CN211597094U - Steel pipe concrete column frame connection strutting arrangement - Google Patents

Steel pipe concrete column frame connection strutting arrangement Download PDF

Info

Publication number
CN211597094U
CN211597094U CN201922332591.3U CN201922332591U CN211597094U CN 211597094 U CN211597094 U CN 211597094U CN 201922332591 U CN201922332591 U CN 201922332591U CN 211597094 U CN211597094 U CN 211597094U
Authority
CN
China
Prior art keywords
cross beam
crossbeam
circular
flange
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922332591.3U
Other languages
Chinese (zh)
Inventor
邱英伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lianchuang Xinrui Design Consultant Wuhan Co ltd
Original Assignee
Lianchuang Xinrui Design Consultant Wuhan Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lianchuang Xinrui Design Consultant Wuhan Co ltd filed Critical Lianchuang Xinrui Design Consultant Wuhan Co ltd
Priority to CN201922332591.3U priority Critical patent/CN211597094U/en
Application granted granted Critical
Publication of CN211597094U publication Critical patent/CN211597094U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a steel pipe concrete column frame connection supporting device, which comprises a supporting column, wherein the left and right side walls of the upper part of the supporting column are horizontally aligned and provided with circular through holes, and the side walls of the supporting column positioned above and below the circular through holes are horizontally provided with screw rod through holes; the circular through hole on the left side of the support column is movably inserted with a left cross beam, and the outer wall of the left cross beam is fixedly welded with a left flange. The utility model discloses when fixed mounting right crossbeam and left crossbeam are carried out in the later stage, peg graft respectively in the circular perforation on the support column when now with right crossbeam and left crossbeam, then overlap left grip slipper and right grip slipper respectively on left crossbeam and right crossbeam, then two screw thread lead screw activities on the left grip slipper are pegged graft in flange, lead screw perforation and mounting hole, then use nut screw to twist to close fixedly, this kind of combination formula is very convenient, need not to use very much bolt fastening, and only need one to two operation workman can, the cost is lower.

Description

Steel pipe concrete column frame connection strutting arrangement
Technical Field
The utility model relates to a building concrete frame technical field specifically is a concrete filled steel tube column frame attach strutting arrangement.
Background
At present, most of building construction in China has great environmental pollution and needs a long construction period, and as the requirements of China on environmental protection and green sustainable development are higher and higher in recent years, the downtime every year is gradually prolonged. As a novel design concept, all or part of components of the fabricated building are prefabricated in a factory, so that the environment pollution is low, and the construction efficiency is high. However, most of fabricated buildings in practical engineering are steel structures or wood structures, and the material system is single.
Publication (announcement) No. CN209443568U discloses a steel tube type steel recycled concrete column PEC steel beam frame, which includes a square steel tube type steel recycled concrete column, PEC steel beams are fixedly connected to any two opposite side surfaces of the steel tube type steel recycled concrete column, and two arc-shaped replaceable members are fixedly connected between the steel tube type steel recycled concrete column and each PEC steel beam. Although the utility model relates to a steel pipe shaped steel recycled concrete post PEC girder steel frame has good bearing capacity and shock resistance, can meet the rapid recovery function of strong external force infringement back.
However, the inventor finds that the technical scheme still has at least the following defects:
this technical scheme adopts very many bolts to fix to all need extra bearing mechanism to set off the crossbeam during installation crossbeam, then operating personnel just can operate the installation, wastes time and energy, and the installation cost is higher.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete filled steel tube column frame attach strutting arrangement has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a steel pipe concrete column frame connection supporting device comprises a supporting column, wherein the left side wall and the right side wall of the upper part of the supporting column are horizontally provided with circular through holes in an aligned mode, and the side walls of the supporting column positioned above and below the circular through holes are horizontally provided with screw rod through holes; a left cross beam is movably inserted into the circular through hole positioned on the left side of the support column, a left flange is fixedly welded on the outer wall of the left cross beam, a left clamping seat is movably sleeved on the left cross beam, and a threaded screw rod is horizontally and fixedly connected to the upper part and the lower part of the left clamping seat;
a right cross beam is horizontally and movably penetrated in the circular through hole on the right side of the supporting column to the left, and a right flange is fixedly welded on the outer wall of the right cross beam; the right clamping seat is movably sleeved on the right cross beam, the upper portion and the lower portion of the right clamping seat are horizontally provided with mounting holes, the right end portion of the threaded screw rod movably penetrates through the mounting holes, and a nut is screwed on the right end portion of the threaded screw rod in the right side of the mounting holes.
As an optimized implementation mode of the utility model, the activity of screw lead screw runs through in left flange and right flange middle part.
As a preferred embodiment of the present invention, each of the threaded screw rods is movably penetrated through the screw rod perforation.
As a preferred embodiment of the utility model, right crossbeam left end fixedly connected with docking plug, docking plug and the right port driving fit of left crossbeam are pegged graft.
As a preferred embodiment of the present invention, the left flange is movably embedded in the recessed portion inside the left clamping seat.
As a preferred embodiment of the present invention, the right flange is movably embedded in the concave portion inside the right clamping seat.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses when fixed mounting right crossbeam and left crossbeam are carried out in the later stage, peg graft respectively in the circular perforation on the support column when now with right crossbeam and left crossbeam, then overlap left grip slipper and right grip slipper respectively on left crossbeam and right crossbeam, then two screw thread lead screw activities on the left grip slipper are pegged graft in flange, lead screw perforation and mounting hole, then use nut screw to twist to close fixedly, this kind of combination formula is very convenient, need not to use very much bolt fastening, and only need one to two operation workman can, the cost is lower.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic view of the overall structure of a concrete filled steel tube column frame connection supporting device of the present invention;
fig. 2 is a schematic side sectional view of a left clamping seat of the concrete filled steel tube column frame connection supporting device of the present invention;
fig. 3 is the utility model relates to a section structure schematic diagram is looked to concrete filled steel tube column frame attach strutting arrangement's right centre gripping seat side.
In the figure: the device comprises a support column 1, a threaded screw rod 2, a circular through hole 3, a butt plug 4, a left cross beam 5, a left flange 6, a left clamping seat 7, a right clamping seat 8, a right cross beam 9, a right flange 10, a nut 11, a screw rod through hole 12 and a mounting hole 13.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention; in the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected" and "disposed" are to be construed broadly, and may for example be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides a technical solution: a steel pipe concrete column frame connection supporting device comprises a supporting column 1, wherein the left side wall and the right side wall of the upper part of the supporting column 1 are horizontally provided with circular through holes 3 in an aligned mode, and the side walls of the supporting column 1, which are positioned above and below the circular through holes 3, are horizontally provided with screw rod through holes 12; a left cross beam 5 is movably inserted into a circular through hole 3 positioned at the left side of the support column 1, a left flange 6 is fixedly welded on the outer wall of the left cross beam 5, a left clamping seat 7 is movably sleeved on the left cross beam 5, and a threaded screw rod 2 is horizontally and fixedly connected to the upper part and the lower part of the left clamping seat 7;
a right cross beam 9 horizontally and movably penetrates through the circular through hole 3 on the right side of the support column 1 to the left, and a right flange 10 is fixedly welded on the outer wall of the right cross beam 9; the right grip slipper 8 has been cup jointed in the activity on the right crossbeam 9, mounting hole 13 has been seted up to the equal level in two parts about the right grip slipper 8, 2 right-hand member portion activities of screw lead screw run through in mounting hole 13, 2 right-hand member portion threads of screw lead screw that are located the mounting hole 13 right side are twisted and are closed nut 11, when fixed mounting right crossbeam 9 and left crossbeam 5 are carried out in the later stage, peg graft respectively in the circular perforation 3 on the support column 1 when right crossbeam 9 and left crossbeam 5 now, then overlap respectively left crossbeam 5 and right crossbeam 9 with left grip slipper 7 and right grip slipper 8, then two screw lead screw 2 activities on the left grip slipper 7 are pegged graft at the flange, lead screw perforation 12 and mounting hole 13 are interior, then use nut 11 threads to twist and close fixedly, this kind of combination formula is very convenient, need not to use very much bolt fastening, and only need one to two operation workman can, the cost is lower.
In this embodiment, the threaded screw rod 2 is movably inserted through the middle of the left flange 6 and the right flange 10.
In this embodiment, each threaded screw rod 2 is movably penetrated through the screw rod through hole 12.
In this embodiment, the left end fixedly connected with of right crossbeam 9 butt plug 4, butt plug 4 and 5 right-hand member mouths of left crossbeam driving fit peg graft, guarantee when butt joint right crossbeam 9 and left crossbeam 5, peg graft each other through butt plug 4 and improve right crossbeam 9 and left crossbeam 5 and guarantee stability to improve the effect of weighing of crossbeam.
In this embodiment, the left flange 6 is movably embedded in the concave portion on the inner side of the left clamping seat 7, and the left clamping seat 7 can ensure a stable system when the left flange 6 is embedded.
In this embodiment, the activity of right flange 10 is embedded in the inboard depressed part of right grip slipper 8, and right grip slipper 8 can carry out the joint to right flange 10 and fix, improves stability.
When a concrete filled steel tube column frame attach strutting arrangement used, need explain, the utility model relates to a concrete filled steel tube column frame attach strutting arrangement, including support column 1, screw lead screw 2, circular perforation 3, docking plug 4, left crossbeam 5, left flange 6, left grip slipper 7, right grip slipper 8, right crossbeam 9, right flange 10, nut 11, lead screw perforation 12, mounting hole 13, the part is the part that general standard or technical field personnel know, and its structure and principle all are that this technical field personnel all can learn through the technical manual or learn through conventional experimental approach.
During the use, when fixed mounting right crossbeam 9 and left crossbeam 5 are carried out in the later stage, peg graft respectively in circular perforation 3 on support column 1 when now with right crossbeam 9 and left crossbeam 5 in, then overlap respectively left grip slipper 7 and right grip slipper 8 on left crossbeam 5 and right crossbeam 9, then two screw lead screw 2 activities on the left grip slipper 7 are pegged graft at the flange, lead screw perforation 12 and mounting hole 13 are interior, then use 11 screw threads of nut to twist and close fixedly, this kind of combination formula is very convenient, need not to use very much bolt fastening, and only need one to two operation workman can, the cost is lower.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a concrete filled steel tube column frame attach strutting arrangement, includes support column (1), its characterized in that: the left side wall and the right side wall of the upper part of the supporting column (1) are both horizontally provided with circular through holes (3) in an aligned mode, and the side walls of the supporting column (1) positioned above and below the circular through holes (3) are both horizontally provided with screw rod through holes (12); a left cross beam (5) is movably inserted into the circular through hole (3) positioned on the left side of the support column (1), a left flange (6) is fixedly welded on the outer wall of the left cross beam (5), a left clamping seat (7) is movably sleeved on the left cross beam (5), and a threaded screw rod (2) is horizontally and fixedly connected to the upper part and the lower part of the left clamping seat (7);
a right cross beam (9) horizontally and movably penetrates through the circular through hole (3) on the right side of the supporting column (1) to the left, and a right flange (10) is fixedly welded on the outer wall of the right cross beam (9); the right clamping seat (8) is movably sleeved on the right cross beam (9), the upper portion and the lower portion of the right clamping seat (8) are horizontally provided with mounting holes (13), the right end portion of the threaded screw rod (2) movably penetrates through the mounting holes (13), and a nut (11) is screwed on the right end portion of the threaded screw rod (2) on the right side of the mounting holes (13).
2. The concrete filled steel tube column frame connecting and supporting device of claim 1, wherein: the threaded screw rod (2) movably penetrates through the middle parts of the left flange (6) and the right flange (10).
3. The concrete filled steel tube column frame connecting and supporting device of claim 1, wherein: each threaded screw rod (2) is movably penetrated through the screw rod through hole (12).
4. The concrete filled steel tube column frame connecting and supporting device of claim 1, wherein: the left end part of the right cross beam (9) is fixedly connected with a butt plug (4), and the butt plug (4) is closely spliced with the right end opening of the left cross beam (5).
5. The concrete filled steel tube column frame connecting and supporting device of claim 1, wherein: the left flange (6) is movably embedded into a concave part on the inner side of the left clamping seat (7).
6. The concrete filled steel tube column frame connecting and supporting device of claim 1, wherein: the right flange (10) is movably embedded in a concave part on the inner side of the right clamping seat (8).
CN201922332591.3U 2019-12-23 2019-12-23 Steel pipe concrete column frame connection strutting arrangement Active CN211597094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922332591.3U CN211597094U (en) 2019-12-23 2019-12-23 Steel pipe concrete column frame connection strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922332591.3U CN211597094U (en) 2019-12-23 2019-12-23 Steel pipe concrete column frame connection strutting arrangement

Publications (1)

Publication Number Publication Date
CN211597094U true CN211597094U (en) 2020-09-29

Family

ID=72594661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922332591.3U Active CN211597094U (en) 2019-12-23 2019-12-23 Steel pipe concrete column frame connection strutting arrangement

Country Status (1)

Country Link
CN (1) CN211597094U (en)

Similar Documents

Publication Publication Date Title
CN203238783U (en) Rectangular concrete filled steel tubular column and steel beam semi-rigid node structure
CN209779871U (en) Building steel structure
CN211597094U (en) Steel pipe concrete column frame connection strutting arrangement
CN205637120U (en) Assembly structure of precast concrete beam and steel core concrete column
CN205206267U (en) Safe multi -functional scaffold
CN111305589B (en) Reinforcing mechanism convenient to install for steel structure connecting piece
CN209724350U (en) A kind of anchor drawing light-duty tunnel portal of armored concrete
CN107740520B (en) High strength curtain bearing structure for building
CN210827850U (en) Quick detachable temporary building fixed knot constructs
CN219638118U (en) High-strength connecting seat for steel structure connection
CN106677193B (en) A kind of active spiral steel pipe is to support
CN216406224U (en) Quick accurate positioning installation construction equipment of assembled shear force wall
CN211448768U (en) Gas outage appearance convenient to installation
CN220318501U (en) Tubular pile combination external member
CN215331455U (en) Frame body structure for large-span high formwork
CN205276657U (en) Consolidate light gauge steel's suspended ceiling system
CN218375659U (en) Assembled pylon
CN214784941U (en) Energy consumption device based on tensile yield deformation control
CN220469165U (en) Spliced damping steel structure
CN220521547U (en) Prefabricated component of assembled frame structure
CN212295588U (en) Triangular truss for high-rise building construction
CN212248766U (en) Prefabricated building wall structure for prefabricated building
CN205776799U (en) A kind of column and the attachment means of crossbeam
CN214885976U (en) Structure is built in room that shock resistance is strong
CN209817491U (en) Constructional engineering frame roof beam reinforcing apparatus

Legal Events

Date Code Title Description
GR01 Patent grant