CN211616195U - A instrument that is used for external culture stone fluting of retaining wall to fix a position - Google Patents

A instrument that is used for external culture stone fluting of retaining wall to fix a position Download PDF

Info

Publication number
CN211616195U
CN211616195U CN201922085822.5U CN201922085822U CN211616195U CN 211616195 U CN211616195 U CN 211616195U CN 201922085822 U CN201922085822 U CN 201922085822U CN 211616195 U CN211616195 U CN 211616195U
Authority
CN
China
Prior art keywords
culture stone
stone
retaining wall
fluting
culture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922085822.5U
Other languages
Chinese (zh)
Inventor
李丕伟
王安鑫
赵发睿
刘禹成
宋树国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co ltd Of China Construction Sixth Engineering Bureau
Original Assignee
China Construction Sixth Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Installation Engineering Co Ltd filed Critical China Construction Sixth Installation Engineering Co Ltd
Priority to CN201922085822.5U priority Critical patent/CN211616195U/en
Application granted granted Critical
Publication of CN211616195U publication Critical patent/CN211616195U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Retaining Walls (AREA)

Abstract

The utility model discloses an instrument that is used for external culture stone fluting of retaining wall to fix a position, including the pot head of suit at a tip of encorbelmenting the top rigid coupling of pot head has rather than the vertically board of stretching down the lower extreme parcel of stretching down has the color bar, the end of color bar and the piece of encorbelmenting is parallel in same horizontal plane, just the size of color bar and the grooved size adaptation of culture stone. Adopt the utility model discloses can mark the fluting position of culture stone accurately on culture stone, and then avoid because of the secondary fluting that artifical range estimation fluting position error caused, can avoid carrying many times because of the accurate or once accurate positioning stone material that causes in fluting position, labour saving and time saving can improve the efficiency of construction, guarantees construction safety. And the grooving size can be visually displayed on the culture stone, the problem that gaps at two ends of the groove are different can not be caused, the hanging and picking piece can be fully stressed, and the construction quality can be well ensured.

Description

A instrument that is used for external culture stone fluting of retaining wall to fix a position
Technical Field
The utility model relates to an instrument for wall wainscot, especially an instrument that is used for the external culture stone fluting of retaining wall to fix a position.
Background
The culture stone retaining wall slotting is the key point in the construction process, and the slotting can cause the structural problems of unfirm cantilever, infill glue, inaccurate positioning and the like when not meeting the requirements, thereby influencing the structural safety. However, in the construction process, the cultural stone is heavy, the size of the overhanging piece is too small, the number of the overhanging piece is large (the number of the overhanging piece is different according to the area and the weight of the stone, and the number of the overhanging piece is large) (the number of the overhanging piece hanging pieces is different according to the size and the weight of the stone, particularly, the slotting of the cultural stone with large size (such as a shale-made limestone plate) needs to be carried repeatedly for many times, and the slotting machine comprises a lot of high-place operations, so that great potential safety hazards and quality hazards are brought to the construction process, and how to conveniently and economically determine the slotting position.
Disclosure of Invention
The utility model provides a solve the technical problem who exists among the known art and provide an instrument that is used for the external culture stone fluting location of retaining wall, this instrument can accomplish the fluting location of culture stone sooner.
The utility model discloses a solve the technical scheme that technical problem that exists among the well-known technique took and be: the utility model provides an instrument that is used for retaining wall external culture stone fluting location, includes the pot head of suit at the piece tip of encorbelmenting the top rigid coupling of pot head has rather than the vertically board that stretches down the lower extreme parcel of board has the color bar, the end of color bar and the piece of encorbelmenting is parallel in same horizontal plane, just the size of color bar and the grooved size adaptation of culture stone.
The coloring strip is made of hard sponge.
The coloring strip is bound at the lower end of the downward extending plate by a rubber sleeve.
The end sleeve and the downward extending plate are both made of galvanized steel plates.
The length of the upper color bar is 2mm larger than the width of the end of the overhanging piece.
The utility model has the advantages and positive effects that: adopt this instrument can mark the fluting position of culture stone accurately on the culture stone, and then avoid because of the secondary fluting that artifical range estimation fluting position error caused, can avoid carrying many times because of the stone material that the fluting position is inaccurate or can not once pinpoint the cause, labour saving and time saving can improve the efficiency of construction, guarantees construction safety. And the grooving size can be visually displayed on the culture stone, the problem that gaps at two ends of the groove are different can not be caused, the hanging and picking piece can be fully stressed, and the construction quality can be well ensured.
Drawings
FIG. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic structural view of the present invention;
fig. 3 is a side sectional view of fig. 2.
In the figure: 1. a retaining wall; 2. an expansion bolt; 3. a cantilever member; 4. coloring strips; 5. culture stone; 6. end sleeves; 7. and a downward extending plate.
Detailed Description
For further understanding of the contents, features and effects of the present invention, the following embodiments are exemplified and will be described in detail with reference to the accompanying drawings:
referring to fig. 1 to 3, the tool for positioning the slotting of the culture stones hung outside the retaining wall comprises an end sleeve 6 sleeved on the end part of an overhanging piece 3, a downward extending plate 7 perpendicular to the end sleeve 6 is fixedly connected to the top of the end sleeve 6, the lower end of the downward extending plate 7 is wrapped with a coloring strip 4, the ends of the coloring strip 4 and the overhanging piece 3 are parallel in the same horizontal plane, and the size of the coloring strip 4 is matched with that of the slotting of the culture stones, so that the slotting according to the coloring size can be hung on the overhanging piece 3.
In this embodiment, the coloring strip 4 is made of hard sponge and is dipped with dye when in use. The upper color strip 4 is bound at the lower end of the lower extension plate 7 by a rubber sleeve, so that the lower extension plate is convenient to replace. The end sleeve 6 and the downward extending plate 7 are both made of galvanized steel sheets. The length of the upper color bar 4 is slightly larger than the width of the end of the overhanging piece, preferably 2mm larger.
When the retaining wall is used, the wall surface of the retaining wall 1 is marked according to the area of the culture stone, the position of the culture stone is determined, the number and the positions of the expansion bolts 2 and the overhanging pieces 3 are determined according to the size and the weight of the culture stone, and the expansion bolts 2 and the overhanging pieces 3 are fixed well. The coloring strip 4 of the above tool is dipped with a dye. The tool is sleeved on the overhanging end of each overhanging piece 3, then the cultural stone to be fixed is horizontally pushed forwards according to the marking position determined in advance until the cultural stone is in light contact with the coloring strip 4 of the tool, the dye on the coloring strip 4 is adhered to the cultural stone 5, the position of the cultural stone 5 with the dye is the position needing slotting, the width of the slotting is the same as the length of the coloring strip 4, and is slightly larger than the width of the end of the overhanging piece, and the width is preferably 2 mm.
Although the preferred embodiments of the present invention have been described with reference to the accompanying drawings, the present invention is not limited to the above-mentioned embodiments, which are only illustrative and not restrictive, and those skilled in the art can make many forms without departing from the spirit and scope of the present invention, which is within the scope of the present invention.

Claims (5)

1. The utility model provides a instrument that is used for retaining wall external culture stone fluting location, its characterized in that, includes the pot head of suit at an overhanging end the top rigid coupling of pot head has rather than the vertically board that stretches down the lower extreme parcel of board has the upper color strip, the end of upper color strip and overhanging piece is parallel in same horizontal plane, just the length of upper color strip and the width adaptation of an end of encorbelmenting.
2. A tool for grooving and positioning an externally hung culture stone on a retaining wall according to claim 1, wherein the coloring strip is made of hard sponge.
3. A tool for grooving and positioning an externally hung culture stone on a retaining wall according to claim 1, wherein the coloring strip is bound to the lower end of the downward extending plate by a rubber sleeve.
4. A tool for grooving and positioning an externally hung culture stone on a retaining wall according to claim 1, wherein the end sleeve and the downward extending plate are both made of galvanized steel.
5. A tool for grooving and positioning an externally hung cultural stone on a retaining wall according to claim 1, wherein the length of the coloring strip is 2mm greater than the width of the end of the overhanging piece.
CN201922085822.5U 2019-11-28 2019-11-28 A instrument that is used for external culture stone fluting of retaining wall to fix a position Active CN211616195U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922085822.5U CN211616195U (en) 2019-11-28 2019-11-28 A instrument that is used for external culture stone fluting of retaining wall to fix a position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922085822.5U CN211616195U (en) 2019-11-28 2019-11-28 A instrument that is used for external culture stone fluting of retaining wall to fix a position

Publications (1)

Publication Number Publication Date
CN211616195U true CN211616195U (en) 2020-10-02

Family

ID=72626943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922085822.5U Active CN211616195U (en) 2019-11-28 2019-11-28 A instrument that is used for external culture stone fluting of retaining wall to fix a position

Country Status (1)

Country Link
CN (1) CN211616195U (en)

Similar Documents

Publication Publication Date Title
CN104889967A (en) Planar arc marking tool and application
CN211616195U (en) A instrument that is used for external culture stone fluting of retaining wall to fix a position
CN109227972B (en) Stone natural surface processing tool
CN208205979U (en) Soil thickness measuring device
CN1948939A (en) Ground drill
CN110815607B (en) Intermittent manual mushroom stone piece knocking machine
CN211662944U (en) English scriber
CN205255847U (en) Marker used for english teaching
CN211006276U (en) Paver operation elevation lofting detection auxiliary device
CN204552636U (en) A kind of centralizer that can reduce frictionally damage
CN211590755U (en) Self-absorption fixed type multipoint punching positioning tool for irregular plates
CN209820306U (en) Auxiliary ruler for poster of billboard
CN209194305U (en) Adjustable cover for manhole set cuts device
CN203681097U (en) Ruler for English teaching
CN216884653U (en) Device for adjusting thickness of granite
CN207700635U (en) A kind of inner corner trim trowel
CN209615480U (en) A kind of tool assisting butt
CN216115680U (en) Device capable of finding out parallel lines quickly
CN211396476U (en) A lofting instrument for fitment
CN213969133U (en) Perforating device is used in installation of portable bill-board
CN201979946U (en) Teaching scriber
CN209839321U (en) Simple and easy secret slight irrigation pipe laying device
CN210180979U (en) Engineering supervision is with detecting instrument
CN202356670U (en) Drilling template for back wall panel on speed increasing frame of wind power equipment
CN109030149A (en) Rebound method in concrete compressive strength detection is using slide bar scribing line auxiliary tool and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.

Address before: 300451 no.4919, Tanggu new North Road, Binhai New Area, Tianjin

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: The First Construction Co.,Ltd. of China Construction Sixth Engineering Bureau

Address before: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee before: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.