CN211596403U - Tower top double-main-cable anchoring device - Google Patents

Tower top double-main-cable anchoring device Download PDF

Info

Publication number
CN211596403U
CN211596403U CN201922351309.6U CN201922351309U CN211596403U CN 211596403 U CN211596403 U CN 211596403U CN 201922351309 U CN201922351309 U CN 201922351309U CN 211596403 U CN211596403 U CN 211596403U
Authority
CN
China
Prior art keywords
anchoring
plate
baffle
main
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922351309.6U
Other languages
Chinese (zh)
Inventor
左雷彬
陈晓晖
詹胜文
李国辉
马晓成
任文明
倪娜
刘思萌
许峻岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp filed Critical China National Petroleum Corp
Priority to CN201922351309.6U priority Critical patent/CN211596403U/en
Application granted granted Critical
Publication of CN211596403U publication Critical patent/CN211596403U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a two main push-towing rope anchor in top of tower for two main push-towing rope of suspension cable pipeline bridge are connected, including two bilateral symmetry's anchor unit, every anchor unit includes: a base plate is arranged at the bottom of the anchoring unit; a cover plate is arranged at the top of the anchoring unit; the front end and the rear end of the longitudinal direction of the base plate foundation are symmetrically provided with anchoring ends, two sides and the middle part of each anchoring end are respectively and vertically provided with a construction plate, baffle plates are respectively arranged along the front end and the tail end of each construction plate, the baffle plates are fixedly connected with the base plate foundation and the construction plates and are arranged perpendicular to the construction plates, two openings are symmetrically arranged at the corresponding positions of each baffle plate in a left-right mode, and a main cable penetrates through the openings and is anchored between the baffle plates; the baffles of each anchoring end are connected and reinforced through a plurality of connecting plates. The device is compared in the single main push-towing rope of unilateral with the ripe form of cable saddle anchor, can effectively solve the two main push-towing rope of unilateral and do not have anchor's trade current situation.

Description

Tower top double-main-cable anchoring device
Technical Field
The utility model relates to a two main push-towing rope anchor in top of tower that is used for two main push-towing rope of suspension cable pipeline bridge to connect belongs to oil transportation (gas) pipeline design technical field.
Background
In the current long oil and gas pipeline suspension cable formula of defeated oil and gas strides across the design field, the unilateral is usually designed for a main push-towing rope, however to carrying on that the pipeline diameter is big, lay many pipelines and stride the great suspension cable pipeline bridge of footpath simultaneously, because the design load is great, if the unilateral adopts a main push-towing rope, main push-towing rope design diameter is very big, sometimes even does not have finished product cable to select from (this condition takes on-the-spot prefabricated parallel cable strand method design main push-towing rope), is unfavorable for on-the-spot transportation and installation this moment. Therefore, with the continuous improvement of the construction period and the quality requirement of the long-distance pipeline crossing, a single-side double-main-cable form appears, a single main cable is equally divided into two main cables with smaller sections, and the transportation and installation efficiency can be greatly improved.
Compared with a mature mode that a traditional cable saddle can be used for anchoring a single-side single main cable, due to the novelty of the form of the single-side double main cable, a stable and reliable tower top double main cable anchoring device is not available at present for large-scale application, anchoring of the double main cables at the tower top becomes a difficult point and a key for restricting popularization of the form, and the anchoring quality of the main cables at the tower top also directly influences the stability and safety of full bridges such as a main tower, a bridge deck and the like, so that various stages such as site construction, later-period operation and maintenance are influenced.
SUMMERY OF THE UTILITY MODEL
According to the development current situation of present long oil gas pipeline, the unilateral that appears in crossing over the form to the suspension cable carries out the structural style of two main push-towing ropes anchor simultaneously, the utility model aims to provide a simple structure, the atress is stable, safe and reliable, convenient maintenance, workable and installation just are applicable to the top of tower two main push-towing ropes anchor of various main push-towing ropes and arbitrary main tower form, realized both sides limit and main two main push-towing ropes simultaneously at the main tower top of tower connect the anchor, provide a new device for solving pipeline suspension cable crossing main push-towing ropes anchor problem.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a two main push-towing rope anchor in top of tower for two main push-towing rope of suspension cable pipeline bridge are connected, includes two bilateral symmetry's anchor unit, connects through a plurality of tie-beam between two anchor units, and wherein every anchor unit includes:
a bottom plate foundation is arranged at the bottom of the anchoring unit, the bottom plate foundation is horizontally arranged and connected with the top of the main tower, and the longitudinal direction of the bottom plate foundation is perpendicular to the connecting beam;
the front end and the rear end of the longitudinal direction of the base plate foundation are symmetrically provided with anchoring ends, and the two anchoring ends of each anchoring unit are connected through a cross beam;
two sides and the middle part of each anchoring end are respectively and vertically provided with a structural plate, and the structural plates are arranged along the longitudinal direction of the bottom plate foundation; baffles are respectively arranged along the front end and the tail end of the construction plate, the baffles are fixedly connected with the base plate foundation and the construction plate and are respectively perpendicular to the base plate foundation and the construction plate, two openings are symmetrically formed in the corresponding position of each baffle in the left-right direction, and a main cable penetrates through the openings and is anchored between the baffles; the baffles of each anchoring end are connected and reinforced through a plurality of connecting plates.
Furthermore, the two main cable anchor devices on the top of the tower are all designed by steel plates, and except that the cover plates are connected by bolts, other components are connected by welding.
Furthermore, the bottom plate foundation is in a box-shaped cross section, and a plurality of reinforcing rib plates are respectively arranged along the transverse direction and the longitudinal direction of the bottom plate foundation.
Further, a cover plate is arranged at the top of the anchoring unit; the cover plate comprises a middle arc-shaped cover plate and two end cover plates, the end cover plates are arranged at the tops of the anchoring ends, and the middle arc-shaped cover plate is arranged between the two end cover plates.
Furthermore, the cross section of the connecting beam is I-shaped and is connected with the bottom plate foundations of the two anchoring units, so that the left anchoring unit and the right anchoring unit are connected into a whole.
Furthermore, the cross beam is arranged along the longitudinal two sides and the middle position of each anchoring unit, and the bottom of the cross beam is attached to the bottom plate foundation.
Furthermore, a first baffle is arranged on the end face of the outer side of each anchoring end, a third baffle and a second baffle are sequentially arranged on the end face of the inner side of each anchoring end in a parallel mode, the first baffle, the third baffle and the second baffle are perpendicular to the structural plates respectively, two holes are symmetrically formed in the corresponding positions of the first baffle, the third baffle and the second baffle in a bilateral mode, and the main cable penetrates through the holes and is anchored between the baffles.
Further, upper portion, middle part, the lower part correspondence between first baffle and the third baffle sets gradually first connecting plate, second connecting plate, third connecting plate, wherein first connecting plate and the equal vertical arrangement of third connecting plate, the second connecting plate perpendicular to first connecting plate and third connecting plate, the second connecting plate all has the arrangement in the both sides of baffle trompil.
Furthermore, the end cover plate is welded with the top of the construction plate, and the middle arc-shaped section cover plate is connected with the top of the baffle plate at the end face of the inner side of the anchoring end through a bolt.
The utility model has the advantages that:
two main push-towing rope anchor in top of tower is symmetrical arrangement, both can mill prefabricated back integral hoisting, also can half prefabricated back field assembly. And simultaneously the device can accomplish the connection and the anchor of main push-towing rope at the top of the tower more effectively, safely.
Two main cable anchor in top of the tower are enclosed construction, can protect main cable ground tackle to the utmost, at the operation in-process, also can be convenient maintain and overhaul.
Two main push-towing rope anchor on top of the tower is whole to be formed through the steel sheet preparation of different thickness, can adjust steel sheet thickness according to the atress degree of component is nimble, to the less structure of non-bearing and atress, can reduce its material thickness, consequently can alleviate device weight to a certain extent.
The utility model discloses compare in the single main push-towing rope of unilateral with the ripe form of cable saddle anchor, can effectively solve the two main push-towing rope of unilateral and do not have the trade current situation of anchor, the application of this device can also effectively save construction cycle, engineering cost, the operation and the maintenance of the pipeline and bridge of being convenient for.
Drawings
Fig. 1 is the front view of the tower top double main cable anchoring device of the present invention.
Fig. 2 is the utility model discloses a top of the tower double main cables anchor device top view.
Fig. 3 is a side view of the tower top double main cable anchoring device of the present invention.
Fig. 4 is a cross-sectional view taken along line a-a of fig. 1.
Fig. 5a is a bottom plate plan view of the tower top double main cable anchoring device of the present invention.
Fig. 5b is a side view of the bottom plate of the tower top double main cable anchoring device of the present invention.
Fig. 6 is the structural plate schematic diagram of the tower top double main cable anchoring device of the present invention.
Fig. 7a is a front view of the first baffle plate of the tower top double main cable anchoring device of the present invention.
Fig. 7b is a side view of the first baffle plate of the tower top double main cable anchoring device of the present invention.
Fig. 7c is a front view of the second baffle and the third baffle of the tower top double main cable anchoring device of the present invention.
Fig. 7d is a side view of the second baffle and the third baffle of the tower top double main cable anchoring device of the present invention.
Fig. 8a is the first connecting plate of two main push-towing rope anchor in top of the tower and the second connecting plate structure sketch map of the utility model.
Fig. 8b is a schematic diagram of a third connecting plate structure of the tower top double-main-cable anchoring device of the present invention.
Fig. 9 is the schematic view of the beam structure of the double main cable anchoring device on the tower top of the present invention.
Fig. 10a is a side view of the connecting beam structure of the double main cable anchoring device on the tower top of the present invention.
Fig. 10b is the schematic view of the cross-section structure of the connecting beam of the double main cable anchoring device on the tower top of the present invention.
Fig. 11 is a layout diagram of the double main cable anchoring device on the top of the main tower.
The structure comprises 1-an upper top plate, 2-a lower bottom plate, 3-a long side wall plate, 4-a third reinforcing rib plate, 5-a first reinforcing rib plate, 6-a second reinforcing rib plate, 7-a wide side wall plate, 8-a bottom plate foundation, 9-a structural plate and 10-a first baffle plate; 11-a second baffle; 12-a third baffle; 13-a first connection plate; 14-a second connecting plate; 15-a third connecting plate; 16-end cover plate; 17-middle arc segment cover plate; 18-a cross beam; 19-horizontal member, 20-vertical member, 21-connecting beam, 22-anchoring unit, 23-anchoring end.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
Referring to fig. 1 to 3, a tower top double-main-cable anchoring device for connecting a double main cable of a suspension cable pipeline bridge is a front-back symmetrical and left-right balanced structure, and comprises two anchoring units 22 symmetrically arranged left and right, wherein the two anchoring units 22 are connected through a plurality of connecting beams 21, and each anchoring unit 22 comprises:
the bottom of the anchoring unit 22 is provided with a bottom plate foundation 8, the bottom plate foundation 8 is horizontally arranged and connected with an embedded part on the top of the main tower, and the longitudinal direction of the bottom plate foundation 8 is perpendicular to the connecting beam 21. A cover plate is provided on the top of the anchoring unit 22.
The front end and the rear end of the bottom plate foundation 8 in the longitudinal direction are symmetrically provided with anchoring ends 23, the two anchoring ends 23 of each anchoring unit 22 are connected through a cross beam 18, specifically, the cross beams 18 are arranged along the two longitudinal sides and the middle position of each anchoring unit 22, and the bottom of each cross beam 18 is attached to the bottom plate foundation 8.
The two sides and the middle part of each anchoring end 23 are respectively vertically provided with a structural plate 9, the specific structure of each structural plate 9 is as shown in fig. 3 and 6, and the structural plates 9 are arranged along the longitudinal direction of the bottom plate foundation 8 and used for maintaining the stability of the whole tower top double-main-cable anchoring device. Baffles are respectively arranged along the front end and the tail end of the construction plate 9, namely the inner side end face and the outer side end face of the anchoring end, the baffles are fixedly connected with the bottom plate foundation 8 and the construction plate 9 and are respectively perpendicular to the bottom plate foundation 8 and the construction plate 9, two holes are symmetrically arranged at the corresponding positions on each baffle in a left-right mode, a main cable penetrates through the holes and is anchored between the baffles, large radial and axial displacement is avoided, the baffles are main stress components and bearing structures of the whole device, and the material and the thickness of the baffles can be adjusted according to the span ratio and the span of the main cable spanned by the suspension cables and the specification and model of the main cable. The baffles of each anchoring end 23 are connected and reinforced by a plurality of connecting plates.
Specifically, as shown in fig. 3, a first baffle 10 is respectively disposed on an end surface of an outer side of each anchoring end 23, a third baffle 12 and a second baffle 11 are sequentially arranged in parallel at a joint of the anchoring end 23 and an intermediate body, that is, on an end surface of an inner side of the anchoring end 23, the first baffle 10, the third baffle 12 and the second baffle 11 are respectively perpendicular to the structure plate 9, two holes are symmetrically formed in corresponding positions of the first baffle 10, the third baffle 12 and the second baffle 11, and a main cable passes through the holes and is anchored between the baffles.
Referring to fig. 3 and 4, a first connecting plate 13, a second connecting plate 14 and a third connecting plate 15 are correspondingly and sequentially arranged at the upper part, the middle part and the lower part between the first baffle plate 10 and the third baffle plate 12, wherein the first connecting plate 13 and the third connecting plate 15 are both vertically arranged, the second connecting plate 14 is perpendicular to the first connecting plate 13 and the third connecting plate 15, and the second connecting plate 14 is arranged at both sides of the baffle plate opening hole, so that the stability of the baffle plate is further enhanced.
Referring to fig. 5a and 5b, fig. 5a is a top view of the floor base 8 and fig. 5b is a side view of the floor base 8. The base plate foundation 8 is in a box-shaped section and is a basic frame consisting of an upper top plate 1, a lower bottom plate 2, two wide side wall plates 7 and two long side wall plates 3. 4 reinforcing rib plates are vertically arranged in sequence along the transverse direction of the bottom plate foundation 8 and comprise two first reinforcing rib plates 5 and two second reinforcing rib plates 6, wherein the two second reinforcing rib plates 6 are respectively arranged at positions close to the end parts of the bottom plate foundation 8, the two first reinforcing rib plates 5 are respectively arranged near the connecting parts of the rear ends of the anchoring ends 23 and the bottom plate foundation 8, and the reinforcing rib plates at the front end and the rear end of the bottom plate foundation 8 are symmetrically arranged; a third reinforcing floor 4 is vertically provided along the longitudinal middle of the floor base 8. The arrangement of a plurality of reinforcing rib plates and reasonable positions thereof can reinforce and consolidate the bearing capacity of the base of the bottom plate.
As shown in fig. 3, the top cover plate connects and encloses the anchoring ends 23 at the front and rear ends and the intermediate structure between the anchoring ends 23 at the two ends into a whole for protecting the main cable anchoring cup and the internal structure of the device from the erosion of the harsh environment. The cover plates comprise a middle arc-shaped cover plate 17 and two end cover plates 16, the end cover plates 16 are arranged at the tops of the anchoring ends 23, and the middle arc-shaped cover plate 17 is arranged between the two end cover plates 16, namely the middle arc-shaped cover plate 17 is positioned at the top of the middle body and also positioned at the topmost part of the whole device.
As shown in fig. 10a and 10b, the cross section of the connecting beam 21 is i-shaped, and is formed by welding two horizontal members 19 and a vertical member 20 positioned between the horizontal members, and the connecting beam 21 is transversely connected with the bottom plate foundations 8 of the two anchoring units 22, so that the left and right anchoring units 22 are connected into a whole.
The double-main-cable anchoring device at the tower top is designed by steel plates, and except for the middle arc-shaped cover plate 17 which is connected by bolts, other components are connected by welding.
In this embodiment, the front structure of the tower top double main cable anchoring device is set for side-span main cable anchoring, as shown on the left side in fig. 11, and the rear structure is set for main-span main cable anchoring, as shown on the right side in fig. 11.
The specific embodiment is as follows:
the gas transmission pipeline adopts a suspension cable type one-span river-crossing scheme, the main span is designed to be 355m, the rise span ratio of a main cable is 1/10, the bridge deck structure adopts a single-layer steel combined bridge deck, and the width of the bridge deck is 2.74 m. The calculated span of the engineering main cable is 57.7+355+55.1 meters, the main cable is hot-extruded with polyethylene parallel steel wires, the main cables are arranged in two groups, the center distance between the two groups of main cables is 3 meters, and each group is provided with 2 main cables with the distance of 550 mm.
If each group of main cables in the project adopts one main cable, the diameter of the main cable is too large (about 16cm), and the transportation and installation of the main cable are difficult, so that the main cable is divided into two groups which are connected by cable clamps, each group consists of 265 galvanized coating high-strength steel wires with the diameter of 5mm, the standard tensile strength of the steel wires is not less than 1770MPa, and the effective sectional area of a single strand is 5203mm2Nominal breaking load 9214 kN. The outer-extruded double-layer PE is anticorrosive, the color of the outer layer of the PE is red, and the strength safety coefficient is more than or equal to 2.50.
The main push-towing rope adopts at the top of the tower the utility model discloses a device is connected and the anchor, and whole device is long 4.1m, wide 2.484m, high 1.0828m, and wherein unilateral bottom plate basis height is 0.2m, and the length and width is 2.484 x 1.1m respectively. The device is composed of Q345C steel plates, the maximum thickness of the steel plate used by the base plate foundation is 25mm, the minimum thickness is 16mm, and the two sides of the steel plate are 30 steel plates in total; the structural plate consists of 12 steel plates, the inclination angle of the structural plate and the horizontal plane is 111.8 degrees, and the thickness of the steel plates is 20 mm; the baffle plate consists of 24 steel plates, the thickness of the outer baffle plate is 25mm, and the thickness of the inner steel plate is 60 mm; the connecting plate is composed of 32 steel plates, and the thickness of the connecting plate is 20 mm; the number of the top cover plates is 6, the upper part of the top cover plate is arc-shaped, the arc length is 1522mm, the thickness is 5mm, and the thicknesses of the other cover plates are 20 mm; the cross beam is made of trapezoidal steel plates, the inclination angles of two sides of the cross beam are 111.8 degrees, the number of the cross beams is 6, and the thickness of the cross beam is 20 mm; the connecting beam is composed of 5 beams, each beam is composed of 3 steel plates, and the thickness of each steel plate is 8 mm. Two devices are respectively arranged on east and west of the full bridge, and the total weight of each device is 7.9 t.
The concrete installation method of the tower top double-main cable anchoring device is as follows:
as shown in FIG. 11, the device can select integral prefabricated hoisting or semi-prefabricated hoisting and then carry out assembly connection on site according to the condition whether integral hoisting is available on site terrain or not. The bottom plate foundation is connected with an embedded part on the top of the main tower, the device is fixed on the top of the main tower, and reinforcing rib plates of the bottom plate foundation can be encrypted according to the bearing condition so as to ensure the stability of the foundation.
The baffle is open pore structure, and the side span main push-towing rope passes the trompil with the midspan main push-towing rope, and the anchor fixing clip is died between the baffle, avoids producing great radial and axial displacement, and the baffle is main atress component and bearing structure of whole device, can carry out the material and the thickness adjustment of baffle according to the main push-towing rope ratio, span, the specification model of main push-towing rope strides over.
The top cover plate seals the left side structure and the right side structure into a whole and is used for protecting the main cable anchor cup and the internal structure of the device from being corroded by severe environment, the middle arc-shaped section cover plate on the uppermost part is not connected when the cable is empty, the middle arc-shaped section is connected after the cable length adjustment is completed and the anchor head is locked, and the middle arc-shaped section is connected before the bridge deck structure is erected.
The device is whole to be formed through the preparation of the steel sheet of different thickness, through having corresponding design, can adjust different components, can accomplish connection and the anchor to the main push-towing rope on the top of the tower more effectively, safely, in the operation in-process, also can conveniently overhaul and maintain it, compare in the single main push-towing rope of unilateral with the ripe form of cable saddle anchor, can effectively solve the two main push-towing rope of unilateral and do not have anchor device's trade current situation, the application of this device can also effectively save construction cycle, engineering cost, be convenient for the operation and the maintenance of pipeline and bridge. It is suitable for oil (gas) pipeline using suspension cable crossing.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. The tower top double-main-cable anchoring device is characterized by comprising two anchoring units (22) which are arranged in a bilateral symmetry mode, wherein the two anchoring units (22) are connected through a plurality of connecting beams (21), and each anchoring unit (22) comprises:
a bottom plate foundation (8) is arranged at the bottom of the anchoring unit (22), the bottom plate foundation (8) is horizontally arranged and connected with the top of the main tower, and the longitudinal direction of the bottom plate foundation (8) is perpendicular to the connecting beam (21);
the longitudinal front end and the longitudinal rear end of the bottom plate foundation (8) are symmetrically provided with anchoring ends (23), and the two anchoring ends (23) of each anchoring unit (22) are connected through a cross beam (18);
two sides and the middle part of each anchoring end (23) are respectively and vertically provided with a structural plate, and the structural plates are arranged along the longitudinal direction of the bottom plate foundation (8); baffles are respectively arranged along the front end and the tail end of the construction plate, the baffles are fixedly connected with the bottom plate foundation (8) and the construction plate (9) and are respectively perpendicular to the bottom plate foundation (8) and the construction plate (9), two openings are symmetrically formed in the corresponding positions of each baffle, and a main cable penetrates through the openings and is anchored between the baffles; the baffles of each anchoring end (23) are connected and reinforced by a plurality of connecting plates.
2. The tower top double main cable anchoring device according to claim 1, wherein the tower top double main cable anchoring device is designed by steel plates, and except for the cover plates which are connected by bolts, the other components are connected by welding.
3. The tower top double main cable anchoring device according to claim 1, wherein the bottom foundation (8) is box-shaped in cross section and is provided with several reinforcing ribs in the transverse and longitudinal directions.
4. The overhead twin main line anchoring device according to claim 1, wherein a cover plate is provided on top of the anchoring unit (22); the cover plate comprises a middle arc-shaped cover plate (17) and two end cover plates (16), the end cover plates (16) are arranged at the tops of the anchoring ends (23), and the middle arc-shaped cover plate (17) is arranged between the two end cover plates (16).
5. The tower top double main cable anchoring device according to claim 1, wherein the cross section of the connecting beam (21) is in a shape of Chinese character 'i', and is connected with the bottom plate foundations (8) of the two anchoring units (22), so that the left and right anchoring units (22) are connected into a whole.
6. The tower top double main cable anchoring device according to claim 1, wherein the cross beams (18) are arranged along two longitudinal sides and a middle position of each anchoring unit (22), and the bottom of the cross beams (18) is arranged to be attached to the bottom plate foundation (8).
7. The tower top double main cable anchoring device according to claim 1, wherein a first baffle (10) is arranged on the outer end face of each anchoring end (23), a third baffle (12) and a second baffle (11) are arranged in parallel on the inner end face of each anchoring end (23), the first baffle (10), the third baffle (12) and the second baffle (11) are respectively arranged perpendicular to the construction plate (9), two holes are symmetrically arranged at corresponding positions on the first baffle (10), the third baffle (12) and the second baffle (11), and main cables penetrate through the holes and are anchored between the baffles.
8. The tower top double main cable anchoring device according to claim 1, wherein a first connecting plate (13), a second connecting plate (14) and a third connecting plate (15) are correspondingly and sequentially arranged at the upper part, the middle part and the lower part between the first baffle (10) and the third baffle (12), wherein the first connecting plate (13) and the third connecting plate (15) are vertically arranged, the second connecting plate (14) is perpendicular to the first connecting plate (13) and the third connecting plate (15), and the second connecting plate (14) is arranged at both sides of the baffle opening.
9. The overhead twin main line mooring of claim 4 wherein the end caps (16) are welded to the top of the structural plate (9) and the mid-arch caps (17) are bolted to the top of the skirt at the inboard end of the mooring end (23).
10. The overhead twin main line mooring of claim 1 wherein the two mooring units (22) are connected by 5 parallel tie beams (21).
CN201922351309.6U 2019-12-24 2019-12-24 Tower top double-main-cable anchoring device Active CN211596403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922351309.6U CN211596403U (en) 2019-12-24 2019-12-24 Tower top double-main-cable anchoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922351309.6U CN211596403U (en) 2019-12-24 2019-12-24 Tower top double-main-cable anchoring device

Publications (1)

Publication Number Publication Date
CN211596403U true CN211596403U (en) 2020-09-29

Family

ID=72595133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922351309.6U Active CN211596403U (en) 2019-12-24 2019-12-24 Tower top double-main-cable anchoring device

Country Status (1)

Country Link
CN (1) CN211596403U (en)

Similar Documents

Publication Publication Date Title
CN111424535B (en) Single-column type bridge antidumping reinforcing apparatus
CN106087709B (en) A kind of steel box-girder method in section design of explosion-proof percussion
CN210684443U (en) Pier, bridge structure and tower column
CN111119052B (en) Tower top anchoring device for connecting double main cables of suspension cable pipeline bridge
CN109024234B (en) Single spiral arch and suspension cable combined bridge structure system
CN110130214A (en) A kind of bridge pier, bridge structure, king-post and construction method
CN112942151A (en) Carbon fiber cable net wind-resistant reinforced structure system of ultra-large span suspension bridge and construction method thereof
CN206143645U (en) Stride across navigable river ultra -large -span girder steel assembling support
CN113235389A (en) Ground anchor type suspension bridge structure suitable for special terrain
CN208563573U (en) A kind of embedded steel-pipe assembly concrete connecting structure of girder steel
CN211596403U (en) Tower top double-main-cable anchoring device
CN107702607A (en) A kind of monoblock type bursting work safty shield and preparation method thereof
CN218479026U (en) Pedestrian suspension bridge without side cable and anchorage
CN214883050U (en) Carbon fiber cable net wind-resistant reinforced structure system of oversized span suspension bridge
CN113863114B (en) Cable-stayed bridge with same-layer asymmetric arrangement of male and female railways
CN113638361B (en) Connection structure of port and pier PHC tubular pile and superstructure
CN215290643U (en) Beam-column joint composite stirrup with stiff structure
CN110685219A (en) Suspension bridge sharing anchorage
CN111058569B (en) Multi-steel-beam and concrete combined super-flat beam and construction method of flat beam
CN210712511U (en) Straddle type monorail transit long-span simply-supported arch bridge
CN114182620A (en) Partial cable-stayed bridge structure system of large cantilever core steel box and construction method
CN210368589U (en) Suspended combined bridge for in-situ protection of cable set above foundation pit
CN208563659U (en) Concrete-filled steel tube shear wall
CN216663755U (en) Ground anchor type suspension bridge structure suitable for special terrain
CN215051983U (en) Root-shaped arrangement main cable self-anchored suspension bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant