CN211572491U - Scaffold fixing device for building construction - Google Patents

Scaffold fixing device for building construction Download PDF

Info

Publication number
CN211572491U
CN211572491U CN201921854232.8U CN201921854232U CN211572491U CN 211572491 U CN211572491 U CN 211572491U CN 201921854232 U CN201921854232 U CN 201921854232U CN 211572491 U CN211572491 U CN 211572491U
Authority
CN
China
Prior art keywords
bottom block
threaded
splint
thick bamboo
fixed mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921854232.8U
Other languages
Chinese (zh)
Inventor
刘雪婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Zhongfusheng Construction Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921854232.8U priority Critical patent/CN211572491U/en
Application granted granted Critical
Publication of CN211572491U publication Critical patent/CN211572491U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a construction scaffold frame fixing device relates to construction technical field, including two bottom blocks one, two symmetrical bottom blocks two, every have been placed on the right side of bottom block one the equal fixed mounting in right flank of bottom block one has a grafting section of thick bamboo. This construction scaffold frame fixing device, place the both sides at the scaffold frame with bottom block one and bottom block two respectively, through to both sides pulling bottom block one and bottom block two, thereby the inside of a spacing section of thick bamboo is stretched out to the pulling gag lever post, the transverse spacing of the device has been increased, and insert the inside of a grafting section of thick bamboo with the inserted bar, establish splint one and splint two on four supporting legs of scaffold frame, adjust bottom block one and bottom block two interval each other, and screw shank of bolt and nut, screw threaded pipe one and threaded pipe two, thereby fix the position of bottom block one and bottom block two, thereby the stability of the device has been improved, avoid the unstable problem of heeling of scaffold frame when buildding and using.

Description

Scaffold fixing device for building construction
Technical Field
The utility model relates to a construction technical field specifically is a construction scaffold frame fixing device.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place, including foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like.
Scaffold for construction supports the scaffold frame by four supporting legs usually in the in-process of using, and when the scaffold frame was built higher, the unstable problem caused easily in the bottom, caused easily turning on one's side, consequently just need use scaffold frame fixing device to carry out auxiliary stay to the scaffold frame.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a construction scaffold fixing device possesses the effectual advantage of auxiliary stay, solves the problem that the scaffold heels easily when putting up higher.
The utility model discloses a solve above-mentioned technical problem, provide following technical scheme: the utility model provides a construction scaffold frame fixing device, includes two bottom blocks one, two symmetrical bottom blocks two have been placed on the right side of bottom block one, every the equal fixed mounting in right flank of bottom block one has a section of thick bamboo that pegs graft, every the equal fixed mounting in left surface of bottom block two has a grafting pole, two the left side of grafting pole extends to the inside of two sections of thick bamboo that peg graft respectively.
Two the side that a grafting section of thick bamboo kept away from each other has all seted up the spacing groove, two the equal fixed mounting in a side that the inserted bar kept away from each other has threaded rod one, two the one end that threaded rod one was kept away from each other runs through two spacing grooves respectively and extends to the outside of a grafting section of thick bamboo, two a side that the bottom piece one was close to each other and two bottom pieces two a side that is close to each other fixed mounting respectively have spacing section of thick bamboo and gag lever post, and two gag lever posts extend to the inside of two spacing sections of thick bamboo respectively, two the slide has all been seted up to the side that spacing section of thick bamboo was kept away from each other, two the equal fixed mounting in a side that the gag lever post was kept away from each other has threaded rod two, two the.
Furthermore, a first threaded pipe matched with the first threaded rod is placed on one side face, far away from the two inserting cylinders, of the first threaded pipe, and inner rings of the first threaded pipe are respectively in threaded connection with the outer surfaces of the first threaded rod.
By adopting the technical scheme, the positions of the pair of insertion rods and the insertion cylinder are better fixed by screwing the threaded pipe.
Furthermore, a second threaded pipe matched with the second threaded rod is placed on one side face, far away from the two limiting cylinders, of the two limiting cylinders, and inner rings of the second threaded pipes are respectively in threaded connection with the outer surfaces of the second threaded rods.
Through adopting above-mentioned technical scheme, better fix through the position of screwing screwed pipe two pairs of gag lever posts and spacing section of thick bamboo.
Furthermore, hinged frames are fixedly mounted on the upper surfaces of the first bottom block and the second bottom block, supporting rods are fixedly hinged inside the hinged frames through pin shafts, grooves are formed in the top ends of the supporting rods, and connecting rods are fixedly hinged inside the grooves through pin shafts.
Through adopting above-mentioned technical scheme, better through the bracing piece carry out auxiliary stay to four supporting legs of scaffold frame after the installation.
Further, every the equal fixed mounting in top of connecting rod has splint one, every the surface of splint one all has splint two, every through the fixed hinge joint of round pin axle splint one and the equal fixed mounting in the one end that splint two are close to each other has the connecting plate, the shank of bolt, every have been placed to a side of connecting plate the threaded end of shank of bolt all runs through two connecting plates and extends to the outside of connecting plate, and the equal threaded connection of the threaded end of every shank of bolt has the nut.
Through adopting above-mentioned technical scheme, better supporting leg through splint one and splint two pairs of scaffolds is established fixedly.
Furthermore, a base plate is fixedly installed on the bottom surface of each of the first bottom block and the second bottom block.
Through adopting above-mentioned technical scheme, better support the device through the backing plate, better and ground contact increase frictional force to better improvement stability.
Compared with the prior art, this scaffold fixing device for building construction possesses following beneficial effect:
1. the utility model discloses a be provided with bottom block one and bottom block two, at the in-process that uses, place the both sides at the scaffold frame with bottom block one and two respectively, and through to both sides pulling bottom block one and bottom block two, thereby the pulling gag lever post stretches out the inside of a spacing section of thick bamboo, thereby increased the device's horizontal interval, and insert the inside of a grafting section of thick bamboo with the inserted bar, thereby increase the stress area of the device bottom, the stability of better assurance scaffold when putting up and using.
2. The utility model discloses a be provided with bracing piece, splint one and splint two, establish splint one and splint two on four supporting legs of scaffold frame, adjust bottom piece one and the interval between bottom piece two each other, make its adjustment to extreme position, and screw shank and nut, screw screwed pipe one and screwed pipe two, thereby fix bottom piece one and the position of bottom piece two, thereby improved the device's stability, avoid the problem that the scaffold frame unstability heeled when buildding and using.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the present invention;
fig. 3 is an enlarged schematic view of a structure shown in fig. 2 according to the present invention.
In the figure: 1-bottom block I, 2-threaded rod I, 3-threaded pipe I, 4-limiting groove, 5-inserting barrel, 6-inserting rod, 7-backing plate, 8-limiting rod, 9-slideway, 10-limiting barrel, 11-threaded pipe II, 12-threaded rod II, 13-bottom block II, 14-hinged rack, 15-supporting rod, 16-groove, 17-connecting rod, 18-clamping plate I, 19-threaded rod, 20-connecting plate, 21-nut and 22-clamping plate II.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a construction scaffold frame fixing device, includes two bottom blocks 1, and two symmetrical bottom blocks two 13 have been placed on two bottom block 1's right sides, and the equal fixed mounting in right flank of every bottom block 1 has a section of thick bamboo 5 that plugs, and the equal fixed mounting in left surface of every bottom block two 13 has a grafting pole 6, and the left side of two grafting poles 6 extends to the inside of two sections of thick bamboo 5 that plugs respectively.
One side surface of each of the two inserting cylinders 5, which is far away from each other, is provided with a limiting groove 4, one side surface of each of the two inserting rods 6, which is far away from each other, is fixedly provided with a threaded rod I2, one end of each of the two threaded rods I2, which is far away from each other, penetrates through the two limiting grooves 4 and extends to the outer side of the inserting cylinder 5, one side surface of each of the two bottom blocks I1, which is close to each other, and one side surface of each of the two bottom blocks II 13, which is close to each other, are fixedly provided with a limiting cylinder 10 and a limiting rod 8, each of the two limiting rods 8 extends to the inner side of the two limiting cylinders 10, one side surface of each of the two limiting cylinders 10, which is far away from each other, is provided with a threaded rod II 12, one end of each of the two threaded rods II 12, which is far away from each other, penetrates, inner rings of the two threaded pipes I3 are respectively in threaded connection with the outer surfaces of the two threaded rods I2, the positions of the inserting connection rod 6 and the inserting connection cylinder 5 are preferably fixed by screwing the threaded pipes I3, a threaded pipe II 11 matched with the threaded rod II 12 is arranged on one side surface, far away from each other, of the two limiting cylinders 10, the inner rings of the two threaded pipes II 11 are respectively in threaded connection with the outer surfaces of the two threaded rods II 12, the positions of the limiting rod 8 and the limiting cylinders 10 are preferably fixed by screwing the threaded pipe II 11, hinged frames 14 are fixedly arranged on the upper surfaces of each bottom block I1 and the bottom block II 13, a support rod 15 is fixedly hinged inside each hinged frame 14 through a pin shaft, a groove 16 is formed in the top end of each support rod 15, a connecting rod 17 is fixedly hinged inside each groove 16 through a pin shaft, and four support legs of the scaffold are preferably supported after installation through the support rods 15, the equal fixed mounting in top of every connecting rod 17 has splint one 18, the surface of every splint one 18 all has splint two 22 through the fixed articulated of round pin axle, the equal fixed mounting in one end that every splint one 18 and splint two 22 are close to each other has connecting plate 20, shank of bolt 19 has been placed to a side of connecting plate 20, the screw thread end of every shank of bolt 19 all runs through two connecting plates 20 and extends to the outside of connecting plate 20, and the equal threaded connection of the screw thread end of every shank of bolt 19 has nut 21, the better supporting leg of scaffold is established fixedly through splint one 18 and splint two 22, the equal fixed mounting in bottom surface of every bottom block 1 and bottom block two 13 has backing plate 7, the better supports the device through backing plate 7, better and ground contact increase frictional force, thereby better improvement stability.
When in use, the first bottom block 1 and the second bottom block 13 are respectively placed at two sides of the scaffold, and the first bottom block 1 and the second bottom block 13 are pulled towards the two sides, thereby pulling the limiting rod 8 to extend out of the inner part of the limiting cylinder 10, thereby increasing the transverse spacing of the device, inserting the inserting rod 6 into the inner part of the inserting cylinder 5, thereby increasing the stress area of the bottom of the device, better ensuring the stability of the scaffold during the building and the use, sleeving the splint I18 and the splint II 22 on the four supporting legs of the scaffold, adjusting the distance between the bottom block I1 and the bottom block II 13 to ensure that the bottom of the scaffold is adjusted to the limit position, and the bolt rod 19 and the nut 21 are screwed, the first threaded pipe 3 and the second threaded pipe 11 are screwed, therefore, the positions of the first bottom block 1 and the second bottom block 13 are fixed, the stability of the device is improved, and the problem that the scaffold is unstable and inclined when being built and used is avoided.

Claims (6)

1. The utility model provides a construction scaffold fixing device, includes two bottom blocks one (1), its characterized in that: two symmetrical bottom blocks II (13) are placed on the right sides of the two bottom blocks I (1), an inserting cylinder (5) is fixedly installed on the right side face of each bottom block I (1), an inserting rod (6) is fixedly installed on the left side face of each bottom block II (13), and the left sides of the two inserting rods (6) extend into the two inserting cylinders (5) respectively;
two spacing groove (4) have all been seted up to the side of keeping away from each other of a section of thick bamboo of pegging graft (5), two the equal fixed mounting in a side that peg graft pole (6) kept away from each other has threaded rod (2), two the one end that threaded rod (2) kept away from each other runs through two spacing groove (4) respectively and extends to the outside of a section of thick bamboo of pegging graft (5), two a side that piece (1) is close to each other and two a side that piece two (13) are close to each other respectively fixed mounting have spacing section of thick bamboo (10) and gag lever post (8), and two gag lever posts (8) extend to the inside of two spacing section of thick bamboo (10) respectively, two slide (9) have all been seted up to a side that spacing section of thick bamboo (10) was kept away from each other, two the equal fixed mounting in a side that gag lever post (8) were kept away from each other has threaded rod two (12), two the one end that two (12) were kept away .
2. A construction scaffolding fixture as claimed in claim 1, in which: and a first threaded pipe (3) matched with the first threaded rod (2) is placed on one side surface, far away from the first inserting cylinder (5), of the first inserting cylinder, and inner rings of the first threaded pipe (3) are respectively in threaded connection with the outer surfaces of the first threaded rod (2).
3. A construction scaffolding fixture as claimed in claim 1, in which: and a second threaded pipe (11) matched with the second threaded rod (12) is arranged on one side surface of the two limiting cylinders (10) far away from each other, and the inner rings of the second threaded pipes (11) are respectively in threaded connection with the outer surfaces of the second threaded rods (12).
4. A construction scaffolding fixture as claimed in claim 1, in which: every the equal fixed mounting of the upper surface of bottom block (1) and bottom block two (13) has articulated frame (14), every the inside of articulated frame (14) all has bracing piece (15) through the fixed hinge joint of round pin axle, every the top of bracing piece (15) all is seted up flutedly (16), every the inside of recess (16) all has connecting rod (17) through the fixed hinge joint of round pin axle.
5. A construction scaffolding fixture as claimed in claim 4, in which: every the equal fixed mounting in top of connecting rod (17) has splint one (18), every the surface of splint one (18) all articulates through the round pin hub fixation has splint two (22), every the equal fixed mounting in one end that splint one (18) and splint two (22) are close to each other has connecting plate (20), shank of bolt (19), every have been placed to a side of connecting plate (20) the threaded end of shank of bolt (19) all runs through two connecting plates (20) and extends to the outside of connecting plate (20), and the equal threaded connection of the threaded end of every shank of bolt (19) has nut (21).
6. A construction scaffolding fixture as claimed in claim 1, in which: and the bottom surfaces of the first bottom block (1) and the second bottom block (13) are fixedly provided with backing plates (7).
CN201921854232.8U 2019-10-30 2019-10-30 Scaffold fixing device for building construction Active CN211572491U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921854232.8U CN211572491U (en) 2019-10-30 2019-10-30 Scaffold fixing device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921854232.8U CN211572491U (en) 2019-10-30 2019-10-30 Scaffold fixing device for building construction

Publications (1)

Publication Number Publication Date
CN211572491U true CN211572491U (en) 2020-09-25

Family

ID=72529955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921854232.8U Active CN211572491U (en) 2019-10-30 2019-10-30 Scaffold fixing device for building construction

Country Status (1)

Country Link
CN (1) CN211572491U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112878649A (en) * 2021-01-11 2021-06-01 范会义 Hydraulic engineering scaffold in adaptable waters
CN114575583A (en) * 2022-03-18 2022-06-03 安徽省申栈工程科技有限公司 Fixing device for building scaffold steel pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112878649A (en) * 2021-01-11 2021-06-01 范会义 Hydraulic engineering scaffold in adaptable waters
CN114575583A (en) * 2022-03-18 2022-06-03 安徽省申栈工程科技有限公司 Fixing device for building scaffold steel pipe

Similar Documents

Publication Publication Date Title
CN211572491U (en) Scaffold fixing device for building construction
CN213626546U (en) Scaffold with base
CN217027954U (en) Scaffold for building engineering
CN214329893U (en) Supporting structure of building construction template
CN215488038U (en) Hydraulic engineering construction drainage pipe convenient to adjust
CN211172608U (en) Keel of cold-bending glass curtain wall
CN211523504U (en) Combined truss convenient to connect
CN210369872U (en) High mortise-tenon joint formula scaffold frame of security
CN112376909A (en) Formwork fixing device for construction engineering and construction method thereof
CN220848190U (en) Stone curtain wall mounting and fixing structure
CN212105087U (en) Scaffold for building construction
CN216921342U (en) Prevention of seepage water wall form structure is under construction to building engineering
CN219080960U (en) High-strength and high-toughness wood building template
CN211286553U (en) Multistage assembled lattice frame building structure
CN220790549U (en) Scaffold jacking inner steel limiting device
CN215631611U (en) Hang mould bearing structure
CN219411426U (en) Large-deformation-adaptive non-prestress pull rod connecting structure
CN220247534U (en) Scaffold with auxiliary inclined supporting structure
CN213269219U (en) Connector for mounting top of hexagonal awning
CN211371495U (en) Concrete pump pipe fixing device
CN216713838U (en) Beam bottom supporting and jacking device capable of being rapidly installed and disassembled
CN212078682U (en) Post mould fastener for building construction
CN211850772U (en) Building engineering external scaffolding is wall spare even
CN216305308U (en) Water conservancy building construction tubular column supports system connecting piece
CN212984569U (en) Scaffold for assembly type building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220602

Address after: 3-6, No. 1, Xuefu Road, Xiazhu Township, Minqing County, Fuzhou, Fujian 350800

Patentee after: Fujian zhongfusheng Construction Development Co.,Ltd.

Address before: 476000 2108, floor 21, building B, Huicheng international, intersection of Shenhuo Avenue and Xiangjun Road, Suiyang District, Shangqiu City, Henan Province

Patentee before: Liu Xueting

TR01 Transfer of patent right