application of force, installs and corrects all low down of efficiency, is unfavorable for the problem that extensive construction operation used, but this kind of electric power engineering construction is with rectifying the device and do not possess the removal function for its convenience of use is lower.
Based on this, the utility model designs an electric power engineering construction is with rectifying device to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power engineering construction is with device of rectifying to solve the current electric power engineering construction that proposes in the above-mentioned background art and do not possess the removal function with the device of rectifying, make its lower problem of convenience of use.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an electric power engineering construction is with rectification device, includes the chassis, four groups removal wheels are installed to the bottom on chassis, the equal fixed mounting in bottom four corners on chassis has first pneumatic cylinder, the bottom rigid coupling of first pneumatic cylinder has a support sole, the front side rigid coupling has articulated piece in the top on chassis, the top of articulated piece articulates there is the support column, it has the second pneumatic cylinder to articulate between the right side downside of support column and the chassis top, the upper left side rigid coupling of support column has the solid line ear, the top left side fixed mounting on chassis has the motor, the front side of motor is provided with two sets of bearing frames of rigid coupling on the chassis, rotates between two sets of the bearing frame and is connected with the serving dish, the serving dish passes through the coupling joint with the output of motor, it has the rope to coil on the serving dish, a free end and the solid line ear rigid coupling of rope, the top right side fixed mounting on chassis has the switch board, the hydraulic press is fixedly mounted on the rear side in the top of the chassis, a trailer is fixedly connected to the right side of the chassis, a centering assembly is arranged on the front side of the supporting column, sliding rods penetrating through the supporting column are fixedly connected to the rear side of the centering assembly in an up-and-down symmetrical mode, the sliding rods are connected with the supporting column in a sliding mode, a third hydraulic cylinder is fixedly mounted in the middle of the supporting column, and the telescopic end of the third hydraulic cylinder is fixedly connected with the centering assembly.
Preferably, the righting component comprises a righting frame, a fourth hydraulic cylinder is uniformly installed on the right side wall of the righting frame, the left side telescopic end of the fourth hydraulic cylinder penetrates through the righting frame wall, and a pressing wheel set is installed on the left side telescopic end of the fourth hydraulic cylinder and the inner cavity left side wall of the righting frame.
Preferably, the pressing wheel set comprises a wheel set frame, and a pressing wheel is rotatably connected in the wheel set frame.
Preferably, a motor protective cover is mounted on the exterior of the motor.
Preferably, the rope is a steel rope.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses simple structure, convenient operation is applicable to in the electric power engineering construction, rectify the slope to the wire pole and right, through will draw further pulling equipment such as being connected with tractors, be favorable to hoisting device's removal convenience, also be favorable to promoting the operating efficiency, descend simultaneously through the further flexible end of the first pneumatic cylinder of control four groups for support the sole further with the ground butt, and make and remove the further ground that breaks away from of wheel, stability when can hoisting device operation. Further through second pneumatic cylinder and motor step, can realize righting the helping hand to the wire pole, during dual application of force, be favorable to promoting righting efficiency.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
fig. 3 is a schematic structural view of the centering assembly of the present invention.
In the drawings, the reference numerals denote the following components:
1-chassis, 2-moving wheel, 3-first hydraulic cylinder, 4-supporting foot plate, 5-hinged block, 6-supporting column, 7-second hydraulic cylinder, 8-wire fixing lug, 9-motor, 10-bearing seat, 11-rope winding disc, 12-rope, 13-control cabinet, 14-oil press, 15-trailer, 16-righting component, 161-righting frame, 162-fourth hydraulic cylinder, 163-pressing wheel group, 1631-wheel group frame, 1632-pressing wheel, 17-sliding rod and 18-third hydraulic cylinder.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model provides a technical solution of a rectification device for power engineering construction: an inclination correcting device for electric power engineering construction comprises a chassis 1, four groups of moving wheels 2 are mounted at the bottom of the chassis 1, first hydraulic cylinders 3 are fixedly mounted at four corners of the bottom of the chassis 1, supporting foot plates 4 are fixedly connected to the bottom of the first hydraulic cylinders 3, a hinged block 5 is fixedly connected to the front side of the top of the chassis 1, a supporting column 6 is hinged to the top of the hinged block 5, a second hydraulic cylinder 7 is hinged between the right lower side of the supporting column 6 and the top of the chassis 1, a wire fixing lug 8 is fixedly connected to the left side of the top of the supporting column 6, a motor 9 is fixedly mounted on the left side of the top of the chassis 1, two groups of bearing seats 10 fixedly connected to the chassis 1 are arranged on the front side of the motor 9, a rope winding disc 11 is rotatably connected between the two groups of bearing seats 10, the rope winding disc 11 is connected with the output end of the motor 9 through a coupler, a rope 12 is wound on the rope winding disc 11, one, the rear side fixed mounting has hydraulic press 14 in the top of chassis 1, and the right side rigid coupling of chassis 1 has trailer 15, and the front side of support column 6 is provided with righting subassembly 16, and the rear side longitudinal symmetry rigid coupling of righting subassembly 16 has the slide bar 17 that runs through support column 6, slide bar 17 and support column 6 sliding connection, and the middle part fixed mounting of support column 6 has third pneumatic cylinder 18, and the flexible end and the righting subassembly 16 rigid coupling of third pneumatic cylinder 18.
Further, the righting assembly 16 includes a righting frame 161, a fourth hydraulic cylinder 162 is uniformly installed on the right side wall of the righting frame 161, a left side telescopic end of the fourth hydraulic cylinder 162 penetrates through the wall of the righting frame 161, a left side telescopic end of the fourth hydraulic cylinder 162 and a left side wall of an inner cavity of the righting frame 161 are both provided with a pressing wheel set 163, wherein the shape of the cross section of the righting frame 161 is U-shaped, and when the righting frame 161 is sleeved on a telegraph pole, the pressing wheel set 163 on the righting frame 162 and the pressing wheel set 163 on the inner cavity wall of the righting frame 161 clamp the telegraph pole.
Further, pinch roller set 163 includes wheel set 1631, and the internal rotation of wheel set 1631 is connected with pinch roller 1632, through pinch roller 1632, can right the in-process at the wire pole, rolls on the wire pole lateral wall, is favorable to righting the pendulum of subassembly 16.
Furthermore, a motor protective cover is arranged outside the motor 9, so that the motor can be protected, and the motor is prevented from being damaged due to external collision.
Furthermore, the ropes 12 are steel ropes, so that the strength is improved, and the phenomenon that the ropes 12 are broken when stressed to influence the inclination correction work of the telegraph pole is avoided.
All hydraulic cylinders are communicated with an oil press 14 through a control cabinet 13, and the motor 9 is electrically connected with an external power supply through the control cabinet 13.
One specific application of this embodiment is: the utility model relates to an inclination correcting device for electric power engineering construction, which is suitable for the electric power engineering construction, when the utility pole is used, the utility pole is connected with a tractor and other traction equipment through the trailer 15, so that the utility pole can be moved to the position near the utility pole to be corrected, then, the telescopic ends of the four groups of first hydraulic cylinders 3 are controlled to descend simultaneously, so that the supporting foot plates 4 are abutted with the ground, the moving wheels 2 are separated from the ground, then, the second hydraulic cylinder 7 is actuated to tilt the centering assembly 6 to fit into the utility pole, and then, the fourth hydraulic cylinder 162 is controlled and started by the control cabinet 13, so that the pressing wheel set 163 on the fourth hydraulic cylinder and the pressing wheel set 163 on the inner cavity wall of the righting frame 161 clamp the telegraph pole, then the telescopic end of the second hydraulic cylinder 7 is driven to push up towards the upper left, and the motor 9 is controlled to start up at the same time, so as to drive the rope coiling disc 11 to coil the rope 12, and the telegraph pole is centered by the aid of the force.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (5)

1. The utility model provides an electric power engineering construction is with rectification device, includes chassis (1), its characterized in that: four groups of moving wheels (2) are installed at the bottom of the chassis (1), first hydraulic cylinders (3) are fixedly installed at four corners of the bottom of the chassis (1), a supporting foot plate (4) is fixedly connected to the bottom of each first hydraulic cylinder (3), a hinged block (5) is fixedly connected to the front side of the top of the chassis (1), a supporting column (6) is hinged to the top of the hinged block (5), a second hydraulic cylinder (7) is hinged between the lower right side of the supporting column (6) and the top of the chassis (1), a wire fixing lug (8) is fixedly connected to the upper left side of the supporting column (6), a motor (9) is fixedly installed on the left side of the top of the chassis (1), two groups of bearing seats (10) fixedly connected to the chassis (1) are arranged on the front side of the motor (9), a rope coiling disc (11) is rotatably connected between the two groups of bearing seats (10), and the rope coiling disc (11) is connected with the output, rope (12) are wound on rope coiling disc (11), a free end and solidus ear (8) rigid coupling of rope (12), the top right side fixed mounting on chassis (1) has switch board (13), rear side fixed mounting has hydraulic press (14) in the top on chassis (1), the right side rigid coupling on chassis (1) has and drags string (15), the front side of support column (6) is provided with righting subassembly (16), the rear side longitudinal symmetry rigid coupling of righting subassembly (16) has slide bar (17) that runs through support column (6), slide bar (17) and support column (6) sliding connection, the middle part fixed mounting of support column (6) has third pneumatic cylinder (18), the flexible end and the righting subassembly (16) rigid coupling of third pneumatic cylinder (18).
2. The inclination correcting device for electric power engineering construction according to claim 1, characterized in that: righting subassembly (16) including righting frame (161), fourth pneumatic cylinder (162) are evenly installed to the right side wall of righting frame (161), the flexible end in left side of fourth pneumatic cylinder (162) runs through righting frame (161) wall, all install on the flexible end in left side of fourth pneumatic cylinder (162) and the inner chamber left side wall of righting frame (161) and compress tightly wheelset (163).
3. The inclination correcting device for electric power engineering construction according to claim 2, characterized in that: the pressing wheel set (163) comprises a wheel set frame (1631), and a pressing wheel (1632) is rotatably connected in the wheel set frame (1631).
4. The inclination correcting device for electric power engineering construction according to claim 1, characterized in that: and a motor protective cover is arranged outside the motor (9).
5. The inclination correcting device for electric power engineering construction according to claim 1, characterized in that: the rope (12) is a steel rope.
CN201921809719.4U 2019-10-25 2019-10-25 Electric power engineering construction is with device of rectifying Expired - Fee Related CN211647549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921809719.4U CN211647549U (en) 2019-10-25 2019-10-25 Electric power engineering construction is with device of rectifying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921809719.4U CN211647549U (en) 2019-10-25 2019-10-25 Electric power engineering construction is with device of rectifying

Publications (1)

Publication Number Publication Date
CN211647549U true CN211647549U (en) 2020-10-09

Family

ID=72691036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921809719.4U Expired - Fee Related CN211647549U (en) 2019-10-25 2019-10-25 Electric power engineering construction is with device of rectifying

Country Status (1)

Country Link
CN (1) CN211647549U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006513A (en) * 2021-02-05 2021-06-22 中铁十六局集团路桥工程有限公司 Intelligent continuous wall deviation rectifying device and method for three-in-one soil foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006513A (en) * 2021-02-05 2021-06-22 中铁十六局集团路桥工程有限公司 Intelligent continuous wall deviation rectifying device and method for three-in-one soil foundation

Similar Documents

Publication Publication Date Title
CN108238563B (en) Electric jack bracket of motor home based on heavy single-leg support
CN211647549U (en) Electric power engineering construction is with device of rectifying
CN106320801A (en) Manual and electric dual-control folding roof tent
CN206643572U (en) Large centrifugal pump auxiliary assembling apparatus
CN208103738U (en) A kind of wheel lock device
CN215772264U (en) A equipment is laid to transmission line for during transmission line construction
CN207697777U (en) A kind of electric wire lever apparatus being readily transported installation
CN211393540U (en) Steel member hoist and mount auxiliary device
CN210619883U (en) Efficient energy-saving winding and unwinding device for transmission cable
CN208264091U (en) Lid Truck tarpaulin mechanism
CN217807694U (en) Coiling mechanism of elastic cord production usefulness
CN113879968B (en) Travelling car with buffer gear for European crane
CN215885718U (en) Protection stereotype processing rolling auxiliary structure
CN212743482U (en) Electric power engineering construction is with device of rectifying
CN212224697U (en) Construction is with recoverable bearing diagonal structure
CN210366197U (en) Winding mechanism of laser molding press
CN108545064B (en) Automobile trap device
CN207844916U (en) A kind of mining simple box discharge mechanism
CN209702022U (en) A kind of hydraulic pay-off stand
CN210710087U (en) Flood prevention cable collection device
CN111232103B (en) Solar charging device of electric vehicle
CN212968869U (en) Mobile cable rack for building construction
CN218137735U (en) High pressure well head trap end cover is dismantled installation and is lifted device
CN210682863U (en) Winding device of grounding wire
CN217198305U (en) Tower transfer device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201009

Termination date: 20211025