CN111326970A - Power equipment installation insulating frame capable of being installed quickly - Google Patents

Power equipment installation insulating frame capable of being installed quickly Download PDF

Info

Publication number
CN111326970A
CN111326970A CN202010320256.6A CN202010320256A CN111326970A CN 111326970 A CN111326970 A CN 111326970A CN 202010320256 A CN202010320256 A CN 202010320256A CN 111326970 A CN111326970 A CN 111326970A
Authority
CN
China
Prior art keywords
mounting
power equipment
rod
fixed mounting
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010320256.6A
Other languages
Chinese (zh)
Inventor
鲍忠科
查祺
邵旋
温从众
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Guangqi Intelligent Electric Appliance Co ltd
Original Assignee
Anhui Guangqi Intelligent Electric Appliance Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Guangqi Intelligent Electric Appliance Co ltd filed Critical Anhui Guangqi Intelligent Electric Appliance Co ltd
Priority to CN202010320256.6A priority Critical patent/CN111326970A/en
Publication of CN111326970A publication Critical patent/CN111326970A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/50Pedestal- or pad-mounted casings; Parts thereof or accessories therefor
    • H02B1/505Pedestal- or pad-mounted casings; Parts thereof or accessories therefor retractable installations
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/28Casings; Parts thereof or accessories therefor dustproof, splashproof, drip-proof, waterproof or flameproof
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/56Cooling; Ventilation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Patch Boards (AREA)

Abstract

The invention discloses a power equipment installation insulating frame capable of being quickly installed, which comprises a bottom plate, welding rods, a sliding block, an installation plate and a protective cover, wherein installation bolts are fixedly installed at four corners of the bottom plate, the welding rods are fixedly installed at positions, close to the four corners, of the top of the bottom plate, a sliding groove is formed in one side of each welding rod, the sliding block is installed in the sliding groove in a sliding mode, the installation plate is fixedly installed between the sliding blocks, a rubber plate is arranged at the top of the installation plate, a fixing structure is arranged at positions, close to the four corners, of the top of the rubber plate, the protective cover is fixedly installed at the top of the installation plate through screws, and heat. The protective cover is arranged on the mounting plate, the protective cover can be driven to move upwards through the screw rod when the protective cover is mounted, then the power equipment is mounted on the mounting plate, and then the screw rod is screwed again to drive the protective cover to move downwards to be clamped on the power equipment to protect the power equipment, so that the power equipment is prevented from being corroded by rainwater.

Description

Power equipment installation insulating frame capable of being installed quickly
Technical Field
The invention relates to the technical field of power equipment installation, in particular to a power equipment installation insulating frame capable of being installed quickly.
Background
The power equipment mainly comprises power generation equipment and power supply equipment, wherein the power generation equipment mainly comprises a power station boiler, a steam turbine, a gas turbine, a water turbine, a generator, a transformer and the like, the power supply equipment mainly comprises power transmission lines, transformers, contactors and the like with various voltage grades, and an insulating frame is required to be used for installation when the power equipment is installed.
The existing insulating frame has the following defects:
1. the existing insulating frame is generally used for installing power equipment through bolts, and is not easy to detach and install, so that the installation speed is low.
2. The installation height of the existing insulating frame cannot be adjusted according to the use requirement.
3. The existing insulating frame is lack of a protection mechanism, and after the power equipment is installed on the insulating frame, the power equipment is easily corroded by wind and rain.
Disclosure of Invention
The present invention is directed to a power equipment mounting insulation frame capable of being mounted quickly, so as to solve the problems in the background art.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a power equipment installation insulator bracket that can install fast, includes bottom plate, welding rod, slider, mounting panel and protection casing, four angles fixed mounting of bottom plate have construction bolt, the bottom plate top is close to the position department fixed mounting at four angles and has welding rod, one side of welding rod is equipped with the spout, the inside slidable mounting of spout has the slider, fixed mounting has the mounting panel between the slider, the top of mounting panel is equipped with the rubber slab, the position department that the rubber slab top is close to four angles is equipped with fixed knot and constructs, screw rod fixed mounting has the protection casing at the top of mounting panel, the four sides of protection casing all are equipped with the thermovent.
Preferably, there is a limiting plate inside the fixed structure through spring fixed mounting, one side fixed mounting of limiting plate has an inserted bar, the inserted bar extends to the outside of fixed structure, the opposite side fixed mounting of limiting plate has a pull rod, the pull rod extends to the outside end fixed mounting of fixed structure has a pull ring.
Preferably, one side of the welding rod is provided with a fixing screw hole, and a fixing bolt is fixedly arranged in the fixing screw hole.
Preferably, one side of the sliding block is fixedly provided with a connecting screw hole, and the other side of the sliding block is provided with a connecting rod.
Preferably, the top end of the screw rod is provided with a screwing block, and the bottom end of the screw rod is provided with a bearing seat.
Preferably, the bottom end of the mounting bolt is fixedly provided with a limiting sleeve, and the bottom of the limiting sleeve is embedded with a rubber block.
Compared with the prior art, the invention has the beneficial effects that:
1. this power equipment installation insulating frame that can install fast has set up fixed knot and has constructed, moves to the inboard through pull ring pulling inserted bar, then places power equipment on the mounting panel, loosens the spring, thereby inside can carrying out quick installation and dismantlement to power equipment to the screw that the inserted bar inserted on power equipment under the effect of spring.
2. This power equipment installation insulating frame that can install fast has set up spout, slider and fixing bolt, when the installation, can drive the mounting panel through the slider according to the user's needs and remove to adjust power equipment's mounting height, then fix the slider inside screwing into connecting the screw with fixing bolt.
3. This power equipment installation insulator bracket that can install fast has set up screw rod and protection casing, when the installation, can drive the protection casing rebound through the screw rod, then installs power equipment on the mounting panel, then twists once more and moves the screw rod and drive protection casing lapse card and protect it on power equipment, avoids power equipment to receive the rainwater erosion.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a fixing structure according to the present invention;
FIG. 3 is a schematic view of a welding rod according to the present invention.
In the figure: 1. a base plate; 2. installing a bolt; 201. a limiting sleeve; 202. a rubber block; 3. welding a rod; 301. fixing screw holes; 302. fixing the bolt; 4. a chute; 5. a slider; 501. a connecting screw hole; 502. a connecting rod; 6. mounting a plate; 7. a fixed structure; 701. a spring; 702. a limiting plate; 703. inserting a rod; 704. a pull rod; 705. a pull ring; 8. a screw; 801. twisting the block; 802. a bearing seat; 9. a protective cover; 10. a heat dissipation port; 11. a rubber plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, an embodiment of the present invention is shown: an insulating frame for mounting power equipment capable of being quickly mounted comprises a bottom plate 1, welding rods 3, sliders 5, mounting plates 6 and a protective cover 9, wherein mounting bolts 2 are fixedly mounted at four corners of the bottom plate 1 through thread structures, the bottom plate 1 is fixedly mounted through the mounting bolts 2, the welding rods 3 are welded at positions, close to the four corners, of the top of the bottom plate 1, a sliding groove 4 is formed in one side of each welding rod 3, the sliders 5 are slidably mounted inside the sliding grooves 4, the mounting plates 6 are fixedly mounted between the sliders 5, the mounting plates 6 can be driven to vertically slide through the sliders 5 to adjust the height of the mounting plates 6, rubber plates 11 are arranged at the tops of the mounting plates 6, the rubber plates 11 play an insulating role, fixing structures 7 are arranged at positions, close to the four corners, of the tops of the rubber plates 11, the fixing structures 7 are used for fixedly mounting the power equipment, the protection casing 9 card plays the guard action on power equipment, and the four sides of protection casing 9 all are equipped with thermovent 10, and thermovent 10 is used for the heat dissipation.
Fixed knot constructs 7's inside and has welded limiting plate 702 through spring 701, the welding of one side of limiting plate 702 has inserted bar 703, inserted bar 703 extends to fixed knot constructs 7's the outside, the welding of limiting plate 702's opposite side has pull rod 704, pull rod 704 extends to fixed knot constructs 7's outside end welding has pull ring 705, before the power equipment installation, at first handheld pull ring 705 pulls inserted bar 703 and moves to the inboard, then place power equipment on mounting panel 6, then loosen pull ring 705, it inserts inside power equipment's the screw to push inserted bar 703 under spring 701's effect, thereby can install power equipment fast.
One side of the welding rod 3 is provided with a fixing screw hole 301, a fixing bolt 302 is fixedly installed inside the fixing screw hole 301 through a thread structure, and after the sliding block 5 slides to a required position inside the sliding groove 4, the fixing bolt 302 is screwed into the connecting screw hole 501 to fix the sliding block 5.
One side of the sliding block 5 is fixedly provided with a connecting screw hole 501, the connecting screw hole 501 is convenient for the fixing bolt 302 to be screwed in, the other side of the sliding block 5 is provided with a connecting rod 502, and the sliding block 5 is fixedly connected with the mounting plate 6 through the connecting rod 502.
The top of screw rod 8 is equipped with twists the piece 801, twists the piece 801 and is convenient for twist screw rod 8 and move, and the bottom of screw rod 8 is equipped with bearing frame 802, and screw rod 8 passes through the bottom fixed connection of bearing frame 802 with protection casing 9.
The bottom welding of construction bolt 2 has stop collar 201, and the bottom of stop collar 201 is inlayed and is installed block rubber 202, and block rubber 202 has the effect of shock attenuation buffering, avoids external vibrations to cause construction bolt 2 not hard up to appear.
The working principle is as follows: when the installation, the staff can slide the slider 5 to drive the mounting plate 6 to move according to the use requirement, the installation height is adjusted, then the fixing bolt 302 is screwed into the connecting screw hole 501 to fix the slider 5, then the screw 8 is screwed through the screwing block 801 to drive the protective cover 9 to move upwards, then the inserting rod 703 is pulled to move inwards by the handheld pull ring 705, then the electric power equipment is placed on the mounting plate 6, then the pull ring 705 is loosened, the inserting rod 703 is pushed under the action of the spring 701 to be inserted into the screw hole of the electric power equipment, so that the electric power equipment can be quickly installed, and then the screw 8 is screwed through the screwing block 801 to drive the protective cover 9 to move downwards to be clamped on the electric power equipment to protect the electric power equipment.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a power equipment installation insulator cradle that can install fast, includes bottom plate (1), welding rod (3), slider (5), mounting panel (6) and protection casing (9), its characterized in that: four angle fixed mounting of bottom plate (1) have construction bolt (2), bottom plate (1) top is close to the position department fixed mounting at four angles and has welding rod (3), one side of welding rod (3) is equipped with spout (4), the inside slidable mounting of spout (4) has slider (5), fixed mounting has mounting panel (6) between slider (5), the top of mounting panel (6) is equipped with rubber slab (11), the position department that rubber slab (11) top is close to four angles is equipped with fixed knot structure (7), screw rod (8) fixed mounting has protection casing (9) at the top of mounting panel (6) is passed through, the four sides of protection casing (9) all are equipped with thermovent (10).
2. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: fixed knot constructs the inside of (7) and has limiting plate (702) through spring (701) fixed mounting, and one side fixed mounting of limiting plate (702) has inserted bar (703), and inserted bar (703) extend to the outside of fixed knot structure (7), and the opposite side fixed mounting of limiting plate (702) has pull rod (704), and pull rod (704) extend to the outside end fixed mounting of fixed knot structure (7) have pull ring (705).
3. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: one side of the welding rod (3) is provided with a fixing screw hole (301), and a fixing bolt (302) is fixedly mounted inside the fixing screw hole (301).
4. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: one side of the sliding block (5) is fixedly provided with a connecting screw hole (501), and the other side of the sliding block (5) is provided with a connecting rod (502).
5. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: the top of screw rod (8) is equipped with twists piece (801), the bottom of screw rod (8) is equipped with bearing frame (802).
6. A quick-installable electrical equipment mounting insulator rack as claimed in claim 1 wherein: the bottom fixed mounting of construction bolt (2) has stop collar (201), and rubber block (202) are inlayed and are installed to the bottom of stop collar (201).
CN202010320256.6A 2020-04-22 2020-04-22 Power equipment installation insulating frame capable of being installed quickly Pending CN111326970A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010320256.6A CN111326970A (en) 2020-04-22 2020-04-22 Power equipment installation insulating frame capable of being installed quickly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010320256.6A CN111326970A (en) 2020-04-22 2020-04-22 Power equipment installation insulating frame capable of being installed quickly

Publications (1)

Publication Number Publication Date
CN111326970A true CN111326970A (en) 2020-06-23

Family

ID=71169908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010320256.6A Pending CN111326970A (en) 2020-04-22 2020-04-22 Power equipment installation insulating frame capable of being installed quickly

Country Status (1)

Country Link
CN (1) CN111326970A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111816394A (en) * 2020-07-10 2020-10-23 广州沐风信息科技有限公司 Power equipment installs insulating frame
WO2024093010A1 (en) * 2022-10-31 2024-05-10 济宁华源热电有限公司 High-precision assistance device for mounting of steam turbine rotor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111816394A (en) * 2020-07-10 2020-10-23 广州沐风信息科技有限公司 Power equipment installs insulating frame
CN111816394B (en) * 2020-07-10 2021-11-16 东台市新杰科机械有限公司 Power equipment installs insulating frame
WO2024093010A1 (en) * 2022-10-31 2024-05-10 济宁华源热电有限公司 High-precision assistance device for mounting of steam turbine rotor

Similar Documents

Publication Publication Date Title
CN111326970A (en) Power equipment installation insulating frame capable of being installed quickly
CN109818298B (en) Electrified installation device of aerial insulated wire lightning protection puncture fastener
CN211579312U (en) Power equipment installation insulating frame capable of being installed quickly
CN210040997U (en) Adjustable distribution box
CN205123046U (en) Outdoor block terminal of synthesizing convenient to height -adjusting
CN214889359U (en) Underground heating pipeline fixing device
CN205212287U (en) Switch board is used in chemical plant
CN206117066U (en) WLG tubular busbar groove is with wind -powered electricity generation generating line mounting structure
CN208461426U (en) A kind of arrester
CN220186479U (en) Angle steel tower equipment mounting frame
CN211479807U (en) Outdoor voltage transformer easy to install
CN205670486U (en) A kind of transformer water proof radiating base
CN220456205U (en) New forms of energy transformer radiator protective structure
CN219979493U (en) Temporary drop-out fuse
CN220553807U (en) Transformer substation arrester mounting structure
CN215672565U (en) Lightning arrester for wind power generation
CN204858336U (en) Distribution equipment with support function
CN221305241U (en) Grounding lightning rod for power transmission line
CN210167794U (en) Maintenance-free large-capacity combined overvoltage protection device
CN220066431U (en) High-voltage centrally-installed switchgear with circuit arrangement mechanism
CN211701119U (en) Power equipment box connecting device
CN220341867U (en) Change platform insulation external member
CN218414177U (en) Transformer cooler
CN202384721U (en) Power transmission line windproof bias apparatus fixed wire clamp
CN220539374U (en) Cement pole that lightning was hit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination