CN211647298U - A concrete placement bearing structure for construction of building - Google Patents

A concrete placement bearing structure for construction of building Download PDF

Info

Publication number
CN211647298U
CN211647298U CN201821442402.7U CN201821442402U CN211647298U CN 211647298 U CN211647298 U CN 211647298U CN 201821442402 U CN201821442402 U CN 201821442402U CN 211647298 U CN211647298 U CN 211647298U
Authority
CN
China
Prior art keywords
bracing piece
fixed plate
concrete
buffer
movably connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821442402.7U
Other languages
Chinese (zh)
Inventor
陈建娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yueyang Hongguang Machinery Manufacturing Co ltd
Original Assignee
Yueyang Hongguang Machinery Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yueyang Hongguang Machinery Manufacturing Co ltd filed Critical Yueyang Hongguang Machinery Manufacturing Co ltd
Priority to CN201821442402.7U priority Critical patent/CN211647298U/en
Application granted granted Critical
Publication of CN211647298U publication Critical patent/CN211647298U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a concrete placement bearing structure for construction of building belongs to construction technical field, which comprises a fixing plate and i, bracing piece and accent rise the frame, the equal swing joint in fixed plate below has the bracing piece, the equal swing joint in bracing piece below has the accent to rise the frame, the fixed plate includes buffer baffle, buffer spring and boss, buffer baffle all welds at the fixed plate inner wall, the equal swing joint of buffer spring link is between buffer baffle and fixed plate, the boss all welds in the fixed plate below, and boss and bracing piece top link swing joint, the bracing piece includes the draw-in groove, stiffener and cardboard, the draw-in groove all welds in the bracing piece left and right sides. Be provided with the boss among the device, can slow down the gravity impact that the concrete fell into the production through boss and bracing piece threaded connection, it has sufficient stability to reach the bracing piece to make the fixed plate have firm support, improved the security of concrete placement construction, have extensive practicality.

Description

A concrete placement bearing structure for construction of building
Technical Field
The utility model relates to a construction technical field, more specifically the theory relates to a concrete placement bearing structure.
Background
The concrete pouring refers to the process of pouring concrete into a mold until the concrete is plasticized, in the civil engineering and building engineering, materials such as concrete and the like are put into the mold to be made into a preset shape, the free height of the concrete is not more than 2m when the concrete is poured, and corresponding measures are taken when the free height of the concrete is more than 3m, but the prior concrete pouring has the following disadvantages:
because during concrete placement, during artifical tamping, the concrete can flow all around, and has certain promotion to the fixed plate, leads to producing the gap easily between the fixed plate to and when the concrete freely fell to the fixed plate from the conveyer pipe, can receive great gravity impact, lead to the bracing piece stability of fixed plate below less than, consequently need innovate on current basis, provide a concrete placement bearing structure for building construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the concrete and freely falling from the conveyer pipe when on the fixed plate, can receive great gravity impact, lead to the more weak technical problem of bracing piece stability of fixed plate below, a concrete placement bearing structure for building construction is provided, be provided with the boss among the device, can slow down the gravity impact that the concrete fell into the production through boss and bracing piece threaded connection, it has sufficient stability to reach the bracing piece, thereby make the fixed plate have firm support, the security of concrete placement construction has been improved, and wide practicality is provided.
In order to achieve the purpose, the experiment provides the following technical scheme: a concrete pouring supporting structure for building construction comprises a fixed plate, supporting rods and lifting adjusting frames, wherein the supporting rods are movably connected below the fixed plate, and the lifting adjusting frames are movably connected below the supporting rods;
the fixed plate comprises buffer baffles, buffer springs and reinforcing blocks, the buffer baffles are welded on the inner wall of the fixed plate, the connecting ends of the buffer springs are movably connected between the buffer baffles and the fixed plate, the reinforcing blocks are welded below the fixed plate, and the reinforcing blocks are movably connected with the connecting ends above the supporting rods;
the supporting rods comprise clamping grooves, reinforcing rods and clamping plates, the clamping grooves are welded on the left side and the right side of the supporting rods, the connecting ends of the reinforcing rods are movably connected between the supporting rods, and the clamping plates are movably connected on the left side and the right side of the reinforcing rods;
transfer and rise the frame and include spacing hole, telescopic link, unable adjustment base and rubber slab, spacing hole all runs through the setting and is transferring and rise the frame right side, the telescopic link all cup joints and rises a middle part transferring, unable adjustment base all welds in the telescopic link bottom, the rubber slab passes through the setting of closely laminating of glue in the unable adjustment base bottom.
Further preferred embodiments: the thickness of the buffer baffle is 2cm-5 cm.
Further preferred embodiments: the number of the buffer springs is 3 and more than 3, and the specification and the size of the buffer springs are consistent.
Further preferred embodiments: all be equipped with the screw hole in the middle part of boss below, and all be threaded connection with bracing piece top link.
Further preferred embodiments: the middle part of the clamping groove is provided with a groove which is movably clamped with the clamping plate.
Further preferred embodiments: the telescopic link right side all runs through and is provided with a plurality of spacing bolt holes, and spacing bolt hole passes through bolt fixed connection with spacing hole.
Further preferred embodiments: the bottom of the rubber plate is a rough surface.
The utility model provides a concrete placement bearing structure for building construction has following beneficial effect:
(1) can reach stiffener installation, dismantlement convenience with stiffener movable mounting on the bracing piece through draw-in groove and cardboard activity joint to the speed of buildding of bracing piece and stiffener has been improved.
(2) After the telescopic rod is well adjusted in position, the limiting bolt hole corresponds to the limiting hole in position and is fixed by an external bolt, so that the distance between the telescopic rod and the lifting frame can be adjusted, the height of the supporting rod is adjusted and changed, and the whole supporting structure is well adjusted.
To sum up, this kind of concrete placement bearing structure for building construction has extensive practicality to when solving the current concrete that proposes in the above-mentioned background art and freely falling the fixed plate from the conveyer pipe on, can receive great gravity impact, lead to the less than good problem of bracing piece stability of fixed plate below, have higher spreading value.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an enlarged schematic view of fig. 1A of the present invention.
Fig. 3 is an enlarged schematic view of fig. 1B of the present invention.
Fig. 4 is the schematic view of the sectional structure of the lifting frame of the present invention.
In FIGS. 1-4: the fixing plate comprises a fixing plate 1, a buffer baffle 101, a buffer spring 102, a reinforcing block 103, a support rod 2, a clamping groove 201, a reinforcing rod 202, a clamping plate 203, a lifting frame 3, a limiting hole 301, an expansion rod 302, a fixing base 303 and a rubber plate 304.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
