CN211597811U - Rail guard is used in civil engineering bridge construction - Google Patents

Rail guard is used in civil engineering bridge construction Download PDF

Info

Publication number
CN211597811U
CN211597811U CN202020074909.2U CN202020074909U CN211597811U CN 211597811 U CN211597811 U CN 211597811U CN 202020074909 U CN202020074909 U CN 202020074909U CN 211597811 U CN211597811 U CN 211597811U
Authority
CN
China
Prior art keywords
rod
connecting rod
seat
protective net
guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020074909.2U
Other languages
Chinese (zh)
Inventor
樊易之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020074909.2U priority Critical patent/CN211597811U/en
Application granted granted Critical
Publication of CN211597811U publication Critical patent/CN211597811U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a guard rail for civil engineering bridge construction, which comprises a support fixedly connected to the ground; the support is provided with a first hinge seat; a connecting rod is connected in the first hinge seat; the other end of the connecting rod is connected in the second hinge seat; the second hinged seat is fixedly arranged on the guardrail rod; a locking assembly is arranged between the connecting rod and the guardrail rod; a protective net supporting rod is arranged outside the support; the protective net supporting rod is linked with the connecting rod. The utility model discloses a connecting rod that sets up between support and guardrail bar, the folding or the expansion state of adjustment guardrail bar that can be nimble, after guardrail bar expandes completely, can fix guardrail bar and the relative position of base through the locking subassembly, guarantee that it can not take place to remove at will. Meanwhile, in the process of unfolding the guard bar, the connecting rod can drive the protective net supporting rod to rotate outwards, so that a fulcrum is provided for installation of the protective net.

Description

Rail guard is used in civil engineering bridge construction
Technical Field
The utility model relates to a rail guard, concretely relates to rail guard is used in civil engineering bridge construction belongs to the construction equipment field.
Background
In the middle of bridge or civil engineering work progress, because the building object often is higher, in order to guarantee operation personnel's safety, need install the guardrail additional at the building edge, prevent that constructor from endangering life safety because unexpected falling. Because the particularity of building site can produce more building rubbish in the work progress, also can apply to auxiliary assembly such as some building apparatus, component, these apparatus often are small, and weight is great, in order to prevent it from dropping among the prior art, need bind the protection network on the guardrail, but adopt the guardrail of this kind of mode of binding to have higher height, otherwise the protection network can't expand completely, forms the fold, just can mix with dust in the fold, follow-up clearance is comparatively complicated. Therefore, it is necessary to design a guard rail to facilitate installation of a guard net.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at overcoming the defect among the prior art, provide a rail guard is used in civil engineering bridge construction, simple to use, the dismouting is swift, and the protecting effect is good.
The guard rail for civil engineering bridge construction designed for achieving the purpose comprises a support fixedly connected to the ground; the support is provided with a first hinge seat; the connecting rod is connected in the hinged seat; the other end of the connecting rod is connected in the second hinge seat; the second hinged seat is fixedly arranged on the guardrail rod; a locking assembly is arranged between the connecting rod and the guardrail rod; a protective net supporting rod is arranged outside the support; and a transmission mechanism is connected between the protective net supporting rod and the connecting rod.
Preferably, the connecting rods comprise a plurality of connecting rods; each connecting rod is parallel to each other; the locking assembly comprises an angle seat, a locking seat and a pressing handle.
The connecting rod can be hinged through the connecting rod, and the unfolding or folding state of the guardrail can be adjusted.
Preferably, the corner seat is arranged at the upper end of the connecting rod positioned at the outermost side; the corner seat is provided with a vertical part and a horizontal part; the locking seat is fixedly connected to the bottom of the guardrail rod.
Preferably, the surface of the horizontal part is provided with a jack; the horizontal part and the vertical part are arranged at a right angle; a bolt matched with the jack is arranged in the locking seat; the upper end of the angle seat is hinged with the locking seat.
Preferably, the top end of the bolt is connected with the pressing handle; the locking seat is provided with an assembly groove body relative to the pressing handle; the pressing handle is connected in the assembling groove body through an elastic piece.
By pressing the handle and the latch, the extended state of the guardrail can be locked for use.
Preferably, the bottom of the support is provided with a cavity for placing a protective net supporting rod; the contact rod is arranged in the extending direction of the connecting rod.
When the guardrail is unfolded and the angle of the connecting rod gradually increases, the contact rod at the tail end of the connecting rod can be contacted with the supporting rod of the protective net to be abutted against the supporting rod of the protective net, so that the supporting rod of the protective net is outwards overturned until the supporting rod is perpendicular to the supporting seat.
Preferably, the protective net supporting rod is arranged in the cavity through a torsion spring; the first contact rod is in contact with the inner end of the protective net supporting rod.
The utility model discloses a connecting rod that sets up between support and guardrail bar, the folding or the expansion state of adjustment guardrail bar that can be nimble, after guardrail bar expandes completely, can fix guardrail bar and the relative position of base through the locking subassembly, guarantee that it can not take place to remove at will. Meanwhile, in the process of unfolding the guard bar, the connecting rod can drive the protective net supporting rod to rotate outwards, so that a fulcrum is provided for installation of the protective net.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the locking assembly.
Fig. 3 is a schematic structural view of the pressing handle.
Fig. 4 is a schematic structural view between the supporting rods and the connecting rods of the protection net.
Fig. 5 is a schematic structural view of the supporting rod and the connecting rod of the protection net in another state.
In the figure, 1 is a support, 2 is a first hinged seat, 3 is a connecting rod, 4 is a second hinged seat, 5 is a guard rail, 6 is a protective net supporting rod, 7 is an angle seat, 8 is a locking seat, 8.1 is a bolt, 9 is a pressing handle, and 10 is a contact rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Terms used herein, including technical and scientific terms, have the same meaning as terms commonly understood by one of ordinary skill in the art, unless otherwise defined. It will be understood that terms defined in commonly used dictionaries have meanings that are consistent with their meanings in the prior art.
Referring to fig. 1 to 5, a guard rail for civil engineering bridge construction includes a support 1 fixedly connected to the ground; the support 1 is provided with a first hinge seat 2; the first hinge base 2 is internally connected with a connecting rod 3; the other end of the connecting rod 3 is connected in the second hinge seat 4; the second hinged seat 4 is fixedly arranged on the guardrail rod 5; a locking assembly is arranged between the connecting rod and the guardrail rod; a protective net supporting rod 6 is arranged outside the support 1; the protective net supporting rod 6 is linked with the connecting rod 3.
Specifically, the connecting rod is connected between support and guardrail bar through first articulated seat and the articulated seat of second, through promoting guardrail bar, can adjust the contained angle between connecting rod and the support to reach the purpose of adjustment guardrail bar state. Meanwhile, when the angle of the connecting rod changes, the connecting rod and the protective net supporting rod 6 are in linkage relation, the protective net supporting rod is turned outwards from the support 1, and a supporting point is provided for installation of the protective net.
Furthermore, the connecting rods 3 comprise a plurality of connecting rods; each connecting rod 3 is parallel to each other; the locking assembly comprises an angle seat 7, a locking seat 8 and a pressing handle 9.
Furthermore, the corner seat 7 is arranged at the upper end of the connecting rod 3 positioned at the outermost side; the corner seat 7 is provided with a vertical part and a horizontal part; the locking seat 8 is fixedly connected to the bottom of the guardrail bar 5.
Specifically, in the present embodiment, the corner seat 7 is fixed to the end of the outer link, and the upper end of the corner seat is hinged to the locking seat 8.
Furthermore, the surface of the horizontal part is provided with a jack; the horizontal part and the vertical part are arranged at a right angle; a bolt 8.1 matched with the jack is arranged in the locking seat 8; the upper end of the angle seat is hinged with the locking seat.
Specifically, after guardrail bar expandes completely, loosen and press handle 9, the elastic component can push down the bolt for the bolt is from 8 internal downstream of locking seats, and enter into the jack on the corner seat 7, make the angle that is called and between the locking seat unable change again, because locking seat 8 and guardrail bar fixed connection, so guardrail bar has also realized the fixed of position.
When the guardrail needs to be folded, the pressing handle 9 is pressed.
Furthermore, the top end of the bolt 8.1 is connected with the pressing handle 9; the locking seat is provided with an assembly groove body relative to the pressing handle; the pressing handle is connected in the assembling groove body through an elastic piece.
Further, a cavity for placing a protective net supporting rod 6 is formed at the bottom of the support 1; and a contact rod 10 arranged in the extending direction of the connecting rod 3.
Furthermore, the protective net supporting rod 6 is arranged in the cavity through a torsion spring; the contact rod is contacted with the inner end of the protective net support rod.
Specifically, in this embodiment, in the process of the connecting rod 3 turning upwards, the contact rod 10 of the extending portion thereof presses down the inner end of the supporting rod of the protection net (connected to the inside of the cavity through the torsion spring), and the other end of the supporting rod of the protection net turns outwards towards the inside of the cavity, if the connecting rod is folded, the contact rod is separated from the inner end of the supporting rod of the protection net, and the supporting rod of the protection net returns to the inside of the cavity again due to the existence of the torsion spring.
For making contact bar 10 bottom can contact with protection network bracing piece inner, need set up a circular arc arch at contact bar 10 tip, when the connecting rod is in fold condition, the circular arc arch can not contact with the protection network bracing piece, when the connecting rod was in upturning in-process, because the contact bar can be along with its angular variation and downwardly rotating, so the circular arc arch on the contact bar can ejecting crashproof net bracing piece.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the present invention can be modified or replaced by other means without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims.

Claims (7)

1. The utility model provides a rail guard is used in civil engineering bridge construction which characterized in that: comprises a support (1) fixedly connected to the ground; the support (1) is provided with a first hinged seat (2); a connecting rod (3) is connected in the first hinged seat (2); the other end of the connecting rod (3) is connected into the second hinge seat (4); the second hinged seat (4) is fixedly arranged on the guardrail rod (5); a locking assembly is arranged between the connecting rod and the guardrail rod; a protective net supporting rod (6) is arranged on the outer side of the support (1); the protective net supporting rod (6) is linked with the connecting rod (3).
2. The guard rail for civil engineering bridge construction according to claim 1, characterized in that: the connecting rods (3) comprise a plurality of connecting rods; each connecting rod (3) is parallel to each other; the locking assembly comprises an angle seat (7), a locking seat (8) and a pressing handle (9).
3. The guard rail for civil engineering bridge construction according to claim 2, characterized in that: the angle seat (7) is arranged at the upper end of the connecting rod (3) positioned at the outermost side; the corner seat (7) is provided with a vertical part and a horizontal part; the locking seat (8) is fixedly connected to the bottom of the guardrail rod (5).
4. The guard rail for civil engineering bridge construction according to claim 3, characterized in that: the surface of the horizontal part is provided with a jack; the horizontal part and the vertical part are arranged at a right angle; a bolt (8.1) matched with the jack is arranged in the locking seat (8); the upper end of the angle seat is hinged with the locking seat.
5. The guard rail for civil engineering bridge construction according to claim 4, characterized in that: the top end of the bolt (8.1) is connected with a pressing handle (9); the locking seat is provided with an assembly groove body relative to the pressing handle; the pressing handle is connected in the assembling groove body through an elastic piece.
6. The guard rail for civil engineering bridge construction according to claim 1, characterized in that: the bottom of the support (1) is provided with a cavity for placing a protective net supporting rod (6); and the contact rod (10) is arranged in the extending direction of the connecting rod (3).
7. The guard rail for civil engineering bridge construction according to claim 6, characterized in that: the protective net supporting rod (6) is arranged in the cavity through a torsional spring; the contact rod is contacted with the inner end of the protective net support rod.
CN202020074909.2U 2020-01-14 2020-01-14 Rail guard is used in civil engineering bridge construction Expired - Fee Related CN211597811U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020074909.2U CN211597811U (en) 2020-01-14 2020-01-14 Rail guard is used in civil engineering bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020074909.2U CN211597811U (en) 2020-01-14 2020-01-14 Rail guard is used in civil engineering bridge construction

Publications (1)

Publication Number Publication Date
CN211597811U true CN211597811U (en) 2020-09-29

Family

ID=72576902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020074909.2U Expired - Fee Related CN211597811U (en) 2020-01-14 2020-01-14 Rail guard is used in civil engineering bridge construction

Country Status (1)

Country Link
CN (1) CN211597811U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113774838A (en) * 2021-09-23 2021-12-10 吴学峰 Novel multifunctional protective fence special for road and bridge green belt

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113774838A (en) * 2021-09-23 2021-12-10 吴学峰 Novel multifunctional protective fence special for road and bridge green belt

Similar Documents

Publication Publication Date Title
US2650014A (en) Stepladder
CN211597811U (en) Rail guard is used in civil engineering bridge construction
EP1788167A1 (en) Collapsible platform
GB1526323A (en) Mobile elevationally adjustable folding stage
CN112299290B (en) Adjustable multifunctional building construction platform
GB1599581A (en) Retractable fuselage mounted undercarriage for an aircraft
CN211198527U (en) Working bucket applied to aerial work platform
CN112282336A (en) Folding dual-purpose scaffold
CN208363550U (en) Folding is walked on stage mechanism
CN204225755U (en) Ground foot support assembly
EP2378052A2 (en) Folding stepladder
CN203569923U (en) Foldable stage
CN206367504U (en) A kind of foldable baby trolley vehicle frame and foldable baby trolley
CN209892255U (en) Support device and anchor rod drill carriage
CN217206245U (en) Cat ladder for building
CN210055328U (en) Linkage retractable arm brace sofa bed
EP1527243B1 (en) Erectable canopy with reinforced roof structure
CN205935607U (en) Portable folding scaffold frame
CN212044560U (en) Turnover pedal
CN106049224B (en) A kind of hydraulic spreader in large displacement expansion joint gap
CN207657884U (en) A kind of perambulator finger turning joint
CN211298797U (en) Table with foldable side wings
CN106193564B (en) A kind of locking plate pendulum lock fixed pattern operation console
CN218912889U (en) Convertible pavement slab device suitable for multiple limit conditions
CN104295226A (en) Floor foot supporting assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200929

Termination date: 20220114