CN212376228U - Be applied to steel trestle behind dam of power station - Google Patents

Be applied to steel trestle behind dam of power station Download PDF

Info

Publication number
CN212376228U
CN212376228U CN202021981558.XU CN202021981558U CN212376228U CN 212376228 U CN212376228 U CN 212376228U CN 202021981558 U CN202021981558 U CN 202021981558U CN 212376228 U CN212376228 U CN 212376228U
Authority
CN
China
Prior art keywords
steel
stand
tripod
behind dam
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021981558.XU
Other languages
Chinese (zh)
Inventor
曲猛
田永
孙达
王奔
杨银杰
武永超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Zhuoliang Formwork Co ltd
Original Assignee
Yunnan Zhuoliang Formwork Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Zhuoliang Formwork Co ltd filed Critical Yunnan Zhuoliang Formwork Co ltd
Priority to CN202021981558.XU priority Critical patent/CN212376228U/en
Application granted granted Critical
Publication of CN212376228U publication Critical patent/CN212376228U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a be applied to steel landing stage behind dam of power station, it includes the tripod, buries piece, girder, steel platform, escape way, the side of tripod is provided with buries the piece, the top of tripod is provided with a plurality of girders, be provided with the steel platform on the girder, be provided with escape way on the steel platform. The utility model discloses the atress is reasonable, and the appearance is pleasing to the eye: the part of burying is the bearing system of steel trestle, except that once only burying each part can have enough to meet the need the use, when guaranteeing construction safety, has improved work efficiency greatly. The utility model discloses simple structure, the ann tears the convenience open: the steel trestle can be assembled on the ground, is convenient and quick, can realize the integral lifting of the unit, and improves the mounting speed. The utility model discloses the width is free, can design the width according to the engineering needs. The utility model discloses steel landing stage compromises construction safety passageway and bears the effect of cooling circulation system.

Description

Be applied to steel trestle behind dam of power station
Technical Field
The utility model relates to a power station equipment field especially relates to a be applied to steel landing stage behind dam of power station.
Background
In the construction of a dam body of a hydropower station, large-volume concrete pouring is involved, so a cooling water pipe needs to be arranged in the dam body, a temperature monitoring system needs to be arranged behind the dam, and a bearing monitoring system and a construction platform convenient for people to walk together need to be erected behind the dam. Common scaffold is often adopted to set up in the traditional construction, the potential safety hazard of the method is very big, the construction efficiency is low, the platform effect is not ideal, and constructors are inconvenient to walk together, so how to solve the problems of setting up the platform, passing potential safety hazard and improving the construction efficiency is a problem to be solved urgently.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a be applied to steel landing stage behind dam of power station to prior art not enough.
In order to achieve the above purpose, the present invention is achieved by the following technical solutions.
The utility model provides a be applied to steel trestle behind dam of power station, it includes the tripod, buries piece, girder, steel platform, escape way, the side of tripod is provided with buries the piece, the top of tripod is provided with a plurality of girders, be provided with the steel platform on the girder, be provided with escape way on the steel platform.
Further, the tripod includes pole setting, crossbeam, bracing, the crossbeam is installed perpendicularly on the top of pole setting, the bottom in the pole setting is installed to the one end of bracing, and the other end is installed on the crossbeam.
Furthermore, the vertical rods and the cross beams are formed by welding double-groove steel.
Furthermore, the inclined strut is a round tube with adjustable length.
Further, it includes the atress bolt, climbs awl, ripple screw rod to bury the piece, the side at the top of pole setting is installed to the atress bolt, climb the awl and install on the atress bolt, the ripple screw rod is installed and is climbed on the awl.
Furthermore, the main beam is a rectangular steel pipe with the specification of 120mmX80mmX3mm, and the main beam and the cross beam are perpendicular to each other.
Furthermore, the steel platform is made of a shaped steel springboard.
Further, the escape way includes first stand, second stand, landing stage crossbeam, back timber, roof distribution roof beam, landing stage roof, truss otter board, first stand, second stand relative perpendicular setting respectively are on the steel platform, the level is provided with the landing stage crossbeam between the top side of first stand, second stand, be provided with the back timber between the top of first stand, second stand, the spaced roof distribution roof beam that is provided with on the back timber, be provided with the landing stage roof on the roof distribution roof beam, be provided with the truss otter board on first stand, the second stand respectively.
Furthermore, the first upright column, the second upright column and the trestle crossbeam are rectangular steel pipes, and the specification is 80mmX40mmX3 mm.
Furthermore, the top beam and the top plate distribution beam are rectangular steel tubes, and the specification is 40mmX40mmX3 mm.
The utility model has the advantages that:
1. the utility model discloses the atress is reasonable, and the appearance is pleasing to the eye: the embedded part of the steel trestle behind the dam is a bearing system of the steel trestle behind the dam, and each part can be used in a turnover mode, so that the working efficiency is greatly improved while the construction safety is guaranteed.
2. The utility model discloses simple structure, the ann tears the convenience open: the steel trestle can be assembled on the ground behind the dam, is convenient and fast, can realize that the unit is wholly hoisted, has improved the speed of installation.
3. The utility model discloses the width is free, can design the width according to the engineering needs.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a partial structure of the embedded part of the present invention;
in the figure: 1. a tripod; 2. embedding the parts; 3. a main beam; 4. a steel platform; 5. a secure channel; 11. erecting a rod; 12. a cross beam; 13. bracing; 21. a stressed bolt; 22. climbing a cone; 23. a corrugated screw; 51. a first upright post; 52. a second upright post; 53. a trestle bridge beam; 54. a top beam; 55. a roof distribution beam; 56. a landing stage top plate; 57. truss net plates.
Detailed Description
The present invention is further illustrated by the following examples, but is not limited to the contents of the specification.
As shown in the figure: the utility model provides a be applied to steel trestle behind dam of power station, it includes tripod 1, buries 2, girder 3, steel platform 4, escape way 5, and the side of tripod 1 is provided with buries 2, and the top of tripod 1 is provided with a plurality of girders 3, is provided with steel platform 4 on the girder 3, is provided with escape way 5 on steel platform 4.
The tripod 1 is a plurality of, sets up the interval according to actual bearing needs, and bearing is big, and the interval is just little, and general interval is 4m, and the tripod 1 includes pole setting 11, crossbeam 12, bracing 13, and crossbeam 12 is installed perpendicularly on the top of pole setting 11, and the crossbeam 12 on each tripod 1 is in same horizontal plane, and the bottom at pole setting 11 is installed to the one end of bracing 13. The other end is arranged on a beam 12, and the upright stanchion 11 is tightly attached to the side surface of the dam body to play a role of supporting.
The upright rods 11 and the cross beams 12 are formed by welding double-channel steel, and the inclined struts 13 are round tubes with adjustable lengths, so that the pitching construction working condition can be met; the cat ladder of the prior art bears weight through the rigidity of self, and when the cat ladder reached a take the altitude, lower part cat ladder warp easily, and the requirement to the cat ladder material is higher, and the cost of manufacture is high.
The embedded part 2 comprises a stressed bolt 21, an upward-climbing cone 22 and a corrugated screw 23, wherein the stressed bolt 21 is arranged on the side surface of the top end of the upright rod 11, the upward-climbing cone 22 is arranged on the stressed bolt 21, the corrugated screw 23 is arranged on the upward-climbing cone 22, and the corrugated screw 23 is arranged on a concrete structure of a dam body to transmit the load on the trestle to the structure; the prior art is the installation cat ladder, and this kind of mode can not be fine fix the cat ladder, in case the cat ladder is fixed not good, produces the potential safety hazard easily, installs the high cost of cat ladder simultaneously.
The girder 3 is the rectangle steel pipe, and the specification is 120mmX80mmX3mm, girder 3 and crossbeam 12 mutually perpendicular, and girder 3 is three at least, can increase the quantity of girder 3 according to the increase of actual bearing to strengthen the intensity of whole landing stage.
A steel platform 4 is laid on the main beam 3, and the steel platform 4 is made of a shaped steel springboard, so that the walking of constructors can be met; the prior art can only walk up and down through the crawling ladder, the walking of two ends of constructors cannot be realized by the technology, the crawling ladder is too troublesome to walk up and down, and the working efficiency is influenced.
Safe passageway 5 includes first stand 51, second stand 52, landing stage crossbeam 53, top beam 54, roof distribution roof beam 55, landing stage roof 56, truss otter board 57, first stand 51, second stand 52 is relative perpendicular setting respectively on steel platform 4, first stand 51, the level is provided with landing stage crossbeam 53 between the top side of second stand, first stand 51, be provided with top beam 54 between the top of second stand, the spaced is provided with a plurality of roof distribution roof beam 55 on top beam 54, be provided with landing stage roof 56 on roof distribution roof beam 55, first stand 51, be provided with truss otter board 57 on the second stand 52 respectively.
First stand 51, second stand 52, landing stage crossbeam 53 are the rectangle steel pipe, and the specification is 80mmX40mmX3mm, and the number of first stand 51, second stand 52 sets up according to actual need, between first stand 51, is provided with truss otter board 57 between the second stand 52 respectively, plays the effect of protection railing, and truss otter board 57 is the wire net, can prevent that personnel from falling.
The top beam 54 and the top plate distribution beam 55 are rectangular steel pipes with the specification of 40mmX40mmX3mm,
the utility model provides a escape way 5 comprises wire net, stand etc. and the wire net is fixed on the stand, and the stand has also played the reinforcing effect of truss.
As used in the specification and in the claims, certain terms are used to refer to particular components. As one skilled in the art will appreciate, manufacturers may refer to a component by different names. This specification and claims do not intend to distinguish between components that differ in name but not function. In the following description and in the claims, the terms "include" and "comprise" are used in an open-ended fashion, and thus should be interpreted to mean "include, but not limited to. "substantially" means within an acceptable error range, and a person skilled in the art can solve the technical problem within a certain error range to substantially achieve the technical effect. In addition, the following description is of the preferred embodiment of the present invention, and is made for the purpose of illustrating the general principles of the invention and not for the purpose of limiting the invention. The protection scope of the present invention is subject to the limitations defined by the appended claims.
It is also noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a good or system that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such good or system. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a commodity or system that includes the element.
While the foregoing description shows and describes several preferred embodiments of the invention, it is to be understood, as noted above, that the invention is not limited to the forms disclosed herein, but is not intended to be exhaustive or to exclude other embodiments and may be used in various other combinations, modifications, and environments and is capable of changes within the scope of the inventive concept as expressed herein, commensurate with the above teachings, or the skill or knowledge of the relevant art. But that modifications and variations may be effected by those skilled in the art without departing from the spirit and scope of the invention, which is to be limited only by the claims appended hereto.

Claims (10)

1. The utility model provides a be applied to steel trestle behind dam of power station which characterized in that: the novel steel platform comprises a tripod (1), embedded parts (2), girders (3), a steel platform (4) and a safety channel (5), wherein the embedded parts (2) are arranged on the side surface of the tripod (1), a plurality of girders (3) are arranged on the top end of the tripod (1), the steel platform (4) is arranged on the girders (3), and the safety channel (5) is arranged on the steel platform (4).
2. The steel trestle behind dam applied to hydropower station of claim 1, characterized in that: tripod (1) is including pole setting (11), crossbeam (12), bracing (13), crossbeam (12) are installed perpendicularly to the top of pole setting (11), the bottom in pole setting (11) is installed to the one end of bracing (13), and the other end is installed on crossbeam (12).
3. The steel trestle behind dam applied to hydropower station according to claim 2, characterized in that: the upright stanchion (11) and the cross beam (12) are formed by welding double-groove steel.
4. The steel trestle behind dam applied to hydropower station according to claim 2, characterized in that: the inclined strut (13) is a round tube with adjustable length.
5. The steel trestle behind dam applied to hydropower station of claim 1, characterized in that: the embedded part (2) comprises a stress bolt (21), a climbing cone (22) and a corrugated screw rod (23), the stress bolt (21) is installed on the side face of the top end of the vertical rod (11), the climbing cone (22) is installed on the stress bolt (21), and the corrugated screw rod (23) is installed on the climbing cone (22).
6. The steel trestle behind dam applied to hydropower station of claim 1, characterized in that: the main beam (3) is a rectangular steel pipe with the specification of 120mmX80mmX3mm, and the main beam (3) and the cross beam (12) are perpendicular to each other.
7. The steel trestle behind dam applied to hydropower station of claim 1, characterized in that: the steel platform (4) is made of a shaped steel springboard.
8. The steel trestle behind dam applied to hydropower station of claim 1, characterized in that: safe passageway (5) include first stand (51), second stand (52), landing stage crossbeam (53), back timber (54), roof distribution roof beam (55), landing stage roof (56), truss otter board (57), first stand (51), second stand (52) are relative perpendicular respectively and set up on steel platform (4), level is provided with landing stage crossbeam (53) between the top side of first stand (51), second stand, be provided with back timber (54) between the top of first stand (51), second stand, spaced on back timber (54) is provided with a plurality of roof distribution roof beam (55), be provided with landing stage roof (56) on roof distribution roof beam (55), be provided with truss otter board (57) on first stand (51), second stand (52) respectively.
9. The steel trestle behind dam applied to hydropower station according to claim 8, characterized in that: the first upright post (51), the second upright post (52) and the trestle crossbeam (53) are rectangular steel pipes, and the specification is 80mmX40mmX3 mm.
10. The steel trestle behind dam applied to hydropower station according to claim 8, characterized in that: the top beam (54) and the top plate distribution beam (55) are rectangular steel pipes, and the specification is 40mmX40mmX3 mm.
CN202021981558.XU 2020-09-11 2020-09-11 Be applied to steel trestle behind dam of power station Expired - Fee Related CN212376228U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021981558.XU CN212376228U (en) 2020-09-11 2020-09-11 Be applied to steel trestle behind dam of power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021981558.XU CN212376228U (en) 2020-09-11 2020-09-11 Be applied to steel trestle behind dam of power station

Publications (1)

Publication Number Publication Date
CN212376228U true CN212376228U (en) 2021-01-19

Family

ID=74176323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021981558.XU Expired - Fee Related CN212376228U (en) 2020-09-11 2020-09-11 Be applied to steel trestle behind dam of power station

Country Status (1)

Country Link
CN (1) CN212376228U (en)

Similar Documents

Publication Publication Date Title
CN109898819B (en) Foldable telescopic overhanging tool type scaffold system and installation method thereof
US6270057B1 (en) Reuseable multi-story building construction guardrail system
CN209942196U (en) Cantilever support system for large-volume concrete structure
CN110685226A (en) Hydraulic integral self-climbing construction platform
CN111894252A (en) Be applied to steel trestle behind dam of power station
EP0606948A1 (en) Universal supporting construction
CN212376228U (en) Be applied to steel trestle behind dam of power station
US8752801B2 (en) Apparatus and kit for supporting inclined structures
CN116005949A (en) Double-layer concrete beam template erecting device for stairway and use method
CN211312215U (en) Hydraulic integral self-climbing construction platform
CN214828568U (en) Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame
US20140360810A1 (en) Apparatus and Kit for Supporting Inclined Structures
CN212897481U (en) High-altitude construction platform at bottom of structure
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN214462394U (en) High-altitude overhanging scaffold
CN211775606U (en) Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway
CN211006345U (en) Lattice formula cat ladder
CN211396522U (en) Construction platform with triangular transportation channel
CN213539817U (en) Horizontal frame of frame type safety ladder cage
CN212688719U (en) Bridge vase-shaped pier body protective bracket
CN213679551U (en) Tower crane pedestrian passageway
GB2550562A (en) Scaffold
CN216076209U (en) Adjust nimble outer hanging handling frame of building
CN216999305U (en) Thin-wall pier steel bar construction operation platform device
CN218025126U (en) Passageway for upper tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210119