CN211555173U - Intelligent low-voltage distribution network operation and maintenance comprehensive simulation system - Google Patents
Intelligent low-voltage distribution network operation and maintenance comprehensive simulation system Download PDFInfo
- Publication number
- CN211555173U CN211555173U CN202020415116.2U CN202020415116U CN211555173U CN 211555173 U CN211555173 U CN 211555173U CN 202020415116 U CN202020415116 U CN 202020415116U CN 211555173 U CN211555173 U CN 211555173U
- Authority
- CN
- China
- Prior art keywords
- output
- input
- acquisition module
- electric connection
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Electrically Operated Instructional Devices (AREA)
Abstract
The utility model discloses a net fortune dimension integrated simulation system is joined in marriage to intelligent low pressure, including emulation training system, computer, server and low pressure platform district system, the one-way electric connection of output of emulation training system and the input of computer, the one-way electric connection of output of computer and the input of server. The utility model discloses a simulation training system, a computer, the cooperation of server and low pressure platform district system is used, utilize the virtual reality technique to simulate actual operation environment, join in marriage net fortune dimension relevant theoretical knowledge and practice operation with the low pressure and combine together, utilize advanced three-dimensional response equipment in the vision, let the training personnel go the actual work project of simulation operation in virtual safe environment in the sense of hearing, thereby good training effect has been gained, can effectually improve the operation level that net fortune dimension was joined in marriage to training personnel low pressure, can overcome the problem that exists and not enough in the present distribution lines operation maintenance training process.
Description
Technical Field
The utility model relates to an electric power tech field specifically is intelligent low pressure distribution network operation and maintenance integrated simulation system.
Background
The significance and responsibility of safe and stable operation of the power grid are great, the development of operation and inspection work is an important technical means for ensuring safe and stable operation of the power grid and improving the reliability of the power grid, all the time, the power enterprises pay attention to the training work of power workers, particularly distribution network operation and inspection personnel, the training mode mainly comprises the steps of holding theoretical learning classes, training classes, discussion classes and the like, students are regularly organized to arrive at an operation and inspection site for watching and learning through teaching forms such as theoretical explanation, multimedia courseware and the like, and the perceptual knowledge and the practical ability of the trainees are improved The practical manual operation of the trainees is limited due to the limitations of various factors such as fields and equipment, the typical faults and defect types which can be learned and identified by the trainees are limited, the trainees are not suitable for large-scale development, and the requirements of practical power production cannot be met.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an intelligent low pressure is joined in marriage net operation and maintenance and is synthesized simulation system, possesses the advantage of the real teaching of instructing of intelligent simulation, and it is less to have solved the actual manual operation chance of student, and typical trouble, defect type that can supply student's study, discernment are limited, are unfavorable for the problem of extensive developing.
In order to achieve the above object, the utility model provides a following technical scheme: an intelligent low-voltage distribution network operation and maintenance comprehensive simulation system comprises a simulation training system, a computer, a server and a low-voltage transformer area system, wherein the output end of the simulation training system is unidirectionally and electrically connected with the input end of the computer, the output end of the computer is unidirectionally and electrically connected with the input end of the server, the output end of the server is unidirectionally and electrically connected with the input end of the low-voltage transformer area system, the simulation training system comprises a control panel, a processor, a simulation program, an image output, a 3D display, 3D glasses and an operating handle, the output end of the control panel is unidirectionally and electrically connected with the input end of the processor, the output end of the processor is unidirectionally and electrically connected with the input end of the image output, and the output end of the image output is unidirectionally and electrically connected with the input end of the 3D display, the input end of the processor is electrically connected with the output end of the operating handle in a one-way mode.
Preferably, the low-voltage transformer area system comprises a transformer, a line inlet side voltage acquisition module, a low-voltage load main switch, a TC acquisition module and a line outlet side voltage acquisition module, wherein the input end of the transformer is connected with the external 10KV medium-voltage side, and the output end of the transformer provides 0.4KV current and is connected with the input end of the line inlet side voltage acquisition module.
Preferably, the input end of the low-voltage load main switch is connected with the output end of the incoming line side voltage acquisition module, and the output end of the low-voltage load main switch is connected with the input end of the CT acquisition module.
Preferably, the input end of the outgoing line side voltage acquisition module is connected with the output end of the CT acquisition module, and the output end of the outgoing line side voltage acquisition module is connected with an external device.
Preferably, the input end of the 3D glasses is electrically connected with the output end of the control panel in a one-way mode, and the computer and the simulation training system are connected with the server.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a simulation training system, a computer, the cooperation of server and low pressure platform district system is used, utilize the virtual reality technique to simulate actual operation environment, join in marriage net fortune dimension relevant theoretical knowledge and practice operation with the low pressure and combine together, utilize advanced three-dimensional response equipment in the vision, let the training personnel go the actual work project of simulation operation in virtual safe environment in the sense of hearing, thereby good training effect has been gained, can effectually improve the operation level that net fortune dimension was joined in marriage to training personnel low pressure, can overcome the problem that exists and not enough in the present distribution lines operation maintenance training process.
2. The utility model discloses an operation and maintenance operation environment is joined in marriage to nearly real virtual low pressure net of constructing of advanced multimedia technology, makes the training person actual operation under the virtual simulation environment of safety join in marriage net operation and examines imitative operation project to reach the effect that improves the training person and join in marriage net operation and overhaul operation ability.
Drawings
FIG. 1 is a schematic diagram of the system of the present invention;
FIG. 2 is a schematic diagram of the simulation training system of the present invention;
fig. 3 is a schematic view of the low-voltage transformer area system of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The components adopted by the utility model are all universal standard components or components known by the technicians in the field, and the structure and the principle of the components are known by the technicians through technical manuals or conventional experimental methods.
Referring to fig. 1-3, an intelligent low-voltage distribution network operation and maintenance integrated simulation system comprises a simulation training system, a computer, a server and a low-voltage distribution area system, wherein the low-voltage distribution area system comprises a transformer, an incoming line side voltage acquisition module, a low-voltage load main switch, a TC acquisition module and an outgoing line side voltage acquisition module, the input end of the transformer is connected with the external 10KV medium-voltage side, the output end of the transformer provides 0.4KV current and is connected with the input end of the incoming line side voltage acquisition module, the input end of the low-voltage load main switch is connected with the output end of the incoming line side voltage acquisition module, the output end of the low-voltage load main switch is connected with the input end of the CT acquisition module, the input end of the outgoing line side voltage acquisition module is connected with the output end of the CT acquisition module, the output end of the outgoing line side voltage acquisition module is connected with, the output end of the computer is unidirectionally and electrically connected with the input end of the server, the output end of the server is unidirectionally and electrically connected with the input end of the low-voltage distribution area system, the simulation training system comprises a control panel, a processor, a simulation program, an image output, a 3D display, 3D glasses and an operating handle, the input end of the 3D glasses is unidirectionally and electrically connected with the output end of the control panel, the computer and the simulation training system are both connected with the server, the output end of the control panel is unidirectionally and electrically connected with the input end of the processor, the output end of the processor is unidirectionally and electrically connected with the input end of the simulation program, the output end of the processor is unidirectionally and electrically connected with the input end of the image output, the output end of the image output is unidirectionally and electrically connected with the input end of the 3D display, the input end of the processor is unidirectionally and electrically connected with the output end, make the training person actual operation low pressure under safe virtual simulation environment join in marriage net operation and maintenance work item, thereby reach the effect that improves the training person and join in marriage net operation and overhaul the operation ability, use through the cooperation of emulation training system, a computer, server and low pressure platform district system, utilize virtual reality technique to simulate actual operation environment, join in marriage net operation and maintenance relevant theoretical knowledge and practical operation with the low pressure and integrate, utilize advanced three-dimensional response equipment in the vision, let the training person go the simulation operation actual work item in virtual safe environment in the sense of hearing, thereby good training effect has been obtained, can effectually improve the operation level that training person's low pressure joined in marriage net operation and maintenance, can overcome the problem and the not enough that exist in the present distribution lines operation overhauls the training process.
When the device is used, the control panel is a touch screen and is used for controlling an operation interface of a low-voltage transformer area system and setting system parameters, the processor is used for processing data and executing simulation programs, a trainer utilizes the operation handle to realize specific operation, corresponding trigger signals are transmitted to the processor through a data line of the operation handle, the result processed by the processor is displayed through the 3D display through image output, and the trainer can recognize three-dimensional scenes displayed by the 3D display through the 3D glasses.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. Intelligent low pressure distribution network operation and maintenance integrated simulation system, including simulation training system, computer, server and low pressure platform district system, its characterized in that: the output of emulation training system and the one-way electric connection of the input of computer, the one-way electric connection of the output of computer and the input of server, the one-way electric connection of the output of server and the input of low-voltage transformer district system, emulation training system includes control panel, treater, simulation program, image output, 3D display, 3D glasses and operating handle, the one-way electric connection of the output of control panel and the input of treater, the one-way electric connection of the output of treater and simulation program's input, the one-way electric connection of the output of treater and image output's input, the one-way electric connection of the output of image output and 3D display's input, the one-way electric connection of the input of treater and operating handle's output.
2. The intelligent low-voltage distribution network operation and maintenance comprehensive simulation system according to claim 1, characterized in that: the low-voltage transformer area system comprises a transformer, a wire inlet side voltage acquisition module, a low-voltage load main switch, a TC acquisition module and a wire outlet side voltage acquisition module, wherein the input end of the transformer is connected with the external 10KV medium-voltage side, and the output end of the transformer provides 0.4KV current and is connected with the input end of the wire inlet side voltage acquisition module.
3. The intelligent low-voltage distribution network operation and maintenance comprehensive simulation system according to claim 2, characterized in that: the input end of the low-voltage load main switch is connected with the output end of the incoming line side voltage acquisition module, and the output end of the low-voltage load main switch is connected with the input end of the CT acquisition module.
4. The intelligent low-voltage distribution network operation and maintenance comprehensive simulation system according to claim 2, characterized in that: the input end of the outgoing line side voltage acquisition module is connected with the output end of the CT acquisition module, and the output end of the outgoing line side voltage acquisition module is connected with external equipment.
5. The intelligent low-voltage distribution network operation and maintenance comprehensive simulation system according to claim 1, characterized in that: the input end of the 3D glasses is electrically connected with the output end of the control panel in a one-way mode, and the computer and the simulation training system are connected with the server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020415116.2U CN211555173U (en) | 2020-03-27 | 2020-03-27 | Intelligent low-voltage distribution network operation and maintenance comprehensive simulation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020415116.2U CN211555173U (en) | 2020-03-27 | 2020-03-27 | Intelligent low-voltage distribution network operation and maintenance comprehensive simulation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211555173U true CN211555173U (en) | 2020-09-22 |
Family
ID=72496026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020415116.2U Active CN211555173U (en) | 2020-03-27 | 2020-03-27 | Intelligent low-voltage distribution network operation and maintenance comprehensive simulation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211555173U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113053199A (en) * | 2021-03-11 | 2021-06-29 | 国网河北省电力有限公司培训中心 | Distributed regional communication power supply simulation training system |
CN114299799A (en) * | 2021-12-10 | 2022-04-08 | 上海金智晟东电力科技有限公司 | Simulation system, electronic device and readable storage medium suitable for distribution automation training |
-
2020
- 2020-03-27 CN CN202020415116.2U patent/CN211555173U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113053199A (en) * | 2021-03-11 | 2021-06-29 | 国网河北省电力有限公司培训中心 | Distributed regional communication power supply simulation training system |
CN114299799A (en) * | 2021-12-10 | 2022-04-08 | 上海金智晟东电力科技有限公司 | Simulation system, electronic device and readable storage medium suitable for distribution automation training |
CN114299799B (en) * | 2021-12-10 | 2024-02-27 | 上海金智晟东电力科技有限公司 | Simulation system, electronic device and readable storage medium suitable for distribution automation training |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211555173U (en) | Intelligent low-voltage distribution network operation and maintenance comprehensive simulation system | |
CN103632581A (en) | Debugging, operation and maintenance simulation method of electric energy collection terminals | |
CN103559822A (en) | Substation simulation training system | |
CN102054377A (en) | Remote simulation training system for electrical tests of transformer | |
CN102881202A (en) | Virtual reality based on-load tap switch maintenance training method | |
CN103903496A (en) | 10kV digital power distribution room simulation training system | |
CN202221628U (en) | Simulation system for power grid of hybrid transformer substation | |
CN101635106A (en) | Simulation training system of centralized control station | |
CN107909901A (en) | Power supply station's Training Room marketing training cabinet and its application process | |
CN107591038A (en) | A kind of pole transformer stops the simulated operation interactive system of multiple labour | |
CN103077632A (en) | Isolation disconnecting link electric operating mechanism training device | |
CN110942698B (en) | Simulation real operation control platform for distribution network uninterrupted operation | |
CN105810062A (en) | 10kV typical customer transformer substation intelligent simulation training system | |
CN112598945A (en) | Relay protection test simulation system and method based on virtual reality | |
CN205920669U (en) | Automatic experimental apparatus of electric power system | |
CN103136994B (en) | Based on the open architecture PLC Electrical Engineering Practice device of safe voltage | |
CN110852654A (en) | Cable terminal manufacturing training system based on VR technology | |
CN116029105A (en) | Simulation training method for comprehensive energy practical training | |
CN109166393A (en) | Application method based on intelligent troubleshooting electric cabinet | |
CN111951656B (en) | Electric power network safety practical training teaching system and method based on sand table simulation and AR | |
Xu et al. | Research on 10kV Line Breaker Check Training System Based on Virtual Reality | |
CN205177201U (en) | Virtual interactive emulation training system of 4D based on three -dimensional three -dimensional imaging technique | |
CN201331855Y (en) | Automobile charging system actual training platform | |
CN208207062U (en) | A kind of SCM Based three-phase four-wire system electrical energy meter fault simulator | |
CN104966425A (en) | 10kV cable live work simulation training device and method |