The buffer spring 102 and the rubber plate 304 used in the present invention can be purchased from the market or customized by a private person.
The first embodiment is as follows:
referring to fig. 1 to 4, in an embodiment of the present invention, a concrete pouring supporting structure for building construction includes a fixing plate 1, a supporting rod 2 and a lifting frame 3, wherein the supporting rod 2 is movably connected below the fixing plate 1, and the lifting frame 3 is movably connected below the supporting rod 2;
the fixing plate 1 comprises a buffer baffle plate 101, buffer springs 102 and reinforcing blocks 103, the buffer baffle plate 101 is welded on the inner wall of the fixing plate 1, the connecting ends of the buffer springs 102 are movably connected between the buffer baffle plate 101 and the fixing plate 1, the reinforcing blocks 103 are welded below the fixing plate 1, and the reinforcing blocks 103 are movably connected with the connecting ends above the supporting rods 2;
the supporting rod 2 comprises clamping grooves 201, reinforcing rods 202 and clamping plates 203, the clamping grooves 201 are welded on the left side and the right side of the supporting rod 2, the connecting ends of the reinforcing rods 202 are movably connected between the supporting rods 2, and the clamping plates 203 are movably connected on the left side and the right side of the reinforcing rods 202;
transfer and rise frame 3 and include spacing hole 301, telescopic link 302, unable adjustment base 303 and rubber slab 304, spacing hole 301 all runs through the setting and is transferring and rise 3 right sides, and telescopic link 302 all cup joints transferring and rises 3 middle parts of putting up, and unable adjustment base 303 all welds in telescopic link 302 bottom, and rubber slab 304 passes through the setting of closely laminating of glue in unable adjustment base 303 bottom.
The concrete placement bearing structure for building construction that this embodiment provided, its boss 103 can slow down the gravity impact that the concrete falls into the production, reaches bracing piece 2 and has sufficient stability to make fixed plate 1 have firm support.
Example two:
in the embodiment of the utility model, the preferred scheme is: the thickness of the buffer baffle 101 is 2cm-5cm, so that the buffer baffle 101 can further stabilize the fixed plates 1, and the fixed plates 1 are firm enough, thereby facilitating the concrete pouring work; the number of the buffer springs 102 is 3 or more than 3, and the sizes of the buffer springs 102 are consistent, so that the buffer springs 102 can slow down the pushing of concrete to the fixing plate 1, the fixing plate 1 is not easy to loosen, a gap is not easy to generate, the concrete is prevented from flowing out of the gap, and the waste of the concrete is avoided; the middle parts below the reinforcing blocks 103 are provided with threaded holes and are in threaded connection with the connecting ends above the supporting rods 2, so that the reinforcing blocks 103 can slow down gravity impact generated by concrete falling, the supporting rods 2 have sufficient stability, the fixing plate 1 is stably supported, and the safety of concrete pouring construction is improved; the middle part of the clamping groove 201 is provided with a groove which is movably clamped with the clamping plate 203, so that the reinforcing rod 202 can be movably arranged on the supporting rod 2 by movably clamping the clamping groove 201 with the clamping plate 203, the reinforcing rod 202 is convenient to install and disassemble, and the building speed of the supporting rod 2 and the reinforcing rod 202 is improved; a plurality of limiting bolt holes are formed in the right side of the telescopic rod 302 in a penetrating mode, and the limiting bolt holes are fixedly connected with the limiting holes 301 through bolts, so that after the position of the telescopic rod 302 is adjusted, the limiting bolt holes correspond to the limiting holes 301 in position and are fixed through external bolts, the distance between the telescopic rod 302 and the lifting frame 3 can be adjusted, the height of the supporting rod 2 is adjusted and changed, and the whole supporting structure has good adjusting capacity; rubber slab 304 bottom is the rough surface, makes its rubber slab 304 can increase unable adjustment base 303 and ground frictional force for unable adjustment base 303 is difficult for producing and skids, and then makes whole bearing structure have better stationarity.
The concrete placement bearing structure for building construction that this embodiment provided, its distance that can adjust telescopic link 302 and transfer to rise frame 3 for bracing piece 2 height has obtained adjustment and change, and it has good regulating power to reach whole bearing structure.
Example three:
use the utility model relates to a during concrete placement bearing structure for building construction, at first, install bracing piece 2 on boss 103, make and to stabilize between bracing piece 2 and the fixed plate 1, splice fixed plate 1 according to the required condition, rethread draw-in groove 201 and cardboard 203 activity joint can be with stiffener 202 movable mounting on bracing piece 2, reach the installation of stiffener 202, it is convenient to dismantle, and simultaneously, with telescopic link 302 position regulation back, correspond spacing bolt hole and spacing hole 301 position, fix by external bolt, make can adjust telescopic link 302 and the distance of lifting frame 3, and then bracing piece 2 highly has obtained adjustment and change, and finally, when the concrete falls into fixed plate 1, its boss 103 can slow down the gravity impact that the concrete falls into the production, it has sufficient stability to reach bracing piece 2.
The above is only the preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, without departing from the concept of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent.

Claims (7)

1. The utility model provides a concrete placement bearing structure for room construction, includes fixed plate (1), bracing piece (2) and transfers and rise frame (3), its characterized in that: the lower parts of the fixed plates (1) are movably connected with supporting rods (2), and the lower parts of the supporting rods (2) are movably connected with lifting adjusting frames (3);
the fixing plate (1) comprises a buffer baffle (101), buffer springs (102) and reinforcing blocks (103), the buffer baffle (101) is welded on the inner wall of the fixing plate (1), the connecting ends of the buffer springs (102) are movably connected between the buffer baffle (101) and the fixing plate (1), the reinforcing blocks (103) are welded below the fixing plate (1), and the reinforcing blocks (103) are movably connected with the connecting ends above the supporting rods (2);
the supporting rod (2) comprises clamping grooves (201), reinforcing rods (202) and clamping plates (203), the clamping grooves (201) are welded on the left side and the right side of the supporting rod (2), connecting ends of the reinforcing rods (202) are movably connected between the supporting rod (2), and the clamping plates (203) are movably connected on the left side and the right side of the reinforcing rods (202);
transfer and rise frame (3) and include spacing hole (301), telescopic link (302), unable adjustment base (303) and rubber slab (304), spacing hole (301) all run through the setting and are transferring and rise frame (3) right side, telescopic link (302) all cup joint and rise frame (3) middle part transferring, unable adjustment base (303) all welds in telescopic link (302) bottom, rubber slab (304) closely laminate through glue and set up in unable adjustment base (303) bottom.
2. The concrete cast support structure for house construction according to claim 1, wherein: the thickness of the buffer baffle (101) is 2cm-5 cm.
3. The concrete cast support structure for house construction according to claim 1, wherein: the number of the buffer springs (102) is 3 or more than 3, and the specification and the size of the buffer springs (102) are consistent.
4. The concrete cast support structure for house construction according to claim 1, wherein: the middle part of the lower part of the reinforcing block (103) is provided with a threaded hole and is in threaded connection with the connecting end of the upper part of the supporting rod (2).
5. The concrete cast support structure for house construction according to claim 1, wherein: a groove is formed in the middle of the clamping groove (201), and the groove is movably clamped with the clamping plate (203).
6. The concrete cast support structure for house construction according to claim 1, wherein: the right side of the telescopic rod (302) is provided with a plurality of limiting bolt holes in a penetrating mode, and the limiting bolt holes are fixedly connected with the limiting holes (301) through bolts.
7. The concrete cast support structure for house construction according to claim 1, wherein: the bottom of the rubber plate (304) is a rough surface.
CN201821442402.7U 2018-09-04 2018-09-04 A concrete placement bearing structure for construction of building Active CN211647298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821442402.7U CN211647298U (en) 2018-09-04 2018-09-04 A concrete placement bearing structure for construction of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821442402.7U CN211647298U (en) 2018-09-04 2018-09-04 A concrete placement bearing structure for construction of building

Publications (1)

Publication Number Publication Date
CN211647298U true CN211647298U (en) 2020-10-09

Family

ID=72680507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821442402.7U Active CN211647298U (en) 2018-09-04 2018-09-04 A concrete placement bearing structure for construction of building

Country Status (1)

Country Link
CN (1) CN211647298U (en)

Similar Documents

Publication Publication Date Title
CN203879020U (en) Net rack splicing moulding bed
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN208023710U (en) A kind of connection structure of assembly concrete shear wall
CN108952008A (en) Insert-type steel pipe concrete column and construction method
CN205314542U (en) Construction liquid die plate device that climbs
CN202577960U (en) Suspension outer bearing type combination steel formwork applied in roller compacted concrete (RCC) construction
CN211647298U (en) A concrete placement bearing structure for construction of building
CN219411857U (en) Template device suitable for facing concrete placement
CN211499816U (en) Device for pouring construction of cantilever support of steel-concrete composite beam
CN206090567U (en) Cantilever type reservoir dam template
CN201865053U (en) Continuous steel beam template
CN218205925U (en) Aluminum template supporting structure
CN110450273A (en) A kind of small-sized prefabricated member automatic demoulding equipment
CN212241482U (en) Groove-shaped plate pile die
CN207160052U (en) A kind of skewback for connecting arcuate bead steel construction
CN205894662U (en) Modular triangle steel truss template
CN207079615U (en) A kind of roller-coaster built-in fitting support system
CN213297406U (en) A rail guard for hydraulic engineering
CN214657041U (en) Adjusting type fixture for cast-in-place concrete pile guide pipe
CN212948341U (en) Concrete is with pouring mould convenient to dismantle
CN221502704U (en) Reinforced internal and external corner back edge
CN202509621U (en) Device for bearing steel bracket
CN215519504U (en) Thickness adjusting device for concrete protective layer of steel bar net frame and pouring forming structure of thickness adjusting device
CN212129895U (en) Aluminum template node structure of outer wall of shear wall residential building
CN220580272U (en) Assembled concrete spliced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant