CN211622815U - Communication tower convenient to artifical climbing overhauls - Google Patents

Communication tower convenient to artifical climbing overhauls Download PDF

Info

Publication number
CN211622815U
CN211622815U CN201922419974.4U CN201922419974U CN211622815U CN 211622815 U CN211622815 U CN 211622815U CN 201922419974 U CN201922419974 U CN 201922419974U CN 211622815 U CN211622815 U CN 211622815U
Authority
CN
China
Prior art keywords
tower
multiunit
column
pylon
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922419974.4U
Other languages
Chinese (zh)
Inventor
王旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Junwei Iron Tower Co ltd
Original Assignee
Hebei Junwei Iron Tower Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Junwei Iron Tower Co ltd filed Critical Hebei Junwei Iron Tower Co ltd
Priority to CN201922419974.4U priority Critical patent/CN211622815U/en
Application granted granted Critical
Publication of CN211622815U publication Critical patent/CN211622815U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model relates to a communication tower equipment's that artifical climbing was overhauld technical field, especially relate to a communication tower convenient to artifical climbing is overhauld, it is upwards connected through multiunit cat ladder and multiunit corridor and first king post, second king post, third king post and fourth king post spiral, makes things convenient for the maintainer to climb and overhauls, and the condition of the communication tower is overhauld to the great area convenience maintainer activity, placement tool and diversely that provides through the multiunit platform; still include first pylon, the second pylon, the third pylon, the fourth pylon, four groups of tower seats, the multiunit horizontal pole, the first down tube of multiunit, the multiunit cat ladder, the multiunit corridor, the multiunit second down tube, multiunit mounting and multiunit platform, the multiunit horizontal pole transversely all with first pylon, the second pylon, the interior wall connection of third pylon and fourth pylon, the slant of the first down tube of multiunit all with first pylon, the second pylon, the interior wall connection of third pylon and fourth pylon, the communicator is installed on the platform that is located the top.

Description

Communication tower convenient to artifical climbing overhauls
Technical Field
The utility model relates to a communication tower equipment's that artifical climbing was overhauld technical field especially relates to a communication tower convenient to artifical climbing is overhauld.
Background
With the development of mobile communication, corresponding infrastructure is more and more, and the communication tower is used as an important mobile communication auxiliary facility, and the working state of the communication tower directly influences the communication quality of a wireless network. Communication towers are generally arranged outdoors, and most of the communication towers are arranged in remote areas; and because the manpower is limited, can only regularly patrol and examine communication tower, or go on salvageing in case of problem to communication tower generally highly is higher to be unfavorable for the maintainer to overhaul.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a through multiunit cat ladder and multiunit corridor and first pylon, second pylon, third pylon and fourth pylon spiral upwards connect, make things convenient for the maintainer to scramble and overhaul to a communication tower convenient to artifical the climbing and overhaul of the condition of overhaul communication tower of the great area that provides through the multiunit platform makes things convenient for the maintainer activity, placement tool and diversified.
The utility model discloses a communication tower convenient to artifical climbing overhauls, still include first pylon, the second pylon, the third pylon, the fourth pylon, four groups of tower bases, the multiunit horizontal pole, the first down tube of multiunit, the multiunit cat ladder, the multiunit corridor, multiunit second down tube, multiunit mounting and multiunit platform, first pylon, the second pylon, third pylon and fourth pylon pass through four groups of tower bases fixed connection, the multiunit horizontal pole transversely all with the inner wall connection of first pylon, the second pylon, the third pylon and fourth pylon, multiunit first down tube slant all with the inner wall connection of first pylon, the second pylon, the third pylon and fourth pylon, the multiunit cat ladder is connected with the multiunit corridor, and multiunit cat ladder and multiunit corridor are spiral upward structure, the bottom in multiunit corridor and the top fixed connection of multiunit second down tube, the bottom of multiunit second down tube passes through multiunit mounting and first pylon, The outer wall of second pylon, third pylon and fourth pylon is connected, and the multiunit platform passes through the multiunit horizontal pole to be installed between first pylon, second pylon, third pylon and fourth pylon, and the communicator is installed on the platform that is located the top.
The utility model discloses a communication tower convenient to artifical climbing maintenance still includes the multiunit guardrail, the multiunit guardrail all with the lateral wall fixed connection of multiunit cat ladder, multiunit corridor and multiunit platform.
The utility model discloses a communication tower convenient to artifical climbing overhauls still includes the lightning rod, lightning rod and communicator fixed connection.
The utility model discloses a communication tower convenient to artifical climbing overhauls still includes first connecting piece, second connecting piece, third connecting piece and fourth connecting piece, first connecting piece, second connecting piece, third connecting piece and fourth connecting piece and first pylon, second pylon, third pylon and fourth pylon fixed connection.
The utility model discloses a communication tower convenient to artifical climbing overhauls still includes the zinc-plated coating, and communication tower surface is equipped with the zinc-plated coating.
The utility model discloses a communication tower convenient to artifical climbing overhauls, the whole material of communication tower is the angle steel.
The utility model discloses a communication tower convenient to artifical climbing overhauls, multiunit second down tube carry out fixed connection through thick type bolt.
The utility model discloses a communication tower convenient to artifical climbing overhauls still includes the multiunit screw post, and the bottom of communication tower is fixed through the multiunit screw post.
Compared with the prior art, the beneficial effects of the utility model are that: upwards be connected through multiunit cat ladder and multiunit corridor and first pylon, second pylon, third pylon and fourth pylon spiral, make things convenient for the maintainer to climb and overhaul to the great area that provides through the multiunit platform makes things convenient for the maintainer activity, placement tool and the diversified condition of overhauing the communication tower.
Drawings
FIG. 1 is a schematic view of an axial measurement structure of the present invention;
fig. 2 is a schematic view of the partial front view structure of the present invention;
fig. 3 is a schematic top view of the present invention;
fig. 4 is a schematic view of the fixing member of the present invention;
in the drawings, the reference numbers: 1. a first tower column; 2. a second tower column; 3. a third tower column; 4. a fourth tower column; 5. a tower base; 6. a cross bar; 7. a first diagonal member; 8. climbing a ladder; 9. a corridor; 10. a second diagonal member; 11. a fixing member; 12. a platform; 13. a communicator; 14. a guardrail; 15. a lightning rod; 16. a first connecting member; 17. a second connecting member; 18. a third connecting member; 19. a fourth connecting member; 20. a zinc plating coating; 21. a screw post.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
As shown in fig. 1 to 3, the communication tower convenient for manual climbing and maintenance of the present invention further comprises a first tower column 1, a second tower column 2, a third tower column 3, a fourth tower column 4, four groups of tower bases 5, a plurality of groups of cross rods 6, a plurality of groups of first diagonal rods 7, a plurality of groups of ladder stands 8, a plurality of groups of corridors 9, a plurality of groups of second diagonal rods 10, a plurality of groups of fixing members 11 and a plurality of groups of platforms 12, wherein the first tower column 1, the second tower column 2, the third tower column 3 and the fourth tower column 4 are fixedly connected through the four groups of tower bases 5, the plurality of groups of cross rods 6 are transversely connected with the inner walls of the first tower column 1, the second tower column 2, the third tower column 3 and the fourth tower column 4, the plurality of groups of first diagonal rods 7 are obliquely connected with the inner walls of the first tower column 1, the second tower column 2, the third tower column 3 and the fourth tower column 4, the plurality of ladder stands 8 are connected with the plurality of corridors 9, and the plurality of ladder stands, the bottom ends of the plurality of groups of corridors 9 are fixedly connected with the top ends of the plurality of groups of second inclined rods 10, the bottom ends of the plurality of groups of second inclined rods 10 are connected with the outer walls of the first tower column 1, the second tower column 2, the third tower column 3 and the fourth tower column 4 through a plurality of groups of fixing pieces 11, the plurality of groups of platforms 12 are installed among the first tower column 1, the second tower column 2, the third tower column 3 and the fourth tower column 4 through a plurality of groups of cross rods 6, and the communicator 13 is installed on the platform 12 at the top end; through the spiral connection that makes progress of multiunit cat ladder 8 and multiunit corridor 9 and first pylon 1, second pylon 2, third pylon 3 and fourth pylon 4, make things convenient for the maintainer to climb and overhaul to the great area that provides through multiunit platform 12 makes things convenient for the maintainer to move about, placement tool and the diversified condition of overhauing the communication tower.
The utility model discloses a communication iron tower convenient for manual climbing and maintenance, which also comprises a plurality of groups of guardrails 14, wherein the plurality of groups of guardrails 14 are fixedly connected with the side walls of a plurality of groups of crawling ladders 8, a plurality of groups of corridors 9 and a plurality of groups of platforms 12; the safety of the maintainer in the climbing process is improved by arranging a plurality of groups of guardrails 14.
The utility model discloses a communication iron tower convenient for manual climbing and maintenance, which also comprises a lightning rod 15, wherein the lightning rod 15 is fixedly connected with a communicator 13; the lightning rod 15 is arranged to protect the communication iron tower from being damaged by lightning in a thunderstorm weather.
The utility model discloses a communication tower convenient to artifical climbing maintenance, still include first connecting piece 16, second connecting piece 17, third connecting piece 18 and fourth connecting piece 19, first connecting piece 16, second connecting piece 17, third connecting piece 18 and fourth connecting piece 19 and first pylon 1, second pylon 2, third pylon 3 and fourth pylon 4 fixed connection; because it needs first pylon 1, second pylon 2, third pylon 3 and fourth pylon 4 of extension to build the communication tower high excessively, strengthen stably when making first pylon 1, second pylon 2, third pylon 3 and fourth pylon 4 carry out the extension through first connecting piece 16, second connecting piece 17, third connecting piece 18 and fourth connecting piece 19 and connect, improve communication tower stability.
The utility model discloses a convenient communication tower that climbs manually and overhauls, still include the galvanized coating 20, the surface of communication tower is equipped with the galvanized coating 20; the steel is protected from corrosion by the zinc coating 20.
The utility model discloses a communication tower convenient to artifical climbing maintenance, the whole material of communication tower is the angle steel; the angle steel can form various stressed components according to different requirements of structures, can also be used as a connecting piece between components, and has better weldability, plastic deformation performance and certain mechanical strength.
The utility model discloses a communication tower convenient to artifical climbing maintenance, multiunit second down tube 10 carries out fixed connection through thick type bolt; and a thick bolt is selected for fixed connection, so that the structural stability of the cable is improved.
The utility model discloses a communication tower convenient to artifical climbing maintenance, still include multiunit screw post 21, the bottom of communication tower is fixed through multiunit screw post 21; stability is improved by multiple sets of screw studs 21.
The utility model discloses a communication tower convenient to artifical climbing overhauls, it is at the during operation, at first through multiunit cat ladder 8 and multiunit corridor 9 and first column 1, second column 2, third column 3 and the 4 spiral of fourth column upwards connect, make things convenient for the maintainer to climb and overhaul, later the great area that provides through multiunit platform 12 makes things convenient for the maintainer activity, placement tool and the diversified condition of overhauing the communication tower, then through set up multiunit guardrail 14 improve the security that the maintainer climbed in-process can.
The utility model discloses a communication iron tower convenient for manual climbing and maintenance, the installation mode, the connection mode or the setting mode of which are common mechanical modes, and the communication iron tower can be implemented as long as the beneficial effects can be achieved; the utility model discloses a communication tower's communicator 13 convenient to artifical climbing overhauls is purchase on the market, and this industry technical staff only need according to its subsidiary service instruction install and operate can.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.

Claims (8)

1. A communication iron tower convenient for manual climbing and maintenance is characterized by further comprising a first tower column (1), a second tower column (2), a third tower column (3), a fourth tower column (4), four groups of tower bases (5), a plurality of groups of cross rods (6), a plurality of groups of first inclined rods (7), a plurality of groups of ladder stands (8), a plurality of groups of corridors (9), a plurality of groups of second inclined rods (10), a plurality of groups of fixing pieces (11) and a plurality of groups of platforms (12), wherein the first tower column (1), the second tower column (2), the third tower column (3) and the fourth tower column (4) are fixedly connected through the four groups of tower bases (5), the plurality of groups of cross rods (6) are transversely connected with the inner walls of the first tower column (1), the second tower column (2), the third tower column (3) and the fourth tower column (4), the plurality of groups of first inclined rods (7) are obliquely connected with the inner walls of the first tower column (1), the second tower column (2), the third tower column (3) and the fourth tower column (4), multiunit cat ladder (8) are connected with multiunit corridor (9), and multiunit cat ladder (8) and multiunit corridor (9) are spiral upward structure, the bottom in multiunit corridor (9) and the top fixed connection of multiunit second down tube (10), the bottom of multiunit second down tube (10) is passed through multiunit mounting (11) and first column (1), second column (2), the outer wall connection of third column (3) and fourth column (4), install at first column (1) through multiunit horizontal pole (6) multiunit platform (12), second column (2), between third column (3) and fourth column (4), install on the platform (12) that are located the top communicator (13).
2. The communication tower convenient for manual climbing and overhauling according to claim 1, further comprising a plurality of sets of guardrails (14), wherein the plurality of sets of guardrails (14) are fixedly connected with the side walls of the plurality of sets of ladder stands (8), the plurality of corridors (9) and the plurality of sets of platforms (12).
3. The communication tower convenient for manual climbing and overhauling according to claim 2, further comprising a lightning rod (15), wherein the lightning rod (15) is fixedly connected with the communicator (13).
4. The communication tower convenient for manual climbing and overhauling according to claim 3, further comprising a first connecting piece (16), a second connecting piece (17), a third connecting piece (18) and a fourth connecting piece (19), wherein the first connecting piece (16), the second connecting piece (17), the third connecting piece (18) and the fourth connecting piece (19) are fixedly connected with the first tower column (1), the second tower column (2), the third tower column (3) and the fourth tower column (4).
5. The communication tower convenient for manual climbing and overhauling as recited in claim 4, further comprising a galvanized coating (20), wherein the galvanized coating (20) is arranged on the surface of the communication tower.
6. The communication tower convenient to climb and overhaul by hand according to claim 5, characterized in that the whole material of the communication tower is angle steel.
7. The communication tower convenient for manual climbing and overhauling as per claim 6, characterized in that the multiple groups of second inclined rods (10) are fixedly connected by thick bolts.
8. The communication tower convenient for manual climbing and overhauling according to claim 7, further comprising a plurality of groups of screw columns (21), wherein the bottom end of the communication tower is fixed by the plurality of groups of screw columns (21).
CN201922419974.4U 2019-12-27 2019-12-27 Communication tower convenient to artifical climbing overhauls Active CN211622815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922419974.4U CN211622815U (en) 2019-12-27 2019-12-27 Communication tower convenient to artifical climbing overhauls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922419974.4U CN211622815U (en) 2019-12-27 2019-12-27 Communication tower convenient to artifical climbing overhauls

Publications (1)

Publication Number Publication Date
CN211622815U true CN211622815U (en) 2020-10-02

Family

ID=72633190

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922419974.4U Active CN211622815U (en) 2019-12-27 2019-12-27 Communication tower convenient to artifical climbing overhauls

Country Status (1)

Country Link
CN (1) CN211622815U (en)

Similar Documents

Publication Publication Date Title
CN203441073U (en) Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN211622815U (en) Communication tower convenient to artifical climbing overhauls
CN107059641A (en) Goods-shelf type pier shaft external scaffolding
CN206736745U (en) Goods-shelf type pier shaft external scaffolding
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN207183801U (en) One kind uses new sail type power distribution equipment framework made of composite insulating material
CN110700545A (en) Lightning protection grounding connection method for climbing frame
CN212336872U (en) Communication tower convenient to maintenance signal device
CN201554254U (en) Communication tower and communication tower platform
CN210191764U (en) Detachable railing for ocean platform
CN215594839U (en) Station auxiliary device applied to super high-rise steel-concrete structure
CN218150727U (en) Tower entrance inclined ladder
CN212271774U (en) Sharing platform based on transmission tower
CN212376228U (en) Be applied to steel trestle behind dam of power station
CN204112829U (en) Integrate the radar Special iron Tower System of shelter, staircase, mounting platform
CN205452794U (en) Reinforcing apparatus of lightning rod
CN104234493B (en) Integrate the radar Special iron Tower System of shelter, staircase, mounting platform
CN217379219U (en) Prefabricated formula steel construction transformer substation platform
CN214424400U (en) Cat ladder can be dismantled temporarily to people about steel construction
CN216076209U (en) Adjust nimble outer hanging handling frame of building
CN211500003U (en) Communication tower safety device
CN215717057U (en) Transformer substation is with adjustable maintenance work platform of high altitude folding
CN211456474U (en) Cable termination tower overhauls platform
CN217028374U (en) Durable anticorrosion iron guard rail
CN212224590U (en) Super large and large section steel column construction operation platform