CN211548987U - underground substation structure - Google Patents
underground substation structure Download PDFInfo
- Publication number
- CN211548987U CN211548987U CN201922248124.2U CN201922248124U CN211548987U CN 211548987 U CN211548987 U CN 211548987U CN 201922248124 U CN201922248124 U CN 201922248124U CN 211548987 U CN211548987 U CN 211548987U
- Authority
- CN
- China
- Prior art keywords
- underground
- ventilation
- courtyard
- main transformer
- outdoor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本实用新型公开了一种地下变电站结构,包括建筑筏板基础、地下连续墙和内衬墙,所述建筑筏板基础设置在该地下变电站结构外侧范围,所述内衬墙设置在所述建筑筏板基础的内侧,所述建筑筏板基础上设置有主变压器室,所述主变压器室的外侧设置有户外下沉庭院,所述户外下沉庭院的下方设置有消防水池。本实用新型可以有效解决设备吊装引起的漏水问题,同时,后期运行检修期间吊装设备也更加方便;由于一整面墙体对着户外,所以站内通风可以达到地上变电站的通风条件,减少通风设施和通风管道,降低层高,减少造价和施工安全风险;消防水池和站本体联合设计,节省了水池用地。
The utility model discloses an underground substation structure, which comprises a building raft foundation, an underground continuous wall and an inner lining wall. The building raft foundation is arranged in the outer area of the underground substation structure, and the inner lining wall is arranged in the building. On the inner side of the raft foundation, a main transformer room is arranged on the building raft foundation, an outdoor sunken courtyard is arranged on the outer side of the main transformer room, and a fire fighting pool is arranged below the outdoor sunken courtyard. The utility model can effectively solve the problem of water leakage caused by the hoisting of the equipment, and at the same time, it is more convenient to hoist the equipment during the later operation and maintenance; because a whole wall is facing the outdoors, the ventilation in the station can reach the ventilation conditions of the ground substation, and the ventilation facilities and the cost of ventilation can be reduced. Ventilation ducts reduce floor height, cost and construction safety risks; the joint design of the fire pool and the station body saves pool land.
Description
技术领域technical field
本实用新型涉及地下变电站技术领域,尤其涉及一种地下变电站结构。The utility model relates to the technical field of underground substations, in particular to an underground substation structure.
背景技术Background technique
在城市地区,由于城市规划的要求,一些变电站不得不建于地下。地下变电站通常为地下三层结构,地下三层为电缆层和主变油池,主变、GIS等重要设备一般布置在地下二层,并需要夸两层的高大空间。其他电气设备房间布置在地下一层和地下二层。In urban areas, due to urban planning requirements, some substations have to be built underground. The underground substation is usually an underground three-story structure, and the third underground layer is the cable layer and the main transformer oil pool. Other electrical equipment rooms are arranged on the first and second basement floors.
变电站中布置有大量大型电气设备,电气设备通常需要整体吊装运输,因此需要为设备设置专门的吊装空间和吊装通道。此外,电气设备发热量较大,需要良好的通风,地上变电站一般有较好的通风条件,但是地下变电站的通风条件一般较差,需要设置专门的通风设施和通风管道。A large number of large electrical equipment are arranged in the substation, and the electrical equipment usually needs to be hoisted and transported as a whole, so it is necessary to set up a special hoisting space and hoisting channel for the equipment. In addition, the electrical equipment generates a large amount of heat and needs good ventilation. The above-ground substations generally have good ventilation conditions, but the ventilation conditions of the underground substations are generally poor, and special ventilation facilities and ventilation pipes need to be set up.
参照图1,为现有的地下变电站设计方案,包括现在站本体外侧范围内设置地下连续墙2,然后开挖至坑底并现浇建筑整体筏板基础1,以及建筑内衬墙3,所述建筑筏板基础1上设置主变压器房间4,主变压器室4的顶部设置设备吊装孔5,在主变压器室4右侧走廊内布置通风管道,并增大层高,以满足设备吊装运输和通风管道布置要求。Referring to Figure 1, the design scheme for the existing underground substation includes setting an underground diaphragm wall 2 within the outer range of the current station body, then excavating to the bottom of the pit and casting the integral raft foundation 1 and the building lining wall 3. The
在现有技术条件下,一般采用在主变压器房间上方设置吊装孔的方式以满足设备吊装要求,但是容易造成顶部漏水,对电气设备造成严重破坏。通风方案一般采用设置专门的通风机房的方式,在走廊、电气房间设置通风管道,但这样会造成房间层高增大,整个地下变电站深度增加,进一步造成工程造价大幅增大,并带来更多的施工安全隐患。Under the existing technical conditions, the method of setting hoisting holes above the main transformer room is generally adopted to meet the equipment hoisting requirements, but it is easy to cause water leakage at the top and cause serious damage to the electrical equipment. The ventilation scheme generally adopts the method of setting up a special ventilation machine room, and setting ventilation pipes in the corridor and electrical room, but this will increase the height of the room and increase the depth of the entire underground substation, which will further increase the project cost and bring more construction safety hazards.
本技术领域的技术人员致力于解决上述技术缺陷。Those skilled in the art are devoted to solving the above-mentioned technical defects.
实用新型内容Utility model content
有鉴于现有技术的上述缺陷,本实用新型的技术目的在于解决现有地下变电站设备吊装和通风方面的技术缺陷问题。In view of the above-mentioned defects of the prior art, the technical purpose of the present invention is to solve the technical defects in the hoisting and ventilation of the existing underground substation equipment.
为实现上述技术目的,本实用新型提供了一种地下变电站结构,包括建筑筏板基础、地下连续墙和内衬墙,所述建筑筏板基础设置在该地下变电站结构外侧范围,所述内衬墙设置在所述建筑筏板基础的内侧,所述建筑筏板基础上设置有主变压器室,所述主变压器室的外侧设置有户外下沉庭院,所述户外下沉庭院的下方设置有消防水池,所述户外下沉庭院的室外地面设置有地下庭院地面,所述主变压器室的外墙上设置有主变运输孔和通风百叶窗。In order to achieve the above technical purpose, the utility model provides an underground substation structure, including a building raft foundation, an underground continuous wall and an inner lining wall, the building raft foundation is arranged on the outer side of the underground substation structure, and the inner lining is provided. The wall is arranged on the inner side of the building raft foundation, the main transformer room is arranged on the building raft foundation, the outer side of the main transformer room is arranged with an outdoor sunken courtyard, and the fire protection is arranged below the outdoor sunken courtyard A pool, the outdoor ground of the outdoor sunken courtyard is provided with an underground courtyard ground, and the outer wall of the main transformer room is provided with main transformer transportation holes and ventilation shutters.
优选的,所述内衬墙与主体结构采用混凝土水平支撑连接。Preferably, the lining wall and the main structure are connected by a concrete horizontal support.
优选的,所述主变压器室和所述地下庭院地面均设置在地下二层。Preferably, the main transformer room and the ground of the underground courtyard are both arranged on the second underground floor.
优选的,所述户外下沉庭院最下方的地下三层部位设置有消防水池。Preferably, a fire-fighting pool is arranged at the bottom three-storey part of the outdoor sunken courtyard.
本实用新型的有益效果:The beneficial effects of the present utility model:
本实用新型由于上述结构设计,可以有效解决设备吊装引起的漏水问题,同时,后期运行检修期间吊装设备也更加方便;由于一整面墙体对着户外,所以站内通风可以达到地上变电站的通风条件,减少通风设施和通风管道,降低层高,减少造价和施工安全风险;消防水池和站本体联合设计,节省了水池用地。Due to the above-mentioned structural design, the utility model can effectively solve the problem of water leakage caused by the hoisting of the equipment, and at the same time, it is more convenient to hoist the equipment during the later operation and maintenance; since a whole wall faces the outdoors, the ventilation in the station can reach the ventilation conditions of the ground substation. , reduce ventilation facilities and ventilation pipes, reduce floor height, reduce construction cost and construction safety risks; the joint design of fire pool and station body saves pool land.
附图说明Description of drawings
图1为现有技术中地下变电站的剖面结构示意图;1 is a schematic cross-sectional structure diagram of an underground substation in the prior art;
图2为本实用新型地下变电站的剖面结构示意图。FIG. 2 is a schematic cross-sectional structure diagram of an underground substation of the present invention.
图中:1建筑筏板基础、2地下连续墙、3内衬墙、4主变压器室、5主变吊装孔、6主变运输孔、7通风百叶窗、8消防水池、9混凝土水平支撑、10地下庭院地面、11户外下沉庭院、12通风管道。In the picture: 1 building raft foundation, 2 underground diaphragm wall, 3 inner lining wall, 4 main transformer room, 5 main transformer hoisting hole, 6 main transformer transportation hole, 7 ventilation shutter, 8 fire pool, 9 concrete horizontal support, 10 Underground courtyard ground, 11 outdoor sunken courtyards, 12 ventilation pipes.
具体实施方式Detailed ways
以下将结合附图对本实用新型的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本实用新型的目的、特征和效果。The concept, specific structure and technical effects of the present utility model will be further described below in conjunction with the accompanying drawings, so as to fully understand the purpose, characteristics and effects of the present utility model.
实施例:Example:
如图2所示,一种地下变电站结构,该地下变电站结构包括建筑筏板基础1、地下连续墙2和内衬墙3,建筑筏板基础1设置在该地下变电站结构外侧范围,内衬墙3设置在建筑筏板基础1的内侧,建筑筏板基础1上设置有主变压器室4,主变压器室4的外侧设置有户外下沉庭院11,户外下沉庭院11的下方设置有消防水池8,户外下沉庭院11的室外地面设置有地下庭院地面10,主变压器室4的外墙上设置有主变运输孔6和通风百叶窗7,以满足设备吊装运输和通风要求。As shown in Figure 2, an underground substation structure, the underground substation structure includes a building raft foundation 1, an underground continuous wall 2 and an inner lining wall 3, the building raft foundation 1 is set in the outer range of the underground substation structure, and the inner lining wall 3 is arranged on the inner side of the building raft foundation 1, the
具体的,通风百叶窗7直接面向户外,满足设备通风散热要求,减少站内通风设施和通风管道的配置。Specifically, the ventilation shutters 7 face the outdoors directly to meet the ventilation and heat dissipation requirements of the equipment and reduce the configuration of ventilation facilities and ventilation ducts in the station.
具体的,内衬墙3与主体结构采用混凝土水平支撑9连接,保证墙体抗侧刚度。Specifically, the lining wall 3 and the main structure are connected by a concrete horizontal support 9 to ensure the lateral stiffness of the wall.
具体的,主变压器室4和地下庭院地面10均设置在地下二层。Specifically, the
具体的,户外下沉庭院11最下方的地下三层部位设置有消防水池8。Specifically, a fire-
具体的,由于主变压器室4布置在地下二层,地下庭院地面10也设置在地下二层,因此户外下沉庭院11处地下三层的地方可以布置消防水池8,对于普通地下站,消防水池8要单独设置,而本方案中将消防水池和站本体联合设计,节省了水池用地。Specifically, since the
以上详细描述了本实用新型的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本实用新型的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本实用新型的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。The preferred embodiments of the present invention have been described in detail above. It should be understood that those skilled in the art can make many modifications and changes according to the concept of the present invention without creative efforts. Therefore, any technical solutions that can be obtained by those skilled in the art through logical analysis, reasoning or limited experiments on the basis of the prior art according to the concept of the present invention shall fall within the protection scope determined by the claims. .
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922248124.2U CN211548987U (en) | 2019-12-16 | 2019-12-16 | underground substation structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922248124.2U CN211548987U (en) | 2019-12-16 | 2019-12-16 | underground substation structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211548987U true CN211548987U (en) | 2020-09-22 |
Family
ID=72505926
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922248124.2U Expired - Fee Related CN211548987U (en) | 2019-12-16 | 2019-12-16 | underground substation structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211548987U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110984639A (en) * | 2019-12-16 | 2020-04-10 | 上海电力设计院有限公司 | Underground transformer substation structure |
-
2019
- 2019-12-16 CN CN201922248124.2U patent/CN211548987U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110984639A (en) * | 2019-12-16 | 2020-04-10 | 上海电力设计院有限公司 | Underground transformer substation structure |
| CN110984639B (en) * | 2019-12-16 | 2024-09-20 | 上海电力设计院有限公司 | Underground transformer station structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207685859U (en) | A kind of underground pipe gallery | |
| CN106351254A (en) | Multilayer urban underground comprehensive pipe gallery | |
| CN109944273A (en) | A kind of city tunnel, track traffic regional tunnel and pipe gallery build structure jointly | |
| CN110863513A (en) | Multifunctional integrated node of underground comprehensive pipe gallery intersection, lifting opening and ventilation opening | |
| CN110984639B (en) | Underground transformer station structure | |
| CN215562792U (en) | Underground station with inverted station hall layer | |
| CN115821987A (en) | Non-excavation formula buries utility tunnel working well deeply | |
| CN203617365U (en) | Underground device for storage batteries of communication base station brick-concrete machine room | |
| CN206886484U (en) | One kind circulation building hoist system | |
| CN106193685A (en) | Prefabricated assembled communications equipment room structure | |
| CN218990255U (en) | A prefabricated composite node suitable for rapid construction of small-scale comprehensive utility gallery | |
| CN217307269U (en) | Closed compact marine converter station | |
| CN214219240U (en) | Detachable outdoor overhead square structure | |
| CN105256840B (en) | A kind of controller switching equipment basis well | |
| CN209891242U (en) | Direct-buried underground belt metal lining layer concrete air duct for boiler room | |
| CN107055275A (en) | One kind circulation building hoist system and implementation | |
| CN102691311A (en) | Precast assembled comprehensive pipe gallery fan house | |
| CN206581296U (en) | Multichannel underground pipe gallery with ventilation escape mouth structure | |
| CN208430611U (en) | A kind of Dual-sealing waterproof construction for toilet floor drain | |
| CN210369035U (en) | A subway station structure | |
| CN115748809A (en) | Prefabricated combination node suitable for small-size utility tunnel is under construction fast | |
| CN202578060U (en) | Prefabricated assembled comprehensive pipe rack ventilating engine room | |
| CN218970065U (en) | Co-constructed structure of underground road and comprehensive utility corridor | |
| CN110080284A (en) | A kind of Metro Station Structure and build engineering method | |
| CN216551985U (en) | Detachable assembly type fire fighting pipe ditch |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200922 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
