CN211548066U CN201921325192.8U CN201921325192U CN211548066U CN 211548066 U CN211548066 U CN 211548066U CN 201921325192 U CN201921325192 U CN 201921325192U CN 211548066 U CN211548066 U CN 211548066U
Authority
CN
China
Prior art keywords
truss
unidirectional
prestressed
string
guy cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921325192.8U
Other languages
English (en)
Inventor
刘洪庆
程忠美
杨景东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Jianchuang Steel Structure Co ltd
Original Assignee
Harbin Jianchuang Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Jianchuang Steel Structure Co ltd filed Critical Harbin Jianchuang Steel Structure Co ltd
Priority to CN201921325192.8U priority Critical patent/CN211548066U/zh
Application granted granted Critical
Publication of CN211548066U publication Critical patent/CN211548066U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

本实用新型属于钢结构技术领域,尤其涉及一种煤场、料场封闭的大跨度预应力管桁架钢结构。单向张弦桁架等间距枞向阵列设置,每个单向张弦桁架间通过若干个横向联系桁架固定连接,同时与山墙管桁架连接,单向张弦桁架上设置有水平支撑结构,单向张弦桁架下方设置有架索结构。架索结构通过在单榀预应力张弦桁架内部张拉一根主索,主索通过预应力拉索索头和预应力拉索索夹与单向张弦桁架连接,通过调整销轴,可以使主索在单向张弦桁架上的松紧程度,从而可以根据不同的使用情况,调整住所的长度,使单根主索能够有效的减少风荷载对结构的不利影响。

Description

一种煤场、料场封闭的大跨度预应力管桁架钢结构
技术领域
本实用新型属于钢结构技术领域,尤其涉及一种煤场、料场封闭的大跨度预应力管桁架钢结构。
背景技术
随着我国的全面发展,电力能源的需求日益增进,电厂储煤量相应需要增加,然而大量的煤或料在运输、倒运过程中,产生扬尘,造成环境污染,所以对原有煤场、料场进行封闭改造是非常有必要的保护环境的措施。
现有煤场、料场的大跨度预应力管桁架钢结构体系多采用单根主索的形式,用以提高张弦管桁架主结构的跨中刚度,在恒载作用下主索内力为拉力,从而在张拉过程中对管桁架通过撑索杆产生向上顶升力,从而产生反拱现象,但是现有的管桁架主索长度固定,主索在力的作用下会产生下挠变形,此变形将会对索减小水平力作用降低,所以对结构不利,而且在风荷载作用下,对结构产生向上的吸力,在主索长度固定的情况下,单根主索不能有效减少风荷载对结构的不利影响。
实用新型内容
为了克服现有技术中的缺限,本实用新型提供一种煤场、料场封闭的大跨度预应力管桁架钢结构,该种结构能够实现大跨度煤场、料场的全封闭,结构整体性好,提高结构的安全度,也降低了材料成本。
本实用新型的技术方案:
一种煤场、料场封闭的大跨度预应力管桁架结构,包括:单向张弦桁架、横向联系桁架、山墙管桁架、水平支撑结构和柱脚支座;所述单向张弦桁架等间距枞向阵列设置,所述横向联系桁架横向设置,每个所述单向张弦桁架之间通过若干个所述联系桁架固定连接,同时,位于两端的所述单向张弦桁架与所述山墙管桁架固定连接,所述单向张弦桁架上设置有用于稳定支撑的水平支撑结构,所述单榀预应力张弦桁架底部与所述柱脚支座固定连接,所述单榀预应力张弦桁架下方设置有预应力拉索结构。
进一步的,所述预应力拉索结构包括预应力拉索,所述预应力拉索设置在所述单向张弦桁架下部,所述预应力拉索两端通过预应力拉索索头与所述单向张弦桁架肩部固定连接,所述预应力拉索与所述单向张弦桁架之间设置有若干撑索杆,所述撑索杆两端通过预应力拉索索夹分别与所述预应力拉索和单向张弦桁架固定连接。
进一步的,所述预应力拉索索头包括连接板,所述连接板与所述单向张弦桁架肩部固定连接,所述连接板上设置有销轴和加劲板。
进一步的,所述预应力拉索索夹包括固定块,所述固定块套接在所述预应力拉索外表面,所述固定块通过销轴连接有撑索杆加劲板,所述撑索杆端部与所述撑索杆加劲板固定连接。
本实用新型的有益效果为:
本实用新型提出了一种煤场、料场封闭的大跨度预应力管桁架钢结构,每个单向张弦桁架等间距枞向阵列设置,每个单向张弦桁架间通过若干个横向联系桁架固定连接,同时,单向张弦桁架与山墙管桁架连接,单向张弦桁架上设置有用于稳定支撑的水平支撑结构,单向张弦桁架下方设置有架索结构。架索结构通过在单榀预应力张弦桁架内部张拉一根主索,主索通过预应力拉索索头和预应力拉索索夹与单向张弦桁架连接,通过调整销轴,可以使主索在单向张弦桁架上的松紧程度,从而可以根据不同的使用情况,调整住所的长度,使单根主索能够有效的减少风荷载对结构的不利影响。
附图说明
图1为本实用新型的整体轴测图;
图2为单向张弦桁架结构截面图;
图3为预应力拉索索头连接节点示意图;
图4为预应力拉索索夹连接节点示意图。
1-单向张弦桁架;2-横向联系桁架;3-山墙管桁架;4-水平支撑结构;5-柱脚支座5;6-预应力拉索结构;7-预应力拉索;8-预应力拉索索头;9-撑索杆; 10-预应力拉索索夹;11-连接板;12-销轴;13-加劲板;14-固定块;15- 撑索杆加劲板。
本实用新型目的实现、功能特点及优点将结合实施例,参照附图做进一步说明。
具体实施方式
应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。
具体实施方式一:
结合图1-4所示,本实施例公开的一种煤场、料场封闭的大跨度预应力管桁架结构,包括:单向张弦桁架、横向联系桁架2、山墙管桁架3、水平支撑结构4和柱脚支座5;所述单向张弦桁架1等间距枞向阵列设置,所述横向联系桁架横向设置,每个所述单向张弦桁架1之间通过若干个所述联系桁架2 固定连接,同时,位于两端的所述单向张弦桁架1与所述山墙管桁架3固定连接,所述单向张弦桁架1上设置有用于稳定支撑的水平支撑结构4,所述单榀预应力张弦桁架1底部与所述柱脚支座5固定连接,所述单榀预应力张弦桁架1下方设置有预应力拉索结构6。
具体实施方式二:
本实施例是在具体实施方式二的基础上,具体的,所述预应力拉索结构6包括预应力拉索7,所述预应力拉索7设置在所述单向张弦桁架1下部,所述预应力拉索7两端通过预应力拉索索头8与所述单向张弦桁架1肩部固定连接,所述预应力拉索7与所述单向张弦桁架1之间设置有若干撑索杆9,所述撑索杆9 两端通过预应力拉索索夹10分别与所述预应力拉索7和单向张弦桁架1固定连接。
具体实施方式三:
本实施例是在具体实施方式二的基础上,具体的,所述预应力拉索索头8包括连接板11,所述连接板11与所述单向张弦桁架1肩部固定连接,所述连接板11上设置有销轴12和加劲板13。
具体实施方式四:
本实施例是在具体实施方式三的基础上,具体的,所述预应力拉索索夹10包括固定块14,所述固定块14套接在所述预应力拉索7外表面,所述固定块14 通过销轴连接撑索杆加劲板15,所述撑索杆9端部与所述撑索杆加劲板15 固定连接。
以上所述,仅为本实用新型的常规的实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型披露的技术范围内,可轻易想到的变化或替换,都应涵盖在本实用新型的保护范围内。因此,本实用新型的保护范围应该以权利要求书的保护范围为准。

Claims (4)

1.一种煤场、料场封闭的大跨度预应力管桁架钢结构,其特征在于,包括:单向张弦桁架(1)、横向联系桁架(2)、山墙管桁架(3)、水平支撑结构(4)和柱脚支座(5);所述单向张弦桁架(1)等间距枞向阵列设置,所述横向联系桁架横向设置,每个所述单向张弦桁架(1)之间通过若干个所述联系桁架(2)固定连接,同时,位于两端的所述单向张弦桁架(1)与所述山墙管桁架(3)固定连接,所述单向张弦桁架(1)上设置有用于稳定支撑的水平支撑结构(4),所述单向张弦桁架(1)底部与所述柱脚支座(5)固定连接,所述单向张弦桁架(1)下方设置有预应力拉索结构(6)。
2.根据权利要求1所述的一种煤场、料场封闭的大跨度预应力管桁架钢结构,其特征在于,所述预应力拉索结构(6)包括预应力拉索(7),所述预应力拉索(7)设置在所述单向张弦桁架(1)下部,所述预应力拉索(7)两端通过预应力拉索索头(8)与所述单向张弦桁架(1)肩部固定连接,所述预应力拉索(7)与所述单向张弦桁架(1)之间设置有若干撑索杆(9),所述撑索杆(9)两端通过预应力拉索索夹(10)分别与所述预应力拉索(7)和单向张弦桁架(1)固定连接。
3.根据权利要求2所述的一种煤场、料场封闭的大跨度预应力管桁架钢结构,其特征在于,所述预应力拉索索头(8)包括连接板(11),所述连接板(11)与所述单向张弦桁架(1)肩部固定连接,所述连接板(11)上设置有销轴(12)和加劲板(13)。
4.根据权利要求3所述的一种煤场、料场封闭的大跨度预应力管桁架钢结构,其特征在于,所述预应力拉索索夹(10)包括固定块(14),所述固定块(14)套接在所述预应力拉索(7)外表面,所述固定块(14)通过销轴连接撑索杆加劲板(15),所述撑索杆(9)端部与所述撑索杆加劲板(15)固定连接。
CN201921325192.8U 2019-08-15 2019-08-15 一种煤场、料场封闭的大跨度预应力管桁架钢结构 Active CN211548066U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921325192.8U CN211548066U (zh) 2019-08-15 2019-08-15 一种煤场、料场封闭的大跨度预应力管桁架钢结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921325192.8U CN211548066U (zh) 2019-08-15 2019-08-15 一种煤场、料场封闭的大跨度预应力管桁架钢结构

Publications (1)

Publication Number Publication Date
CN211548066U true CN211548066U (zh) 2020-09-22

Family

ID=72488396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921325192.8U Active CN211548066U (zh) 2019-08-15 2019-08-15 一种煤场、料场封闭的大跨度预应力管桁架钢结构

Country Status (1)

Country Link
CN (1) CN211548066U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252803A (zh) * 2020-11-13 2021-01-22 大唐环境产业集团股份有限公司 一种整体环保封闭料棚
CN112502511A (zh) * 2020-11-13 2021-03-16 大唐环境产业集团股份有限公司 一种对料场进行整体环保封闭的料棚
CN112982667A (zh) * 2021-02-09 2021-06-18 哈尔滨建创钢结构有限公司 一种装配式气囊折叠展开结构及施工方法
CN113565336A (zh) * 2021-07-31 2021-10-29 中冶(上海)钢结构科技有限公司 一种可活动的支承胎架柱及其使用方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112252803A (zh) * 2020-11-13 2021-01-22 大唐环境产业集团股份有限公司 一种整体环保封闭料棚
CN112502511A (zh) * 2020-11-13 2021-03-16 大唐环境产业集团股份有限公司 一种对料场进行整体环保封闭的料棚
CN112982667A (zh) * 2021-02-09 2021-06-18 哈尔滨建创钢结构有限公司 一种装配式气囊折叠展开结构及施工方法
CN113565336A (zh) * 2021-07-31 2021-10-29 中冶(上海)钢结构科技有限公司 一种可活动的支承胎架柱及其使用方法

Similar Documents

Publication Publication Date Title
CN211548066U (zh) 一种煤场、料场封闭的大跨度预应力管桁架钢结构
CN104847017B (zh) 一种预应力工业料场罩棚结构及施工方法
CN204530991U (zh) 一种大跨度预应力拱桁架与索膜组合结构
CN109235651B (zh) 大跨度刚性山墙空间网格-索膜结构体系
CN108265977B (zh) 一种复杂工况下的大跨度空间网壳组装胎架施工方法
CN102061742B (zh) 防震钢筋混凝土仿古建筑结构体系
CN103437457A (zh) 一种可更换钢连梁双层钢板高强混凝土组合联肢剪力墙
CN109235650B (zh) 大跨度刚性山墙空间网格-三段组合索拱桁架-膜结构体系
CN217216418U (zh) 一种光伏面板用檩条支撑系统
CN203559329U (zh) 一种钢-rpc组合桥梁
CN108756409B (zh) 一种提高钢筋混凝土框架侧移刚度及耗能的抗震结构
CN213358939U (zh) 一种三索超大跨预应力张弦桁架结构
EP3450748A1 (en) Connecting structure for steel tube truss and tower barrel of lattice wind power generation tower, prestressed polygon wind tower provided with circular box girder for direct fan on top of tower, wind power generation tower, and wind tower having prestressed anti-fatigue structure
CN110258800B (zh) 一种带支撑连接的全装配式可恢复功能rcs组合节点
CN214574650U (zh) 一种经济的大跨张弦管桁架结构
CN202248960U (zh) 超高性能混凝土预制拼装阳台底板
CN206941363U (zh) 一种大跨度拱桥桥面梁支承体系
CN202401384U (zh) 钢桁斜拉桥压重构造
CN216141987U (zh) 一种用于渠道遮盖的多跨配重式索桁架结构
CN215758853U (zh) 一种用于渠道遮盖的大跨度装配式索桁架结构
CN214402963U (zh) 一种整体环保封闭料棚
CN112127282B (zh) 特大桥主墩钢结构
CN107460955A (zh) 一种大跨度预应力装配式工业厂房
CN203403349U (zh) 一种箱型系梁组合拱桥
CN108104349B (zh) 一种斜压杆桁架张弦梁组合结构和实施方法

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A large span prestressed pipe truss steel structure with closed coal yard and stockyard

Effective date of registration: 20210220

Granted publication date: 20200922

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd.

Registration number: Y2021230000002

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220224

Granted publication date: 20200922

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd.

Registration number: Y2021230000002

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A large-span prestressed pipe truss steel structure with closed coal yard and stockyard

Effective date of registration: 20220324

Granted publication date: 20200922

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd.

Registration number: Y2022230000009

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230403

Granted publication date: 20200922

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd.

Registration number: Y2022230000009

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A large-span prestressed pipe truss steel structure with closed coal and material yards

Effective date of registration: 20230530

Granted publication date: 20200922

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd.

Registration number: Y2023230000045

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20200922

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd.

Registration number: Y2023230000045

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A large-span prestressed pipe truss steel structure with closed coal and material yards

Granted publication date: 20200922

Pledgee: Harbin Kechuang Financing Guarantee Co.,Ltd.

Pledgor: Harbin Jianchuang Steel Structure Co.,Ltd.

Registration number: Y2024230000037

PE01 Entry into force of the registration of the contract for pledge of patent right