CN211622721U - Tripod operating platform - Google Patents

Tripod operating platform Download PDF

Info

Publication number
CN211622721U
CN211622721U CN201922002282.XU CN201922002282U CN211622721U CN 211622721 U CN211622721 U CN 211622721U CN 201922002282 U CN201922002282 U CN 201922002282U CN 211622721 U CN211622721 U CN 211622721U
Authority
CN
China
Prior art keywords
bolt
tripod
embedded
grooves
stressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922002282.XU
Other languages
Chinese (zh)
Inventor
张凤举
冯子恒
陈杨化
喻宁招
张锋凌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN201922002282.XU priority Critical patent/CN211622721U/en
Application granted granted Critical
Publication of CN211622721U publication Critical patent/CN211622721U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a tripod operating platform, which comprises two tripod bodies, at least two I-shaped wood pieces, a plurality of wood springboards, two embedded parts and a safety pin; every built-in fitting is by buried bolt in advance, climb awl, atress bolt, its characterized in that: two embedded bolts are embedded in the designated positions of the wall body with the corresponding structure, each embedded bolt is screwed with one climbing cone, and each climbing cone is screwed with one stressed bolt; all I-beams are respectively inserted into the hollow parts in the bodies of the two tripods and fixed, all wood springboards are fixed above the I-beams to form a tripod platform, bolt grooves are formed in the tops of the inner sides of the two tripods, bolt holes are formed in the bolt grooves, the bolt grooves are inserted into stressed bolts, and safety pins are inserted into the bolt holes of the bolt grooves to clamp the stressed bolts. The utility model discloses simple structure, the equipment is convenient, saves operation platform material purchase, platform equipment time, and application scope is extensive, improves work efficiency, is suitable for required operation platform in the construction to repeatedly usable saves time and saves labour.

Description

Tripod operating platform
Technical Field
The utility model relates to a construction technical field especially relates to be used for construction operation platform.
Background
In present construction, relate to a very much a plurality of construction operation platform, traditional operation platform structure is complicated, assembles loaded down with trivial details, material purchase cycle length, and the turnover number of times is few. Resulting in loss of time, material, and cost.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the problems and the defects of the prior art, and providing a tripod operating platform. The utility model discloses an operation platform simple structure, the equipment is convenient, has saved the time of operation platform material purchase, platform equipment, and application scope is extensive, improves work efficiency, required operation platform in the applicable construction to repeatedly usable saves time and saves labour.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a tripod operating platform comprises two tripod bodies, at least two I-shaped woods, a plurality of wood springboards, two embedded parts and a safety pin; every built-in fitting is by buried bolt in advance, climb awl, atress bolt, its characterized in that: two embedded bolts are embedded in the designated positions of the wall body with the corresponding structure, each embedded bolt is screwed with one climbing cone, and each climbing cone is screwed with one stressed bolt; all I-beams are respectively inserted into the hollow parts in the bodies of the two tripods and fixed, all wood springboards are fixed above the I-beams to form a tripod platform, bolt grooves are formed in the tops of the inner sides of the two tripods, bolt holes are formed in the bolt grooves, the bolt grooves are inserted into stressed bolts, and safety pins are inserted into the bolt holes of the bolt grooves to clamp the stressed bolts.
The bottom of the inner side of the tripod is provided with the supporting legs, so that the integral operating platform is convenient to abut against a structural wall.
The inner side of the tripod body is provided with two rod piece connecting ends, and the rod piece connecting ends are convenient for fixing a steel pipe and are used for fixing a protective net.
The outer side of the tripod body is provided with two bolt holes, and pipe fittings used for installing protective nets are fixed through the bolt holes.
The utility model has the advantages that: the utility model discloses an operation platform simple structure, the equipment is convenient, has saved the time of operation platform material purchase, platform equipment, and application scope is extensive, improves work efficiency, required interim operation platform in the applicable construction to repeatedly usable saves time and saves labour.
Drawings
Fig. 1 is a schematic diagram of the three-dimensional effect of the present invention.
Fig. 2 is a schematic diagram of the three-dimensional effect of the tripod body and the embedded part of the present invention.
Wherein: 1. a tripod body; 2. a stressed bolt; 3. climbing a cone; 4. embedding bolts in advance; 5. a bolt slot; 6. a shear pin; 7. a support leg; 8. a rod member connecting end; 9. bolt holes; 10. i-shaped wood; 11. a wood springboard.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1 and 2, the utility model comprises two tripod bodies 1, three i-shaped wood 10, a plurality of wood springboards 11, two embedded parts and a safety pin 6; every built-in fitting is by buried bolt 4 in advance, climb awl 3, atress bolt 2, its characterized in that: two embedded bolts 4 are embedded in the designated positions of the wall body with the corresponding structure, each embedded bolt 4 is screwed with one climbing cone 3, and each climbing cone 3 is screwed with one stressed bolt 2; all I-beams 10 are respectively inserted into the hollow parts of the two tripod bodies 1 and fixed, all wood springboards 11 are fixed above the I-beams 10 to form a tripod platform, bolt grooves 5 are formed in the tops of the inner sides of the two tripod bodies 1, bolt holes are formed in the bolt grooves 5, the bolt grooves 5 are inserted into the stressed bolts 2, and safety pins 6 are inserted into the bolt holes of the bolt grooves 5 to clamp the stressed bolts 2. The bottom of the inner side of the tripod body 1 is provided with a supporting leg 7, so that the integral operating platform is convenient to abut against a structural wall; two rod connecting ends 8 are arranged on the inner side of the tripod body 1, and the rod connecting ends 8 are convenient for fixing steel pipes and are used for fixing a protective net; the outer side of the tripod body 1 is provided with two bolt holes 9, and a pipe fitting for installing a protective net is fixed through the bolt holes 9.
The above, only be the embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the present invention, the technical solution and the utility model thereof should be covered within the protection scope of the present invention.

Claims (4)

1. A tripod operating platform comprises two tripod bodies, at least two I-shaped woods, a plurality of wood springboards, two embedded parts and a safety pin; every built-in fitting is by buried bolt in advance, climb awl, atress bolt, its characterized in that: two embedded bolts are embedded in the designated positions of the wall body with the corresponding structure, each embedded bolt is screwed with one climbing cone, and each climbing cone is screwed with one stressed bolt; all I-beams are respectively inserted into the hollow parts in the bodies of the two tripods and fixed, all wood springboards are fixed above the I-beams to form a tripod platform, bolt grooves are formed in the tops of the inner sides of the two tripods, bolt holes are formed in the bolt grooves, the bolt grooves are inserted into stressed bolts, and safety pins are inserted into the bolt holes of the bolt grooves to clamp the stressed bolts.
2. A tripod operating platform according to claim 1, wherein: the bottom of the inner side of the tripod body is provided with a supporting leg.
3. A tripod operating platform according to claim 1, wherein: the inner side of the tripod body is provided with two rod piece connecting ends.
4. A tripod operating platform according to claim 1, wherein: the outer side of the tripod body is provided with two bolt holes.
CN201922002282.XU 2019-11-19 2019-11-19 Tripod operating platform Active CN211622721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922002282.XU CN211622721U (en) 2019-11-19 2019-11-19 Tripod operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922002282.XU CN211622721U (en) 2019-11-19 2019-11-19 Tripod operating platform

Publications (1)

Publication Number Publication Date
CN211622721U true CN211622721U (en) 2020-10-02

Family

ID=72625955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922002282.XU Active CN211622721U (en) 2019-11-19 2019-11-19 Tripod operating platform

Country Status (1)

Country Link
CN (1) CN211622721U (en)

Similar Documents

Publication Publication Date Title
CN204327103U (en) A kind of reaction frame started for tunneling shield
CN211622721U (en) Tripod operating platform
CN104358328B (en) All-steel four-steel pipe multistage mountable overlong buckling-restrained brace
CN211499678U (en) Construction fastener formula steel pipe template strutting arrangement
CN205857670U (en) A kind of external wall construction hanging basket is encorbelmented device
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN104989098A (en) Laminated plate support frame
CN202925879U (en) Multidirectional combined connector
CN205935618U (en) Scaffold puts up localization support device
CN207210968U (en) Box beam roof steel bar skeleton colligation mold
CN203473395U (en) Special placing rack for construction site pipeline
CN104652799A (en) Metal frame device
CN104234190A (en) Designing method for reinforced floor chord member of pipe truss structure
CN201873949U (en) Bride prestress stretch-draw trolley
CN203114533U (en) Wind power equipment valve base
CN203514948U (en) Large-span portable arched tent
CN207485453U (en) A kind of telescopic tunnel support Mobile workbench
CN207003265U (en) New road bridge formwork support meanss
CN203034916U (en) Assembled construction barrier
CN112319997A (en) Concatenation formula harbour goods shelves tray
CN204802893U (en) Electronic hoisting frame
CN206971718U (en) Novel road bridge anticollision wall form
CN105643559B (en) A kind of device suitable for heavy caliber fire hose quick assembling
CN205998902U (en) A kind of combination type stock section being applied to large-scale tower crane fast assembling-disassembling
CN205531402U (en) Steel construction temporary remove lattice column butting positioning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant