CN211593887U - But building engineering construction is with hoisting device - Google Patents

But building engineering construction is with hoisting device Download PDF

Info

Publication number
CN211593887U
CN211593887U CN201921770796.3U CN201921770796U CN211593887U CN 211593887 U CN211593887 U CN 211593887U CN 201921770796 U CN201921770796 U CN 201921770796U CN 211593887 U CN211593887 U CN 211593887U
Authority
CN
China
Prior art keywords
fixedly connected
building engineering
engineering construction
belt
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921770796.3U
Other languages
Chinese (zh)
Inventor
孙东光
卢英杰
于永
赵青荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921770796.3U priority Critical patent/CN211593887U/en
Application granted granted Critical
Publication of CN211593887U publication Critical patent/CN211593887U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a but building engineering construction belongs to building engineering technical field with hoisting device. A lifting device for building engineering construction comprises a fixed bottom plate, wherein a supporting column is fixedly connected to the top of the fixed bottom plate, and a fixed block is fixedly connected to one end, far away from the fixed bottom plate, of the supporting column; the utility model discloses a PMKD, the support column, the fixed block, servo motor, the axis of rotation, the backplate, the division board, rotate the wheel, the belt, from the cooperation setting between driving wheel and the live-rollers, when needs are given and carry fragment of brick and grit, the staff can directly fall required material on the conveyer belt, rotation through servo motor, thereby drive the removal of conveyer belt, can be more quick convenient go on the material transportation, and through the setting of backplate and baffle, can prevent that the material from spilling, the staff only need below load the material can, not only effectively improve work efficiency, and the emergence of accident has also been avoided.

Description

But building engineering construction is with hoisting device
Technical Field
The utility model relates to a building engineering technical field especially relates to a but building engineering construction is with hoisting device.
Background
With the development of urbanization, the building industry is increasingly strong, and materials are often required to be lifted in building construction. In the building industry, lifting between floors of some building materials is generally required to meet construction requirements. The lifting of the bulk of the building material can be achieved by a special crane. Small-size building job site, construction worker must rely on the manpower to carry building material to the construction site, the transportation mode wastes time and energy, when the wall becomes than higher, perhaps need the higher time of material transportation, generally all alone down throw away the masonry, alone catch the material at last and construct, this kind of long-time repetitive work, and there is very big potential safety hazard, the great difficult promotion of grit quality in some times, construction worker's intensity of labour has been increased, and work efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the potential safety hazard is big, intensity of labour is high and the efficiency of construction is slow, and the constructional engineering construction that provides is with hoisting device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a but building engineering construction is with hoisting device, includes PMKD, PMKD's top fixedly connected with support column, PMKD's one end fixedly connected with fixed block is kept away from to the support column, the fixed slot has been seted up to fixed block one side, it has the live-rollers to peg graft at the middle part of fixed slot, the surface of live-rollers is provided with the conveyer belt, PMKD's top fixedly connected with motor support frame, motor support frame's top fixedly connected with servo motor, servo motor's one end fixedly connected with axis of rotation.
Preferably, both sides of the conveyor belt are fixedly connected with guard plates, and the outer surface of the conveyor belt is fixedly connected with a partition plate.
Preferably, one end of the rotating shaft is fixedly connected with a rotating wheel, a belt is arranged on the outer surface of the rotating wheel, and the rotating wheel is movably connected with a driven wheel through the belt.
Preferably, four corners of the bottom of the fixed bottom plate are fixedly connected with universal wheels.
Preferably, the bottom of the fixed bottom plate is provided with a threaded hole, and a threaded rod is arranged inside the threaded hole.
Preferably, the bottom of the threaded rod is fixedly connected with a fixing plate.
Compared with the prior art, the utility model provides a but building engineering construction is with hoisting device possesses following beneficial effect:
1. the utility model discloses, through PMKD, the support column, the fixed block, servo motor, the axis of rotation, the backplate, the division board, rotate the wheel, the belt, from the cooperation setting between driving wheel and the live-rollers, when needs are given when carrying fragment of brick and grit, the staff can directly fall required material on the conveyer belt, rotation through servo motor, thereby drive the removal of conveyer belt, can be more quick convenient go on the material transportation, and through the setting of backplate and baffle, can prevent that the material from spilling, very big assurance transportation stationarity, the staff only need below load the material can, not only effectively improve work efficiency, and the emergence of accident has also been avoided.
2. The utility model discloses, through the setting of screw hole, threaded rod and fixed plate, when the device used, the threaded rod was rotated and the fixed plate was made and ground was removed to fix with ground, can guarantee that the device is more stable when the operation, was difficult for rocking.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a right side view of the structure of the present invention;
fig. 3 is a schematic view of the bottom view structure of the present invention;
fig. 4 is a schematic view of the top view structure of the present invention.
In the figure: 1. fixing the bottom plate; 2. a support pillar; 3. a fixed block; 4. fixing grooves; 5. a rotating roller; 6. A conveyor belt; 7. a motor support frame; 8. a servo motor; 9. a rotating shaft; 10. a guard plate; 11. a partition plate; 12. a rotating wheel; 13. a belt; 14. a driven wheel; 15. a universal wheel; 16. a threaded hole; 17. a threaded rod; 18. and (7) fixing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, a lifting device for building engineering construction comprises a fixed base plate 1, universal wheels 15 are fixedly connected to four corners of the bottom of the fixed base plate 1, a support column 2 is fixedly connected to the top of the fixed base plate 1, a fixed block 3 is fixedly connected to one end of the support column 2 away from the fixed base plate 1, a fixed groove 4 is formed in one side of the fixed block 3, a rotating roller 5 is inserted into the middle of the fixed groove 4, a conveyor belt 6 is arranged on the outer surface of the rotating roller 5, guard plates 10 are fixedly connected to both sides of the conveyor belt 6, a partition plate 11 is fixedly connected to the outer surface of the conveyor belt 6, a motor support frame 7 is fixedly connected to the top of the fixed base plate 1, a servo motor 8 is fixedly connected to the top of the motor support frame 7, a rotating shaft 9 is fixedly connected to one, the rotating wheel 12 is movably connected with a driven wheel 14 through a belt 13, the driven wheel is arranged through the matching between the fixed bottom plate 1, the supporting column 2, the fixed block 3, the servo motor 8, the rotating shaft 9, the guard plate 10, the partition plate 11, the rotating wheel 12, the belt 13, the driven wheel 14 and the rotating roller 5, when bricks and gravels need to be carried, a worker can directly pour required materials on the conveying belt 6 and drive the conveying belt 6 to move through the rotation of the servo motor 8, the materials can be quickly and conveniently conveyed, the materials can be prevented from spilling through the arrangement of the guard plate 10 and the partition plate 11, the conveying stability is greatly ensured, the worker only needs to fill the materials at the lower side, the working efficiency is effectively improved, the occurrence of accidents is also avoided, the threaded hole 16 is formed in the bottom of the fixed bottom plate 1, and the threaded rod 17 is arranged inside the threaded hole 16, the bottom fixedly connected with fixed plate 18 of threaded rod 17, through the setting of screw hole 16, threaded rod 17 and fixed plate 18, when the device used, rotation threaded rod 17 made fixed plate 18 remove to ground to fix with ground, can guarantee that the device is when the operation, more stable, difficult rocking.
In the utility model, through the matching arrangement between the fixed bottom plate 1, the support column 2, the fixed block 3, the servo motor 8, the rotating shaft 9, the guard plate 10, the partition plate 11, the rotating wheel 12, the belt 13, the driven wheel 14 and the rotating roller 5, when bricks and gravels need to be carried, a worker can directly pour required materials on the conveyor belt 6, through the rotation of the servo motor 8, the movement of the conveyor belt 6 is driven, the materials can be transported more quickly and conveniently, and through the arrangement of the guard plate 10 and the partition plate 11, the materials can be prevented from spilling, the transportation stability is greatly ensured, the worker only needs to fill the materials at the lower side, not only the work efficiency is effectively improved, but also the occurrence of accidents is avoided, through the arrangement of the threaded hole 16, the threaded rod 17 and the fixed plate 18, when the device is used, the threaded rod 17 is rotated to enable the fixed plate 18 to move to the ground, thereby fix with ground, can guarantee that the device is more stable when the operation, is difficult for rocking.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a but constructional engineering construction is with hoisting device, includes PMKD (1), its characterized in that, top fixedly connected with support column (2) of PMKD (1), one end fixedly connected with fixed block (3) of PMKD (1) are kept away from in support column (2), fixed slot (4) have been seted up to fixed block (3) one side, peg graft at the middle part of fixed slot (4) and have live-rollers (5), the surface of live-rollers (5) is provided with conveyer belt (6), the top fixedly connected with motor support frame (7) of PMKD (1), the top fixedly connected with servo motor (8) of motor support frame (7), the one end fixedly connected with axis of rotation (9) of servo motor (8).
2. A liftable device for building engineering construction according to claim 1, characterized in that both sides of the conveyor belt (6) are fixedly connected with guard plates (10), and the outer surface of the conveyor belt (6) is fixedly connected with partition plates (11).
3. The lifting device for building engineering construction as claimed in claim 1, characterized in that one end of the rotating shaft (9) is fixedly connected with a rotating wheel (12), the outer surface of the rotating wheel (12) is provided with a belt (13), and the rotating wheel (12) is movably connected with a driven wheel (14) through the belt (13).
4. The elevating device for construction of building engineering according to claim 1, wherein universal wheels (15) are fixedly connected to four corners of the bottom of the fixed bottom plate (1).
5. The elevating device for building engineering construction according to claim 1, characterized in that the bottom of the fixed bottom plate (1) is provided with a threaded hole (16), and a threaded rod (17) is arranged inside the threaded hole (16).
6. A liftable device for building engineering construction according to claim 5, characterised in that a fixing plate (18) is fixedly connected to the bottom of the threaded rod (17).
CN201921770796.3U 2019-10-22 2019-10-22 But building engineering construction is with hoisting device Expired - Fee Related CN211593887U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921770796.3U CN211593887U (en) 2019-10-22 2019-10-22 But building engineering construction is with hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921770796.3U CN211593887U (en) 2019-10-22 2019-10-22 But building engineering construction is with hoisting device

Publications (1)

Publication Number Publication Date
CN211593887U true CN211593887U (en) 2020-09-29

Family

ID=72586080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921770796.3U Expired - Fee Related CN211593887U (en) 2019-10-22 2019-10-22 But building engineering construction is with hoisting device

Country Status (1)

Country Link
CN (1) CN211593887U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112478609A (en) * 2020-11-30 2021-03-12 福鼎未来景观设计有限公司 Hoister for cement production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112478609A (en) * 2020-11-30 2021-03-12 福鼎未来景观设计有限公司 Hoister for cement production

Similar Documents

Publication Publication Date Title
CN209815081U (en) Hollow brick conveyer
CN211593887U (en) But building engineering construction is with hoisting device
CN210972668U (en) Semi-automatic trigger down
CN212689504U (en) Building scaffold convenient to transportation material
CN112478577A (en) Conveying belt overturning mechanism
CN210823985U (en) Novel electric lifting discharging platform capable of adjusting chain tightness
CN210683055U (en) Device convenient to building material transport
CN211249286U (en) Flexible material feeding unit of digit control machine tool
CN210794746U (en) Loading attachment for building
CN210098179U (en) Sand screening installation
CN210418301U (en) Fixed-point discharging conveyor for coal mine
CN210149376U (en) Material transporting device for constructional engineering
CN112758702A (en) Building brick material conveyor
CN205471247U (en) Lifting machine for building engineering
CN213534728U (en) Evaporate and press aerated concrete block handling device
CN218774959U (en) Feeding structure for ore washing machine
CN211870037U (en) Cement that cement manufacture used promotes conveyor
CN215671193U (en) High-altitude construction feeding machine
CN220091657U (en) Waste material processing apparatus for civil construction
CN215101761U (en) Lifting arm for LOW-emissivity LOW-E coating material and replacing device
CN221393603U (en) Building material transfer device
CN218593338U (en) But cement product processing is with automatic feed's feed arrangement
CN215702912U (en) Concrete mixing tank drier feed arrangement
CN213651252U (en) Cement promotes conveyor for cement manufacture
CN211337882U (en) Transportation clamping device for processing porous bricks for energy-saving buildings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200929

Termination date: 20211022