Power equipment installation insulating frame capable of being installed quickly Download PDFInfo
- Publication number
- CN211579312U CN211579312U CN202020610001.9U CN202020610001U CN211579312U CN 211579312 U CN211579312 U CN 211579312U CN 202020610001 U CN202020610001 U CN 202020610001U CN 211579312 U CN211579312 U CN 211579312U
- Authority
- CN
- China
- Prior art keywords
- mounting
- fixed mounting
- power equipment
- rod
- protection casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Insulators (AREA)
Abstract
The utility model discloses a power equipment installation insulator bracket that can install fast, including bottom plate, welding rod, slider, mounting panel and protection casing, four angle fixed mounting of bottom plate have an installation bolt, the bottom plate top is close to the position department fixed mounting at four angles and has the welding rod, one side of welding rod is equipped with the spout, the inside slidable mounting of spout has the slider, fixed mounting has the mounting panel between the slider, the top of mounting panel is equipped with the rubber slab, the position department that the rubber slab top is close to four angles is equipped with fixed knot and constructs, screw rod fixed mounting has the protection casing at the top of mounting panel, the four sides of protection casing all are equipped with the thermovent. The utility model discloses set up screw rod and protection casing, when the installation, can drive protection casing rebound through the screw rod, then install power equipment on the mounting panel, then twist once more and move the screw rod and drive protection casing lapse card and protect it on power equipment, avoid power equipment to receive the rainwater erosion.
Description
Technical Field
The utility model relates to a power equipment installs technical field, specifically is a power equipment installation insulating frame that can install fast.
Background
The power equipment mainly comprises power generation equipment and power supply equipment, wherein the power generation equipment mainly comprises a power station boiler, a steam turbine, a gas turbine, a water turbine, a generator, a transformer and the like, the power supply equipment mainly comprises power transmission lines, transformers, contactors and the like with various voltage grades, and an insulating frame is required to be used for installation when the power equipment is installed.
The existing insulating frame has the following defects:
1. the existing insulating frame is generally used for installing power equipment through bolts, and is not easy to detach and install, so that the installation speed is low.
2. The installation height of the existing insulating frame cannot be adjusted according to the use requirement.
3. The existing insulating frame is lack of a protection mechanism, and after the power equipment is installed on the insulating frame, the power equipment is easily corroded by wind and rain.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a power equipment installation insulator bracket that can install fast to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a power equipment installation insulator bracket that can install fast, includes bottom plate, welding rod, slider, mounting panel and protection casing, four angles fixed mounting of bottom plate have construction bolt, the bottom plate top is close to the position department fixed mounting at four angles and has welding rod, one side of welding rod is equipped with the spout, the inside slidable mounting of spout has the slider, fixed mounting has the mounting panel between the slider, the top of mounting panel is equipped with the rubber slab, the position department that the rubber slab top is close to four angles is equipped with fixed knot and constructs, screw rod fixed mounting has the protection casing at the top of mounting panel, the four sides of protection casing all are equipped with the thermovent.
Preferably, there is a limiting plate inside the fixed structure through spring fixed mounting, one side fixed mounting of limiting plate has an inserted bar, the inserted bar extends to the outside of fixed structure, the opposite side fixed mounting of limiting plate has a pull rod, the pull rod extends to the outside end fixed mounting of fixed structure has a pull ring.
Preferably, one side of the welding rod is provided with a fixing screw hole, and a fixing bolt is fixedly arranged in the fixing screw hole.
Preferably, one side of the sliding block is fixedly provided with a connecting screw hole, and the other side of the sliding block is provided with a connecting rod.
Preferably, the top end of the screw rod is provided with a screwing block, and the bottom end of the screw rod is provided with a bearing seat.
Preferably, the bottom end of the mounting bolt is fixedly provided with a limiting sleeve, and the bottom of the limiting sleeve is embedded with a rubber block.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this power equipment installation insulating frame that can install fast has set up fixed knot and has constructed, moves to the inboard through pull ring pulling inserted bar, then places power equipment on the mounting panel, loosens the spring, thereby inside can carrying out quick installation and dismantlement to power equipment to the screw that the inserted bar inserted on power equipment under the effect of spring.
2. This power equipment installation insulating frame that can install fast has set up spout, slider and fixing bolt, when the installation, can drive the mounting panel through the slider according to the user's needs and remove to adjust power equipment's mounting height, then fix the slider inside screwing into connecting the screw with fixing bolt.
3. This power equipment installation insulator bracket that can install fast has set up screw rod and protection casing, when the installation, can drive the protection casing rebound through the screw rod, then installs power equipment on the mounting panel, then twists once more and moves the screw rod and drive protection casing lapse card and protect it on power equipment, avoids power equipment to receive the rainwater erosion.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the fixing structure of the present invention;
fig. 3 is a schematic view of the structure of the welding rod of the present invention.
In the figure: 1. a base plate; 2. installing a bolt; 201. a limiting sleeve; 202. a rubber block; 3. welding a rod; 301. fixing screw holes; 302. fixing the bolt; 4. a chute; 5. a slider; 501. a connecting screw hole; 502. a connecting rod; 6. mounting a plate; 7. a fixed structure; 701. a spring; 702. a limiting plate; 703. inserting a rod; 704. a pull rod; 705. a pull ring; 8. a screw; 801. twisting the block; 802. a bearing seat; 9. a protective cover; 10. a heat dissipation port; 11. a rubber plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: an insulating frame for mounting power equipment capable of being quickly mounted comprises a bottom plate 1, welding rods 3, sliders 5, mounting plates 6 and a protective cover 9, wherein mounting bolts 2 are fixedly mounted at four corners of the bottom plate 1 through thread structures, the bottom plate 1 is fixedly mounted through the mounting bolts 2, the welding rods 3 are welded at positions, close to the four corners, of the top of the bottom plate 1, a sliding groove 4 is formed in one side of each welding rod 3, the sliders 5 are slidably mounted inside the sliding grooves 4, the mounting plates 6 are fixedly mounted between the sliders 5, the mounting plates 6 can be driven to vertically slide through the sliders 5 to adjust the height of the mounting plates 6, rubber plates 11 are arranged at the tops of the mounting plates 6, the rubber plates 11 play an insulating role, fixing structures 7 are arranged at positions, close to the four corners, of the tops of the rubber plates 11, the fixing structures 7 are used for fixedly mounting the power equipment, the protection casing 9 card plays the guard action on power equipment, and the four sides of protection casing 9 all are equipped with thermovent 10, and thermovent 10 is used for the heat dissipation.
Fixed knot constructs 7's inside and has welded limiting plate 702 through spring 701, the welding of one side of limiting plate 702 has inserted bar 703, inserted bar 703 extends to fixed knot constructs 7's the outside, the welding of limiting plate 702's opposite side has pull rod 704, pull rod 704 extends to fixed knot constructs 7's outside end welding has pull ring 705, before the power equipment installation, at first handheld pull ring 705 pulls inserted bar 703 and moves to the inboard, then place power equipment on mounting panel 6, then loosen pull ring 705, it inserts inside power equipment's the screw to push inserted bar 703 under spring 701's effect, thereby can install power equipment fast.
One side of the welding rod 3 is provided with a fixing screw hole 301, a fixing bolt 302 is fixedly installed inside the fixing screw hole 301 through a thread structure, and after the sliding block 5 slides to a required position inside the sliding groove 4, the fixing bolt 302 is screwed into the connecting screw hole 501 to fix the sliding block 5.
One side of the sliding block 5 is fixedly provided with a connecting screw hole 501, the connecting screw hole 501 is convenient for the fixing bolt 302 to be screwed in, the other side of the sliding block 5 is provided with a connecting rod 502, and the sliding block 5 is fixedly connected with the mounting plate 6 through the connecting rod 502.
The top of screw rod 8 is equipped with twists the piece 801, twists the piece 801 and is convenient for twist screw rod 8 and move, and the bottom of screw rod 8 is equipped with bearing frame 802, and screw rod 8 passes through the bottom fixed connection of bearing frame 802 with protection casing 9.
The bottom welding of construction bolt 2 has stop collar 201, and the bottom of stop collar 201 is inlayed and is installed block rubber 202, and block rubber 202 has the effect of shock attenuation buffering, avoids external vibrations to cause construction bolt 2 not hard up to appear.
The working principle is as follows: when the installation, the staff can slide the slider 5 to drive the mounting plate 6 to move according to the use requirement, the installation height is adjusted, then the fixing bolt 302 is screwed into the connecting screw hole 501 to fix the slider 5, then the screw 8 is screwed through the screwing block 801 to drive the protective cover 9 to move upwards, then the inserting rod 703 is pulled to move inwards by the handheld pull ring 705, then the electric power equipment is placed on the mounting plate 6, then the pull ring 705 is loosened, the inserting rod 703 is pushed under the action of the spring 701 to be inserted into the screw hole of the electric power equipment, so that the electric power equipment can be quickly installed, and then the screw 8 is screwed through the screwing block 801 to drive the protective cover 9 to move downwards to be clamped on the electric power equipment to protect the electric power equipment.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. The utility model provides a power equipment installation insulator cradle that can install fast, includes bottom plate (1), welding rod (3), slider (5), mounting panel (6) and protection casing (9), its characterized in that: four angle fixed mounting of bottom plate (1) have construction bolt (2), bottom plate (1) top is close to the position department fixed mounting at four angles and has welding rod (3), one side of welding rod (3) is equipped with spout (4), the inside slidable mounting of spout (4) has slider (5), fixed mounting has mounting panel (6) between slider (5), the top of mounting panel (6) is equipped with rubber slab (11), the position department that rubber slab (11) top is close to four angles is equipped with fixed knot structure (7), screw rod (8) fixed mounting has protection casing (9) at the top of mounting panel (6) is passed through, the four sides of protection casing (9) all are equipped with thermovent (10).
2. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: fixed knot constructs the inside of (7) and has limiting plate (702) through spring (701) fixed mounting, and one side fixed mounting of limiting plate (702) has inserted bar (703), and inserted bar (703) extend to the outside of fixed knot structure (7), and the opposite side fixed mounting of limiting plate (702) has pull rod (704), and pull rod (704) extend to the outside end fixed mounting of fixed knot structure (7) have pull ring (705).
3. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: one side of the welding rod (3) is provided with a fixing screw hole (301), and a fixing bolt (302) is fixedly mounted inside the fixing screw hole (301).
4. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: one side of the sliding block (5) is fixedly provided with a connecting screw hole (501), and the other side of the sliding block (5) is provided with a connecting rod (502).
5. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: the top of screw rod (8) is equipped with twists piece (801), the bottom of screw rod (8) is equipped with bearing frame (802).
6. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: the bottom fixed mounting of construction bolt (2) has stop collar (201), and rubber block (202) are inlayed and are installed to the bottom of stop collar (201).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020610001.9U CN211579312U (en) | 2020-04-22 | 2020-04-22 | Power equipment installation insulating frame capable of being installed quickly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020610001.9U CN211579312U (en) | 2020-04-22 | 2020-04-22 | Power equipment installation insulating frame capable of being installed quickly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211579312U true CN211579312U (en) | 2020-09-25 |
Family
ID=72527885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020610001.9U Active CN211579312U (en) | 2020-04-22 | 2020-04-22 | Power equipment installation insulating frame capable of being installed quickly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211579312U (en) |
-
2020
- 2020-04-22 CN CN202020610001.9U patent/CN211579312U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111326970A (en) | Power equipment installation insulating frame capable of being installed quickly | |
CN202034151U (en) | Post type lightning arrester device | |
CN211579312U (en) | Power equipment installation insulating frame capable of being installed quickly | |
CN210040997U (en) | Adjustable distribution box | |
CN214889359U (en) | Underground heating pipeline fixing device | |
CN214853909U (en) | Protective device for pole-mounted switch | |
CN214535284U (en) | Intelligent safety protection device for signal equipment of railway locomotive depot | |
CN206117066U (en) | WLG tubular busbar groove is with wind -powered electricity generation generating line mounting structure | |
CN208461426U (en) | A kind of arrester | |
CN211479807U (en) | Outdoor voltage transformer easy to install | |
CN220456205U (en) | New forms of energy transformer radiator protective structure | |
CN220186479U (en) | Angle steel tower equipment mounting frame | |
CN211701119U (en) | Power equipment box connecting device | |
CN221305241U (en) | Grounding lightning rod for power transmission line | |
CN203690871U (en) | Thunder air termination rapid mounting structure | |
CN210167794U (en) | Maintenance-free large-capacity combined overvoltage protection device | |
CN220539374U (en) | Cement pole that lightning was hit | |
CN215267215U (en) | Low-voltage draw-out type switch cabinet | |
CN216795459U (en) | Pressure regulating type household intelligent safety electricity saver | |
CN219717893U (en) | Dynamic reactive compensation switching regulator | |
CN211456944U (en) | Lightning protection grounding device of wind driven generator | |
CN220341867U (en) | Change platform insulation external member | |
CN214171511U (en) | Connecting disc convenient to disassemble and assemble for vapor-liquid flow water level control device | |
CN214848054U (en) | Anti-seismic voltage transformer | |
CN219798451U (en) | Intelligent Internet of things water meter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |