CN211572881U - Detachable temporary guardrail for building - Google Patents

Detachable temporary guardrail for building Download PDF

Info

Publication number
CN211572881U
CN211572881U CN201922175001.0U CN201922175001U CN211572881U CN 211572881 U CN211572881 U CN 211572881U CN 201922175001 U CN201922175001 U CN 201922175001U CN 211572881 U CN211572881 U CN 211572881U
Authority
CN
China
Prior art keywords
guardrail
vertical rod
locking screw
shaped
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922175001.0U
Other languages
Chinese (zh)
Inventor
杨康雨
任建业
姚文军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Corp Ltd
Priority to CN201922175001.0U priority Critical patent/CN211572881U/en
Application granted granted Critical
Publication of CN211572881U publication Critical patent/CN211572881U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a removable temporary guardrail for building, the technical scheme of adoption is the mode that adopts guardrail and railing post equipment to M-LOK principle is connected, but realizes quick assembly disassembly, including railing post, montant, upper beam, underbeam and locking device, the ditch is dug to the locking screw for T type, interior hexagonal, and railing post adopts the octagon, can be as required to eight directions extension railing, and used screw is metric system.

Description

Detachable temporary guardrail for building
Technical Field
The utility model relates to a guardrail field specifically is a temporary guardrail can be dismantled for building.
Background
The in-process of construction installation guardrail needs to build interim guardrail earlier in order to ensure staff's safety, and current mode is for welding the steel pipe on the building, and this kind of mode need cut, polish etc. dismantling the in-process, not only wastes time and energy, still influences the building pleasing to the eye.
The M-LOK system is a light weapon accessory mounting system released in 2014, the M-LOK adopts a rectangular hollow structure on a gun fender, a T-shaped nut is arranged at the bottom of the accessory, a nut rotating shaft adopts a mode of combining an arc and an edge, the two arcs are opposite, the two 90-degree edges are opposite, the nut is inserted into the rectangular hollow groove in an aligning mode during mounting, and then the nut is rotated by 90 degrees, so that the accessory can be locked on the fender.
SUMMERY OF THE UTILITY MODEL
In view of the problems in the prior art, the utility model discloses a detachable temporary guardrail for buildings, which adopts the technical proposal that a guardrail and a railing post are connected by the M-LOK principle to realize the rapid disassembly and assembly, and comprises the railing post, a first vertical rod, an upper beam and a lower beam, wherein the railing post and the railing are connected by the M-LOK system connection principle, and the locking mode is a T-shaped clamp nut and a locking screw; the guardrail column main body is an octagonal cylindrical column, each surface of the column is provided with an upper M-LOK system interface slot and a lower M-LOK system interface slot, and the size and the shape of each slot are the same as those of the clamping pin nut; the first vertical rod of the guardrail is fixed by an upper beam and a lower beam, two second vertical rods are arranged at two ends of the beam and are wider than the first vertical rod in the middle, a locking device consisting of a clamping nut and a locking screw is arranged on each second vertical rod, the head of each locking screw faces inwards, and a circular hole is formed in the part, where the locking screw is arranged, of each second vertical rod.
As a preferred technical scheme of the utility model, the locking screw is T-shaped, the T-shaped head is the same as the clamping nut, and the planing ditch at the head of the locking screw is positioned at the center of the T-shaped head and is a standard internal hexagonal planing ditch; the connecting part of the locking screw and the second vertical rod is cylindrical.
As a preferred technical scheme of the utility model, railing stand bottom is a round platform shape base, and both ends threaded hole about the base, screw hole are standard screw thread hole, use screw and ground fixed during installation railing stand.
As a preferred technical solution of the present invention, the rotation shaft of the bayonet nut is composed of two sections, the section connected to the railing post is an arc-shaped and corner-angle body specific to the M-LOK system, the two arc surfaces are opposite, the two 90-degree corner-angle surfaces are opposite, and the thickness of the rotation shaft is the same as that of the railing post; the end connected with the second vertical rod is a cylinder, and the thickness of the cylinder is the same as that of the second vertical rod.
The utility model has the advantages that: the utility model adopts the M-LOK structure, so that the guardrail can be assembled and disassembled more quickly, and the M-LOK locking structure is stable and has good shock resistance; the locking screw is changed into a T-shaped and inner hexagonal groove, the locking tool is metric, the locking tool is convenient to obtain, and the locking tool can be locked by hands or other tools under the condition of no tool; the railing stand column is octagonal, the railing can be extended to eight directions as required, the base is provided with standard screw thread holes, and the parts are convenient and fast to obtain.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic top view of the balustrade post of the present invention;
fig. 3 is a schematic view of the locking structure of the present invention;
in the figure: the novel guardrail comprises 1-guardrail upright posts, 2-slots, 3-threaded holes, 4-first vertical rods, 5-upper beams, 6-lower beams, 7-locking devices, 8-clamping-pin nuts, 9-locking screws and 10-second vertical rods.
Detailed Description
Example 1
As shown in fig. 1 to 3, the utility model discloses a temporary guardrail can be dismantled for building, the technical scheme of adoption is the mode that adopts guardrail and railing post equipment to M-LOK principle is connected, but realizes quick assembly disassembly, including railing post 1, first montant 4, upper beam 5, underbeam 6, its characterized in that: the guardrail upright post 1 is connected with the guardrail by adopting an M-LOK system connection principle, and the locking mode is a T-shaped clamp nut 8 and a locking screw 9; the main body of the railing column 1 is an octagonal cylindrical column, each surface of the column is provided with an upper M-LOK system interface slot 2 and a lower M-LOK system interface slot 2, and the size and the shape of each slot 2 are the same as those of a clamping pin nut; the first vertical rod 4 of the guardrail is fixed by an upper beam 5 and a lower beam 6, two second vertical rods 10 are arranged at two ends of the beam, the width of the first vertical rod 4 is larger than that of the middle of the beam, a locking device 7 consisting of a clamping nut 8 and a locking screw 9 is arranged on each second vertical rod 10, the head of each locking screw 9 faces inwards, and a circular hole is formed in the position, where the locking screw 9 is arranged, of each second vertical rod 10.
As a preferred technical scheme of the utility model, the locking screw 9 is T-shaped, the T-shaped head is the same as the clamping nut 8, and the planing groove at the head of the locking screw 9 is positioned at the center of the T-shaped head and is a standard inner hexagonal planing groove; the connecting part of the locking screw 9 and the second vertical rod 10 is cylindrical.
As a preferred technical scheme of the utility model, 1 bottom of railing post is a round platform shape base, and both ends threaded hole 3 about the base, and threaded hole 3 is standard screw thread hole.
As a preferred technical solution of the present invention, the rotation axis of the locking nut 8 is composed of two sections, the section connected to the railing post 1 is an arc-shaped and angular body unique to the M-LOK system, the two arc surfaces are opposite, the two 90-degree angular surfaces are opposite, and the thickness thereof is the same as the thickness of the railing post 1; the end connected with the second vertical rod 10 is a cylinder, and the thickness of the cylinder is the same as that of the second vertical rod 10.
The utility model discloses a theory of operation: because of slot on the railing post is the same with locking device's card foot nut size on the guardrail, card foot nut rotating shaft length is the same with railing post wall thickness, installation locking device's montant thickness sum, during equipment guardrail and railing post, will block foot nut and pass the slot, and card foot nut T type bottom surface is flat mutually with railing post inner wall this moment, and rotatory locking screw blocks the foot nut and can tightly block the railing post.
The mechanical connection of the present invention is a conventional means adopted by those skilled in the art, and can be taught through limited tests, and belongs to the widely used prior art.
Components not described in detail herein are prior art.
Although the present invention has been described in detail with reference to the specific embodiments, the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge range of those skilled in the art, and modifications or variations without creative efforts are still within the scope of the present invention.

Claims (4)

1. The utility model provides a temporary guardrail can be dismantled for building, includes railing post (1), first montant (4), entablature (5), underbeam (6), its characterized in that: the guardrail upright posts (1) are connected with the guardrail by adopting an M-LOK system connection principle, and the locking mode is a T-shaped clamp nut (8) and a locking screw (9); the main body of the railing column (1) is an octagonal cylindrical column, each surface of the column is provided with an upper M-LOK system interface slot (2) and a lower M-LOK system interface slot (2), and the size and the shape of each slot (2) are the same as those of the clamping pin nut; the first vertical rod (4) of the guardrail is fixed by an upper beam (5) and a lower beam (6), two second vertical rods (10) are arranged at two ends of the beam, the width of the first vertical rod (4) is larger than that of the middle of the beam, a locking device (7) consisting of a clamping nut (8) and a locking screw (9) is arranged on each second vertical rod (10), the head of each locking screw (9) faces inwards, and a circular hole is formed in the position where the locking screw (9) is arranged on each second vertical rod (10).
2. A detachable temporary guard rail for construction according to claim 1, wherein: the locking screw (9) is T-shaped, the T-shaped head is the same as the clamping nut (8), and the head groove of the locking screw (9) is positioned in the center of the T-shaped head and is a standard inner hexagonal groove; the connecting part of the locking screw (9) and the second vertical rod (10) is cylindrical.
3. A detachable temporary guard rail for construction according to claim 1, wherein: the guardrail is characterized in that the bottom of the guardrail upright post (1) is a round table-shaped base, threaded holes (3) are formed in the left end and the right end of the base, and the threaded holes (3) are standard screw threaded holes.
4. A detachable temporary guard rail for construction according to claim 1, wherein: the rotating shaft of the clamp nut (8) consists of two sections, the section connected with the railing post (1) is an arc-shaped and edge-angle body special for an M-LOK system, the two arc surfaces are opposite, the two 90-degree edge-angle surfaces are opposite, and the thickness of the rotating shaft is the same as that of the railing post (1); the end connected with the second vertical rod (10) is a cylinder, and the thickness of the cylinder is the same as that of the second vertical rod (10).
CN201922175001.0U 2019-12-07 2019-12-07 Detachable temporary guardrail for building Active CN211572881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922175001.0U CN211572881U (en) 2019-12-07 2019-12-07 Detachable temporary guardrail for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922175001.0U CN211572881U (en) 2019-12-07 2019-12-07 Detachable temporary guardrail for building

Publications (1)

Publication Number Publication Date
CN211572881U true CN211572881U (en) 2020-09-25

Family

ID=72533099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922175001.0U Active CN211572881U (en) 2019-12-07 2019-12-07 Detachable temporary guardrail for building

Country Status (1)

Country Link
CN (1) CN211572881U (en)

Similar Documents

Publication Publication Date Title
US4194338A (en) Construction components, assemblies thereof, and methods of making and using same
CN109898652B (en) Steel part connecting structure and connecting method thereof
CN211572881U (en) Detachable temporary guardrail for building
CN117071982A (en) Rail guard convenient to concatenation
CN218935910U (en) Settlement monitoring device after construction of highway soft foundation
CN214658712U (en) Operation platform applied to steel structure high-altitude construction
CN216381437U (en) Novel tunnel construction is strutted device
CN213417851U (en) Interim protector of foundation ditch for construction site operation
CN208563180U (en) A kind of guardrail cross beams bindiny mechanism
CN210918163U (en) Steel beam operation platform
CN209954104U (en) A tailor-welded braced mould for construction elevator standard festival
CN220335655U (en) Flat stone construction clamping device for municipal road engineering construction
CN208563179U (en) Adjustable-angle combines guardrail
CN219261946U (en) Building engineering rail guard
CN220184808U (en) Safety guard rail for electric power construction
CN218819388U (en) Portable distance measuring device for garden engineering planning and design
CN213807520U (en) Foldable portable crawling ladder for building engineering installation
CN217106308U (en) Wooden railing fixed knot of ancient building restoration constructs
CN220620980U (en) Building climbing frame for constructional engineering
CN217581256U (en) Building engineering template fixing device
CN219005068U (en) Flange butt joint device
CN218149361U (en) Assembled metal railing
CN217028405U (en) Building engineering construction is with enclosing fender
CN212175503U (en) Scaffold for highway bridge
CN108265654A (en) A kind of adjustable fence unit of setting angle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant