CN211597964U - Instrumentization assembled flower bed flag platform - Google Patents

Instrumentization assembled flower bed flag platform Download PDF

Info

Publication number
CN211597964U
CN211597964U CN201922203367.4U CN201922203367U CN211597964U CN 211597964 U CN211597964 U CN 211597964U CN 201922203367 U CN201922203367 U CN 201922203367U CN 211597964 U CN211597964 U CN 211597964U
Authority
CN
China
Prior art keywords
flag
flagpole
flag stand
water injection
stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922203367.4U
Other languages
Chinese (zh)
Inventor
朱嘉骐
唐建兵
张豪
袁春华
陈祖平
陈晓晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LONGXIN CONSTRUCTION GROUP CO Ltd
Original Assignee
LONGXIN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LONGXIN CONSTRUCTION GROUP CO Ltd filed Critical LONGXIN CONSTRUCTION GROUP CO Ltd
Priority to CN201922203367.4U priority Critical patent/CN211597964U/en
Application granted granted Critical
Publication of CN211597964U publication Critical patent/CN211597964U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a tool-mounted flower bed flag stand, which comprises a flag stand body and a flagpole, wherein the flag stand body comprises a rack and a decoration panel, and the rack is a stepped framework component formed by welding angle steel; the flagpole is a telescopic rod, the top of the flag stand body is provided with a vertical threaded hole which is butted with the flagpole, and one end of the flagpole is provided with an external thread matched with the threaded hole; the telescopic rod comprises an outer cylinder and an inner cylinder which is sleeved in the outer cylinder and consists of a plurality of sections of telescopic cylinders, and the plurality of sections of telescopic cylinders are in threaded fit; the water injection cavity is further formed in the flag stand body, the water injection port is formed in the back face of the flag stand body, the water outlet hole is formed in the lower portion of the flag stand body, and the water injection port and the water outlet hole are communicated with the water injection cavity. The utility model discloses simple structure, convenient operation has shortened the construction period of flag platform promptly, has reduced installation cost, and convenient the dismantlement is again, but the circulation turnover use, non-staining environment.

Description

Instrumentization assembled flower bed flag platform
Technical Field
The utility model relates to a construction field especially relates to an instrument-like assembled flower bed flag platform.
Background
The traditional flag platform in engineering construction usually adopts the form of concrete foundation and brick platform body, still need plaster the masonry wall body in its work progress, need paste the face brick to the wall body and decorate, and the construction process is many, can not have enough to meet the need, and flag platform cost is with high costs and produce a large amount of harmful building rubbish, and is counter to green energy-conserving construction.
SUMMERY OF THE UTILITY MODEL
In order to solve the above-mentioned defects, the utility model aims to provide an instrumental assembled flower bed flag platform which is easy and simple to handle, can be used repeatedly, has low cost, is environment-friendly and attractive.
In order to achieve the above object, the utility model discloses a following technical scheme realizes: a tool-mounted flower bed flag stand comprises a flag stand body and a flagpole, wherein the flag stand body comprises a stand and a decoration panel, and the stand is a stepped framework assembly formed by welding angle steel; the flagpole is a telescopic rod, a vertical threaded hole in butt joint with the flagpole is formed in the top of the flag stand body, and an external thread matched with the threaded hole is formed in one end of the flagpole; the telescopic rod comprises an outer cylinder and an inner cylinder which is sleeved in the outer cylinder and consists of a plurality of sections of telescopic cylinders, and the plurality of sections of telescopic cylinders are in threaded fit; still be equipped with the water injection chamber in the flag platform body, the back of flag platform body is equipped with the water filling port, the lower part of flag platform body is equipped with the apopore, water filling port and apopore all communicate with the water injection chamber.
The depth of the threaded hole is 0.5m-1.2 m.
Holes are formed in four corners of the flag stand body.
The decorative panel comprises a wood template and an aluminum surface layer bonded on the outer surface of the wood template.
The water injection cavity is made of glass fiber reinforced plastics.
The utility model has the advantages that: the utility model discloses simple structure, convenient operation.
1. The flag platform can be customized, the standardized production of the flag platform is realized, and the construction speed of the temporary flag platform on the construction site is greatly improved.
2. The installation and the disassembly are very convenient, the investment of the expense of temporary facilities for building construction is saved, and the construction cost is saved.
3. The temporary flag platform for the construction site is effectively solved, the construction procedures are multiple, the construction speed is low, and the like.
4. The garbage-free turnover of all components is realized, no construction garbage is generated in the dismounting and mounting process, the environment is protected, and green construction is realized.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Wherein: 1. the novel water injection flag pole comprises a rack, 2 parts of a decoration panel, 3 parts of a flag pole, 4 parts of a threaded hole, 5 parts of an outer barrel, 6 parts of an inner barrel, 7 parts of a water injection cavity, 8 parts of a water injection port, 9 parts of a water outlet hole, 10 parts of a hole.
Detailed Description
The following describes embodiments of the present invention with reference to the drawings.
As shown in fig. 1, the tool-mounted flower bed flag stand comprises a flag stand body and a flag pole 3, wherein the flag stand body comprises a stand 1 and a decoration panel 2, and holes 10 are arranged at four corners of the flag stand body. The decorative panel 2 comprises a wood template and an aluminum surface layer bonded on the outer surface of the wood template. The rack 1 is a step type framework component formed by welding angle steel; the flag pole 3 is a telescopic pole, a vertical threaded hole 4 which is in butt joint with the flag pole 3 is formed in the top of the flag stand body, and the hole depth of an external threaded hole 4 which is matched with the threaded hole 4 and is formed in one end of the flag pole 3 is 0.5-1.2 m. The telescopic rod comprises an outer cylinder 5 and an inner cylinder 6 which is sleeved in the outer cylinder 5 and consists of a plurality of sections of telescopic cylinders, and the plurality of sections of telescopic cylinders are in threaded fit; the flag stand body is also internally provided with a water injection cavity 7, and the water injection cavity 7 is made of glass fiber reinforced plastics. The back of the flag stand body is provided with a water injection port 8, the lower part of the flag stand body is provided with a water outlet hole 9, and the water injection port 8 and the water outlet hole 9 are both communicated with a water injection cavity 7.
The utility model discloses theory of operation and working process:
the utility model discloses set up the flag platform into 1 surface of rack and cover decoration panel 2, realize the quick preparation of flag platform, not only guarantee the appearance structure, also guarantee pleasing to the eye effect. The decoration panel 2 comprises the plank sheathing and the aluminium face layer of bonding at the plank sheathing surface, has sufficient use strength, light in weight moreover, the dismouting of conveniently carrying. The vertical threaded hole 4 that the screw hole 4 butt joint of flagpole 3 is equipped with at this body top of flag platform, makes the flagpole installation dismantle more convenient, does not need extra bolt etc.. The flagpole adopts the telescopic pole, and the practicality is stronger, and height control scope is big, is applicable to various occasions. The utility model discloses a flag platform body increases water injection chamber 7, can increase the stability of flag platform body when using the water injection, also can be when idle drainage to alleviate the weight of flag platform body, convenient transportation.
The utility model discloses simple structure, convenient operation has shortened the construction period of flag platform promptly, has reduced installation cost, and convenient the dismantlement is again, but the circulation turnover use, non-staining environment.
1. The flag platform can be customized, the standardized production of the flag platform is realized, and the construction speed of the temporary flag platform on the construction site is greatly improved.
2. The installation and the disassembly are very convenient, the investment of the expense of temporary facilities for building construction is saved, and the construction cost is saved.
3. The temporary flag platform for the construction site is effectively solved, the construction procedures are multiple, the construction speed is low, and the like.
4. The garbage-free turnover of all components is realized, no construction garbage is generated in the dismounting and mounting process, the environment is protected, and green construction is realized.

Claims (5)

1. A tool-mounted flower bed flag stand comprises a flag stand body and a flagpole, wherein the flag stand body comprises a stand and a decoration panel, and the stand is a stepped framework assembly formed by welding angle steel; the flagpole is the telescopic link, its characterized in that: a vertical threaded hole which is butted with the flagpole is formed in the top of the flag stand body, and an external thread matched with the threaded hole is formed in one end of the flagpole; the telescopic rod comprises an outer cylinder and an inner cylinder which is sleeved in the outer cylinder and consists of a plurality of sections of telescopic cylinders, and the plurality of sections of telescopic cylinders are in threaded fit; still be equipped with the water injection chamber in the flag platform body, the back of flag platform body is equipped with the water filling port, the lower part of flag platform body is equipped with the apopore, water filling port and apopore all communicate with the water injection chamber.
2. The instrumented assembled flower bed flag stand of claim 1, wherein: the depth of the threaded hole is 0.5m-1.2 m.
3. The instrumented assembled flower bed flag stand of claim 1, wherein: holes are formed in four corners of the flag stand body.
4. The instrumented assembled flower bed flag stand of claim 1, wherein: the decorative panel comprises a wood template and an aluminum surface layer bonded on the outer surface of the wood template.
5. The instrumented assembled flower bed flag stand of claim 1, wherein: the water injection cavity is made of glass fiber reinforced plastics.
CN201922203367.4U 2019-12-11 2019-12-11 Instrumentization assembled flower bed flag platform Expired - Fee Related CN211597964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922203367.4U CN211597964U (en) 2019-12-11 2019-12-11 Instrumentization assembled flower bed flag platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922203367.4U CN211597964U (en) 2019-12-11 2019-12-11 Instrumentization assembled flower bed flag platform

Publications (1)

Publication Number Publication Date
CN211597964U true CN211597964U (en) 2020-09-29

Family

ID=72591596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922203367.4U Expired - Fee Related CN211597964U (en) 2019-12-11 2019-12-11 Instrumentization assembled flower bed flag platform

Country Status (1)

Country Link
CN (1) CN211597964U (en)

Similar Documents

Publication Publication Date Title
CN109518989B (en) Multifunctional supporting jacking device for assembled building
CN202265937U (en) Decorative roman column structure
CN108661202A (en) A kind of large area hollow out lattice brick curtain wall construction modelled after an antique and construction method
CN203821961U (en) Assembled-type wall
CN107178173A (en) A kind of concrete curtain wall plate being made up of cellular board component and preparation method
CN211597964U (en) Instrumentization assembled flower bed flag platform
CN207808032U (en) A kind of cement base building materials stripper apparatus
CN207420088U (en) A kind of detachable combination cornice for facade rebuilding construction
CN209339738U (en) A kind of novel fabricated enclosure wall
CN205369627U (en) Be suitable for component formula curtain system of dry construction
CN209958656U (en) Connection node structure for stone and steel column
CN2937291Y (en) Composite wall brick
CN2913498Y (en) Hall column of wood structure building
CN206902768U (en) A kind of post-cast strip adjustable supporting
CN208088511U (en) The combination assembled building element of steel-wood structure
CN211572085U (en) A wallboard connection major structure for assembly type structure
CN111809792B (en) Assembled precast concrete wallboard
CN212201109U (en) Assembled ceramic tile heat preservation intergral template
CN208456101U (en) A kind of housing construction scaffold
CN208685979U (en) A kind of decoration integrated heat-insulation wall plate of separate assembling
CN207402949U (en) A kind of prefabricated panel for concrete prefabricated element production line positions hole tool
CN201007057Y (en) Wooden-plastic square column
CN207277601U (en) A kind of lightweight steel construction assembles the metope modular system of decoration integrated inner wall of building
CN207829216U (en) A kind of light steel ecological wall of low/multilayer assembled
CN207110140U (en) A kind of honeycomb board member for being used to make concrete curtain wall plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200929