CN211571435U - Bridge triangle hanging basket - Google Patents

Bridge triangle hanging basket Download PDF

Info

Publication number
CN211571435U
CN211571435U CN202020090008.2U CN202020090008U CN211571435U CN 211571435 U CN211571435 U CN 211571435U CN 202020090008 U CN202020090008 U CN 202020090008U CN 211571435 U CN211571435 U CN 211571435U
Authority
CN
China
Prior art keywords
sliding
bridge
hanging basket
triangular
sliding groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020090008.2U
Other languages
Chinese (zh)
Inventor
李培海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020090008.2U priority Critical patent/CN211571435U/en
Application granted granted Critical
Publication of CN211571435U publication Critical patent/CN211571435U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a bridge triangle hangs basket, including triangle-shaped frame, bridge body, triangle-shaped frame left part lower extreme is equipped with a plurality of spacing groove, and spacing groove and triangle-shaped frame fixed connection, the carriage release lever has been run through to the spacing inslot, carriage release lever and spacing groove sliding connection, and triangle-shaped frame lower extreme is equipped with the mounting panel. The triangular frame can move left and right through the sliding groove II, the idler wheel, the fixed block, the sliding block II, the sliding groove III and the balls, so that the work of workers is facilitated, the limiting groove and the moving rod can limit the direction of the hanging basket when moving downwards, the hanging basket is prevented from swinging left and right, the stability of the device is improved, and the construction of the workers is facilitated; the hanging basket can be moved left and right through the push rod motor, the sliding groove I and the sliding block I, and workers can adjust the position of the hanging basket according to the distance between different areas of the bridge body and the hanging basket, so that the construction of the workers is facilitated.

Description

Bridge triangle hanging basket
Technical Field
The utility model relates to a bridge construction technical field specifically is basket is hung to bridge triangle.
Background
The bridge is generally a structure which is erected on rivers, lakes and seas and allows vehicles, pedestrians and the like to smoothly pass through. In order to adapt to the modern high-speed developed traffic industry, bridges are also extended to be constructed to span mountain stream, unfavorable geology or meet other traffic needs, so that the buildings are convenient to pass. The bridge generally comprises an upper structure, a lower structure, a support and an auxiliary structure, wherein the upper structure is also called a bridge span structure and is a main structure for spanning obstacles; the lower structure comprises a bridge abutment, a bridge pier and a foundation; the support is a force transmission device arranged at the supporting positions of the bridge span structure and the bridge pier or the bridge abutment; the auxiliary structures refer to bridge end butt straps, tapered revetments, diversion works and the like.
The production and casting of iron in the 18 th century provides a new building material for bridges. However, cast iron has poor impact resistance, low tensile strength and easy fracture, and is not a good bridging material. After the 50 th 19 th century, steel became an important bridging material with the development of acid converter steelmaking and open hearth steelmaking technologies. The steel has high tensile strength and good impact resistance, and particularly steel plates and steel products with rectangular rolled sections appear in the 70 th 19 th century, thereby creating conditions for assembling bridge parts in factories and enabling the steel products to be increasingly widely applied.
In the beginning of 18 th century, cement prepared by mixing and calcining lime, clay and hematite is invented. In the 50 s of the 19 th century, reinforcing steel bars were placed in concrete to make up for the disadvantage of poor tensile property of cement. Since then, reinforced concrete bridges were built in the 70 s of the 19 th century.
The recent bridge construction promotes the rise and development of the scientific theory of bridges. In 1857, a more complete beam theory and torsion theory were proposed on the basis of the theory, statics and material mechanics research of arches of saint wonan. The theory of continuous beams and cantilevers is also established for this period. Bridge truss analysis (such as analysis methods of the gordon truss and the haugh truss) is also solved. After the 70 th century in 19 th century, through the efforts of german K. Kulman, English W.J.M. Rankine, J.C. Maxwell and the like, structural mechanics is greatly developed, and the stress generated by each component of the bridge under the load action can be analyzed. The development of these theories has driven the development of trusses, continuous beams and cantilever beams. At the end of the 19 th century, the theory of elastic arches is more perfect, and the development of arch bridges is promoted. The rise of soil mechanics in the 20 th century promoted the theoretical research of bridge foundation. The modern bridge is divided according to the bridge building materials, and comprises an iron bridge, a steel bridge and a reinforced concrete bridge besides a wood bridge and a stone bridge.
However, most triangular hanging baskets used at present are inconvenient to move, construction efficiency is reduced, when the lower end of a bridge works, the hanging baskets are different in separation distance from the wall of the bridge, a worker construction area is far away from the hanging baskets, construction difficulty is increased, and construction efficiency is reduced. Accordingly, a bridge triangular cradle is provided by those skilled in the art to solve the problems set forth in the background art.
Disclosure of Invention
An object of the utility model is to provide a bridge triangle hangs basket to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a bridge triangular hanging basket comprises a triangular frame and a bridge body, wherein the lower end of the left part of the triangular frame is provided with a plurality of limiting grooves, the limiting grooves are fixedly connected with the triangular frame, a moving rod penetrates through the limiting grooves and is in sliding connection with the limiting grooves, the lower end of the triangular frame is provided with a mounting plate, the mounting plate is connected with a wire coil through a rope, the wire coil is fixedly connected with the triangular frame, the lower end of the mounting plate is fixedly connected with a first sliding groove, a plurality of first sliding blocks penetrate through the first sliding groove, the left side of the first sliding groove is provided with a push rod motor, the push rod motor is fixedly connected with the first sliding blocks, the lower end of the mounting plate is provided with a hanging basket, the hanging basket is fixedly connected with the first sliding blocks, the lower end of the triangular frame is provided with a plurality of fixing blocks, the fixing blocks are positioned above the bridge body, the lower parts of, the roller is connected with the second sliding groove in a sliding mode, the second sliding blocks are arranged at the bottom end of the right side of the triangular frame, the second sliding blocks are clamped into the third sliding groove, and the third sliding groove is fixedly connected with the limiting groove.
As the utility model discloses further scheme, the mounting panel upper end is equipped with a plurality of rings, and rings pass through the screw thread to be connected with the mounting panel, rings and rope fixed connection, and the rope adopts the nylon materials.
As a further scheme of the utility model, the drum left side is equipped with a plurality of pulley, rope and pulley sliding connection.
As a further proposal of the utility model, an end of the sliding groove is provided with an anti-collision block, and the anti-collision block is made of rubber material.
As a further proposal of the utility model, a plurality of ball is arranged in the third sliding groove, and the ball is connected with the second sliding block in a sliding way.
As a further aspect of the utility model, triangle frame left part lower extreme and collar fixed connection, the slipmat is installed to the bottom in the hanging flower basket, and the rope runs through the collar.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the triangular frame can be moved left and right through the sliding groove II, the idler wheels, the fixed block, the sliding block II, the sliding groove III and the balls, so that workers can conveniently work;
2. the hanging basket can be moved left and right through the push rod motor, the sliding groove I and the sliding block I, and workers can adjust the position of the hanging basket according to the distance between different areas of the bridge body and the hanging basket, so that the construction of the workers is facilitated; the direction of movement of rope can be restricted to collar, pulley, prevents that the rope card from making things convenient for the staff to operate on the device, and the slipmat can prevent that the staff from skidding because of the sole and taking place danger during operation.
Drawings
Fig. 1 is a structural schematic diagram of a bridge triangular hanging basket.
Fig. 2 is a schematic structural view of the bridge triangular cradle at a position in fig. 1.
Fig. 3 is a schematic structural view of the bridge triangular cradle at the position B in fig. 1.
FIG. 4 is a schematic structural diagram of a first sliding groove in a triangular hanging basket of a bridge.
In the figure: 1. a triangular frame; 2. a bridge body; 3. a limiting groove; 4. a travel bar; 5. a mounting ring; 6. a hoisting ring; 7. a rope; 8. a pulley; 9. wire coils; 10. mounting a plate; 11. a first sliding groove; 12. a first sliding block; 13. a hanging basket; 14. a non-slip mat; 15. a second sliding groove; 16. a roller; 17. a fixed block; 18. a second sliding block; 19. a sliding groove III; 20. a ball bearing; 21. a push rod motor.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, in the embodiment of the present invention, a triangular hanging basket for a bridge comprises a triangular frame 1 and a bridge body 2, wherein a plurality of limiting grooves 3 are formed at the lower end of the left portion of the triangular frame 1, the limiting grooves 3 are fixedly connected with the triangular frame 1, a moving rod 4 penetrates through the limiting grooves 3, the moving rod 4 is slidably connected with the limiting grooves 3, the lower end of the left portion of the triangular frame 1 is fixedly connected with a mounting ring 5, a mounting plate 10 is arranged at the lower end of the triangular frame 1, a plurality of hanging rings 6 are arranged at the upper end of the mounting plate 10, the hanging rings 6 are connected with the mounting plate 10 through threads, the hanging rings 6 are fixedly connected with a rope 7, the rope 7 is made of nylon material, the mounting plate 10 is connected with a wire coil 9 through the rope 7, the wire coil 9 is fixedly connected with the triangular frame 1, a plurality of pulleys 8 are arranged at the left side of the wire coil 9, the rope 7 is slidably connected, a plurality of first sliding blocks 12 penetrate through the first sliding groove 11, a push rod motor 21 is arranged on the left side of the first sliding groove 11, the push rod motor 21 is fixedly connected with the first sliding blocks 12, an anti-collision block is arranged at the tail end of the first sliding groove 11 and is made of rubber materials, a hanging basket 13 is arranged at the lower end of a mounting plate 10, the hanging basket 13 is fixedly connected with the first sliding blocks 12, an anti-slip mat 14 is arranged at the inner bottom end of the hanging basket 13, a plurality of fixing blocks 17 are arranged at the lower end of a triangular frame 1, the fixing blocks 17 are positioned above a bridge body 2, the lower portions of the fixing blocks 17 are rotatably connected with rollers 16 through rotating shafts, the upper end of the bridge body 2 is fixedly connected with a second sliding groove 15, the rollers 16 penetrate through and are clamped into a second sliding groove 15, the rollers 16 are slidably connected with the second sliding groove 15, a plurality of second sliding blocks 18 are arranged at the bottom end of the right side of, the ball 20 is connected with the second slide block 18 in a sliding way.
The utility model discloses a theory of operation is:
the utility model discloses during the use, through sliding tray two 15, gyro wheel 16, fixed block 17, slider two 18, sliding tray three 19, ball 20, can remove triangle-shaped frame 1 left and right sides, make things convenient for staff's work, through spacing groove 3, carriage release lever 4, collar 5, rings 6, rope 7, pulley 8, drum 9, through the equipment of rope 7 and rings 6 can make things convenient for staff's installation and dismantlement hanging flower basket 13, spacing groove 3 and carriage release lever 4 can restrict the direction when hanging flower basket 13 moves down, prevent hanging flower basket 13 from rocking from side to side, improve device stability, make things convenient for staff's construction, can remove hanging flower basket 13 left and right through push rod motor 21, sliding tray one 11, slider one 12, the staff can adjust the position of hanging flower basket 13 according to the interval between the different regions of bridge body 2 and the hanging flower basket 13, make things convenient for staff's construction; the mounting ring 5 and the pulley 8 can limit the moving direction of the rope 7, so that the rope 7 is prevented from being clamped on the device, and the operation of workers is facilitated.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A bridge triangular hanging basket comprises a triangular frame (1) and a bridge body (2), and is characterized in that a plurality of limiting grooves (3) are formed in the lower end of the left portion of the triangular frame (1), the limiting grooves (3) are fixedly connected with the triangular frame (1), a moving rod (4) penetrates through the limiting grooves (3), the moving rod (4) is slidably connected with the limiting grooves (3), a mounting plate (10) is arranged at the lower end of the triangular frame (1), the mounting plate (10) is connected with a wire coil (9) through a rope (7), the wire coil (9) is fixedly connected with the triangular frame (1), the lower end of the mounting plate (10) is fixedly connected with a sliding groove I (11), a plurality of sliding blocks I (12) penetrate through the sliding groove I (11), a push rod motor (21) is arranged on the left side of the sliding groove I (11), the push rod motor (21) is fixedly connected with the sliding blocks I (12), a hanging basket (13) is arranged at the lower end of the mounting, hanging flower basket (13) and slider (12) fixed connection, triangle-shaped frame (1) lower extreme is equipped with a plurality of fixed block (17), fixed block (17) are located bridge body (2) top, fixed block (17) lower part is rotated through pivot and gyro wheel (16) and is connected, bridge body (2) upper end and sliding tray two (15) fixed connection, gyro wheel (16) run through to block into sliding tray two (15) in, gyro wheel (16) and sliding tray two (15) sliding connection, triangle-shaped frame (1) right side bottom is equipped with a plurality of slider two (18), slider two (18) block is gone into in sliding tray three (19), sliding tray three (19) and spacing groove (3) fixed connection.
2. The triangular hanging basket for the bridge according to claim 1, wherein a plurality of hanging rings (6) are arranged at the upper end of the mounting plate (10), the hanging rings (6) are connected with the mounting plate (10) through threads, the hanging rings (6) are fixedly connected with the rope (7), and the rope (7) is made of nylon materials.
3. The triangular hanging basket for the bridge according to claim 1, wherein a plurality of pulleys (8) are arranged on the left side of the wire coil (9), and the rope (7) is connected with the pulleys (8) in a sliding manner.
4. The triangular hanging basket for the bridge according to claim 1, wherein an anti-collision block is arranged at the tail end of the first sliding groove (11), and the anti-collision block is made of a rubber material.
5. The bridge triangular cradle according to claim 1, wherein a plurality of balls (20) are arranged in the sliding groove III (19), and the balls (20) are slidably connected with the sliding block II (18).
6. The triangular hanging basket for the bridge according to claim 1, wherein the lower end of the left part of the triangular frame (1) is fixedly connected with a mounting ring (5), a non-slip mat (14) is installed at the inner bottom end of the hanging basket (13), and a rope (7) penetrates through the mounting ring (5).
CN202020090008.2U 2020-01-16 2020-01-16 Bridge triangle hanging basket Expired - Fee Related CN211571435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020090008.2U CN211571435U (en) 2020-01-16 2020-01-16 Bridge triangle hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020090008.2U CN211571435U (en) 2020-01-16 2020-01-16 Bridge triangle hanging basket

Publications (1)

Publication Number Publication Date
CN211571435U true CN211571435U (en) 2020-09-25

Family

ID=72554699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020090008.2U Expired - Fee Related CN211571435U (en) 2020-01-16 2020-01-16 Bridge triangle hanging basket

Country Status (1)

Country Link
CN (1) CN211571435U (en)

Similar Documents

Publication Publication Date Title
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN107640706B (en) Hoisting equipment and construction method thereof
CN106758828B (en) The application method of fixed asymmetric bridge girder cantilever assembly equipment
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN109024291A (en) A kind of integration Bridge Erector and its working method
CN105926464A (en) Inverted hanging type trapezoid inclined climbing form traveler
CN110820602A (en) Single-segment box girder bridge girder erection machine and operation method thereof
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN202323654U (en) Stone grinding machine for bridge construction process
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN208533370U (en) A kind of Bridge Erector of large span steel reinforced concrete combination beam erection construction
CN211571435U (en) Bridge triangle hanging basket
CN110344334B (en) Construction method for two-span continuous steel-concrete composite bridge by adopting back cable type bridge girder erection machine
CN111395195A (en) Operation hanging basket for bolted connection of steel-concrete composite beam segments based on bridge girder erection machine
CN105839550B (en) A kind of compressing walking mechanism and cantilever cradle for cantilever cradle
CN207552933U (en) Reinforced mesh entirety mould-entering device
CN114164773B (en) Hanging basket structure
CN212052371U (en) Hanging basket device for variable width concrete box girder suspension casting construction
CN206069230U (en) A kind of multi-tower continuous across hoist cable crane
CN205369044U (en) Integration prestressing force stretch -draw frame construction
CN212769477U (en) Double-machine cooperative hoisting system for overpass railway deep cutting highway bridge under construction
CN211420893U (en) Rapid via hole bridge erecting machine
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN109083023B (en) Continuous rigid frame bridge adopting stiffened framework and construction method thereof
CN211113204U (en) Prefabricated pier stud prevents ftractureing turnover device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200925

Termination date: 20220116

CF01 Termination of patent right due to non-payment of annual fee