CN211597808U - Protective net for constructional engineering - Google Patents

Protective net for constructional engineering Download PDF

Info

Publication number
CN211597808U
CN211597808U CN202020044466.2U CN202020044466U CN211597808U CN 211597808 U CN211597808 U CN 211597808U CN 202020044466 U CN202020044466 U CN 202020044466U CN 211597808 U CN211597808 U CN 211597808U
Authority
CN
China
Prior art keywords
protective net
stake
originated
fixed
initial pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020044466.2U
Other languages
Chinese (zh)
Inventor
孙晓椰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020044466.2U priority Critical patent/CN211597808U/en
Application granted granted Critical
Publication of CN211597808U publication Critical patent/CN211597808U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a protective net for construction engineering, which belongs to the technical field of construction engineering, and the technical proposal is characterized in that the protective net comprises an initial pile, wherein the lower end of the initial pile is welded with a fixed seat, the top end of the initial pile is downwards provided with a cylindrical groove, the right end surface of the initial pile is close to the front side and penetrates through the side wall and the cylindrical groove to form a through groove, the front end surface of the initial pile extends out of the outer end of the initial pile towards the right side, the other end of the extending position of the initial pile, which corresponds to the through groove position, is fixedly provided with a first clamping plate, the utility model has the advantages that the initial pile and a plurality of fixed piles are arranged, and the fixed piles and the initial pile are fixed to the protective net by clamping and clamping, so that the installation, disassembly and recovery are extremely convenient and labor-saving, the protective net is prevented from, can carry out quick effectual protection to irregular topography, and can in time withdraw after using, the extravagant resource does not.

Description

Protective net for constructional engineering
Technical Field
The utility model relates to an elevator guide rail technical field, in particular to protection network for building engineering.
Background
The protection network that current building engineering used has a lot of all to be temporary, it is all very inconvenient when assembling and dismantling, and very waste time, when the protection network is dismantled, the protection network is inconvenient to be deposited, relatively occupation space, it is also very inconvenient to open when using and assemble, excellent in use effect, and current protection network is when using, most need tailor the protection network, the cutting, after the installation is used, most unable reuse after the dismantlement, comparatively extravagant resource.
SUMMERY OF THE UTILITY MODEL
For solving the problem that proposes among the above-mentioned background art, the utility model provides a protection network for building engineering, this protection network include originated stake and spud pile, and the structure is comparatively simple, places joint protection net book back in the originated stake, pulls out, and a plurality of spud piles carry out the joint fixed, and installation, dismantlement are all comparatively convenient, laborsaving, save time, and comparatively environmental protection, not resource-wasting.
The utility model is realized in such a way, a protective net for construction engineering comprises an initial pile, wherein the lower end of the initial pile is welded with a fixed seat, the top end of the initial pile is downwards provided with a cylindrical groove, the right end surface of the initial pile is close to the front side and penetrates through the side wall and the cylindrical groove to form a through groove, the front end surface of the initial pile extends out of the outer end of the initial pile towards the right side, the other end of the extending position of the initial pile, which corresponds to the through groove position, is fixedly provided with a first clamping plate, the right side of the initial pile is fixedly provided with a plurality of fixed piles, each fixed pile comprises a fixed plate and a base, the fixed plate is welded at the position, which is close to the front side, of the upper end surface of the base, is fixedly provided with a second clamping plate, the upper end and the lower end of the extending part of the initial pile, the upper end and the lower, the inside joint of cylindrical inslot has the protection network, the protection network stretches out to run through behind the logical groove, extends to the opposite side of spud pile through fixed plate and second grip block.
In order to make originated stake and spud pile can be better fix on ground, conduct the utility model relates to a protection network tower is preferred for building engineering, the four corners department of fixing base and base all runs through and has seted up the fixed orifices, the inside equal joint of fixed orifices has the inserted bar.
In order to make the fixed protection network that the joint board can be better, as the utility model relates to a protection network tower for building engineering is preferred, equal joint threaded rod between two threaded hole inner walls that correspond, the threaded rod runs through the part that corresponds the screw hole front side and is protruding form, and the opposite side runs through the partial outer wall that corresponds the screw hole outside and has cup jointed lock nut.
In order to make the resistance between grip block and the protection network bigger, the protection network is difficult to drop, as the utility model relates to a protection network tower is preferred for building engineering, the inner wall of first grip block, second grip block and fixed plate is rough form.
When making grip block lower extreme fixed, not influence the protection network, do not destroy the protection network, and guaranteed that the protection network is direct not contact with ground, conduct the utility model relates to a protection network tower for building engineering is preferred, the height that lateral wall lower extreme screw hole before the initial stake was highly greater than to minimum of cylindrical groove.
When making the grip block upper end fixed, do not influence the protection network, do not make the protection network receive the screw thread post to destroy, conduct the utility model relates to a protection network tower is preferred for building engineering, distance between two screw holes of terminal surface before the originated stake and the distance between two screw holes of first grip block all are greater than the height of protection network.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this kind of protection network for building engineering, through originated stake fixed joint protection net book back, pull out the protection network through leading to the groove, then use the spud pile centre gripping, and then continue to pull out the protection network, the spud pile is fixed can surround the protection network at complicated irregular topography, plays fine guard action, whole simple structure, it is comparatively convenient that the installation is dismantled, saves time, and can be very easy withdraw, the environmental protection utilization.
2. This kind of protection network for building engineering through grip block and spud pile and originated stake thread tightening for the protection network is fixed, and does not directly pass the protection network, does not destroy the protection network, and it is convenient to install, and recycle is also more convenient, and the protection network need not carry out specific tailor, cutting.
Drawings
Fig. 1 is an overall structure diagram of a protective net for construction engineering of the present invention;
fig. 2 is a cross-sectional structure diagram of an initial pile of the protective net for construction engineering of the present invention;
fig. 3 is a bottom structure diagram of a spud pile of the protective screening for construction engineering of the present invention;
fig. 4 is an enlarged side view of a position a of the protective net for construction engineering of the present invention;
in the figure, 1, the pile is started; 101. a fixed seat; 2. fixing the pile; 201. a fixing plate; 202. a base; 3. A cylindrical groove; 301. a through groove; 4. a first clamping plate; 5. a threaded hole; 501. a threaded rod; 502. locking the nut; 6. a fixing hole; 7. a protective net; 8. a second clamping plate; 9. and (4) inserting the rod.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. In addition, in the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
Referring to fig. 1 to 4, a protective net for construction engineering includes an initial pile 1, and is characterized in that: the lower end of an initial pile 1 is welded with a fixed seat 101, the top end of the initial pile 1 is downwards provided with a cylindrical groove 3, the right end surface of the initial pile 1 is close to the front side and penetrates through a side wall and the cylindrical groove 3 to be provided with a through groove 301, the front end surface of the initial pile 1 extends out of the outer end of the initial pile 1 towards the right side, the other end of the extending position of the initial pile 1 corresponding to the position of the through groove 301 is fixedly provided with a first clamping plate 4, the right side of the initial pile 1 is fixedly provided with a plurality of fixed piles 2, each fixed pile 2 comprises a fixed plate 201 and a base 202, the fixed plate 201 is welded at the position of the upper end surface of the base 202 close to the front side, the position of the upper end surface of the base 202 close to the rear side is fixedly provided with a second clamping plate 8, the upper end and the lower end of the extending part of the initial pile 1, the, after extending out of the through groove 301, the protection net 7 extends to the other side of the fixing pile 2 through the fixing plate 201 and the second clamping plate 8.
In this embodiment, through the fixed protection network 7 of originated stake 1 and the 2 joint of a plurality of spud piles that set up, and a plurality of spud piles 2 can be placed in different positions for protection network 7 can carry out effective, convenient guard action to irregular topography, and when dismantling, tear threaded rod 501 and lock nut 502 on first grip block 4 and the second grip block 8 down, alright effectively withdraw protection network 7, very convenient transport and removal, and can carry out the reutilization.
As a technical optimization scheme of the utility model, the fixed orifices 6 have all been seted up in the four corners department of fixing base 101 and base 202 through, and the inside equal joint of fixed orifices 6 has inserted bar 9.
In this embodiment, the insertion rod 9 is disposed inside the fixing hole 6 through the opened fixing hole 6, and the fixing base 101 and the base 202 are effectively fixed to the ground or an object by the insertion rod 9.
As the utility model discloses a technical optimization scheme, equal joint threaded rod 501 between two 5 inner walls of screw hole that correspond, threaded rod 501 run through out the part that corresponds 5 front sides of screw hole and is protruding form, and the opposite side runs through out the partial outer wall that corresponds the 5 outsides of screw hole and has cup jointed lock nut 502.
In this embodiment, equal joint threaded rod 501 between two corresponding screw hole 5 inner walls, the opposite side runs through out and has corresponded screw hole 5 outside partial outer wall and cup jointed lock nut 502, makes the better fixed of first grip block 4 and second grip block 8 through threaded rod 501 and lock nut 502, and then the better fixed of protection network 7.
As a technical optimization scheme of the utility model, the inner wall of first grip block 4, second grip block 8 and fixed plate 201 is rough form.
In this embodiment, the inner walls of the first clamping plate 4, the second clamping plate 8 and the fixing plate 201 are all rough, and the clamping plates and the protective net 7 are effectively fixed through the rough arrangement.
As a technical optimization scheme of the utility model, the minimum height that highly is greater than lateral wall lower extreme screw hole 5 before the originated stake 1 of cylindrical groove 3.
In this embodiment, the lowest height of the cylindrical groove 3 is greater than the height of the threaded hole 5 at the lower end of the front side wall of the initial pile 1, so that when the threaded rod 501 on the clamping plate is fixed, the integrity of the protective net 7 is not affected, and the bottom of the protective net 7 is not damaged, so that the protective net 7 can be used for multiple times.
As a technical optimization scheme of the utility model, the distance between two screw holes 5 of terminal surface before the originated stake 1 and the distance between two screw holes 5 of first grip block 4 all are greater than the height of protection network 7.
In this embodiment, the distance between two threaded holes 5 on the front end surface of the start pile 1 and the distance between two threaded holes 5 on the first clamping plate 4 are both greater than the height of the protection net 7, so that when the protection net 7 is fixed, the top end of the protection net 7 is not affected by the threaded rod 501.
The working principle is as follows: firstly, a worker puts a whole roll of a protection net 7 in a cylindrical groove 3 inside an initial pile 1, then pulls out the protection net 7 through a through groove 301, clamps and fixes the protection net 7 through a threaded rod 501 and a lock nut 502 by using a fixing plate 201 and a second clamping plate 8 through a threaded hole 5, further continues to pull out the protection net 7, continues to use a plurality of fixing piles 2 to fix the protection net 7, after the whole place required to be protected is well protected, clamps and fixes the protection net through the threaded rod 501 and the lock nut 502 by using the threaded hole 5 of the first clamping plate 4 corresponding to the position of the initial pile 1, further effectively fixes the insertion rod 9 with the ground through the fixing seat 101 and the fixing holes 6 at the four corners of the base 202, when the disassembly is required, the worker pulls out the insertion rod 9, disassembles the first clamping plate 4 and the plurality of second clamping plates 8, rolls up the protection net 7, stacks the plurality of fixing piles 2 with the initial pile 1, also comparatively save space, convenient transportation, removal, whole protection network 7 installation is convenient, also can carry out quick effectual protection to irregular topography, and does not destroy protection network 7's wholeness, can reuse comparatively environmental protection.
The above description is only exemplary of the present invention and should not be construed as limiting the present invention, and any modifications, equivalents and improvements made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (6)

1. The utility model provides a protection network for building engineering, includes originated stake (1), its characterized in that: the lower extreme welding of originated stake (1) has fixing base (101), cylindrical groove (3) have been seted up downwards on originated stake (1) top, originated stake (1) right-hand member face runs through lateral wall and cylindrical groove (3) near the front side and has seted up logical groove (301), originated stake (1) front end extends originated stake (1) outer end to the right side, originated stake (1) extended position corresponds logical groove (301) position other end and fixes and is provided with first grip block (4), the right side of originated stake (1) is fixed and is provided with a plurality of spuds (2), spud (2) are including fixed plate (201) and base (202), fixed plate (201) welding is in the position that the up end is close to the front side in base (202), the position that the up end is close to the rear side in base (202) is fixed and is provided with second grip block (8), the upper and lower extreme of originated stake (1) extension portion, Threaded holes (5) are all run through in the four corners department of the last lower extreme of first grip block (4), fixed plate (201) and the four corners department of second grip block (8), the inside joint of cylindrical groove (3) has protection network (7), protection network (7) stretch out to run through logical groove (301) back, extend to the opposite side of spud pile (2) through fixed plate (201) and second grip block (8).
2. A protective net for constructional engineering according to claim 1, characterized in that: the fixing base (101) and the four corners of base (202) all run through and have seted up fixed orifices (6), inside equal joint of fixed orifices (6) has inserted bar (9).
3. A protective net for constructional engineering according to claim 1, characterized in that: threaded rod (501) are all clamped between the inner walls of the two corresponding threaded holes (5), the part of the threaded rod (501) penetrating out of the front side of the corresponding threaded hole (5) is in a convex shape, and the other side of the threaded rod penetrates out of the outer wall of the part of the outer side of the corresponding threaded hole (5) and is sleeved with a locking nut (502).
4. A protective net for constructional engineering according to claim 1, characterized in that: the inner walls of the first clamping plate (4), the second clamping plate (8) and the fixing plate (201) are rough.
5. A protective net for constructional engineering according to claim 1, characterized in that: the lowest height of the cylindrical groove (3) is greater than the height of a threaded hole (5) at the lower end of the front side wall of the initial pile (1).
6. A protective net for constructional engineering according to claim 1, characterized in that: the distance between the two threaded holes (5) in the front end face of the initial pile (1) and the distance between the two threaded holes (5) in the first clamping plate (4) are both greater than the height of the protective net (7).
CN202020044466.2U 2020-01-09 2020-01-09 Protective net for constructional engineering Expired - Fee Related CN211597808U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020044466.2U CN211597808U (en) 2020-01-09 2020-01-09 Protective net for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020044466.2U CN211597808U (en) 2020-01-09 2020-01-09 Protective net for constructional engineering

Publications (1)

Publication Number Publication Date
CN211597808U true CN211597808U (en) 2020-09-29

Family

ID=72577693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020044466.2U Expired - Fee Related CN211597808U (en) 2020-01-09 2020-01-09 Protective net for constructional engineering

Country Status (1)

Country Link
CN (1) CN211597808U (en)

Similar Documents

Publication Publication Date Title
CN213391145U (en) Construction hanging flower basket is built in room
CN211473665U (en) Novel assembled steel-wood composite enclosure
CN211597808U (en) Protective net for constructional engineering
CN108487777B (en) Metal fence upright post
WO2018147680A1 (en) Structure and method for constructing temporary earth sheathing
CN210104674U (en) Hydraulic engineering slope bearing structure
KR20190110269A (en) Temporary soil retaining plate recovery unit and it''s recovery methods
CN211038073U (en) Anti-drop fence
CN213417826U (en) Foundation ditch support anti-drop reinforced structure
CN213596408U (en) Pipeline cathodic protection intelligent pile
CN213205024U (en) Ultra-thick ground is wall foundation ditch protector even
CN213572954U (en) Gable external scaffolding counterfort structure with adjustable pre-buried formula
CN210857211U (en) Fixing device for pile driver for preventing pile from inclining
CN211736673U (en) Prefabricated assembled type temporary building combined enclosing wall
CN209779882U (en) pre-buried device of steel pipe concrete and roof beam or floor connected node
CN218493069U (en) Tool type inclined-throwing support rod for door type scaffold
CN218715715U (en) Fence device
CN213806720U (en) Post-top steel structure reinforcing device
CN212896152U (en) Hydraulic engineering construction bank edge protection device
CN211775611U (en) Self-suspension type operating platform for formwork construction
CN216782195U (en) Horizontal formula of lying of concrete barrier prefabricated formwork device
CN217869963U (en) Side protection system for assembled bridge face
CN206902709U (en) A kind of piling equipment for freeway guardrail installation
CN209924942U (en) Special movable baffle device for catwalk of ocean module drilling machine
CN210767794U (en) Adjustable base of formwork scaffold erected on ground beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200929