CN211548710U - Movable outrigger for high-altitude construction of constructional engineering - Google Patents

Movable outrigger for high-altitude construction of constructional engineering Download PDF

Info

Publication number
CN211548710U
CN211548710U CN202020126476.0U CN202020126476U CN211548710U CN 211548710 U CN211548710 U CN 211548710U CN 202020126476 U CN202020126476 U CN 202020126476U CN 211548710 U CN211548710 U CN 211548710U
Authority
CN
China
Prior art keywords
fixture block
wall surface
column
tool box
threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020126476.0U
Other languages
Chinese (zh)
Inventor
张旭英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020126476.0U priority Critical patent/CN211548710U/en
Application granted granted Critical
Publication of CN211548710U publication Critical patent/CN211548710U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of building construction, and discloses a movable scaffold for high-altitude construction of building engineering, which comprises a clamping block, wherein the clamping block is a rectangular block, the right end wall of the clamping block is fixedly connected with a fixed column, the fixed column is a circular column, the excircle of the fixed column is provided with threads, the threads are totally eight groups, the fixed column penetrates through the right side wall of the clamping block and extends to the left side wall of the clamping block, when the device is used, the right end part of the clamping block is fixed with an external fixture at the right end part, at the moment, when a person stands in the tool box, the motor box can be started, the motor box drives a threaded column to rotate, the threaded column can drive the tool box to move downwards through the threads, and the tool box is fixed with the threaded column through the threaded hole, so that the tool box can be prevented from shaking when moving through the threaded column and the threaded hole, thereby improving the effect of safety.

Description

Movable outrigger for high-altitude construction of constructional engineering
Technical Field
The utility model relates to a construction technical field especially relates to a movable outrigger of building engineering high altitude construction usefulness.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The building construction refers to a project which has a top cover, a beam column, a wall and a foundation and can form an internal space to meet the requirements of production, living, study and public activities of people, and in the construction of the building engineering, after a main body is completed, the construction of outer wall sealing plates, decoration, electromechanical installation and the like of a roof is carried out, and the problem that constructors stand and walk when working at a high place is generally solved by adopting a method of building scaffolds, full frames or large-scale mobile upgrading frames. However, when the roof reaches an ultra-high height of more than 30 meters and an ultra-large span space of more than 50 meters, it is difficult to solve the problem that the constructors stand and walk when working at a high place by building scaffolds, full frames or large mobile upgrading frames, and even if the constructors have related facilities, the constructors cannot move generally, which brings great inconvenience to the work of the constructors and can seriously reduce the working efficiency, so that a mobile scaffold appears in the market.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model mainly solves the technical problem existing in the prior art and provides a movable cantilever frame for high-altitude construction of building engineering.
(II) technical scheme
In order to realize the above-mentioned purpose, the utility model discloses a following technical scheme, a movable outrigger of building engineering high altitude construction usefulness, including the fixture block, the fixture block is the piece of rectangle, the right-hand member wall fixedly connected with fixed column of fixture block, the fixed column are circular shape post, the excircle department of fixed column is equipped with the screw thread, and the screw thread is total eight groups totally, the fixed column runs through the right side wall of fixture block and extends to the left side wall of fixture block always, is located the right-hand member of the fixed column of fixture block right side wall has fixing nut through threaded connection, and fixing nut is circular shape nut, the trompil has been seted up to the left end position top of fixture block, and the trompil is rectangular hole, and the inside of trompil is hollow, the trompil runs through the left end position top wall of fixture block just extends to.
Preferably, the left side wall surface and the right side wall surface inside the opening are both fixedly provided with movable shafts, the movable shafts are circular shafts, the movable shafts are hollow, the inner circle of each movable shaft is fixedly provided with a threaded column, and each threaded column is a circular column.
Preferably, a motor box is fixedly mounted at the upper end of the threaded column, the motor box is a rectangular box body, a second thread is arranged at the outer circle of the threaded column, and the total number of the second thread is twenty.
Preferably, the excircle of the threaded column is connected with a tool box through two threads, the tool box is a rectangular box body, the tool box is hollow inside, and the tool box is located below the clamping block.
Preferably, the lower wall surface of the tool box is provided with a threaded hole, the threaded hole is a circular hole, and the threaded hole is located at the outer position of the left end of the lower wall surface of the tool box.
Advantageous effects
The utility model provides a movable outrigger of building engineering high altitude construction usefulness. The method has the following beneficial effects:
(1) this movable outrigger of building engineering high altitude construction usefulness, when using this equipment, at first the right-hand member position with the fixture of fixture block right-hand member department together with outside fixture is fixed, at this moment stand in the inside back of toolbox when the people, the motor case alright with start, at this moment the motor case drives the screw thread post and rotates, the screw thread post through screw thread two alright with drive the toolbox and carry out the downstream, and the toolbox passes through the screw hole and is in the same place with the screw thread post is fixed, the toolbox has just reached and has prevented through screw thread post and screw hole that the toolbox from rocking when removing like this, thereby the effect of security has been improved.
(2) This movable outrigger of building engineering high altitude construction usefulness, when the fixture block passes through the right angle of fixture block right-hand member and the building is fixed, the right angle department of fixture block right-hand member just can rock under with the chucking of fixture again, at this moment fixing through fixed column and fixture, then cup joint on the fixed column through the screw thread with fixing nut, fixing nut has just so reached the effect of supplementary fixed fixture block.
Drawings
FIG. 1 is an overall structure diagram of the present invention;
fig. 2 is a partial schematic view of the threaded hole of the present invention.
Illustration of the drawings:
1 fixture block, 2 fixed columns, 3 threads, 4 fixed nuts, 5 holes, 6 movable shafts, 7 threaded columns, 8 motor boxes, 9 threads II, 10 tool boxes and 11 threaded holes.
Detailed Description
The technical solution of the present invention is further specifically described below by way of examples and with reference to the accompanying drawings.
Example (b): a movable scaffold for high-altitude construction of building engineering is disclosed, as shown in FIGS. 1-2, and comprises a fixture block 1, wherein the fixture block 1 is a rectangular block, a fixed column 2 is fixedly connected to the right end wall surface of the fixture block 1, the fixed column 2 is a circular column, threads 3 are arranged at the outer circle of the fixed column 2, the threads 3 are eight groups in total, the fixed column 2 penetrates through the right side wall surface of the fixture block 1 and extends to the left side wall surface of the fixture block 1, the right end of the fixed column 2 positioned on the right side wall surface of the fixture block 1 is connected with a fixed nut 4 through threads, the fixed nut 4 is a circular nut, an opening 5 is arranged above the left end position of the fixture block 1, the opening 5 is a rectangular hole, the inside of the opening 5 is hollow, the opening 5 penetrates through the upper left end position wall surface of the fixture block 1 and extends to the lower side wall surface of, the left side wall surface and the right side wall surface inside the open pore 5 are both fixedly provided with movable shafts 6, the movable shafts 6 are round shafts, the inner part of the movable shaft 6 is hollow, a threaded column 7 is fixedly arranged at the inner circle part of the movable shaft 6, the threaded column 7 is a round column, a motor box 8 is fixedly arranged at the upper end of the threaded column 7, the motor box 8 is a rectangular box body, a second thread 9 is arranged at the excircle of the threaded column 7, and the second screw thread 9 has twenty groups in total, the excircle of the screw thread column 7 is connected with a tool box 10 through the second screw thread 9 by screw threads, the tool box 10 is a rectangular box body, the tool box 10 is hollow, the tool box 10 is positioned below the fixture block 1, the lower wall of the tool box 10 is provided with a threaded hole 11, the threaded hole 11 is a circular hole, and the threaded hole 11 is located at the outer position of the left end of the lower wall of the tool box 10.
The utility model discloses a theory of operation: when using this equipment, at first the right-hand member position with fixture block 1 right-hand member department is together fixed with outside fixture, at this moment stand at toolbox 10 inside back when the people, motor case 8 alright with start, at this moment motor case 8 drives screw thread post 7 and rotates, screw thread post 7 through two 9 alright with drive toolbox 10 carry out the downstream, and toolbox 10 is together fixed through screw hole 11 and screw thread post 7, toolbox 10 has just reached and has prevented through screw thread post 7 and screw hole 11 that toolbox 10 rocks when removing, thereby the effect of security has been improved.
When fixture block 1 is fixed with the building through the right angle of 1 right-hand member of fixture block, the right angle department of 1 right-hand member of fixture block just can rock under the chucking of fixture again, at this moment fixing through fixed column 2 and fixture, then cup joint on fixed column 2 through the screw with fixation nut 4, and fixation nut 4 has just reached supplementary fixed fixture block 1's effect like this.
The foregoing shows and describes the fundamental principles and principal features of the invention, namely the advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a movable outrigger of building engineering high altitude construction usefulness, includes fixture block (1), its characterized in that: the fixture comprises a fixture block (1), and is characterized in that a fixing column (2) is fixedly connected to the wall surface of the right end of the fixture block (1), threads (3) are arranged at the outer circle of the fixing column (2), a fixing nut (4) is connected to the right end of the fixing column (2) located on the wall surface of the right side of the fixture block (1) through threads, an opening (5) is formed in the position above the left end of the fixture block (1), movable shafts (6) are fixedly mounted on the inner side wall surfaces of the opening (5) in the left and right sides, threaded columns (7) are fixedly mounted on the inner circle of the movable shafts (6), a motor box (8) is fixedly mounted on the upper ends of the threaded columns (7), two threads (9) are arranged at the outer circle of the threaded columns (7), and a tool box.
2. The movable cantilever scaffold for high-altitude construction of constructional engineering as claimed in claim 1, wherein: the fixing column (2) penetrates through the right side wall surface of the fixture block (1) and extends to the left side wall surface of the fixture block (1).
3. The movable cantilever scaffold for high-altitude construction of constructional engineering as claimed in claim 1, wherein: the opening (5) penetrates through the upper wall surface of the left end position of the fixture block (1) and extends to the lower wall surface of the fixture block (1) at the left end position of the fixture block (1).
4. The movable cantilever scaffold for high-altitude construction of constructional engineering as claimed in claim 1, wherein: the tool box (10) is located below the clamping block (1), and a threaded hole (11) is formed in the wall surface below the tool box (10).
5. The movable cantilever scaffold for high-altitude construction of constructional engineering as claimed in claim 4, wherein: the threaded hole (11) is a circular hole, and the threaded hole (11) is located at the outer position of the left end of the wall surface below the tool box (10).
CN202020126476.0U 2020-01-19 2020-01-19 Movable outrigger for high-altitude construction of constructional engineering Expired - Fee Related CN211548710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020126476.0U CN211548710U (en) 2020-01-19 2020-01-19 Movable outrigger for high-altitude construction of constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020126476.0U CN211548710U (en) 2020-01-19 2020-01-19 Movable outrigger for high-altitude construction of constructional engineering

Publications (1)

Publication Number Publication Date
CN211548710U true CN211548710U (en) 2020-09-22

Family

ID=72493034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020126476.0U Expired - Fee Related CN211548710U (en) 2020-01-19 2020-01-19 Movable outrigger for high-altitude construction of constructional engineering

Country Status (1)

Country Link
CN (1) CN211548710U (en)

Similar Documents

Publication Publication Date Title
CN211548710U (en) Movable outrigger for high-altitude construction of constructional engineering
CN204826714U (en) Novel steel constructs a tire supporting frame
CN215668954U (en) Interim steel landing stage of using of site operation
CN214575489U (en) Climbing type scaffold for municipal construction
CN212613608U (en) Scaffold frame is used to multi-use architecture fitment
CN213573365U (en) A warning guardrail for building engineering construction
CN213144105U (en) Convenient construction enclosure capable of being circulated
CN213015777U (en) Movable protective fence for building construction
CN202265762U (en) Connective component for blanket plate and support beam
CN220867975U (en) Safety type guardrail hanging bracket
CN212223618U (en) Bridge template separating mechanism
CN211396698U (en) Safety protection device for building construction
CN219365355U (en) Combined scaffold for constructional engineering
CN212507263U (en) Multifunctional construction platform
CN216552934U (en) Semi-closed assembled safety protection shed of tower crane
CN212271666U (en) PVC building connection structure for protection network
CN212642061U (en) Scaffold frame that engineering construction operation was used is built in room
CN215854775U (en) Anti-climbing device for tower crane
CN219691034U (en) Building construction frame with anti-drop
CN202442877U (en) Track-gauge-variable testbed of window cleaning machine
CN210738052U (en) Demolish scaffold frame of reforming transform fitment usefulness
CN218234271U (en) Bearing frame for building construction
CN215241350U (en) Waterproofing membrane processing is with mould convenient to upper and lower mould is fixed
CN218541430U (en) Building scaffold convenient to adjust
CN214220536U (en) Quick-dismantling scaffold for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200922